Laserfiche WebLink
THIS DETAIL ONLY REFERS TO THE DIAMOND -MESH <br />EXPANDED METAL LATH ATTACHMENT. <br />METAL LATH <br />16GAx1-1\2" LONG (3/4"-1" CROWN) <br />.................................. _. <br />Imo....S. <br />WALL SHEATHING <br />STAPLES @ 6" O.C. VERT BETWEEN " ' M, X.• I 16GAx1-1/2 LONG (3/4"-1 <br />.......... ... .......... . <br />STUDS (NOTED THUS:—) -OFFSET CROWN) STAPLES @ 6" <br />STAPLES BETWEEN STUDS AS SHOWN O.C. (NOTED <br />T INTO STUDS <br />(NOTED THUS:—) <br />METAL LATH ATTACHMENT DETAIL <br />REV. 09.24.21 SCALE: 3/4" = V-0" <br />*DETAIL EXCEEDS THE REQUIREMENTS FOR FBCR 703.7.1 LATH* <br />**ONLY APPLIES TO LENNAR TPA/JAX** <br />CORNER OF <br />HOME <br />GARAGE SIDE <br />10'-0" <br />TANK -LESS W/H <br />H C G <br />000 <br />5'-0" y <br />STUB -OUT FOR 1'-0" 0 9 0 <br />GAS METER 0 o kn <br />U <br />CV = <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />**ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY** <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />T-5" <br />(2)16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2)16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'-9" <br />(3)16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16'-5" <br />1 SIMPSON HTS20 OR 3 16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'-3" <br />(1) SIMPSON HTS20 OR (4)16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6'-1" <br />(2)16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'4" <br />(2)16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2)16d TOENAILS <br />2" X 10" @ 24" O.C. <br />13'-0" <br />(3)16d TOENAILS <br />2" X 12" @ 24" O.C. <br />151-4" <br />(1) SIMPSON HTS20 OR (3)16d TOENAILS <br />[_ * TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />Backer and Filler Block Dimensions <br />BCI®Joist <br />Backer Block <br />Thickness <br />Filler Block Thickness <br />Series <br />3/4" orp <br />5000s 1.8/1.7 <br />nel <br />wood panels <br />Two 3/4" wood panels or 2 x _ <br />t� <br />1-1/8" or two 1/2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x ` + 5/8" or 3/4" wood panel <br />1-1/8" or two 1/2" <br />602.0 <br />wood panels <br />2 x — + 5/8" or 3/4" wood panel <br />902.0 <br />2 x _ lumber <br />Double 2 x — lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking <br />1/8" gap <br />x � <br />FILL CELL STD. 90° HOOK BOND BEAM <br />let— <br />¢ STD. 90° CONT. #5 <br />BAR >� HOOK BAR <br />SIMPS( <br />w/(22)' <br />NAILS 1 <br />5/8" Q <br />#5 CONT. THRU <br />FROM BOLT <br />FOUNDATION <br />TO HIGHEST <br />BOND BEAM <br />v BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />PLYWOOD FLOOR <br />SEE PLAN FOR REQ'D <br />SHEATHING PER PLAN <br />COLUMN AND <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION <br />@ INT. BRG. WALL <br />N.T.S. <br />1/8" min. ) Small gap 2" min. <br />max. A 4 max. <br />Q <br />Clinch nails <br />when <br />possible <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit ___� <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4 Place joists together and nail from each side with 2 rows of 10d nails 2x4/PlywoodlOSB web stiffener 2" min. <br />1 °� required when indicated or 4" max. <br />2x_: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVINGYe" GAP @TOP sides by 6". - Hangers with sides not containing WEB STIFFENER <br />top flange of joist. <br />DOUBLE JOIST CONNECTION - Birdsmouth cuts. N.T.S. <br />- Under 2nd floor column w/ loads <br />N.T.S. higher than 15001b <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 pff max along load bearing wall. <br />Load bearing wall must stack <br />*Non -stacking walls <br />over squash=20 blocks and <br />require additional <br />consideration. Check <br />wall or beam below.* <br />local building <br />1/16' <br />code for appropriate <br />details in <br />One 10d box <br />areas=20 of high <br />or--20 sinker <br />lateral load. <br />1 <br />T <br />nail each side <br />at bearing. <br />Squash block / <br />(2x4 minimum) <br />Bearing wall, Versa -Lam LVL or <br />Glulam Beam <br />Boise Joist Blocking <br />Use 3" (10d) nails at 6" o.c. <br />Provide adequate bearing <br />for each lapped joist. <br />odnails SECTION @ INT. BRG. WALL <br />1 N.T.S. <br />MINIMUM SPACING = 2x GREATEST <br />KNOCKOUTS) ALLOWED DIMENSION OF LARGEST HOLE <br />IN BEARING ZONES D (KNOCKOUT EXEMPTS) <br />(see table below) D <br />(see table below) <br />DO NOT cut, notch <br />ordrillflanges <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls : - for vertical load transfer <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />Web Stiffener Fastener Schedule <br />Joist BearingLocation <br />Series Depth End Intermediate <br />® <br />BCI5000s <br />9-1/2" <br />2-8d <br />2-8d <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />- d <br />BCI 6000s® <br />BC16500s® <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI60s® <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI90s® <br />11- / " <br />3-16d <br />3-16d <br />14" <br />5-16d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />SIMPS( <br />w/(22). <br />NAILS 1 <br />R TRUSS <br />'OP PLATE <br />TYPICAL SIMPSON MGT TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL SIMPSON LUS/HUS/HUC <br />INSTALLATION <br />MIN. EMBEDMENT <br />SCHEDULE FOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL SIMPSON META12 / <br />Plumbing META12 TSS INSTALLATION <br />beam below Load bearing wall must stack over 4__ <br />blocking and wall or beam below.* <br />Joist <br />When joists meet over wall, provide <br />13/4" minimum bearing for each. I -Joist can be offset <br />up to 3" to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />Use 10dx3" nails at 6"o.c. for all joist <br />blocking panel *Non -stacking walls <br />require additional consideration. — <br />jX:::. • ■ • ■ •� <br />6" A %" ROUND HOLE MAY 6'� 0 NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN <br />6" 1Y" <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1Y2" <br />8 <br />T47' <br />1-1" <br />1'--2r' <br />1'2" <br />1--3" <br />V-'U" <br />1-7 " <br />1-11" <br />2'-4' <br />2-9' <br />3' 21 <br />3 7" <br />7Arny 12 <br />1' {T' <br />1'-1" <br />1' 7 <br />It z, <br />1-3' <br />1'-9' <br />2"-4" <br />2-11" <br />3'7" <br />4'2 <br />�t'-9 <br />5-4" <br />ti 16 <br />1'-0P' <br />1'-1" <br />1'-`i <br />1' 2" <br />1'-7"-�i" <br />S'-' "c <br />3-10" <br />4' <br />5' T' <br />6'-4�' <br />i' 2" <br />2f0 <br />T-O' <br />1-1'" <br />1' 2" <br />1' 2"' <br />7-0r' <br />3'-0" <br />4-0" <br />4'-10" <br />6 11" 6=11" T � 1'" 9-11" <br />24 <br />v_(r <br />1'-1'' <br />1'-z, <br />1-3" <br />2-6' <br />37" <br />4-9' <br />S 10" <br />T Z" <br />9-4' <br />9-6' <br />10'-W <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY. <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT, <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. %" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE %" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />N.T.S. <br />Jc <br />A/C CHASE 4" PVC <br />SLEEVE THRU STEM <br />WALL <br />Backer block (12" wide min.) <br />Nail with 10-10d nails. -�— <br />Install tight to top flange. SLEEVE THRU STEM • <br />SEE PLAN FOR--'•• n. • • '.; . <br />FOUNDATION INFO ,' , ' 4 <br />STEM FOUNDATION <br />\ Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />1/4%2" gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4"-2" gap at top of bottom 1/4"4' gap at bottom of top <br />flange. flange. <br />eb stiffner as <br />Web stiffeners are not required when top required ff hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />00 0.6 X Joist <br />lo <br />e i <br />o depthlo <br />I -JOISTS BUCKETS <br />N.T.S. <br />GRADE r-REINF. SEE PLAN <br />A/C CHASE 4" PVC (2) #5 REBAR <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />SIMPSON META12/ META12 TSS <br />INSTALLATION @ MID SPAN <br />NOTE: <br />UPLIFT VALUE <br />IS BASED ON <br />S.P.F. <br />LOCATION OF <br />SECOND H10A <br />SIMPSON H10A • ° (WHEN <br />w/ (18)10d x 1 1/2" REQUIRED) <br />NAILS <br />UPLIFT =1015# <br />TYPICAL SIMPSON H10A <br />INSTALLATION <br />TYPICAL SIMPSON MTS <br />/ HTS INSTALLATION <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE <br />PENETRATION <br />12" BELOW <br />GRADE <br />o <br />d <br />A. 4. <br />- (Tn Tf� <br />PLUMBING LINE <br />PVC OR SCH40 SLEEVE <br />a <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE VERTICAL THRU FND. <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE <br />PENETRATION <br />—\ <br />a <br />PVC OR SCH40 SLEEVE <br />r PLUMBING LINE U G <br />4 L <br />4 _ <br />i e'4 � e <br />�l ..a. <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" <br />CENTERED @ PIPE <br />PENETRATION <br />PVC OR SCH40 SLEEVE <br />PLUMBING LINE <br />d A.I. e <br />a <br />a d <br />a e' 4 V d <br />r , <br />a <br />SEE FND. PLN. <br />SIZE & REINF. <br />N <br />tv _ <br />k3 �w N <br />- <br />7 m x <br />N <br />d <br />m u g M <br />3,. <br />E <br />3 0 <br />0 <br />w <br />ee FFsstt <br />cag <br />< <br />o <br />ti <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential <br />7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />W <br />E <br />g o M8 <br />Lo O A <br />W 5 J <br />W <br />Q <br />13 9LLLL W <br />Z o 07 rL S <br />SLL <br />W <br />� m <br />W P <br />IL z d J <br />O6 0. <br />W ❑ ❑ <br />z <br />z_� <br />z <br />a <br />E3 <br />(n pi <br />z <br />0 <br />ty U 8 <br />u_ <br />(D <br />_� <br />Q) <br />ZA <br />fu <br />�fu <br />W <br />W€ <br />O <br />a <br />• <br />U <br />CO <br />¢ 2 <br />p <br />o g <br />w <br />Z <br />u <br />E <br />.3 <br />ZN <br />z® <br />Q <br />E v <br />Co(o <br />~ <br />W <br /><= <br />g o <br />O� <br />Wr <br />" o <br />dU <br />O <br />O E <br />N <br />ao <br />az <br />wo <br />°d❑ <br />wz <br />19 <br />tt� <br />ram-. L <br />mO <br />g� <br />zco <br />b <br />� <br />(D <br />g <br />wLL <br />5 8 <br />a <br />�W <br />W <br />U <br />3. <br />�- <br />Ww <br />NJ <br />CC)p <br />o. <br />ax <br />° § <br />C) <br />J <br />1 <br />41 Lo <br />tt ^^ <br />Y, <br />LO <br />rn <br />to <br />to <br />CO Cn <br />co <br />C <br />O <br />Y <br />ca <br />0° <br />Ln <br />�I <br />•0 N <br />0) <br />o <br />O <br />N <br />LO <br />LLo-0 <br />T— <br />Q <br />T <br />Ez° <br />LM <br />N <br />M <br />C <br />, <br />E r <br />m <br />a- <br />0 •• v <br />0 � <br />c <br />JOB <br />NO : 22-06465 <br />SCALE : AS NOTED <br />SHEET NO. <br />SN 1 <br />r <br />y <br />