GENERAL PROVISIONS <br />1. THE GENERAL NOTES PRESENTED HEREIN ARE INTENDED TO SERVE AS A GUIDE TO THE CONTRACTOR AND ARE <br />NOT INTENDED TO SUPERCEDE GOVERNING JURISDICTIONAL CRITERIA THAT MAY APPLY. FOR SPECIFIC ITEMS NOT <br />IDENTIFIED ON THE CONSTRUCTION PLANS, THE CONTRACTOR SHALL REQUEST INFORMATION FROM THE <br />ENGINEER AND JURISDICTIONAL INSPECTOR PRIOR TO COMMENCEMENT OF WORK AND ORDERING OF APPLICABLE <br />MATERIALS. <br />2. PRIOR TO CONSTRUCTION WORK, THE CONTRACTOR SHALL COORDINATE CLOSELY WITH THE <br />DEVELOPER FOR TIMING OF CONSTRUCTION TASKS THAT MAY AFFECT ADJACENT PROPERTY USERS. <br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION OF ALL WORK SHOWN OR IMPLIED ON <br />THE CONSTRUCTION PLANS AND SHALL INCLUDE COST TO PERFORM AND INSTALL WORK ITEMS ON BID. <br />4. THE CONTRACTOR SHALL OBTAIN FROM THE DEVELOPER COPIES OF ALL AVAILABLE REGULATORY <br />AGENCY PERMITS. <br />5. CONSTRUCTION ACTIVITIES THAT WILL RESULT IN THE DISTURBANCE OF ONE (1) OR MORE ACRES OF <br />LAND ARE REQUIRED TO OBTAIN COVERAGE UNDER THE U.S. ENVIRONMENTAL PROTECTION AGENCY <br />(EPA) AND FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION NATIONAL POLLUTANT DISCHARGE <br />ELIMINATION SYSTEM (NPDES) GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND <br />SMALL CONSTRUCTION ACTIVITIES (CGP) IF STORMWATER FROM THE ACTIVITY HAS THE POTENTIAL TO <br />ENTER A SURFACE WATER OF THE STATE OR A MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). A <br />CGP NOTICE OF INTENT (NOI) FORM MUST BE FILED WITH THE AGENCY HAVING JURISDICTION OVER THE <br />NPDES PROGRAM AT LEAST 2 DAYS PRIOR TO COMMENCEMENT OF CONSTRUCTION. COVERAGE WILL <br />BE EFFECTIVE 48 HOURS AFTER THE POST -MARKED DATE OF THE COMPLETE NOI SUBMITTAL. THE <br />OPERATOR OF THE PROJECT IS REQUIRED TO SIGN AND FILE THE NOI. THE OPERATOR IS THE ENTITY <br />THAT OWNS OR OPERATES THE PROJECT AND HAS SUFFICIENT AUTHORITY TO ASSURE COMPLIANCE <br />WITH THE PERMIT REQUIREMENTS. TYPICALLY, THE OPERATOR WILL BE THE OWNER, DEVELOPER, OR <br />GENERAL CONTRACTOR. THE ARCHITECT/ENGINEER SHOULD NOT BE INDICATED AS THE OPERATOR <br />AND SIGN THE NOI UNLESS THEY HAVE OPERATIONAL CONTROL OVER THE PROJECT. THE <br />RESPONSIBLE AUTHORITY IS THE PERSON THAT HAS AUTHORITY TO SIGN THE NOI FOR THE OPERATOR. <br />TO TERMINATE PERMIT COVERAGE, THE OPERATOR SHALL FILE A NOTICE OF TERMINATION (NOT) <br />WITHIN 14 DAYS OF FINAL STABILIZATION OF THE SITE. THE CONTRACTOR SHALL KEEP ON SITE A COPY <br />OF THE SWPPP, NOI, AND WATER MANAGEMENT DISTRICT PERMITS ISSUED, TOGETHER WITH THE <br />INSPECTION REPORTS AND CURRENT PLANS, INCLUDING ANY MODIFICATIONS REQUIRED. <br />6. UNLESS OTHERWISE NOTED ON THE PLANS, THE CONTRACTOR SHALL USE THE GEOMETRY PROVIDED <br />ON THE CONSTRUCTION PLANS. BENCHMARK INFORMATION SHALL BE PROVIDED TO THE CONTRACTOR <br />BY THE DEVELOPER OR DEVELOPER'S SURVEYOR. ANY DISCREPANCIES BETWEEN FIELD <br />MEASUREMENTS AND CONSTRUCTION PLAN INFORMATION SHALL BE BROUGHT TO THE ATTENTION OF <br />THE ENGINEER IMMEDIATELY. <br />7. THIS SET OF PLANS MAY CONTAIN DRAWINGS PREPARED BY OTHER PROFESSIONALS, WHICH CONTAIN <br />THE NAME, ADDRESS, AND LOGO OF THE PROFESSIONAL. FORESITE GROUP, INC. IS NOT RESPONSIBLE <br />FOR DRAWINGS PREPARED BY OTHER PROFESSIONALS. <br />8. THE CONTRACTOR SHALL SUBMIT A COPY OF THE SHOP DRAWINGS TO THE ENGINEER FOR APPROVAL <br />PRIOR TO ORDERING THE MATERIALS REQUIRED FOR CONSTRUCTION. PRIOR TO SUBMISSION, THE <br />CONTRACTOR SHALL THOROUGHLY CHECK SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES FOR <br />COMPLETENESS AND FOR COMPLIANCE WITH THE CONSTRUCTION PLANS. THE CONTRACTOR SHALL <br />ALSO VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PERTAINING TO THE SHOP DRAWINGS AND <br />SHALL COORDINATE ANY RELATED WORK. AT THE TIME OF SUBMISSION, THE CONTRACTOR SHALL <br />NOTIFY THE ENGINEER IN WRITING OF DEVIATIONS IN SUBMITTALS FROM THE REQUIREMENTS OF THE <br />CONTRACT DOCUMENTS. THE CONTRACTOR'S RESPONSIBILITY FOR ERRORS AND OMISSIONS IN <br />SUBMITTALS IS NOT RELIEVED BY THE ENGINEER'S REVIEW OF SUBMITTALS. <br />9. THE CONTRACTOR SHALL PROTECT BENCHMARKS, PROPERTY CORNERS, AND OTHER SURVEY <br />MONUMENTS FROM DAMAGE OR DISPLACEMENT. IF A MARKER NEEDS TO BE REMOVED, IT SHALL BE <br />REFERENCED BY A LICENSED LAND SURVEYOR AND REPLACED, AS NECESSARY, BY SAME. <br />10. THE CONTRACTOR IS RESPONSIBLE FOR ALL QUALITY CONTROL TESTING. MINIMUM TESTING SHALL <br />INCLUDE, BUT NOT BE LIMITED TO: A) PIPING AND STRUCTURAL EXCAVATION, BEDDING, BACKFILL <br />MATERIALS AND DENSITY TESTS; B) DETERMINATION OF COMPACTIOE EFFORT NEEDED FOR <br />COMPLIANCE WITH THE DENSITY REQUIREMENTS; C) CONCRETE AND ASPHALT QUALITY CONTROL <br />TESTING INCLUDING DESIGN MIX REVIEW, MATERIALS, FIELD SLUMP AND AIR CONTENT, AND FIELD- AND <br />LAB -CURED STRENGTH SAMPLES AND TESTING. <br />11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REQUIRED TESTING OR APPROVALS FOR ANY WORK <br />(OR ANY PART THEREOF) IF LAWS OR REGULATIONS OF ANY REGULATORY AGENCY SPECWWMIY <br />REQUIRE TESTING, INSPECTIONS OR APPROVAL. THE CONTRACTOR SHALL PAY ALL ASSOCIATED COSTS <br />AND SHALL FURNISH THE DEVELOPER AND ENGINEER THE REQUIRED CERTIFICATES OF INSPECTION, <br />TESTING OR APPROVAL. <br />12.ANY DESIGN OR TESTING LABORATORY UTILIZED BY THE CONTRACTOR SHALL BE AN INDEPENDENT <br />LABORATORY ACCEPTABLE TO THE DEVELOPER AND THE ENGINEER, APPROVED IN WRITING, AND <br />COMPLYING WITH THE LATEST EDITION OF THE "RECOMMENDED REQUIREMENTS FOR INDEPENDENT <br />LABORATORY QUALIFICATION,- PUBLISHED BY THE AMERICAN COUNCIL OF INDEPENDENT <br />LABORATORIES. <br />13. ALL TEST RESULTS SHALL BE PROVIDED (PASSING AND FAILING) ON A REGULAR AND IMMEDIATE BASIS <br />TO THE DEVELOPER AND ENGINEER. <br />14. THE ENTIRE PROJECT SITE SHALL BE THOROUGHLY CLEANED AT THE COMPLETION OF THE WORK. <br />CLEAN ALL INSTALLED PIPELINES, STRUCTURES, SIDEWALKS, PAVED AREAS, ACCUMULATED SILT IN <br />PONDS, AND ALL ADJACENT AREAS AFFECTED BY WORK. EQUIPMENT TO CLEAN THESE SURFACES <br />SHALL BE SUBJECT TO APPROVAL BY THE DEVELOPER. <br />EROSION AND SEDIMENT CONTROL <br />1. EROSION AND SEDIMENT CONTROL MEASURES AS DESCRIBED ON THE STORM WATER POLLUTION <br />PREVENTION PLAN (SWPPP) SHALL BE PROVIDED AND INSTALLED PRIOR TO COMMENCEMENT OF ANY <br />CONSTRUCTION WORK. MINIMUM SEDIMENT CONTROL CONSISTS OF SILT FENCING, HAY BALES, AND <br />FLOATING TURBIDITY BARRIERS PER FDOT INDEX NO. 102 AND 103. MINIMUM EROSION CONTROL <br />CONSISTS OF SEEDING AND MULCHING, SODDING, WETTING SURFACES, PLACEMENT OF COARSE <br />AGGREGATE, AND TEMPORARY PAVING. <br />2. MAINTAIN TEMPORARY EROSION CONTROL SYSTEMS AS DIRECTED BY OWNER, OR GOVERNING <br />AUTHORITIES TO CONTROL EROSION AND SILTATION DURING CONSTRUCTION PERIOD. OWNER HAS <br />AUTHORITY TO LIMIT SURFACE AREA OF ERODIBLE EARTH MATERIAL EXPOSED BY CLEARING AND <br />GRUBBING, EXCAVATION, TRENCHING, BORROW AND EMBANKMENT OPERATIONS. OWNER ALSO HAS <br />AUTHORITY TO DIRECT CONTRACTOR TO PROVIDE IMMEDIATE PERMANENT OR TEMPORARY EROSION <br />AND SEDIMENT CONTROL MEASURES. <br />3. CONTRACTOR SHALL RESPOND TO EROSION AND SEDIMENT CONTROL MAINTENANCE REQUIREMENTS <br />AS SITE CONDITIONS WARRANT, AND IMPLEMENT ADDITIONAL MEASURES TO CONTROL EROSION <br />ORDERED BY OWNER OR GOVERNING AUTHORITIES WITHIN FORTY-EIGHT (48) HOURS OR SOONER IF <br />REQUIRED AT NO ADDITIONAL COST TO THE OWNER. <br />4. CONTRACTOR WILL BE REQUIRED TO INCORPORATE PERMANENT EROSION CONTROL FEATURES INTO <br />PROJECT AT EARLIEST PRACTICAL TIME TO MINIMIZE NEED FOR TEMPORARY CONTROLS. <br />5. THE EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON THE PLANS REPRESENT A MINIMUM <br />REQUIREMENT. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ADDITIONAL EROSION AND <br />SEDIMENT CONTROL MEASURES NEEDED IN ORDER TO PREVENT THE TRANSFER OF SEDIMENT FROM <br />THE PROJECT AREA AND PREVENT THE EROSION OF SURFACES DURING CONSTRUCTION, AS NEEDED <br />TO PROTECT ADJACENT PROPERTIES AND WATER BODIES. <br />6. GRASS ALL DISTURBED AREAS WITHIN SEVEN (7) DAYS OF INITIAL DISTURBANCE. TYPE OF GRASS <br />SHALL BE AS FOLLOWS: TEMPORARY GRASSING TO BE SODDING AT ALL DRAINAGE STRUCTURES, <br />RETENTION AREAS, SWALES AND DITCHES, AND WHERE SLOPES ARE STEEPER THAN 5:1. TEMPORARY <br />GRASSING CAN BE SEED AND MULCH AT ALL OTHER LOCATIONS UNLESS OTHERWISE INDICATED ON <br />THE DRAWINGS OR SPECIFICATIONS. <br />7. CONTRACTOR SHALL INSPECT EVERY TWO (2) WEEKS DURING CONSTRUCTION, REMOVE ANY SEDIMENT <br />BUILD-UP, AND REPAIR AND REINSTALL ANY DAMAGED OR MISSING SEDIMENT CONTROL MEASURES. <br />INSTALL ADDITIONAL MEASURES IF INSPECTION REVEALS ADDITIONAL SEDIMENTATION CONTROL IS <br />NECESSARY. <br />8. AREAS TO BE PAVED SHALL BE TREATED WITH A BITUMINOUS PRIME COAT AND SANDED TO MINIMIZE <br />EROSION, WHERE PAVING IS SCHEDULED TO OCCUR MORE THAN FORTY-EIGHT (48) HOURS AFTER <br />INSTALLATION OF BASE COURSE. AREAS TO BE PAVED WITH CONCRETE SHALL BE EITHER PROTECTED <br />WITH A LAYER OF FDOT COARSE AGGREGATE MATERIAL OR SHALL BE PAVED WITHIN FORTY-EIGHT (48) <br />HOURS OF INSTALLATION OF THE SUBGRADE. INSTALL FINAL SURFACE COURSES WITHIN FORTEEN (14) <br />DAYS AFTER REMOVAL OF EXISTING PAVEMENT. <br />MAINTENANCE OF TRAFFIC <br />1- THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A MAINTENANCE OF TRAFFIC (M.O.T.) PLAN <br />PRIOR TO CONSTRUCTION. THE M.O.T. PLAN SHALL SHOW ALL PROPOSED TRAFFIC CONTROL SIGNS, <br />PAVEMENT MARKINGS, BARRICADES, AND OTHER DEVICES AND SHALL DETAIL ALL PROPOSED <br />CONSTRUCTION SEQUENCING. THE M.O.T. PLAN SHALL BE APPROVED BY THE ENGINEER, OWNER, AND <br />ROADWAY JURISDICTIONAL AGENCY PRIOR TO CONSTRUCTION. ALL PROPOSED ROADWAY AND <br />DRIVEWAY LANE CLOSURES AND TIMING SHALL BE CLOSELY COORDINATED WITH THE ROADWAY <br />JURISDICTIONAL AGENCY PRIOR TO CONSTRUCTION. <br />2. ALL CONSTRUCTION SIGNING AND MARKINGS SHALL BE INSTALLED PRIOR TO CONSTRUCTION AND <br />MAINTAINED DURING CONSTRUCTION IN ACCORDANCE WITH FDOT INDEX NO.600 AND THE MANUAL ON <br />UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). THE PLACEMENT OF THE SIGNING AND MARKINGS <br />SHALL BE APPROVED IN THE FIELD BY THE ENGINEER PRIOR TO CONSTRUCTION. <br />3. INSPECT TRAFFIC CONTROL DEVICES ON A DAILY BASIS TO ENSURE PLACEMENT OF BARRICADES AND <br />FUNCTION OF LIGHTS IS MAINTAINED THROUGHOUT CONSTRUCTION. <br />4_ CONTRACTOR SHALL CONTACT PROPERTY OWNERS TO BE AFFECTED BY CONSTRUCTION AND SHALL <br />COORDINATE TEMPORARY DRIVEWAY CLOSURES AND SEQUENCING. MAINTAIN ACCESS FOR ALL <br />PROPERTY OWNERS DURING CONSTRUCTION. <br />5. WET UNSTABILIZED AREAS AS NECESSARY TO CONTROL DUST. <br />6. ADJUST TRAFFIC CONTROL DEVICES AS REQUIRED UNDER EMERGENCY CONDITIONS. <br />7. THE CONTRACTOR SHALL COORDINATE ACTIVITIES WITH OTHER CONTRACTORS WHO MAY BE WORKING <br />IN THE IMMEDIATE VICINITY. <br />8. IF WORK OCCURS WITHIN FIFTEEN (1 5) FEET OF ACTIVE ROAD TRAVEL LANES BUT NO CLOSER THAN <br />TWO (2) FEET FROM THE EDGE OF PAVEMENT, SIGNAGE AND WARNING DEVICES SHALL BE INSTALLED IN <br />ACCORDANCE WITH FDOT INDEX NO.600 AND 602. <br />9. TYPE I OR TYPE 11 BARRICADES AT 20-FEET CENTERS SHALL BE PLACED AND MAINTAINED ALONG THE <br />EDGE OF THE ROAD WHEREVER DROP-OFFS OR OTHER HAZARDS EXIST, AND TO BLOCK ENTRANCE <br />INTO COMPLETED OR PARTIALLY -COMPLETED PAVEMENTS UNTIL SUCH PAVEMENTS ARE OPEN TO <br />PUBLIC USE. <br />SITE PREPARATION <br />1. UNLESS OTHERWISE DIRECTED BY THE DEVELOPER OR ENGINEER, THE CONTRACTOR SHALL CONTAIN <br />ALL CONSTRUCTION ACTIVITIES WITHIN THE PROPERTY, RIGHT-OF-WAY (R.O.W.), AND EASEMENTS AS <br />INDICATED ON THE DRAWINGS. AT NO TIME SHALL THE CONTRACTOR DISTURB SURROUNDING <br />PROPERTIES OR TRAVEL ON SURROUNDING PROPERTIES WITHOUT WRITTEN CONSENT FROM THE <br />PROPERTY OWNER. ANY REPAIR OR RECONSTRUCTION OF DAMAGED AREAS IN SURROUNDING <br />PROPERTIES SHALL BE REPAIRED BY THE CONTRACTOR ON AN IMMEDIATE BASIS. ALL COSTS FOR <br />REPAIRS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />2. STAKE OUT THE CONSTRUCTION AREA, ESTABLISH LINES AND LEVELS, TEMPORARY BENCH MARKS, <br />BATTER BOARDS, CENTERLINES, BASELINES, AND REFERENCE POINTS FOR THE WORK, AND VERIFY ALL <br />DIMENSIONS RELATING TO INTERCONNECTION WITH EXISTING FEATURES. REPORT ANY <br />INCONSISTENCIES IN THE PROPOSED GRADES, LINES AND LEVELS, DIMENSIONS AND LOCATIONS TO <br />THE ENGINEER BEFORE COMMENCING WORK. <br />FORTUITOUS FINDS <br />1. IF EVIDENCE OF THE EXISTENCE OF HISTORIC RESOURCES IS DISCOVERED OR OBSERVED AT THE <br />SITE, ALL WORK SHALL CEASE IN THE AREA OF EFFECT, AND THE DEVELOPER, OWNER, CONTRACTOR, <br />OR AGENT THEREOF SHALL NOTIFY THE APPRORPRIATE AGENCY IMMEDIATELY. EXAMPLES OF SUCH <br />EVIDENCE INCLUDE WHOLE OR FRAGMENTARY STONE TOOLS, SHELL TOOLS, ABORIGINAL OR <br />HISTORIC POTTERY, HISTORIC GLASS, HISTORIC BOTTLES, BONE TOOLS, HISTORIC BUILDING <br />FOUNDATIONS, SHELL MOUNDS, SHELL MIDDENS, OR SAND MOUNDS. UPON THE AGENCY'S TIMELY <br />ASSESSMENT OF THE SIGNIFICANCE OF THE FINDS, NOTIFICATION TO MITIGATE ANY ADVERSE <br />EFFECTS SHALL BE ISSUED SO AS TO MINIMIZE DELAYS TO DEVELOPMENT ACTIVITIES. <br />2. IF ANY HUMAN SKELETAL REMAINS OR ASSOCIATED BURIAL ARTIFACTS ARE DISCOVERED AT THE SITE, <br />ALL WORK IN THE AREA MUST CEASE, AND THE PERMTTTEE MUST IMMEDIATELY NOTIFY THE NEAREST <br />LAW ENFORCEMENT OFFICE AND THE APPROPRIATE PERMITTING AGENCY. ACCORDING TO CHAPTER <br />872, FLORIDA STATUTES, IT IS UNLAWFUL TO DISTURB, VANDALIZE, OR DAMAGE A HUMAN BURIAL. <br />3. PROTECT ALL TREES AND SHRUBS LOCATED OUTSIDE THE R.O.W., EASEMENTS, AND OWNER -SECURED <br />PROPERTY, PARTICULARLY THOSE TREES AND SHRUBS LOCATED ADJACENT TO WORK AREAS. <br />4. WITHIN THE R.O.W., EASEMENTS, AND OWNER -SECURED PROPERTY, TREES AND SHRUBS SHALL REMAIN <br />IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: NEW ROADWAY CONSTRUCTION - TREES AND <br />SHRUBS TO REMAIN WHERE LOCATED MORE THAN FIFTEEN (15) FEET FROM THE BACK OF CURB, OR <br />OUTSIDE THE LIMITS OF EXCAVATION OR FILL AREAS, WHICHEVER IS FURTHER. UTILITY PIPELINE <br />CONSTRUCTION - TREES AND SHRUBS TO REMAIN OUTSIDE A 15-FEET WIDE PATH, CENTERED ON THE <br />PIPELINE. <br />5. TREES TO REMAIN IN THE CONSTRUCTION AREA SHALL BE BOXED, FENCED OR OTHERWISE PROTECTED <br />IN ACCORDANCE WITH DETAILS ON THE DRAWINGS. DO NOT PERMIT HEAVY EQUIPMENT OR <br />STOCKPILES WITHIN BRANCH SPREAD AREA. <br />AREAS TO RECEIVE CLEARING AND GRUBBING SHALL INCLUDE ALL AREAS TO BE OCCUPIED BY THE <br />PROPOSED IMPROVEMENTS, AREAS FOR FILL AND SITE GRADING, AND BORROW SITES. REMOVE TREES <br />OUTSIDE OF THESE AREAS ONLY AS INDICATED ON THE DRAWINGS OR AS APPROVED IN WRITING BY <br />THE ENGINEER. <br />6. EXERCISE EXTREME CARE DURING THE CLEARING AND GRUBBING OPERATIONS. DO NOT DAMAGE <br />EXISTING STRUCTURES, PIPES OR UTILITIES. <br />7. CLEARING SHALL CONSIST OF REMOVING TREES AND BRUSH AND DISPOSAL OF OTHER MATERIALS <br />THAT ENCROACH UPON OR OTHERWISE OBSTRUCT THE WORK. <br />8. GRUBBING SHALL CONSIST OF REMOVING AND DISPOSING OF STUMPS, ROOTS LARGER THAN TWO (2) <br />INCHES IN DIAMETER, AND MATTED ROOTS. REMOVE TO A DEPTH OF NOT LESS THAN EIGHTEEN (18) <br />INCHES BELOW THE ORIGINAL SURFACE LEVEL OF THE GROUND. <br />9. ALL COMBUSTIBLE DEBRIS AND REFUSE FROM SITE PREPARATION OPERATIONS SHALL BE PROPERLY <br />REMOVED TO LEGAL OFF -SITE DISPOSAL AREAS. <br />10. DAMAGED AREAS SHALL BE REPLACED TO A CONDITION EQUAL TO OR BETTER THAN THE CONDITION <br />PRIOR TO DISTURBANCE. <br />EARTHWORK <br />GRADING: <br />1. GRADING SHOWN ON THESE PLANS ARE PROVIDED TO THE CONTRACTOR FOR GENERAL GRADING <br />INTENT OF THE PROJECT. THE CONTRACTOR SHALL GRADE THE ENTIRE SITE TO PROVIDE POSITIVE <br />DRAINAGE IN ALL AREAS THROUGHOUT THE SITE. SMOOTH TRANSITIONS SHALL BE PROVIDED <br />BETWEEN CONTOURS OR SPOT ELEVATIONS AS SHOWN ON THE PLANS TO ACCOMPLISH THE GRADING <br />INTENT. ALL SLOPES SHALL BE STABILIZED IMMEDIATELY AFTER FINAL GRADING HAS BEEN <br />COMPLETED. CONTRACTOR SHALL NOTIFY OWNER AND ENGINEER PRIOR TO DEMOBILIZATION OF <br />GRADING EQUIPMENT TO DETERMINE THAT THE GRADING INTENT HAS BEEN ACHIEVED. <br />2. ALL PAVING SURFACES IN INTERSECTIONS AND ADJACENT SECTIONS SHALL BE GRADED TO DRAIN <br />POSITIVELY AND TO PROVIDE A SMOOTH TRANSITION OF DRMNG SURFACE FOR VEHICLES WITH NO <br />SHARP BREAKS IN GRADE, AND NO UNUSUALLY STEEP OR REVERSE CROSS SLOPES. THE STANDARD <br />CROWN MAY BE CHANGED TO DRAIN POSITIVELY IN THE AREA OF INTERSECTIONS. THE CONTRACTOR <br />SHALL ACCOMPLISH THE ABOVE AND CONSULT THE ENGINEER SO THAT THE ENGINEER MAY MAKE ANY <br />AND ALL REQUIRED INTERPRETATIONS OF THE PLANS OR GIVE SUPPLEMENTARY INSTRUCTIONS TO <br />ACCOMPLISH THE INTENT OF THE PLANS. <br />3. UNIFORMLY SMOOTH GRADE THE SITE. DEPRESSIONS FROM SETTLEMENT SHALL BE FILLED AND <br />COMPACTED. TOPS OF EMBANKMENTS AND BREAKS IN GRADE SHALL BE ROUNDED. FINISHED <br />SURFACES SHALL BE REASONABLY SMOOTH, COMPACTED, FREE FROM IRREGULAR SURFACE <br />CHANGES, AND COMPARABLE TO THE SMOOTHNESS OBTAINED BY BLADE GRADER OPERATIONS. <br />4. SLOPE GRADES TO DRAIN AWAY FROM STRUCTURES AT A MINIMUM OF'/ -INCH PER FOOT FOR TEN (10) <br />FEET. FINISHED SURFACES ADJACENT TO PAVED AREAS AND WITHIN TEN (10) FEET OF STRUCTURES <br />SHALL BE WITHIN ONE (1) INCH OF THE PROPOSED GRADE. ALL OTHER AREAS SHALL BE WITHIN THREE <br />(3) INCHES OF THE PROPOSED GRADE. <br />5. NEWLY -GRADED AREAS SHALL BE PROTECTED FROM TRAFFIC AND EROSION. ALL SETTLEMENT OR <br />WASHING AWAY THAT MAY OCCUR PRIOR TO SEEDING OR ACCEPTANCE SHALL 13E REPAIRED AND <br />GRADES AND SLOPES RE-ESTABLISHED TO THE REQUIRED ELEVATIONS AT NO ADDITIONAL COST TO <br />THE DEVELOPER. <br />6. THE CONTRACTOR SHALL NOTE THAT FILL AND COMPACTION REQUIREMENTS FOR EACH AREA OF THE <br />SITE MAY DIFFER PER THE IMPROVEMENTS PROPOSED UPON THE RESPECTIVE SURFACE. PROPER FILL <br />AND COMPACTION SHALL BE UTILIZED PER THE PLANS AND GEOTECHNICAL ANALYSIS. THE <br />CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD FOR CLARIFICATION IF NECESSARY. <br />7. THE CONTRACTOR SHALL ENSURE THAT AREAS DESIGNATED FOR COMPLIANCE WITH THE AMERICANS <br />WITH DISABILITIES ACT (ADA) ARE CONSTRUCTED PER CURRENT GUIDELINES. <br />EXCAVATION, TRENCHING, AND FILL: <br />1. THE CONTRACTOR SHALL RECOGNIZE AND ABIDE BY ALL OCCUPATIONAL SAFETY AND HEALTH <br />ADMINISTRATION (OSHA) EXCAVATION SAFETY STANDARDS, INCLUDING THE FLORIDA TRENCH SAFETY <br />ACT (FS 553.60-553.64). ANY MATERIAL, CONSTRUCTION METHODS, OR MATERIAL COST REQUIRED TO <br />COMPLY WITH THESE LAWS SHALL BE INCIDENTAL TO THE CONTRACT AND THE RESPOSIBILITY OF THE <br />CONTRACTOR. <br />2. THE CONTRACTOR SHALL CONSULT THE GEOTECHNICAL REPORT FOR SOIL PREPARATION AND <br />GENERAL EARTHWORK REQUIREMENTS. <br />3. ROUGH EXCAVATE AND GRADE ANY PROPOSED STORMWATER PONDS AT THE BEGINNING OF SITE <br />GRADING ACTIVITIES. DIRECT SITE RUNOFF TO THE PONDS TO MINIMIZE RUNOFF TO OFF -SITE AREAS. <br />4. FIELD DENSITY TESTING FREQUENCIES: A) ONE (1) TEST FOR EACH 10,000 SQUARE FEET OR FRACTION <br />THEREOF PER LIFT OF GENERAL BACKFILLING, WITH A MINIMUM OF TWO (2) TESTS FOR EACH LAYER; B) <br />ONE (1) TEST FOR EACH 100 SQUARE FEET OR FRACTION THEREOF OF BACKFILL AROUND AND UNDER <br />STRUCTURES; C) ONE (1) TEST FOR EACH 300 LINEAL FEET OR FRACTION THEREOF PER LIFT OF <br />GENERAL BACKFILLING IN THE PIPELINE TRENCH; D) ONE (1) TEST PER LIFT PER EACH CHANGE IN TYPE <br />OF FILL; E) ONE (1) TEST PER 1000 SQUARE FEET OF PAVEMENT SUBGRADE, WITH A MINIMUM OF TWO <br />(2) TESTS. <br />5. PREVIOUSLY -EXCAVATED MATERIALS CONFORMING TO THE FOLLOWING REQUIREMENTS SHALL BE <br />UTILIZED WHEREVER POSSIBLE, UNLESS OTHERWISE DIRECTED BY GEOTECHNICAL REPORT: <br />A. ACCEPTABLE MATERIALS: AASHTO M145 CLASSIFICATION A-1, A-3, A-2-4, A-2-6; ASTM D2487 <br />CLASSIFICATION <br />GW, GP, GM, SM, SW, SP; UNLESS OTHERWISE DISAPPROVED WITHIN THE SOIL AND SUBSURFACE <br />INVESTIGATION <br />REPORTS. NO MORE THAN 12% OF ACCEPTABLE MATERIALS SHALL PASS THE NUMBER 200 SIEVE. <br />B. UNACCEPTABLE MATERIALS: AASHTO M145 CLASSIFICATION A-2-5, A-2-7, A-4, A 5, A-6, A-7, A-8; ASTM <br />D2487 CLASSIFICATION GC, SC, ML, MH, CL, CH, OL, OH, PT; UNLESS OTHERWISE APPROVED WITHIN <br />THE SOIL AND <br />SUBSURFACE INVESTIGATION REPORTS. <br />5. PROVIDE BARRIERS, WARNING LIGHTS AND OTHER PROTECTIVE DEVICES AT ALL EXCAVATIONS. <br />6. SIDEWALKS, ROADS, STREETS, AND PAVEMENTS SHALL NOT BE BLOCKED OR OBSTRUCTED BY <br />EXCAVATED MATERIALS, EXCEPT AS AUTHORIZED BY THE ENGINEER, IN WHICH CASE ADEQUATE <br />TEMPORARY PROVISIONS MUST BE MADE FOR SATISFACTORY TEMPORARY SAFE PASSAGE OF <br />PEDESTRIANS AND VEHICLES. MINIMIZE INCONVENIENCE TO PUBLIC TRAVEL OR TO ADJOINING <br />PROPERTY USERS. <br />7. FURNISH, INSTALL, AND MAINTAIN, WITHOUT ADDITIONAL COMPENSATION, SHEETING, BRACING, AND <br />SHORING SUPPORT REQUIRED TO KEEP EXCAVATIONS WITHIN THE PROPERTY OR EASEMENTS <br />PROVIDED, TO SUPPORT THE SIDES OF THE EXCAVATION, AND TO PREVENT ANY MOVEMENT WHICH <br />MAY DAMAGE ADJACENT PAVEMENTS OR STRUCTURES, DELAY THE WORK, OR ENDANGER LIFE AND <br />HEALTH. VOIDS OUTSIDE THE SUPPORTS SHALL BE IMMEDIATELY FILLED AND COMPACTED. <br />8. ALL EXCAVATIONS SHALL BE MADE BY OPEN CUT UNLESS OTHERWISE INDICATED. SLOPE SIDES OF <br />TRENCHES SHALL BE IN ACCORDANCE WITH OSHA REQUIREMENTS AND THE RECOMMENDATIONS <br />CONTAINED WITHIN THE GEOTECHNICAL REPORT. <br />9. EXCAVATE TRENCHES TO DEPTH INDICATED OR REQUIRED FOR FLOW LINES AND INVERT ELEVATIONS. <br />OVER EXCAVATE TRENCHES A MINIMUM OF TWO (2) FEET WHERE EXCAVATIONS OCCUR WITHIN <br />UNSUITABLE SOILS, AND REPLACE OVER -EXCAVATED MATERIAL NTH SUITABLE SOILS. <br />10.EXCEPT AS OTHERWISE INDICATED ON PLANS OR SPECIFICATIONS, EXCAVATE FOR PRESSURE PIPING <br />SO TOP OF PIPING IS A MINIMUM OF THREE (3) FEET BELOW FINISHED GRADE. <br />11. TRENCH BOTTOMS AND THE BOTTOMS OF ALL STRUCTURES SHALL BE KEPT DRY, COMPACTED, AND <br />STABLE TO A DEPTH TWO (2) FEET BELOW THE BOTTOM OF THE TRENCH OR STRUCTURE. <br />12ALL BEDDING, FILL, AND BACKFILL MATERIAL SHALL BE SUITABLE SOILS OR FLOWABLE FILL. WHERE <br />TRENCH OR EXCAVATION IS WITHIN THE INFLUENCE AREA OF ROADWAYS, STRUCTURES, <br />FOUNDATIONS, OR SLABS, PLACE BACKFILL IN LAYERS OF 84NCH LOOSE DEPTH. IN ALL OTHER AREAS, <br />PLACE FILL AND BACKFILL IN LAYERS OF 12-INCH LOOSE DEPTH. <br />13.MINIMUM DENSITY REQUIREMENT (ASTM D1557 OR AASHTO T180): FILL UNDER AND WITHIN THE <br />INFLUENCE AREA OF ROADWAYS, STRUCTURES, SLABS, FOUNDATIONS = 98 PERCENT; POND AND ROAD <br />EMBANKMENT FILL = 95 PERCENT; ALL OTHER AREAS = 90 PERCENT. <br />CONSTRUCTION ABANDONMENT PROCEDURE <br />1. IF CONSTRUCTION OF IMPROVEMENTS IS TERMINATED PRIOR TO COMPLETION PER THE APROVED <br />CONSTRUCTION DOCUMENTS, THE OWNER SHALL REMOVE ANY CONSTRUCTION AND STOCKPILED <br />VEGETATIVE DEBRIS AND FILL AND DISPOSE OF SUCH MATERIALS AT A LEGALLY -APPROVED OFF -SITE <br />LOCATION. DISTURBED LAND SHALL BE ROUGH GRADED, SEEDED AND MULCHED. <br />PAVING, SIDEWALKS, AND CURBING <br />1. MATERIALS AND CONSTRUCTION METHODS FOR THE ROADWAY AND PAVING CONSTRUCTION SHALL BE <br />IN ACCORDANCE WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS <br />FOR ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION. <br />2. ROADWAY PAVING, BASE, AND SUBGRADE THICKNESSES, MATERIAL STABILITY, AND DENSITY <br />REQUIREMENTS SHALL BE IN ACCORDANCE WITH DETAILS ON THESE DRAWINGS AND THE <br />GEOTECHNICAL REPORT. <br />3. SIDEWALKS ARE TO BE CONSTRUCTED IN THE AREAS AS SHOWN ON THE CONSTRUCTION PLANS. THE <br />SIDEWALK SHALL BE CONSTRUCTED OF MINIMUM 41NCHES OF CONCRETE WITH A 28-DAY <br />COMPRESSION STRENGTH OF 2500 PSI. JOINTS SHALL BE EITHER TOOLED OR SAW CUT AT A MAXIMUM <br />DISTANCE OF 5 FEET. ACCESSIBLE RAMPS SHALL BE PROVIDED AT ALL INTERSECTIONS AND SHALL BE <br />IN ACCORDANCE WITH THE FLORIDA ACCESSIBILITY CODE FOR BUILDING CONSTRUCTION, LATEST <br />EDITION. <br />4. CURBING SHALL BE CONSTRUCTED WHERE NOTED ON THE CONSTRUCTION PLANS. CONCRETE FOR <br />CURBS SHALL BE FOOT CLASS "1" CONCRETE WITH A MINIMUM 28-DAY COMPRESSION STRENGTH OF <br />2500 PSI. ALL CURBS SHALL HAVE SAW CUT CONTRACTION JOINTS AND SHALL BE CONSTRUCTED AT <br />INTERVALS NOT TO EXCEED 10 FEET ON CENTER. CONSTRUCTION OF CURBS SHALL BE IN <br />CONFORMANCE WITH FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION <br />(LATEST EDITION) SECTION 520 AND DETAILS PROVIDED ON THE CONSTRUCTION PLANS. <br />5. FIELD COMPACTION DENSITY, STABILITY, AND THICKNESS TESTING FREQUENCIES OF SUBGRADE, BASE, <br />AND ASPHALT SHALL BE TESTED ONCE EVERY 300 LINEAR FEET OF PAVING PER 24-FEET WIDE STRIP, <br />STAGGERED LEFT, CENTER AND RIGHT OF CENTERLINE. WHERE LESS THAN 300 LINEAR FEET OF <br />SUBGRADE, BASE, AND ASPHALT IS PLACED IN ONE (1) DAY, PROVIDE MINIMUM OF ONE (1) TEST FOR <br />EACH DAY'S CONSTRUCTION AT A LOCATION DESIGNATED BY THE ENGINEER. ASPHALT EXTRACTION <br />GRADATION SHALL BE TESTED FROM GRAB SAMPLES COLLECTED ONCE EVERY 1800 SQUARE YARDS OF <br />ASPHALT DELIVERED TO THE SITE (OR A MINIMUM OF ONCE PER DAY). <br />6. PAVING TIMING REQUIREMENTS ARE AS FOLLOWS: <br />A. INSTALL SUBGRADE AND BASE COURSE MATERIALS WITHIN 48 HOURS OF THE REMOVALIOPEN <br />CUTTING OF EXISTING PAVEMENT CONSISTING OF STREETS, DRIVEWAYS, OR SIDEWALK. INSTALL <br />FINAL SURFACE COURSES WITHIN 14 DAYS AFTER REMOVAL OF EXISTING PAVEMENT. <br />B. AREAS TO RECEIVE ASPHALT SHALL RECEIVE EROSION CONTROL MEASURES NO LATER THAN 48 <br />HOURS AFTER ACCEPTANCE OF BASE COURSE. TEMPORARY EROSION CONTROL CONSISTS OF <br />PLACEMENT OF A BITUMINOUS PRIME COAT AND SANDING THE SURFACE. PERMANENT EROSION <br />CONTROL CONSISTS OF PLACEMENT OF THE STRUCTURAL COURSE. <br />C_ AREAS TO RECEIVE CONCRETE PAVING SHALL BE EITHER PROTECTED WITH A LAYER OF FDOT <br />COARSE AGGREGATE MATERIAL OR SHALL BE PAVED WITHIN 48 HOURS OF ACCEPTANCE OF THE <br />SUBGRADE. <br />ACCESSIBILITY <br />1. SITE IMPROVEMENTS SHALL COMPLY WITH THE AMERICANS WITH DISABILITIES ACT AND THE FLORIDA <br />ACCESSIBILITY CODE. THE CONTRACTOR SHALL FURNISH THE OWNER AND ENGINEER WITH PROOF <br />THAT ALL APPLICABLE FEATURES AND AREAS OF THE SITE ARE IN COMPLIANCE WITH THE <br />AFORMENTIONED CRITERIA. <br />SIGNS AND PAVEMENT MARKINGS (OFF -SITE OR IN R-O-W) <br />1. ALL SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE "MANUAL ON UNIFORM <br />TRAFFIC CONTROL DEVICES" AND THE LATEST IMPLEMENTED EDITION OF FDOT ROADWAY AND TRAFFIC <br />DESIGN STANDARDS (INDEX NO. 9535, 11860, 11862, 11865, 17302, 17346 AND 17349 APPLY). GENERALLY, <br />ALL MARKINGS SHALL CONFORM TO THE FOLLOWING: 64NCH EDGE LINES, 64NCH LANE LINES, 64NCH <br />SINGLE CENTERLINES, AND 6-INCH DOUBLE LINE PATTERNS, UNLESS OTHERWISE NOTED ON THE PLANS. <br />2. ALL ROADWAY PAVEMENT MARKINGS IN RIGHT-OF-WAY SHALL BE PAINTED OR THERMOPLASTIC WITH <br />RAISED PAVEMENT MARKERS (TYPE 911 - 4" X 4"), AS INDICATED ON PLANS. RAISED PAVEMENT <br />MARKERS ARE TO BE INSTALLED IN ACCORDANCE WITH PLANS AND FDOT INDEX NO. 17352. <br />3. ON -SITE PAVEMENT MARKINGS SHALL BE PAINTED. PAINT SHALL MEET THE REQUIREMENTS OF FDOT <br />SPECIFICATION SECTION 971, NON -REFLECTIVE WHITE TRAFFIC PAINT. <br />4. ALL ROADWAY TRAFFIC SIGNS SHALL BE MANUFACTURED USING HIGH INTENSITY RETROREFLECTIVE <br />MATERIALS. THE BACK OF ALL FINISHED PANELS SHALL BE STENCILED WITH THE DATE OF FABRICATION, <br />THE FABRICATOR'S INITIALS, AND THE NAME OF THE SHEETING IN 3-INCH LETTERS. <br />5. INTERNAL SITE TRAFFIC SIGNS ARE NOT REQUIRED TO BE RETROREFLECTIVE. <br />6. THE CONTRACTOR SHALL VERIFY THE REQUIRED LENGTH OF THE SIGN COLUMN SUPPORTS IN THE <br />FIELD PRIOR TO FABRICATION. <br />8. PRIOR TO FINAL PAVEMENT MARKING INSTALLATION, A CURE TIME OF THE ASPHALT PER THE <br />MANUFACTURER'S SPECIFICATIONS IS REQUIRED. <br />PAVEMENT MARKINGS (ON -SITE CVS) <br />PART 1-GENERAL <br />1.1 SUMMARY <br />A. SECTION INCLUDES: <br />1. PAINTED MARKINGS APPLIED D TO ASPHALT AND CONCRETE PAVEMENT. <br />2. MARKINGISTRIPING REMOVAL METHODS FOR ASPHALT AND CONCRETE PAVEMENT. <br />3. SEALCOATING AND/OR SLURRY SEALS APPLIED TO ASPHALT AND CONCRETE PAVEMENT. <br />1.2 DEFINITIONS <br />A. SHOT-BLASTING: SMALL METAL BEADS CHIP AWAY PAINT OR ETCH THE CONCRETE SURFACE WITH <br />A SELF-CONTAINED VACUUM. <br />B. GRINDING: REMOVAL METHOD THAT GRINDS DOWN EXISTING SURFACE. <br />C. SEALCOATING AND/OR SLURRY SEALS: A LIQUID THAT IS APPLIED TO ASPHALT TO PROTECT IT <br />FROM OXIDATION AND THE DAMAGE CAUSED BY WINTER CRACKING, AS WELL AS UV RAYS AND <br />TRAFFIC. <br />1. SEALCOAT: HAS A DENSE" LIQUID" CONSISTENCY. <br />2. SLURRY: SEAL IS A COARSER AGGREGATE. <br />1.3 PREINSTALLATION MEETINGS <br />A. PREINSTALLATION CONFERENCE: CONDUCT CONFERENCE AT PROJECT SITE. <br />1. REVIEW METHODS AND PROCEDURES WITH CVS CPM RELATED TO MARKING PAVEMENT <br />INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING: <br />A. PAVEMENT AGING PERIOD BEFORE APPLICATION OF PAVEMENT MARKINGS. <br />B. REVIEW REQUIREMENTS FOR PROTECTING PAVEMENT MARKINGS, INCLUDING RESTRICTION OF <br />TRAFFIC DURING INSTALLATION PERIOD. <br />C. DRYING TIME SHOULD FOLLOW MANUFACTURES RECOMMENDED DRY TIMES AND PRACTICES OR <br />OBTAIN CVS CPM APPROVAL IN WRITING IF DEVIATING. <br />D. CONFIRM WITH CVS CPM IF JUST RE -STRIPING (PAINTING OVER EXISTING LINES) IS ALLOWED OR <br />REMOVING EXISTING PEELING PAINT THAT WOULD JEOPARDIZE THE FINISH QUALITY OF THE POINT <br />SURFACE. <br />1.4 ACTION SUBMITTALS <br />A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT (PAINT, SEALCOAT, SLURRY SEAL, ETC.) <br />1. INCLUDE TECHNICAL DATA AND TESTED PHYSICAL, PERFORMANCE PROPERTIES, MIXING, <br />PREPARATION, AND APPLICATION INSTRUCTION. <br />B. LEED SUBMITTALS: <br />1. PRODUCT DATA FOR CREDIT IEQ 4.2: FOR INTERIOR, FIELD APPLIED, PAVEMENT -MARKING <br />PAINTS, DOCUMENTATION INCLUDING PRINTED STATEMENT OF VOC CONTENT. <br />2. PREFERRED LEED PAINT FORMULA ONLY TO BE USED ON APPLICABLE PROJECTS. GENERAL <br />CONTRACTOR MUST CONFIRM AND OBTAIN APPROVAL FROM CVS CPM. <br />1.5 QUALITY ASSURANCE <br />A. REGULATORY REQUIREMENTS: COMPLY WITH MATERIALS, WORKMANSHIP, AND OTHER <br />APPLICABLE REQUIREMENTS OF CVS/PHARMACY, OR AUTHORITY HAVING JURISDICTION, FOR <br />PAVEMENT -MARKING WORK <br />1. MEASUREMENT AND PAYMENT PROVISIONS AND SAFETY PROGRAM SUBMITTALS INCLUDED IN <br />STANDARD SPECIFICATIONS DO NOT APPLY TO THIS SECTION. <br />1.6 FIELD CONDITIONS <br />A. ENVIRONMENTAL LIMITATIONS: PROCEED WITH PAVEMENT MARKING ONLY ON CLEAN, DRY <br />SURFACES AND AT A MINIMUM AMBIENT OR SURFACE TEMPERATURE OF 40 DEG F FOR ALKYD <br />MATERIALS, 55 DEG F FOR WATER BASED MATERIALS, AND NOT EXCEDDING 95 DEG F, OR PER <br />MANUFACTURE'S RECOMMENDATION. <br />PART 2-PRODUCTS <br />2.1 MANUFACTURERS <br />A. SHERWIN WILLIAM'S SETFAST ACRYLIC LATEX TRAFFIC MARKING PAINT (TM 2161) OR EQUIVALENT <br />PRODUCT THAT MEETS MATERIAL SPECIFICATIONS BELOW. IF WORKING ON LEED PROJECT <br />PREFERRED SPEC IS SHERWIN WILLIAMS SETFAST LOW VOC ACRYLIC TRAFFIC PAINT (TM 5627) OR <br />EQUIVALENT. <br />2.2 PAVEMENT -MARKING MATERIALS <br />A. PAVEMENT -MARKING PAINT: <br />1. ALKYD -RESIN, LEAD AND CHROMATE FREE, COMPLYING WITH AASHTO M 248. <br />2. MPI #32, ALKYD TRAFFIC -MARKING PAINT. <br />3. LATEX, WATERBORNE EMULSION, LEAD AND CHROMATE FREE, COMPLYING WITH FS TT-P-1952. <br />4. MPI #97, LATEX TRAFFIC -MARKING PAINT. <br />B. GLASS BEADS: <br />• 1. ONLY TO BE USED WHEN REQUIRED BY LOCAL. JURISDICTION. <br />2. AASHTO, TYPE 1 (MADE WITH 100% RECYCLED GLASS), ROUNDNESS 75 TO 80 PERCENT TRUE <br />SPHERE BY WEIGHT. <br />C. ALL PAVEMENT MARKING WITH D.O.T RIGHT-OF-WAY SHALL BE THERMOPLASTIC AND IN <br />ACCORDANCE WITH D.O.T SPECIFICATIONS. <br />2.3 SEALCOATING AND/OR SLURRY SEALS <br />A. CONTRACTOR SHALL CONFIRM WITH CVS CPM IF SEALCOATING REQUIRED BASED UPON <br />PAVEMENT MARKINGS REMOVAL TYPE USED AND FIELD CONDITIONS OF EXISTING PAVING. <br />B. TYPE 11 AND TYPE III ARE THE PREFERRED TYPES OF SEALCOAT/ SLURRY SEALS. CONTRACTOR <br />SHALL CONFIRM WITH CVS CPM WHICH TYPE TO USE AND OBTAIN APPROVAL IN WRITING TO <br />DEVIATE FROM THE PREFERRED METHODS. <br />C. TYPES OF SEALCOATI SLURRY SEALS: <br />1. TYPE I (FINEST): (2.36 MM (NO. 8)), FOR SMALL CRACKS, MOSTLY FOR LOW TRAFFIC. <br />2. TYPE 11(GENERAQ: COARSER THAN TYPE 1(6.4 MM (0.25)), FOR MODERATE TRAFFIC AND MOST <br />COMMON TYPE. <br />3. TYPE Ili (COARSE): MOST COARSE TYPE, FOR SEVERE DEFECTS. <br />4. MICROSURFACING: SAME INGREDIENTS AS THE ABOVE COMBINED WITH POLYMER ADDITIVES. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. VERIFY THAT PAVEMENT IS DRY AND IN SUITABLE CONDITION TO BEGIN PAVEMENT MARKING <br />ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS. <br />B. PROCEED WITH PAVEMENT MARKING ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN <br />CORRECTED. <br />3.2 PAVEMENT MARKING <br />A. ALLOW PAVING TO AGE FOR A MINIMUM OF 30 DAYS BEFORE STARTING PAVEMENT MARKING. <br />B. SWEEP AND CLEAN SURFACE TO ELIMINATE LOOSE MATERIAL AND DUST. <br />C. APPLY PAINT WITH MECHANICAL EQUIPMENT TO PRODUCE PAVEMENT MARKINGS, OF DIMENSIONS <br />INDICATED, WITH UNIFORM, STRAIGHT EDGES. <br />1. APPLY GRAPHIC SYMBOLS AND LETTERING WITH PAINT -RESISTANT, DIE -CUT STENCILS, FIRMLY <br />SECURED TO PAVEMENT. MASK AN EXTENDED AREA BEYOND EDGES OF EACH STENCIL TO <br />PREVENT PAINT APPLICATION BEYOND THE STENCIL APPLY PAINT SO THAT IT CANNOT RUN <br />BENEATH THE STENCIL <br />2. BROADCAST GLASS BEADS UNIFORMLY INTO WET MARKINGS AT RATE OF 6 LB/GAL. <br />3.3 PROTECTING AND CLEANING <br />A PROTECT PAVEMENT MARKINGS FROM DAMAGE AND WEAR DURING REMAINDER OF <br />CONSTRUCTION PERIOD. <br />B. CLEAN SPILLAGE AND SOILING FROM ADJACENT CONSTRUCTION USING CLEANING AGENTS AND <br />PROCEDURES RECOMMENDED BY MANUFACTURER OF AFFECTED CONSTRUCTION. <br />3.4 PAVEMENT MARKING REMOVAL <br />A. GENERAL NOTES: OLD MARKINGS MUST BE COMPLETELY REMOVED WITH NO RESIDUAL PAINT <br />MARKINGS BEING OBSERVED PRIOR TO NEW SEAL COAT AND/OR STRIPING. THE PROCESS <br />SHOULD NOT CAUSE EXCESSIVE NOISE, DEBRIS, OR DISRUPTION TO CVS/PHARMACY CUSTOMERS. <br />BLACK OUT PAINT WILL NOT BE USED TO COVER OLD STRIPING. GRINDING AND SHOT BLASTING <br />ARE THE PREFERRED METHODS FOR STRIPINGI MARKING REMOVAL, BUT SAND -BLASTING AND <br />WATERBLASTING MAY BE ALLOWED IF APPROVED BY CVS CPM AND REMOVE THE OLD PAINT <br />ENTIRELY. PLEASE SEE BELOW FOR APPROVED REMOVAL METHODS. <br />B. SHOT-BLASTING: MARKING REMOVAL BY METAL BEADS AT A HIGH SPEED. <br />1. VACUUM MUST FULLY RECOVER ALL BEADS AND DEBRIS. <br />C. SAND -BLASTING: MARKING REMOVAL BY SAND AT A VERY HIGH SPEED. <br />1. SAND MUST BE RECOVERED. <br />D. GRINDING: <br />1. DUST AND GRINDING DEBRIS MUST BE COMPLETELY RECOVERED. <br />E. WATERBLASTINGIHIGH PRESSURE WATER OR STEAM OR SUPERHEATED WATER: <br />1. 40,000 PSI <br />2. DEBRIS MUST BE RECOVERED. <br />3.5 SEALCOATING AND/OR SLURRY SEALS <br />A. USE SEALCOAT PRODUCT FROM ASMA MEMBER, WHICH MEETS THEIR STRICT STANDARD <br />SPECIFICATION. GENERAL CONTRACTOR RESPONSIBLE FOR APPROPRIATE AND CLEAN <br />APPLICATION. FOLLOW MANUFACTURER'S RECOMMENDED DRY TIME BEFORE PAINTING NEW <br />SURFACE. <br />GENERAL COMMENT: <br />* IF CONFLICTS EXIST BETWEEN THESE NOTES AND NOTES ON <br />PLAN SHEETS, DEFER TO NOTES ON PLAN SHEETS. <br />* THESE NOTES AND SPECIFICATIONS ONLY APPLY IN THE EVENT <br />THERE ARE NO JURISDICTIONAL SPECIFICATIONS. <br />#*CVS <br />pharmacy <br />EXISTING BUILDING ± 111200 SF <br />STOW NUMER 0651 <br />37943 OLAND BLVD. <br />ZEPHYRHILLS, FL 33542 <br />PROJECT TYPE ADA MODFCATION <br />DEAL TYPE SELF DEVELORIIENT <br />*4,2; YA_31_*�I�IT-,T, 0:1:1 <br />FL CA 26115 <br />Foresite Group, Inc. <br />10150 Highland Manor Dr. o 1813.549.3250 <br />Suite 210 f 1813.621.3580 <br />Tampa, FL 33610 w I www.fg-inc.net <br />COMILTANT: <br />CLIENT <br />! A <br />Robert Reid Wedding <br />Architects & Planners, AIA, Inc. <br />4112 Cypress Street - Tampa, Florida 33607 - 813-8794M <br />612 South Military Trail - Deerfield Beach, Florida 33442 - 954-492-9M <br />Florida Ucerue fs: Andritecturaillmerior Design: AA-0001123 - Enginaedng: 00002655 <br />MAL' <br />®®®®' C. eq�®®®®® <br />®® t�,� - SQ ®®a <br />® * : No. 6WO •: * <br />iz '® '• STATE OF . • . <br />- . `4 - <br />'®®'� ZI .1ALORIOP• ®' 7!: <br />®/I/ I n 111® 06/01 /18 <br />REVISIONS: <br />10CITY COMMENT 06/01/18 <br />DRAWING BY: JMR <br />DATE: 04/20/2018 <br />JOB NUMBER: 340.050 <br />TITLE: <br />GENERAL NOTES <br />SHEET NUMBER: <br />C�200 <br />COMMENTS: <br />RELEASED FOR CONSTRUCTION <br />