Laserfiche WebLink
DRINK FIXTURE WALL MOUNTING <br />SUPPORT NOTES: <br />1. PROVIDE AND INSTALL 2X6 WHITE PINE - <br />GRADE 2 OR BETTER. <br />2. PROVIDE AND INSTALL 2X4 WHITE PINE - <br />GRADE 2 OR BETTER. <br />3. FASTEN THE 2X6 TO THE WALL WITH THE TOP <br />EDGE OF THE BOARD AT 78" A.F.F., STARTING <br />FROM THE END OF THE LAST COOLER AND <br />STOPPING 5'-0" FROM REAR WALL. <br />4. FASTEN THE 2X4 TO THE WALL WITH THE TOP <br />EDGE OF THE BOARD AT 12"A.F.F., STARTING <br />FROM THE END OF THE LAST COOLER AND <br />STOPPING 5'-0" FROM REAR WALL. <br />5. PRE -DRILL PILOT HOLES IN ALL BOARDS <br />PRIOR TO INSTALLATION TO PREVENT WOOD <br />SPLITS. <br />6. SECURE THE 2X6 WITH THREE SELF -TAPPING <br />SCREWS PER WALL STUD. MINIMUM SCREW <br />SIZE IS 4"x 4". <br />7. FASTEN THE 2X4 WITH WITH ONE <br />SELF -TAPPING SCREW PER WALL STUD. <br />MINIMUM SCREW SIZE IS 4"x4, <br />. <br />8. CAULK THE EDGES OF THE 2X6 AT THE TOP <br />AND BOTTOM WHERE IT MEETS THE WALL PRIOR <br />TO PAINTING. <br />9. PRIME AND PAINT BOTH BOARDS TO MATCH <br />WALL COLOR. <br />LINE OF FREEZER <br />_ COOLERS BEYOND <br />II <br />I I <br />� <br />II II II <br />e <br />II II II <br />(FIXTURE IJPPLIED Al b <br />ll <br />I <br />INSTALLE <br />BY DOLLA <br />GENERAL( I <br />IIMERCHANRISING II <br />A <br />IIDEPARTM�INT II <br />II II II <br />If II II <br />ff II II <br />w <br />II II II <br />II II II <br />CONTRACTOR TO <br />(PROVIDE <br />D INSTAL <br />12x4 WHIT <br />:'INE GRA <br />r l <br />©� <br />� <br />20RBET R <br />I <br />II III <br />II II I <br />CONTRACTOR TO <br />PROVIDE AND INSTALL <br />2x6 WHITE PINE GRADE <br />2 OR BETTER <br />II II II <br />II II II <br />II II II <br />I II II <br />II fI II <br />II II II <br />CONTRACTOR TO <br />I I INSTALL( �x WOOD <br />FRAM IN TO ALLOW <br />I I HORIZO <br />AL ANCH <br />�IO <br />R <br />BOARD <br />RUN <br />I I CONTIN <br />I OUSLY PAIF <br />I I PEMB C ILUMNS <br />II II II <br />II II II <br />if II II <br />II II II <br />�' <br />� I <br />I LI II II � II II II <br />I � If II II II Il II <br />VERIFY ANCHOR BOARDS <br />LOCATION WITH FIXTURE PLAN <br />2 ANCHOR BOARD DETAIL <br />NTS <br />5 <br />T6 <br />WALL TYPES LEGEND <br />SEE SHEET Al 0 FOR ADDITIONAL NOTES AND DETAILS <br />WALL TYPE <br />(I.E. FULL HEIGHT) <br />04 <br />T_ <br />INTERIOR FACE OF PEMB <br />FRAMING BEYOND <br />ANCHOR BOARD: <br />CONTRACTOR TO PROVIDE <br />AND INSTALL 2x6 WHITE <br />PINE GRADE 2 OR BETTER <br />TOP OF FIXTURE TO BE <br />AFFIXED TO DRIED PINE <br />NAILER BY DOLLAR GENERAL <br />MERCHANDISING DEPT <br />FIXTURE SUPPLIED & INSTALLED <br />BY DOLLAR GENERAL <br />MERCHANDISING DEPT <br />MTL LINER PANELS <br />CONTRACTOR TO INSTALL <br />VERTICAL 2X WOOD FRAMING SO <br />THAT HORIZONTAL ANCHOR <br />BOARDS RUN CONTINUOUSLY <br />PAST PEMB COLUMNS <br />ANCHOR BOARD: <br />CONTRACTOR TO PROVIDE <br />AND INSTALL 2x4 WHITE PINE <br />GRADE 2 OR BETTER <br />FINISHED FLOOR <br />EIFS BULLNOSE <br />EIFS PILASTER (REF <br />" 1'4" <br />1'-4" <br />EXTERIOR <br />........ .... <br />- <br />ELEVATIONS) <br />5/8" EXTERIOR GRADE <br />_ � <br />'� COk <br />GYPSUM BOARD <br />SHEATHING ON METAL <br />cD <br />WALL PANELS <br />VINYL FACED R-13 BATT <br />INSULATION + R-6.5 <br />R-6.5 <br />METAL BUILDING COLUMNS <br />CONTINUOUS INSULATION <br />SHALL BE STRAIGHT. TAPERED <br />WITH VAPOR BARRIER (BY <br />COLUMNS &INTERIOR COLUMNS <br />PEMB). <br />REQUIRE WRITTEN APPROVAL. <br />"EWH-2" <br />MAINTAIN INTERIOR CLEARANCE <br />WATER HEATER ON <br />1/2" GYP BOARD OVER LINER <br />C01 <br />OF 68'-0" BETWEEN FACE OF <br />SHELF ABOVE MOP SINK <br />PANELS - REFER TO INTERIOR <br />COLUMNS ON SALES FLOOR <br />ELEVATIONS FOR LOCATIONS <br />MCP SINK (BELOW) <br />DETAIL @COLUMN <br />ABOVE BULLNOSE <br />THIS � <br />3 <br />FAUCET WALL <br />T-0" OF 48" HIGH FRP <br />DEFS ON 4" CMU <br />1'-4" <br />1'4" <br />ALUMINUM CORNER <br />PILASTER (REF EXTERIOR —.GUARDS <br />ELEVATIONS) <br />_ <br />8'-0" WING WALL <br />bo <br />DOORSTOP T-0" <br />4" 4 <br />METAL BUILDING COLUMNS <br />8" CMU (REF EXTERIOR <br />SHALL BE STRAIGHT. TAPERED <br />ELEVATIONS) <br />INTERIORCOLUMNS & <br />REF. <br />REQUIRE WRITTEN APPROVAL. <br />1/2" GYP BOARD OVER LINER <br />STRUCTURAL <br />MAINTAIN INTERIOR CLEARANCE <br />PANELS - REFER TO INTERIOR <br />COI <br />OF 68'-0" BETWEEN FACE OF <br />ELEVATIONS FOR LOCATIONS <br />COLUMNS ON SALES FLOOR <br />DETAIL @ COLUMN <br />BELOW BULLNOSE <br />4 A2i 3�i 2 �! <br />I 1 1 <br />FLOOR PLAN <br />Scale: 1/8" = V-0" <br />ABOVE 4'-0" <br />1 <br />3/4" = P-0" <br />I MOP HOLDER <br />i <br />1 i �:5'-O" OF 48" HIGH FRP <br />'61 <br />5 ENLARGED PLAN_ DETALL <br />SEE 4/P2 ALSO NTS <br />FLOOR PLAN KEYED NOTES <br />RECEIVING DOOR BUZZER <br />(TORK MDL.#TA725 OR EQUAL) <br />2" DOOR SCOPE <br />(REF DOOR SCHEDULE SHEET A5) <br />WEATHER STRIP & LOW PROFILE THRESHOLD (REF <br />DOOR SCHEDULE SHEET A5) <br />STRIPE FLOOR AT RECEIVING DOOR AS INDICATED FOR <br />DESIGNATED EGRESS PATH (PAINT YELLOW) AND <br />DESIGNATE 3'-0" EMS PANEL CLEARANCE (PAINT RED) <br />4A STRIPE FLOOR FOR DESIGNATED ADA EGRESS <br />PATH (PAINT YELLOW) <br />PROVIDE AND INSTALL WATER HEATER ABOVE THE <br />MOP SINK (REF 5/A1 AND 3/P1) <br />BEAUTY AND COSMETICS SHELVING AND EQUIPMENT. <br />METAL LINER PANELS COORDINATE FULL HEIGHT PANELS <br />W/ FURRING @ CMU WEST WALL FOR FLUSH FINISH <br />CART AREA. REFER TO 5/A06 <br />02 <br />J-BOXES - SEE ELECTRICAL FOR DETAILS. <br />10 CONCRETE SLAB ON VAPOR BARRIER <br />(REF STRUCTURAL SHEET S2) <br />METAL BUILDING FRAME REFER TO NOTED WALL <br />SECTION FOR ADDITIONAL INFORMATION <br />1/2" GYP BOARD OVER LINER PANELS W/ R-13 BATT <br />2 INSULATION. METAL LINER PANELS TO DECK ABOVE; <br />GYPSUM BOARD TO RUN TO 10'-0" AFF, PAINTED. <br />ROOF MOUNTED HVAC UNITS - COORDIANTE PAD <br />13 DIMENSIONS WITH HVAC UNITS (REF CIVIL PLAN AND <br />SHEET M1) <br />BROOM FINISH CONCRETE SIDEWALK - SLOPE <br />}4 CONCRETE AWAY FROM BUILDING (TYP) - (COORDINATE <br />WITH CIVIL PLANS). <br />15 EIFS PILASTER (REF EXTERIOR ELEVATIONS) <br />6 STOREFRONT SYSTEM <br />(REF SHEETS A5) <br />1 7 LINE OF CANOPY ABOVE <br />18 A.D.A. COMPLIANT H.C. RAMP. (REF CIVIL PLANS) <br />CART AND BUMPER GUARDS 4" A.F.F <br />9 MC CUE PART #9014 TRIMKIT) (REF 5/A6) <br />WALL HYDRANT (REF PLUMBING SHEET P1 <br />2Q FOR ADDITIONAL INFORMATION) <br />21 REFRIGERATION BY DOLLAR GENERAL <br />STEEL COLUMN. PAINT SW7005 PURE WHITE. WRAP <br />22 STEEL COLUMN WITH TIGHT LOOP CARPET(BLACK) <br />FROM BASE TO 48" A.F.F. <br />23 POWER POLE. COORDINATE FINAL LOCATION <br />WITH ELECTRICAL DRAWINGS <br />FLOOR ARE AT BASE OF COLUMN WITHIN THE <br />24 CONSTRUCTION JOINTS TO BE PAINTED <br />BLACK MAGIC TINT <br />ENDCAP COOLER/FREEZER TO BE HARDWIRED <br />THROUGH WHITE SO CORD. GC TO LEAVE BOTTOM <br />25 HANGING AT 80" AFF. (REF. ELECTRICAL) CORD <br />ANCHORED TO PURLINS ABOVE. COORDINATE LOCATION <br />WITH FINAL DOLLAR GENERAL FIXTURE PLAN. <br />BEAUTY STATION TO BE HARDWIRED THROUGH WHITE <br />SO CORD. GC TO LEAVE BOTTOM HANGING AT 48" <br />25A AFF. (REF. ELECTRICAL) CORD ANCHORED TO PURLINS <br />F <br />ABOVE. COORDINATE LOCATION WITH FINAL DOLLAR <br />GENERAL FIXTURE PLAN. <br />26 PRE -FINISHED METAL DOWNSPOUTS (COORDINATE <br />H <br />SIZE AND LOCATIONS WITH PEMB AND CIVIL PLANS) <br />MG CUE RAILING IN FRONT OF ELECTRICAL PANELS <br />27 8'-0" LONG WITH TOP TWO RAILINGS AND NO MIDDLE <br />POST. <br />8" SMOOTH -FACED CMU PAINTED (REFER TO EXTERIOR <br />28 FINISHES ON SHEET A2). ALIGN FACE OF BLOCK WITH <br />STEEL GIRT. PROVIDE PROPER ANCHORAGE TO <br />STRUCTURE. <br />CONSULTANT: <br />SEAL: JOHN BENEDICT POLSINELLI, AR96059 <br />THIS DRAWING SHALL NOT BE USED FOR <br />CONSTRUCTION PURPOSES UNTIL THE SEAL AND <br />SIGNATURE OF THE RESPONSIBLE REGISTRANT <br />APPEARS ON THE DRAWING, AND PROPER PERMIT <br />FORMS AND RELATED FEES ARE TRANSMITTED BY <br />THE OWNER, OWNER'S AGENT OR CONTRACTOR <br />TO THE AUTHORITY HAVING JURISDICTION. <br />DATE <br />ISSUED FOR <br />REV <br />09/27/2018 <br />PEMB COORDINATION <br />1 2/1 8/2018 <br />PERMIT SUBMITTAL <br />01 /1 1 /201 9 <br />OWNER REVIEW <br />02/07/2019 <br />BID SET <br />03/04/201 9 <br />ADDENDUM 01 <br />06/07/2019 <br />BULLETIN 01 <br />02 <br />Project Manager <br />Drawn <br />L. LONG <br />B. JACKSON <br />Project Leader <br />Checked <br />L. LONG <br />G. KARANFILOVSKI <br />Date <br />Dept Mgr Approval <br />08/07/2018 <br />G. KARANFILOVSKI <br />Client <br />PALMETTO ZEPHYRHILLS-20th St, LLC <br />P.O. BOX 1615 <br />THOMASVILLE, GA 31 792 <br />Office: (229) 226-0682 <br />Contact: John Tate <br />Project <br />DOLLAR GENERAL <br />38965 CR 54 <br />Zephyrhills, FL 33542 <br />(City of Zephyrhills) <br />Store #: 20360 <br />Drawing Title <br />FLOOR PLAN <br />DO NOT SCALE DRAWING <br />Project No. <br />Drawing No. <br />.JCDT.18.0233 <br />Al <br />