Laserfiche WebLink
— __L_11 11 <br />— — — — — — — I <br />(1) LAYER TYPE 11 (#30) UNDERLAYMENT FOR ROOF PITCH >4:12 <br />(2) LAYERS TYPE I OR TYPE 11 (#15 OR #30) UNDERLAYMENT FOR <br />ROOF PITCH 4:12 OR LESS. <br />12 PRE ENGINEERED HURRICANE ANCHOR @ EACH TRUSS <br />WOOD TRUSS @ 24" <br />O.C. MAX. <br />ZZ7 —SHINGLE ROOF <br />FOR UNDERLAYMENT <br />INSULATION— SHINGLE ROOF REQUIREMENTS SEE R905. <br />BAFFLE 15/32" CDX PLYWOOD OR 7/16" <br />O.S,B. (SEE ROOF NAILING <br />INSULATION P SCHEDULE ON SHT SN1) <br />CHART ON FLOO <br />PLAN ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />5/8" OR 1/2" HIGH STRENGTH CEILING 2x SUB FASCIA <br />BOARD PER CODE W/ 13/8" DRYWALL SEE SOFFIT SHEET <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8" O/C WALLS ATTACHED WALL SHEATHING TO <br />1/2" GYP WB (2) TOP PLATE W/ 8d @ 4" <br />DOUBLE 2x S.P.F. TOP PLATE O,C., 2 ROWS <br />1x2 NAILER <br />PLYWOOD SHEATHING <br />2X BLOCKING @ EA. WALL NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT FOR MORE INFO <br />Uj <br />LU <br />16" O.C. 2X S.P.F. STUDS <br />0 U) <br />W/ (4) 16d TOENAILS TO TOP PLATE 7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />2x BOT. PLATE W/ (2) 1 Od @ 6" O.C. APPLY 3 LAYERS W1 TOTAL THICKNESS 7/8" OVER <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />_j LU <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 1 Od D W LAYER 1/8" THICK. <br />U_ <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD ION ER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TOONE SIDE OF THE FLOOR TRUSS FORAN AREA 1000SG, B �R <br />< FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEA�� �,�6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. A,�V <br />FLOOR SYSTEM ETAL SEAT <br />ER PLAN OR FELT <br />'Al PAPER FOR <br />MOISTURE <br />BARRIER <br />E <br />�ER77 OR <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 13/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8'O/C WALLS STD. 90 HOOK (SEE DETAIL) <br />1/2" GYP WB <br />8"x8"X16" CONC. KNOCKOUT <br />INSTALLATION PER BLK. W/1#5 ROD CONT. FILLED <br />CHART ON FLOOR PLAN SOLID W/GROUT <br />NOTE: LAP SHEATHING TO BOTTOM <br />OF BAND JOIST TYPICAL <br />ARCHITECTURAL <br />',�FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />ce) <br />Q (LU) <br />4"x4" INSPECTION PORT AT <br />_j <br />CL EACH FILL CELL TYPICAL <br />Lij U) <br />1x WD FURRING @ 24" O.C. CL AT GARAGE CONTRACTOR <br />BASEBOARD TO CUT BLOCK OR POUR <br />MIN, 2500 PSI CONC, SLAB CURB DUE TO SLOPE <br />MIN. PSI MAY VARY PER NOTE: EXTEND DECO FINISH <br />MUNICIPALITY 4"to 6" BELOW GRADE <br />00 <br />4. A FINISH GRADE <br />co <br />I=_flT___Tm Cy <br />4 <br />6x6 W1.4xW-I 4 1 EI I —I I F <br />WWF OR F1 BERMESA'' c) <br />�`A <br />�—STD. 90'HOOK <br />(3) # 5 REBAR ON 3" CHAIR (SEE DETAIL) <br />WIT' MIN. CLEARANCE <br />.TYP 2-STORY WALL SECTION ('j <br />SCALE: 3/4"=V-0" � S6 <br />USP LSTA24 STRAP W/ 8-1 Od x 11/2" NAILS TO STUD <br />FEND SHEATHING TO <br />)F BEAM OR GIRDER <br />�TE W/ <br />I O.C. <br />)OR TRUSS/JOIST <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />USP LSTA24 STRAP W/ 8-1 Od x 1-112" <br />NAILS TO STUD & 8-10d x 1-1/2" TO <br />BAND JOIST @ EA. STUD <br />2nd FLOOR WALL----- <br />BAND JOIST <br />'USP MP4F @ 24" <br />o.c. w/ 12-8d NAILS <br />1st FLOOR WALL <br />SCALE: N.T.S. <br />2"x BOT. PLATE W/ <br />(2) 1 Od @ 6" O.C. <br />NOTES: * USE <br />MP4F & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />USP LSTA24 STRAP w/ 8-10d x 1 1/2" NAILS <br />TO STUD & 8-1 Od x 1 1/2" TO BAND JOIST @ <br />EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1 ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />A- <br />"T" CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS rN <br />SCALE: N.T.S. �6 <br />2"x4" PANEL BLOCKING @ 48" O/C <br />FOR THE FIRST 8'-0" OF END <br />WALL FROM EA. END. (TYP.) TOP & <br />BOTTOM CHORD ATTACHED W/ (2) <br />2ND FLOOR FRAMING - SEE <br />16d TOE NAILS <br />SECTION J/S6 <br />DECKING <br />ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W1 8d <br />@ 4" O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />FLOOR TRUSS <br />SEE FRAMING <br />---WEEP SCREED <br />PLAN <br />INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" <br />O/C FOR THE 1 ST Z-O" OF <br />USP HTA20 @ 24" O.C. W/ <br />10-1 Od X 1 1/2" NAILS INTO <br />END WALL W/ (2)1 Odx3" @ EA. <br />r7kin IKITn ')"�All PI <br />BLOCKING TRUSS& MIN. 4" <br />EMBEDMENT IN CONC. <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />zx -.)I U U'D p I <br />2"x BOT. PLATE <br />(2) 10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUSE <br />FLOOR CONNECTION <br />TTACHED WALL SHEATHING <br />ONTINUOUS TO BOTTOM RIBBON <br />// 8d @ 4" O.C., 2 ROWS STAGGERED <br /><4 RIBBONS, EACH W/ 4-16d <br />AILS INTO EA, FLOOR TRUSS <br />1EEP SCREED <br />ISTALLED PER. MANUF. <br />SP HTA20 @ EA. TRUSS <br />// 10 - 1 Od x 1 1/2" NAILS INTO FLOOR <br />RUSS & MIN. 4" EMBEDMENT IN <br />�O BLOCK <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=V-0" <br />FOR ADDITIONAL INFORMATION, <br />RIBBONS <br />—DETAIL (FLOOR TRUSS) ( O� <br />SCALE: 1 1/2"=V-0" _Qs_�) <br />NOTE: <br />SEE TYPICAL WALL SECTION <br />C/S3 FOR ADDITIONAL <br />INFORMATION <br />(1) ROW OF 2x BLOCKING @ MID <br />SEE SHEATHING <br />SPECS ON FLOOR <br />�1/2" GYP. W.B. MIN, @ <br />GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT. < 8'-6!'. (2) <br />x 10" "1" BOLT W/ I" <br />ROWS OF 2x BLOCKI?1iG_ @ 3rd PTS <br />EMBEDMENT @ 24" O.C. W/ <br />FOR WALL HGT. > V-15" <br />.111"DIA, <br />2"DIA.X 3116" PLATE WASHER <br />USP SPT22 @ EA. STUD <br />(MIN. SHEAR 3500#. MIN. TYPICAL <br />2 x STUDS @ 16" O.C.. <br />TENSION 2600#.) <br />2X P.T. PLATE <br />6 x 6 W1.4 x W1.4 <br />FWWF OR FIBERMESH <br />A <br />.4 <br />A' <br />4,. CID <br />'.A . 4 A . 'A IE I E <br />(3) #5 CONT. ON 3" <br />CHAIR W/ 3" MIN. <br />E 8" V-8" CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION rs <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" <br />ADDITIONAL SLAB INFORMATION. <br />15/32" OSB <br />EXPOSUREI <br />SHEATHING <br />PROVIDE <br />BLOCKING <br />REQUIRED I <br />SECTION X- <br />NOT FULL <br />HEIGHT SHI <br />(2)- 2x TOP PLATE <br />BEYOND <br />15/32" OSE <br />EXPOSUREI <br />F <br />SHEATHING Lu <br />Lu <br />SOLID 2x U) <br />BLOCKING @ ALL 9 <br />C <br />SHEATHING 0 <br />EDGES(SEE <br />OPENING <br />SECTION X- <br />LLJ <br />0 <br />_x <br />x <br />777,�). <br />_2x STUDS Lu <br />BEYOND. m <br />U) <br />SEE PLAN 2 <br />0 <br />U) <br />I 1z _4_ \-2x4 P.T, BASE <br />2x RIBBON OR VERTICAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM WALL ELEVATION DIAGRAM <br />4 FT. <br />4 FT. <br />2 <br />2 <br />5 FT� 4 FT. <br />5 FT. 4 FT. <br />0) 2 2 <br />4 FT. <br />4 FT. 4 F <br />ROOF NAILING ZONE DIAGRAM <br />ROOF NAILING SCHEDULE: <br />NAILING ZONES (SHINGLE AND TILE) <br />Lu <br />ZONE 1: 8d RING SHANK NAILS @ 6" O.C. ON EDGE AND 6" O.0 IN FIELD <br />ZONE 2:8d RING SHANK NAILS @ 6" O.C. ON EDGE AND 6" O.0 IN FIELD <br />z <br />ZONE 3 8d RING SHANK NAILS @ 4" O.C. ON EDGE AND 4" O,C IN FIELD <br />z <br />(NOTE: IF 5/8" PLYWOOD IS USED, CONTRACTOR MUST USE 10d RING <br />LL <br />0 <br />SHANK NAILS) <br />NOTE: <br />U) <br />ROOF SHEATHING: (APA RATED EXPOSURE 1) 1/2" PLYWOOD <br />(TILE) OR 7/16" OSB MIN. (SHINGLES) SPAN RATED 24/16 <br />uj 0 <br />0 F <br />SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, ATTACH <br />OX (�n Om 2 uz') <br />PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE ATTACHED TO <br />U , 2 LL <br />uj 0 LL <br />STUD AND OR BLOCKING AT ALL EDGES. <br />LU , 0 <br />LL = LL <br />A MINIMUM 1/8" SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES <br />AND END JOINTS TO ALLOW FOR EXPANSIONS. FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THAN 1/8" <br />S" = NAIL 3/8" <br />SPACING <br />r 3/4" <br />NAIL AT BASE 2 ROWS @ 4" O.C. W18d COMMON NAIL <br />NAIL AT TOP PLATE TWO ROWS @ 4" O.C. W/8d COMMON NAIL <br />@ NAIL OPENING PERIMETER @ W O.C. W/8d COMMON NAIL <br />@ NAIL INT. AT T� O.C. W/8d COMMON NAIL <br />STAGGER ALL VERT. JOINTS & NAIL @ 4" O.C. <br />W/8d COMMON NAIL <br />SHEATHING SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />W/ 8d COMMON NAILS @ 4" O,C. <br />@ (2) 8d NAILS @ Y O.C. TO EACH TRUSS END OR @ VERTICAL <br />MEMBER IF GABLE END <br />NOTE: <br />• 8d NAILS FOR WALL SHEATHING MUST BE MIN.131" X 2 1/2" <br />• DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/9'. <br />AT ALL PANEL BLOCKING <br />LOCATIONS MIN 2 X 4 #2 SPF <br />TURNED VERTICAL W/ 7116" <br />IOSB FLITCH PLATE TO W1 (2) <br />12d TOENAILS EA. END. NAIL <br />FLITCH PLATE TO VERTICAL <br />W/ (4) 8d NAILS <br />k') u ­­ �. � .,. <br />STAGGERED <br />C _� WALL SHEATHING INSTALL. <br />��6� &NAILING SCHED. SECTION X-X <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED@ 12" O/C FOR <br />2x CRIPPLES @ <br />2"x10" OR GREATER HEADER <br />16" O.C, W/ (2) 12d <br />TOENAILS T/B <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />S4 \—INTERIOR <br />HEADER <br />1 Od NAILS @ <br />8" O/C TYP. <br />BOX HEADER (1) 2x SILL PLATE W/ (2) <br />ONLY 12d TOENAILS. <br />DOUBLE 2x <br />EXTERIOR HEADERS <br />CRIPPLE STUD <br />(1) 2x SILL PLATE W/ (2) <br />TYPICAL (U.N.O. <br />12d TOENAILS. OPENING <br />LARGER THAN 4 ft (2) 2x <br />SILL PLATE W/ MP3 CLIPS <br />EACH SIDE <br />0 <br />0 <br />SEE PLAN FOR REQUIRED <br />CONNECTIONS <br />LOAD BEARING/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS I <br />,BEAM <br />(2) ROWS OF 2x BLOCKING <br />@ THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W1 8" <br />EMBEDMENT @ 24" O.C, W/ <br />2"DIA.X 3/16" PLATE WASHE7R <br />(MIN. SHEAR 3500#. MIN. TYPICA\L <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN.\ <br />SLAB W/ 6x6 W1.4xW1.4 <br />WWF OR FIBERMESH <br />A <br />A <br />A <br />I I 5=1 I 1=1 I IEI I A <br />A <br />A <br />A d <br />I I M, I 11-11 <br />(3) 5 REBAR ON 3" CHAIR V-8" <br />W/Y MIN. CLEARANCE <br />ALTERNATE FOOTING <br />@ WOOD IST FLR. SEE J/S6 <br />FOR ADDITIONAL <br />INFORMATION. <br />Im <br />T01.1 <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2"x4"WALL <br />2"x6"WALL <br />STRAPS <br />SIZE <br />JACKS <br />� STUDS <br />JACKS <br />STUDS <br />EA END <br />EA END <br />EA END <br />EA END <br />V-4- <br />(1) <br />2) <br />(1) <br />(2) <br />(1) LISP LSTA30 <br />4-4 <br />(2) <br />(3) <br />(2) <br />(2) <br />( ) USP LSTA 0 <br />(3) <br />(3) <br />(2) <br />(3) <br />1 (2) USP LSTA30 <br />PLYWOOD SHEATHING <br />NAILED PER NAILING SCHEDULE SEE <br />DETAIL C/S6 FOR MORE INFO <br />-2X STUDS@ 16" O/C <br />-7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" <br />OVER METAL LATH. FIRST 2 LAYERS 318" <br />THICK EACH. 3RD LAYER 1/8" THICK. <br />-USP SPT22 @ EA. STUD <br />-2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />AL FINISH GRADE <br />C? <br />9 2� <br />SCALE: 3/4"=T-O" <br />0 !�2 <br />co <br />CD <br />CD <br />CO <br />nj <br />U) 71 <br />V) (D <br />(1) C/�l <br />4— Lu <br />U <br />0 LLJ <br />F E <br />0 <br />=3 <br />cn <br />(0 co <br />un <br />0 C:) <br />a) C', <br />E <br />8 <br />0) cl) <br />,_ . C, <br />LO 10- cO <br />0 CN <br />c) <br />T <br />U, <br />LL 00 <br />00 <br />0 10 — <br />CL Is, <br />0 <br />< cn <br />CL <br />0 <br />)m < <br />All <br />BID. <br />N D c <br />C.0 <br />C, co <br />D OM Z .... �Z <br />1z <br />;z <br />__j <br />L, <br />m m 10 <br />> 0 <br />LU <br />0- <br />CS <br />0 <br />t <br />TO he best of th� I i1j;Windr4 wledge JCMfi. <br />u r a <br />belief, the struct d lt� s oni <br />drawingg <br />within these ce.79 with the 2017 <br />i e a (5y <br />Building Code - Res d ntia 6 61 1 <br />signature and seal is only for thmpupura engineering <br />portions of the drawing pages bearing Engineer's signature <br />and seal. <br />C) <br />z r_j <br />0 (3) <br />P-4 4-J <br />V) — <br />=) <br />> U-) <br />, c1r) c:) <br />4-J N <br />U-) <br />70 <br />a) Lr) <br />LL <br />zU <br />0-00 <br />< <br />E <br />LU c� F— <br />W <br />_j c:) <br />t.0 <br />cz <br />0 <br />z <br />z <br />< <br />U �� 80 0, <br />E <br />..� <br />Z w LU W <br />�Uz� <br />25 z <br />q cc) L9 Z, <br />z z <br />0 <br />Y: z <br />z <br />0 <br />Lr) <br />_j <br />Ln <br />> <br />Ln <br />On <br />z <br />0 <br />U <br />_.- <br />U-) <br />0 <br />:J < <br />< <br />Lu <br />r-4 <br />cc <br />ILL <br />gM2 <br />op a < <br />z 0� <br />cz, <br />< <br />< <br />Lu of <br />2: a <br />z <br />Lr) <br />:0, 9 cg <br />ui aU_ U_ <br />cz <br />< 0, <br />LU <br />U.J <br />< <br />z <br />E3 �- <br />L0 �zu <br />c) <br />It- <br />Ln <br />c:) <br />Z <br />D <br />R z <br />m <br />0 <br />cb <br />< <br />uj <br />r7l <br />r__4 <br />in- <br />V) <br />2: <br />SCALE AS NOTED <br />DATE 1/5/2018 <br />TECH: MIAMES <br />VERSION NO 2mO <br />SHEET NO. <br />S6 <br />No <br />En <br />En <br />ED <br />