My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6802 Back Forty Lp
Zephyrhills
>
Building Department
>
Building Plans
>
6802 Back Forty Lp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 3:02:14 PM
Creation date
2/19/2025 2:53:30 PM
Metadata
Fields
Template:
Building Plans
Street #
6802
Location
Back Forty Lp
Contractor
Lennar Homes LLC
Building Plans - Permit #
5930
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CROSS BRACING DETAIL (TYP.) <br />SCALE: N.T.S. <br />TRUSS NOTES: <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 CONY. FRAMED RIDGE <br />ED <br />BE NAIL <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER MAY MIN. (4) IL WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. D6 <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT SEE TYP TRUSS BLOCKING DETAILS <br />VV/ L-IV\,i`W "P %'lI A\VVV VV Lu <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />U <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />MAX &EACH END ALTERNATE BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP - <br />CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. <br />---LWOOD TRUSS J <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE: N.T.S. <br />PORCH SLAB SEE EXTEND <br />FOUNDATION PLAN SLAB 1 1/2" <br />(2) #5's CONT. T&B w/ <br />4„ #3 STIRRUPS AT 4'-0" <br />TWHEN DEPTH <br />EXCEEDS 30" <br />GRADE <br />V-4" <br />ILL 15 <br />PORCH S <br />SCALE: N.T.S. <br />DIAGONAL - <br />AT 8'-0" <br />MAX <br />2X4 CONT, AT <br />T & B CHORD <br />WOOD <br />TRUSS <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />10d TOP & BOTTOM <br />OR SIMPSON H2.5A w/ <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2X4 SPF 2 (2) #7X 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />* * 2x6 RAFTERS FOR SPANS 4FT TO 8FT <br />2X4 RAFTERS FOR SPANS LESS THAN <br />4FT @ 2'4"O.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO BEAM <br />CONC. MASONRY <br />STEEL OR WOOD <br />BEARING SUPPORT <br />A -A ALTERNATE BLOCKING <br />DETAIL a@ INTERIOR BEARING r3 <br />SCALE: N.T.S. <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />SEE FLOOR PLAN SEE PLAN FOR <br />FOR BRG. OR REQ'D STAIR INFO, <br />NON-BRG. WALL IF CONCRETE STAIRS <br />FORMED & POURED <br />W/ (1) #5 EACH STEP <br />2 <br />�rd W <br />., <br />- = 4" U) <br />-- <br />Z cn <br />Q <br />J <br />PORCH SLAB SEE c� <br />d <br />FOUNDATION PLAN w X <br />w¢ <br />cn � <br />' Z <br />(2) #5's CONT. T&B .< <br />_ z W/ #3 STIRRUPS AT N _ <br />4'-0" <br />WHEN DEPTH <br />EXCEEDS 30" LOWER OR <br />GARAGE SLAB <br />V-4" SEE PLAN <br />LARGE STEP DOWN 17 <br />SCALE: N.T.S. <br />2X4 STUDS W/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />SEEROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />PROVIDE 2X4 MIN. BLOCKING AT <br />OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />N TRUSS <br />G.T. ---- <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER A USSES HIP <br />SIDE OR BOTH IF REQ'D) G.T <br />(2) 12D NAILS — <br />AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE: N.T.S. <br />z <br />0 <br />w <br />J <br />w <br />w <br />w <br />On <br />WOOD POST. SEE FLR <br />PLAN FOR SIZE & BASE <br />CONNECTION SEE <br />\ PLAN <br />EXTEND <br />SLAB 1 1/2" <br />- - (2) #5's CONT. T&B w/ <br />411 - • <br />#3 STIRRUPS AT 4'-0" <br />PORCH SLAB SEE WHEN DEPTH <br />FOUNDATION PLAN <br />EXCEEDS 30" <br />GRAD <br />— N cz <br />A L <br />2 ENTRY PORCH SILL 14 <br />SCALE: N.T.S. <br />WOOD OR MASONRY ABOVE <br />MASONRY PIER SEE FLOOR PLAN O <br />FOR COLUMN INFO WOOD OR MASONRY <br />INTEGRATE M <br />KNEEWALL IN <br />MAIN HOUSE <br />REQUIRED <br />t MASONRY KN <br />COURSES w/ <br />W/ (1) #5 CON <br />T <br />ASONRY ABOVE MASONRY <br />TO CMU BASE OR PIER SEE FLOOR <br />PER ELEVATION IF PLAN FOR COLUMN <br />INFO <br />EE WALL MAX 3 <br />TOP K.O. COURSE CMU BASE W/ (1) #5 <br />. FILLED CELL VERTICAL EACH <br />SPAN MAX 6'-8" CORNER FILLEDAk I I <br />MAX 3 SOLID. SEE ELEV. <br />COURSE FOR BASE SIZE <br />(3) #5's EA. WAY <br />80 <br />8" <br />SLAB O PORCH SLAB SEE <br />Ak <br />FOUNDATION PLAN <br />LEVEL - <br />v, <br />:. <br />(2) #5's CONT T&B w/ - _'' z <br />TOP COURSE TO <br />BE CHAIR BLOCKS. <br />ENTIRE BASE TO <br />BE FILLED SOLID <br />SEE ELEV. FOR <br />BLK HGT. <br />#5 REBAR CONT <br />@ SLAB LEVEL <br />EXTEND SLAB <br />1 1/2" BEYOND <br />BLOCK FACE <br />EXTEND <br />SLAB 1 1/2" <br />SEE CUT CONTRACTOR T#3 STIRRUPS AT 4'-0" '- <br />O INSTALL SECTION FOR ' • I � <br />MIN 3" x 3" WEEP HOLE MORE INFO WHEN DEPTH <br />ALONG w/ PITCHING SLAB EXCEEDS 30" <br />V-4" <br />TO DRAIN WATER <br />KNEEWALL OPT. (ELEV TO INDICATE) MASONRY COLUMN <br />ENTRY PORCH SILL �16 <br />SCALE: N.T.S. <br />SIMPSON LSTA18 <br />w/ (12) 1 Od NAILS <br />CENTERED AT <br />SPLIT TO TIE <br />BEAMS TOGETHER <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INFO <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />- - (14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION aC� FLOOR <br />CONNECTION 22 <br />SCALE: N.T.S. <br />iIMPSON HUC410 w/ (14) <br />6d INTO HEADER & (6) <br />Od INTO BEAM - SEE <br />2001` PLAN FOR MORE <br />NFO <br />SEE FLOOR PLAN FOR <br />SEE PLAN <br />FOR CANT. <br />COLUMN SIZE & BASE 7/16" OSB FLITCH PLATE <br />CONNECTION INFO REQ'D ONLY WHEN <br />INDICATED ON BM. <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR SCHEDULE/PLAN <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A SCHEDULDE/ON PLANM OPTION B CONNECTION I NFO OPTION C <br />COMMON BM. TO POST ATTACHMENT <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON (2) HTS20 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />A r A <br />SEE PLAN FOR <br />TOP OF JEAM <br />R <br />SEE PLAN FOR <br />W <br />CANT. IF <br />INDICATED <br />CORNER 'I —SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />�X <br />COMMON BM. ATTACHMENT <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />MIDDLE <br />BM. SPLICE OVER <br />CENTER OF POST <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />-TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL 7 <br />SCALE: N.T.S. <br />2x4 #2 SYP NAILER. NA <br />TO STUDS w/ (3) 16d @ <br />EACH STUD - TOENAIL <br />EACH TRUSS TO <br />NAILER w/ (3) 10d <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY w/ <br />(3) ROWS OF 16d NAILS <br />AT 24" 0. C. <br />ROOF AND EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />VERIFY FLOOR JOIST W/ RIM <br />BOARD OR FLOOR GABLE W/ <br />FRAMING PLAN <br />SIMPSON LUS26 w/ (8) 10d • <br />NAILS OR IF 2 PLY TRUSS SEE FLOOR FRAMING PLAN <br />SIMPSON LUS26-2 w/ (8) 16d NAILS TO LEDGER AND J/S6 FOR MORE INFO. <br />VERIFY WITH PLAN FOR <br />2X8 #2 SYP CONT. LEDGER W/ LOCATION AND DIRECTION <br />(4) 16d NAILS ATTACH NAILS (IF PARALLE SEE 2/D2 FOR <br />INTO END OF EACH FLOOR BLOCKING INFO) <br />TRUSS, 24" O.C. MAX. (AT EACH <br />SIDE OF G.T. INSTALL (4) NAILS MASONRY WALL <br />EACH SIDE) (TYPICAL) <br />SECTION AT LOW ROOF s <br />SCALE: 1/2" = V-0" <br />%2' CDX PLYWOOD OR Y/6" O.S.B. <br />SHEATHING REQ'D FROM BOTTOM <br />OF WALL TO ROOF SHEATHING <br />ABOVE W/ 8d NAILS @ 4" O.C. IN <br />FIELD, EDGES & BOUNDARIES — <br />SEE PLAN MAX. <br />24" STEPS <br />SEE PLAN FOR OPT. <br />STAIR INFO. IF <br />CONCRETE STAIRS <br />FORMED & POURED <br />W/ (1) #5 EACH STEP <br />° <br />GARAGE OR <br />LOWER SLAB <br />SEE PLAN <br />COMMON TRUSS <br />W/ INTERIOR BRG. <br />SEE PLAN FOR <br />CONNECTIONS <br />INFO. <br />RUSS/ <br />TOP WAI <br />YSEE PLAN <br />MIN. (2) 2x8 #2 SYP <br />HEADER. SEE Q/S4 FOR <br />REQ'D CONNECTIONS <br />2x4 #2 SPF STUDS @ <br />12" O.C. W/ USP SPT22 <br />@ BASE & SPT24 @ <br />TOP <br />2x4 #2 SYP P.T. PLATE W/ <br />EPDXY ANCHOR OR <br />2„ J-BOLT OR %2 TITEN HD <br />ANCHOR @ 24" O.C. W/ <br />MIN. 6" EMBEDMENT <br />a <br />a A° <br />a ° <br />° <br />p° A <br />° <br />MAIN HOUSE <br />° e <br />SLAB <br />.6 �. . <br />4. <br />(2) #5's CONT. T&B <br />W/ #3 STIRRUPS AT <br />a 4'-0" WHEN DEPTH <br />EXCEEDS 30" <br />14 <br />e <br />° <br />e • 4 <br />A�L <br />° d <br />V-4" <br />SECTION GARAGE MONO 21 <br />SCALE: N.T.S. <br />rn <br />C* <br />N <br />0 <br />o� <br />i V t7. n CZ <br />=gym <br />.: C �- 6- <br />y C <br />Nx <br />d <br />g= <br />decc <br />i <br />ti5 d 69 SS <br />= � > <br />� . rz <br />C <br />a <br />a <br />...••'0� <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />,gyp . BSc E i' W <br />IW- o E <br />o co <br />0 N o <br />I 0 s�Co <br />4 ;i Q C J LL w <br />LL <br />— O a- Y <br />s a9 Z o <br />IY. 'Co N <br />o2 CO <br />W r, rn <br />W Co. <br />co <br />M Z co <br />a <br />�n N <br />O U U O <br />Z <br />W ❑ ❑ <br />M <br />CMV M <br />z <br />0 <br />z <br />J <br />in <br />N z <br />via <br />Cz <br />tO �, o <br />Y I (may N <br />�N w <br />�C5 = <br />In <br />v ai <br />cr r ,rLLJ= E 9 <br />w <br />s I� <br />o <br />rn <br />e i-4 M <br />CD w <br />Z <br />M O Q <br />J <br />W <br />E oo <o <br />a o z© <br /><z <br />i— r0 g o 00 <br />OG z <br />E � U p < <br />Lr ' r <br />=o WI <br />0< 0 <br />O O U Z F <br />m J m ¢ w <br />¢� �z <br />co3 0< <g <br />w a <br />a� oLL � � <br />m �� <br />_ _C) <br />v z`Q o 3 <br />2O = <br />` J <br />>M <br />0 <br />m <br />ro <br />� M <br />NCL <br />^ � O <br />Q Y <br />/ / O <br />C° <br />r1 0 <br />I� <br />L0 <br />m <br />-14 <br />O � <br />M O <br />00 <br />O 0 Ln <br />N Q 0CN <br />o T" <br />00CN <br />E � ° <br />m 0 w r Z <br />Z E In `N <br />2 <br />d U q p <br />JOB NO: 23-00509 <br />SCALE : AS NOTED <br />SHEET NO. <br />D1 <br />(MONO) <br />TOP COURSE TO <br />BE CHAIR BLOCKS. <br />ENTIRE BASE TO <br />BE FILLED SOLID <br />SEE ELEV. FOR <br />BLK HGT. <br />#5 REBAR CONT <br />@ SLAB LEVEL <br />EXTEND SLAB <br />1 1/2" BEYOND <br />BLOCK FACE <br />EXTEND <br />SLAB 1 1/2" <br />SEE CUT CONTRACTOR T#3 STIRRUPS AT 4'-0" '- <br />O INSTALL SECTION FOR ' • I � <br />MIN 3" x 3" WEEP HOLE MORE INFO WHEN DEPTH <br />ALONG w/ PITCHING SLAB EXCEEDS 30" <br />V-4" <br />TO DRAIN WATER <br />KNEEWALL OPT. (ELEV TO INDICATE) MASONRY COLUMN <br />ENTRY PORCH SILL �16 <br />SCALE: N.T.S. <br />SIMPSON LSTA18 <br />w/ (12) 1 Od NAILS <br />CENTERED AT <br />SPLIT TO TIE <br />BEAMS TOGETHER <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INFO <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />- - (14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION aC� FLOOR <br />CONNECTION 22 <br />SCALE: N.T.S. <br />iIMPSON HUC410 w/ (14) <br />6d INTO HEADER & (6) <br />Od INTO BEAM - SEE <br />2001` PLAN FOR MORE <br />NFO <br />SEE FLOOR PLAN FOR <br />SEE PLAN <br />FOR CANT. <br />COLUMN SIZE & BASE 7/16" OSB FLITCH PLATE <br />CONNECTION INFO REQ'D ONLY WHEN <br />INDICATED ON BM. <br />7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR SCHEDULE/PLAN <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A SCHEDULDE/ON PLANM OPTION B CONNECTION I NFO OPTION C <br />COMMON BM. TO POST ATTACHMENT <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON (2) HTS20 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />A r A <br />SEE PLAN FOR <br />TOP OF JEAM <br />R <br />SEE PLAN FOR <br />W <br />CANT. IF <br />INDICATED <br />CORNER 'I —SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />�X <br />COMMON BM. ATTACHMENT <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />MIDDLE <br />BM. SPLICE OVER <br />CENTER OF POST <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />-TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL 7 <br />SCALE: N.T.S. <br />2x4 #2 SYP NAILER. NA <br />TO STUDS w/ (3) 16d @ <br />EACH STUD - TOENAIL <br />EACH TRUSS TO <br />NAILER w/ (3) 10d <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY w/ <br />(3) ROWS OF 16d NAILS <br />AT 24" 0. C. <br />ROOF AND EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />VERIFY FLOOR JOIST W/ RIM <br />BOARD OR FLOOR GABLE W/ <br />FRAMING PLAN <br />SIMPSON LUS26 w/ (8) 10d • <br />NAILS OR IF 2 PLY TRUSS SEE FLOOR FRAMING PLAN <br />SIMPSON LUS26-2 w/ (8) 16d NAILS TO LEDGER AND J/S6 FOR MORE INFO. <br />VERIFY WITH PLAN FOR <br />2X8 #2 SYP CONT. LEDGER W/ LOCATION AND DIRECTION <br />(4) 16d NAILS ATTACH NAILS (IF PARALLE SEE 2/D2 FOR <br />INTO END OF EACH FLOOR BLOCKING INFO) <br />TRUSS, 24" O.C. MAX. (AT EACH <br />SIDE OF G.T. INSTALL (4) NAILS MASONRY WALL <br />EACH SIDE) (TYPICAL) <br />SECTION AT LOW ROOF s <br />SCALE: 1/2" = V-0" <br />%2' CDX PLYWOOD OR Y/6" O.S.B. <br />SHEATHING REQ'D FROM BOTTOM <br />OF WALL TO ROOF SHEATHING <br />ABOVE W/ 8d NAILS @ 4" O.C. IN <br />FIELD, EDGES & BOUNDARIES — <br />SEE PLAN MAX. <br />24" STEPS <br />SEE PLAN FOR OPT. <br />STAIR INFO. IF <br />CONCRETE STAIRS <br />FORMED & POURED <br />W/ (1) #5 EACH STEP <br />° <br />GARAGE OR <br />LOWER SLAB <br />SEE PLAN <br />COMMON TRUSS <br />W/ INTERIOR BRG. <br />SEE PLAN FOR <br />CONNECTIONS <br />INFO. <br />RUSS/ <br />TOP WAI <br />YSEE PLAN <br />MIN. (2) 2x8 #2 SYP <br />HEADER. SEE Q/S4 FOR <br />REQ'D CONNECTIONS <br />2x4 #2 SPF STUDS @ <br />12" O.C. W/ USP SPT22 <br />@ BASE & SPT24 @ <br />TOP <br />2x4 #2 SYP P.T. PLATE W/ <br />EPDXY ANCHOR OR <br />2„ J-BOLT OR %2 TITEN HD <br />ANCHOR @ 24" O.C. W/ <br />MIN. 6" EMBEDMENT <br />a <br />a A° <br />a ° <br />° <br />p° A <br />° <br />MAIN HOUSE <br />° e <br />SLAB <br />.6 �. . <br />4. <br />(2) #5's CONT. T&B <br />W/ #3 STIRRUPS AT <br />a 4'-0" WHEN DEPTH <br />EXCEEDS 30" <br />14 <br />e <br />° <br />e • 4 <br />A�L <br />° d <br />V-4" <br />SECTION GARAGE MONO 21 <br />SCALE: N.T.S. <br />rn <br />C* <br />N <br />0 <br />o� <br />i V t7. n CZ <br />=gym <br />.: C �- 6- <br />y C <br />Nx <br />d <br />g= <br />decc <br />i <br />ti5 d 69 SS <br />= � > <br />� . rz <br />C <br />a <br />a <br />...••'0� <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 7th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers signature and seal. <br />,gyp . BSc E i' W <br />IW- o E <br />o co <br />0 N o <br />I 0 s�Co <br />4 ;i Q C J LL w <br />LL <br />— O a- Y <br />s a9 Z o <br />IY. 'Co N <br />o2 CO <br />W r, rn <br />W Co. <br />co <br />M Z co <br />a <br />�n N <br />O U U O <br />Z <br />W ❑ ❑ <br />M <br />CMV M <br />z <br />0 <br />z <br />J <br />in <br />N z <br />via <br />Cz <br />tO �, o <br />Y I (may N <br />�N w <br />�C5 = <br />In <br />v ai <br />cr r ,rLLJ= E 9 <br />w <br />s I� <br />o <br />rn <br />e i-4 M <br />CD w <br />Z <br />M O Q <br />J <br />W <br />E oo <o <br />a o z© <br /><z <br />i— r0 g o 00 <br />OG z <br />E � U p < <br />Lr ' r <br />=o WI <br />0< 0 <br />O O U Z F <br />m J m ¢ w <br />¢� �z <br />co3 0< <g <br />w a <br />a� oLL � � <br />m �� <br />_ _C) <br />v z`Q o 3 <br />2O = <br />` J <br />>M <br />0 <br />m <br />ro <br />� M <br />NCL <br />^ � O <br />Q Y <br />/ / O <br />C° <br />r1 0 <br />I� <br />L0 <br />m <br />-14 <br />O � <br />M O <br />00 <br />O 0 Ln <br />N Q 0CN <br />o T" <br />00CN <br />E � ° <br />m 0 w r Z <br />Z E In `N <br />2 <br />d U q p <br />JOB NO: 23-00509 <br />SCALE : AS NOTED <br />SHEET NO. <br />D1 <br />(MONO) <br />
The URL can be used to link to this page
Your browser does not support the video tag.