My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
38135 Market Square Dr (10)
Zephyrhills
>
Building Department
>
Building Plans
>
38135 Market Square Dr (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 5:37:27 PM
Creation date
2/25/2025 4:12:18 PM
Metadata
Fields
Template:
Building Plans
Street #
38135
Location
Market Square Dr
Contractor
Wallace Associate
Building Plans - Permit #
11964
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tv <br />Q <br />I I <br />I <br />I <br />I <br />8'-717/32" L V-415/32" <br />4 4J 5 b 1 <br />OENLARGED DIMENSIONED FLOOR PLAN <br />SCALE: Vail = I'-0" <br />DIMENSION PLAN NOTES <br />I. THIS PLAN IS FOR DIMENSIONAL PURPOSES ONLY <br />2. FOR DIMENSIONING PURPOSES, METAL STUD WALLS ARE DRAWN AT <br />4" OR 6" WIDE U.N.C. - BLOCK WALLS ARE DRAWN AT 8" WIDE U.N.O. <br />3. 8" BLOCK WALLS AND 6" METAL STUD WALLS ARE DIMENSIONED TO <br />FACE OF WALL - 4" METAL STUD WALLS ARE DIMENSIONED TO <br />CENTER OF WALL, U.N.O. <br />4. GENERAL CONTRACTOR TO NOTIFY ARCHITECT AFTER LAYOUT IS <br />COMPLETE AND WALL TRACK 15 IN PLACE PRIOR TO FRAMING ANY <br />WALL <br />5. CONTRACTOR SHALL REFER TO WINDOW / DOOR SHOP DRAWINGS <br />FOR ALL REQUIRED MA50NRY / ROUGH OPENINGS PRIOR TO <br />CONSTRUCT ION. <br />KEY PLAN <br />■ <br />REVISIONS <br />BY <br />VE / OUNER CN65 <br />4 01.25.11 <br />DC <br />VE / OWNER CNGS <br />6 II. 18. ll <br />DC <br />E <br />o <br />ro <br />ovo <br />m <br />ro <br />7 x � <br />N .. E m <br />rn a. cn <br />C\1 <br />O C <br />~� O U <br />t� <br />to <br />0 <br />co <br />t` <br />N <br />� 1 � <br />LZ. <br />{ 147 <br />o cy v.................g � i <br />1 P44 �1 <br />N � <br />(1) 00 <br />o <br />o p o <br />0 <br />x <br />o a <br />a� <br />0 <br />1 � <br />U_ <br />Z <br />o J N <br />ItLO <br />_ <br />� M <br />� <br />v —� <br />X Q N D <br />w U -° <br />O O <br />a LLJ o <br />v m <br />a) LO :s <br />O Q M <br />O 0 00 s <br />L _ M <br />(L <br />N <br />O <br />J <br />L.- <br />Date: 12. 15. 10 <br />Scale: AS NOTED <br />Project Mgr: JLO <br />Drawn: SEH <br />Job: 09-45 <br />Sheet <br />A2b <br />H:\Projects\Projects 2009\0945 - FMC - ZH ASC Expansion\CD\REV.06\Architectural\A02b - ENLARGED D1M.dwg, 1/10/2012 1:50:19 PM, DC <br />I i 7 III <br />
The URL can be used to link to this page
Your browser does not support the video tag.