Laserfiche WebLink
Al 49, <br />NORM nn <br />ARCHITECTS ENGINEERS PLANNERS <br />Reason for Issue Date <br />Bulletin 01 June 7, 2019 <br />Project Information NORR Project No. <br />Dollar General Zephyrhills, FL JCDT18-0233-00 <br />Intent <br />REVISION WRITE-UP <br />This TRANSMITTAL is issued to provide new and/or updated project documents. <br />Drawings <br />The following 15RAWINGS accompany and form a part of this TRANSMITTAL. <br />ARCHITECTURAL <br />Revised Drawings: CS, F1, Al, A9 <br />r tf ur;`a.: 1 �� <br />ELECTRICAL°It <br />I� 1,4; <br />. <br />Revised Drawings: E1, E5 <br />ARCHITECTURAL DRAWING REVISIONS <br />1. Dwg No CS <br />a. Index has been updated to reflect current issuance. <br />b. Revised the National Account Vendors list as per technical bulletin TB19-003 <br />updates. <br />C. Revised Prototype "E" release date as per technical bulletin TB19-003 updates. <br />2. Dwg No F1 <br />a. Revised fixtures, coolers, freezers and dimensions as per technical bulletin <br />TB19-004 Reissue. <br />b. Relocated equipment out of access ramps for handicap parking. <br />3. Dwg No Al <br />a. Revised fixtures, coolers, freezers and dimensions as per technical bulletin <br />TB19-004 Reissue. <br />b. Revised note 9 as per technical bulletin TB19-004 Reissue. <br />4. Dwg No A9 <br />a. Added notes to cable tray plan as per technical bulletin TB19-003 updates. <br />ELECTRICAL DRAWING REVISIONS <br />1. Dwg No E1 <br />a. Revised the location of (4) power drops in the Sales Area. <br />Printed: Last printed 10/06/2019 1:52 PM (DOI: 04.04.2005) <br />