Laserfiche WebLink
*DIAGONAL SPACED NOTE: PENDING BEAM <br />AT 15'-0" O.C. MAX BEARING LOCATION, THE <br />PROVIDE 2X4 MIN. BLOCKING AT BEAM CAN SIT ON TOP OF <br />SEE ROOF COLUMN W/ (2) HTW20 <br />PLAN SHEATHING Q OF HIP/RIDGE, TYP.BETWEEN STRAPS JACK TRUSS (AS SHOWN) <br />TRUSSES W/ (2) 12D NAILS EACH OR GABLE END SEE TRUSS <br />END TO TRUSS TOP CHORD LAYOUT <br />TY <br />2X4 BLOCKING P' <br />CLIP EACH TRUSS <br />BETWEEN TRUSSES TRUSS (2) 2x8 #2 SYP W/ USP JUS46 OR JUS461F (SEE ROOF PLAN <br />BLOCKING A 7/16" O.S.B. FLITCH BUCKET TO COLUMN FOR TYPE) <br />SECT. A -A PLATE TOP @ TRUSS <br />BRIG. SUPPORT COLUMN BUILT-UP FRAME OUT TO <br />A BLOCK EDGE <br />(2)-2x4's OR 4x4 W/ (2)-10d <br />G.T. NAILS @ 8" O.C. EACH PLY SEE DETAIL 4/D1 <br />(SHOWN AS 4 x 4) FOR BEAM SIZE <br />TOP CHORD WHEN REQ'D <br />ADD 2X4 ALONGSIDE <br />° EXTERIOR SHEATHING <br />° TO PREVENT PLYWOOD (2) USP HTA20's ATTACHED PER NAILING <br />SPAN FROM EXCEEDING JACK TYPICAL BLOCK w/(10)-10d x 1 1/2 EA. TO COL. SCHEDULE 2x SPF #2 <br />WALL ALT: (2) USP MSTAM36 <br />MAX 24" SPAN (EITHER USSES HIP AT 16" O.C. <br />SIDE OR BOTH IF REQ'D) G.T STRAPS CENTERED <br />w/(13)-10d NAILS Ea TO COL. <br />CONTINUOUS LATERAL BRACING- TIE BEAM BUILDER FRAMERADIUS <br />NAIL OVER X-BRACE AS SHOWN - <br />INSTALL BING . AT TRUSS WEBS (2T 'DNAILS O C MAX AS REQUIRED <br />FOR NAIL12 <br />X-BRACING-2x4SPF SYP BEAM @ RAISED ENTRY <br />w/ 2-16d @EACH TRRUSSSS WEB <br />CROSS BRACING DETAIL (TYP)rl—" HIP/RIDGE BLOCKING DETAIL 2 MASONRY WALL 4 KNEEWALL @ ENTRY FRONT WALL K6 <br />SCALE: 1/2" = 1'-0" SCALE: 1/2"=V-0" SCALE: 1/2" = V-0" SCALE: 1/2" = 1'-0" <br />TRUSS NOTES. TYP. HAND FRAMING ABOVE TRUSS <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2002 CONV. FRAMED RIDGE 2X4 STUDS & PLATES AT 2'-0" O.C. USP LSTA18 <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER MAY BE NAILED EACH DIRECTION TYP. U.N.O. VERTICAL SCAB CENTERED @ USP HD4101F BUCKET ISEE PLAN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE w/ MIN. (4) 12d WHEN 2 x 6 #2 SPF 48" O.C. SPLIT TO TIE SEE ROOF PLAN FOR 1 FOR CANT. <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST IT LANDS NEXT TO W/ (4) 10d TOP & BEAMS TOGETHER MORE INFOPRE-ENG. TRUSS R USP RT7 <br />O BOTTOM 2x8 BLKING. NAILED @EACH BO <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES SIDE w/ (3) 12d NAILS WHEN BO TOM L W/ 8 - 8d <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & REQUIRED w/ (2) USP HTW20 IN PLACE OF (4) 10d <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION W/ (14) - 10d X 1 1/2" EACH71/_SEE FLOOR PLAN FOR <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED COLUMN SIZE & BASE 7/16" OSB FLITCH PLATE <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER SEE FLOOR PLAN CONNECTION INFO REQ'D ONLY WHEN <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. COLLAR TIE FOR COLUMN SIZE INDICATED ON BM. 2x4 #2 SYP NAILER. NAIL <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />EVERY 3rd & ADDITIONAL INFO. 7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR SCHEDULE/PLAN TO STUDS w/3-16d @ <br />RAFTER REQ'D ONLY WHEN COLUMN SIZE & BASE EA. STUD. TOENAIL EA. <br />LATERAL BRACING SPECIFIED BY THE TRUSS M ADDITIONAL <br />DIAGONAL <br />ALL LATERAL AT 20' 0" INDICATED ON BM. OPTION B CONNECTION INFO OPTION C TRUSS TO NAILER w/3-10d ROOF AND EXTERIOR <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0 '�'� OPTION A SCHEDULE/PLAN SHEATHING ATTACHED <br />O.C. MAXIMUM. 2x4 SPF 2 LING SCHEDULE <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED W/ 2-16D (2) #7X 3-1/2" WOOD PER SEE NAILING <br />FLOOR WALL SECTION <br />NAILS AT EACH TRUSS INTERSECTION. CB SCREW EACH TRUSS COMMON B M . TO POST ATTACHMENT A 4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS OR USP RT7 @ 48" O.C. FOR ADDITIONAL INFORMATION <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT TB SEE ROOF PLAN SCALE: 3/4"=1'-0" <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. DB g FOR BEAM SIZE & BM. SPLICE OVER <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS BEVEL CUTS CONNECTION INFO. CENTER OF POST <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS PRE-ENG. TRUSS (OPTIONAL) A A <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING I SEE PLAN FOR <br />MAX & EACH END ALTERNATE BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP TOP OF BEAM <br />DIRECTION TYP. A <br />CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIAGONAL 2x8 #2 SPF RIDGE BEAM <br />AT 8'41 WOOD <br />MAX TRUSS 2x6 #2 SYP RAFTERS FOR SPANS 4FT USP ST18 USP ST18 <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS TYP. U.N.O. SEE PLAN FOR TYP. U.N.O. • <br />THAN 4FT @ 2'-0"O.C. MAX. w/ (3) 10d CANT. IF USP JU26 OR IF 2 PLY <br />COMMON TOENAILS TO RIDE BEAM SEE FLOOR PLAN FOR INDICATED TRUSS USP JUS26-2 <br />COLUMN SIZE & <br />TRUSS TO LEDGER SEE FLOOR FRAMING <br />2X4 CONT. AT CONC. MASONRY ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) 2X8 #2 SYP CONT. LEDGER w/ PLAN AND J/S6 FOR MORE <br />T & B CHORD STEEL OR WOOD <br />BEARING SUPPORT MIDDLE (4) 16d NAILS ATTACH NAILS INFO. VERIFY WITH PLAN <br />t/ <br />INTO END OF EACH FLOOR FOR LOCATION AND <br />TRUSS, 24" O.C. MAX. (AT DIRECTION (IF PARALLE <br />SEE 2/D2 FOR BLOCKING <br />A -A ALTERNATE BLOCKING CORNER SEE FOUNDATION EACH SIDE OF G.T. INSTALL <br />(4) NAILS EACH SIDE) INFO) <br />PLAN FOR MORE INFO MASONRY WALL <br />DETAIL @ INTERIOR BEARING 3 (TYPICAL) <br />SCALE: 1/2" = V-0" COMMON BM. ATTAC H M E N TK'18 <br />WOOD TRUSS <br />A PROVIDE BLOCKING AT ALL TRUSS BEARING SCALE:3/4"=1'-0" SECTION AT LOW ROOF 9 <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS SCALE: 1/2" = V-0" <br />TYP. WOOD TRUSS BLOCKING DETAIL STANDARD HEEL HEIGHT <br />SCALE:. 1/2"=V-0" <br />OL VARIES 2x STUDS @26" O.C. <br />ROOF SHEATHING SEE 1/S5 FOR USP @ <br />ATTACHED PER ADDITIONAL SEE PLAN FOR BASE & SPT24 @ TOP <br />NAILING SCHEDULE OUTLOOKER 81 NAILS AT VALLEY TRUSS <br />4" O.C. INFO. 2x BLOCKING BETWEEN <br />2x4 #2 SPF BRACING @ EXTERIOR SHEATHING INFO. STUDS TO TRUSS W/ (2) <br />TO O.C. 12d COMMON TRUSSES. ATTACHED PER <br />TOENAILSS TOO TOP I 12d TOENAILS EACH END <br />SEE TRUSS PLAN 2x4 STUDS W/ USP <br />STRUCTURAL SHEATHING PLATE & (2) 12d END MIN. (2) 2x4 FOR CONNECTION SPT22 @ BASE SEE NAILING SCHEDULE <br />NAILS TO TRUSS BETWEEN TRUSSES (2) <br />ATTACHED PER NAILING BOTTOM CHORD SPF TOP INFORMATION. J/S6 FOR MORE GABL 12d NAILS TO EACH <br />PLATE INFO. TRUSS LOW ROOF/WALL VERTIVAL STUD) <br />SCHEDULE <br />SHEATHING ATTACHED 2x BASE PLATE W/ (2) 12d <br />VARIES W/ PV-_ _ VARIES SEE PLAN PER NAILING SCHEDULE NAILS @ 16" O.C. ALONG W/ <br />FOR WALL LOCATION 2x4 BASE PLATE W/ 1/2" PLYWOOD <br />ROOF SLOPE USP LSTA30 OR USP MTW12 TO BLOCKING <br />MTW12 TO FLOOR (2) 16d NAILS TO BELOW @ 16" O.C. <br />WOOD WALL GIRDER BELOW @ 16" EACH COMMON <br />O C TRUSS/ FRAMING <br />OR TRUSS. 2X4 CONT. W/ (2) MIN. 2x4 #2 SPF STUDS @ TYP TOP &BOTTOM ' <br />SEE PLAN 16d COMMONS 16" O.C. W/ EXTERIOR j <br />NAILS EACH SHEATHING ATTACHED a <br />STUD TYP. T&B PER NAILING SCHEDULE & <br />MASONRY WALL BELOW: USP <br />---- <br />o . <br />PLYWOOD <br />(3) 12d TOENAILS TO HTA16 @ 4'-0" O.C. TO GABLE FLOORING <br />TRUSS OR SEE PLAN FOR PLATE BELOW MASONRY WALL e < TRUSS BEAM BELOW: USP <br />ROOF SYSTEM TOP OF WALL OR BEAM HTW20 @ 4'-0" O.C. TO GABLE <br />MIN. 2x4 #2 SYP P.T. PLATE 16" FLOOR SYSTEM FLOOR GIRDER SEE TRUSS PLAN aa, TRUSS <br />W/ 1/2"X8" EPDXY ANCHOR SEE PLAN FOR SEE PLAN FOR e LOW ROOF TRUSS W/ (2) 2x6 BLOCKING UNDER FLOOR G.T. <br />MASONRY WALL SEE @ 3 FROM EACH END & DIRECTION CONNECTION SEE ROOF PLAN COMMON TRUSS RAISED BOTTOM CHORD 2nd FLOOR WALL W/ USP SEE PLAN <br />PLAN FOR MORE 16" O.C. MAX. as FOR CONNECTION EXTENSION SEE TRUSS JUS24-2 EACH END <br />SHEAR TRANSFER INFO. SECTION @ FLOOR MANUF. CONNECTIONS SPEC'S <br />FOR <br />TO G.T. <br />EXTERIOR. WALL SECTION ENTRY s CONNECTIONK�22SECTION AT HIP GABLEK`12 SECTION @BUMP OUT 39 <br />SCALE: 3/4" = 1'-0" SCALE: 3/4" = V-0" SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0" SCALE: 3/4"=V-0" <br />DETAILS & SECTIONS <br />me <br />Z o <br />o <br />Z co <br />co <br />0 <br />z <br />COC �' <br />.�1 <br />P, <br />C M � <br />s- <br />a) ct3 ti <br />>2LO <br />°) <br />t Z <br />o <br />•DDD tL <br />C <br />, <br />V 1 (D <br />O C M <br />o <br />4--) LU <br />02 <br />00 <br />U — <br />Q Lij <br />- <br />Lf)CLI <br />F_ <br />. <br />t11 <br />r— o <br />N <br />a <br />— U <br />N <br />m0o0 <br />2 LL t` <br />V N <br />Y <br />a <br />a°�i <br />Q rn <br />:5 0 o <br />co0.n < <br />0) <br />A' <br />B D. <br />N C B D• C <br />a° � <br />Lo <br />_ <br />°9jtEJe�,de <br />W <br />O <br />Q wco v :Oil! <br />y'ro <br />0 <br />l6 <br />Co <br />LL C) LE <br />LU <br />✓/'��asO <br />.�a�,�li/11tiE8i1190���```� <br />m <br />❑ ❑ <br />To the best of the Engineer's knowledge, information, and <br />belief, the structural plans and specifications contained <br />within these drawings comply with the Florida Building <br />Code 5th Edition (2014) Residential. Engineer's signature <br />and seal is only for the structural engineering portions of <br />the drawing pages bearing Engineer's signature and seal. <br />O <br />oN <br />Z <br />O�i� <br />>J)ro <br />M <br />am L^ <br />Ln <br />� u-LLill.-. <br />Q <br />07 Q <br />UC <br />L 00 <br />00 <br />a <br />Ems.. <br />Z§S <br />W J O ~ <br />er <br />oZ <br />�5 <br />W� <br />za <br /><a <br />zR�a <br />W o <br />0WZ <br />u_O <br />W N <br />O <br />d" <br />U) <br />z <br />F W <br />Z Z <br />z z <br />}o <br />O <br />az <br />�W <br />z <br />0 <br />Z <br />M <br />w <br />N <br />O <br />> <br />o <br />a <br />U/ <br />� <br />//1 <br />_j <br />Q <br />a4g <br />0 <br />aVYV� <br />0 <br />( % <br />U 2 m <br />N <br />M <br />Zaoa <br />Q <br />Lr) <br />Foa� <br />$ L a <br />Z <br />N <br />� �aW <br />W <br />—i <br />Lr) <br />,--I <br />u l <br />2:Q <br />w <br />W, S <br />N o z U <br />Ear <br />O <br />N <br />Q <br />Z <br />Z <br /><wZ <br />aN <br />W <br />! <br />U <br />LLJ <br />Z <br />z <br />SCALE : AS NOTED <br />DATE : 2/24/2014 <br />TECH: ERAND <br />VERSION N0. <br />10 <br />SHEET NO. <br />D1 <br />