Laserfiche WebLink
MECHANICAL SPECIFICATIONS: <br />PART 1 - GENERAL <br />1.1 SUBMITTALS <br />A. PRODUCT DATA: FOR EACH TYPE OF PRODUCT <br />INDICATED. <br />1.2 WARRANTY <br />A. WARRANT NEW AND MODIFIED DUCTWORK FOR <br />PERIOD OF ONE YEAR FROM DATE OF FINAL <br />ACCEPTANCE OF JOB, AGAINST NOISE AND <br />VIBRATION UNDER FULL RANGE OF OPERATING <br />CONDITIONS. <br />PART 2 - PRODUCTS <br />2.1 METAL DUCTS <br />A.CONTINUOUS HOT -DIP MILL GALVANIZED. MINIMUM <br />COATING OF G60, LOCK -FORMING QUALITY STEEL <br />SHEETS IN ACCORDANCE WITH ASTM A653. <br />B. GAUGES: SHEET METAL GAUGE AS SPECIFIED IN <br />SMACNA - HVAC DUCT CONSTRUCTION <br />STANDARDS BUT NOT LESS THAN THE FOLLOWING: <br />1. RECTANGULAR DUCT: 26 GAUGE FOR ALL SIZES. <br />2. ROUND DUCT: PRIME GRADE STEEL SHEET. <br />a. 14 INCH DIAMETER AND SMALLER: 26 <br />GAUGE. <br />b. 15 INCH DIAMETER THRU 26 INCH <br />DIAMETER: 24 GAUGE. <br />C.ROUND DUCT SHALL BE SPIRAL SEAM WHERE <br />EXPOSED AND NOT INSULATED. IN ALL OTHER <br />AREAS SPIRAL OR LONGITUDINAL SHALL BE USED. <br />2.2 TURNING VANES <br />A.MANUFACTURED TURNING VANES FOR METAL <br />DUCTS: CURVED BLADES OF GALVANIZED SHEET <br />STEEL: SUPPORT WITH BARS PERPENDICULAR TO <br />BLADES SET; SET INTO VANE RUNNERS SUITABLE <br />FOR DUCT MOUNTING. <br />B. GENERAL REQUIREMENTS: COMPLY WITH SMACNA <br />"HVAC DUCT CONSTRUCTION STANDARDS - METAL <br />AND FLEXIBLE": FIGURES 4-3 "VANES AND VANE <br />RUNNERS," 4-4, "VANE SUPPORT IN ELBOWS." <br />C.VANE CONSTRUCTION: SINGLE WALL <br />2.3 SEALANT AND GASKET <br />A.GENERAL SEALANT AND GASKET REQUIREMENTS: <br />SURFACE -BURNING CHARACTERISTICS FOR <br />SEALANTS AND GASKETS SHALL BE A MAXIMUM <br />FLAME -SPREAD INDEX OF 25 AND A MAXIMUM <br />SMOKE- DEVELOPED INDEX OF 50 WHEN TESTED <br />ACCORDING TO UL 723; CERTIFIED BY AN NRTL. <br />2.4 HANGERS AND SUPPORTS <br />A. HANGER RODS: CADMIUM -PLATED STEEL RODS <br />AND NUTS. <br />B. STRAP AND ROD SIZES: COMPLY WITH SMACNA'S <br />"HVAC DUCT CONSTRUCTION STANDARDS - METAL <br />AND FLEXIBLE" TABLE 5-1." RECTANGULAR DUCT <br />HANGERS MINIM SIZE." AND TABLE 5-2 "MINIMUM <br />HANGER SIZES FOR ROUND DUCT." <br />C. STEEL CABLES FOR GALVANIZED STEEL DUCTS: <br />GALVANIZED STEEL COMPLYING WITH ASTM A 603. <br />D. STEEL CABLE END CONNECTIONS: CADMIUM <br />PLATED STEEL ASSEMBLIES WITH BRACKETS, <br />SWIVEL, AND BOLTS DESIGNED FOR DUCT HANGER <br />SERVICE; WITH AN AUTOMATIC -LOCKING AND <br />CLAMPING DEVICE. <br />E. DUCT ATTACHMENTS: SHEET METAL SCREWS, <br />BLIND RIVETS, OR SELF -TAPPING METAL SCREWS; <br />COMPATIBLE WITH DUCT MATERIALS. <br />2.5 MECHANICAL EQUIPMENT <br />A. PROVIDE EQUIPMENT INDICATED ON DRAWINGS. <br />B. PRODUCTS REQUIRING ELECTRICAL CONNECTION: <br />LISTED AND CLASSIFIED BY UNDERWRITERS <br />LABORATORIES, INCORPORATED, AND <br />ACCEPTABLE TO THE AUTHORITY HAVING <br />JURISDICTION AS SUITABLE FOR THE PURPOSE <br />SPECIFIED AND INDICATED. <br />C.OPERATION AND MAINTENANCE DATA: INCLUDE <br />MANUFACTURER'S DESCRIPTIVE LITERATURE. <br />OPERATING INSTRUCTIONS, MAINTENANCE AND <br />REPAIR DATA, AND PARTS LISTING FOR <br />MECHANICAL EQUIPMENT. <br />2.6 CONTROLS <br />A.PROVIDE COMPLETE CONTROLS SYSTEM <br />INCLUDING STEP-DOWN TRANSFORMERS FOR 24 <br />VAC CONTROL, RELAYS, RELAY BOARDS, RELAY <br />BASES, PRINTED CIRCUIT BOARDS, THERMOSTATS, <br />TIMERS, SENSORS, INDICATORS, ACTUATORS, AND <br />OTHER NECESSARY DEVICES REQUIRED FOR <br />COMPLETE INSTALLATION INCLUDING <br />ENCLOSURES FOR EQUIPMENT. LOCATIONS AND <br />TYPES OF THERMOSTATS, TIMERS, AND OTHER <br />CONTROLS EQUIPMENT ARE INDICATED ON <br />DRAWINGS. <br />B. POWER SUPPLIES: TRANSFORMERS WITH CLASS 2 <br />CURRENT -LIMITING TYPE OR OVERCURRENT <br />PROTECTION; LIMIT CONNECTED LOADS TO 80 <br />PERCENT OF RATED CAPACITY. DC POWER <br />SUPPLY SHALL MATCH OUTPUT CURRENT AND <br />VOLTAGE REQUIREMENTS AND BE FULL WAVE <br />RECTIFIER TYPE. <br />C.DEVICES <br />1. TEMPERATURE SENSORS <br />a. ACCURACY: PLUS OR MINUS 0.36 DEG F OR <br />0.2 PERCENT AT CALIBRATION POINT. <br />MECHANICAL SPECS. (CONT): <br />b. WIRE: TWISTED SHIELDED PAIR - CABLE. <br />c. OUTSIDE AIR SENSORS: WATERTIGHT INLET <br />FITTING, SHIELDED FROM DIRECT <br />SUNLIGHT. <br />2. PROGRAMMABLE THERMOSTAT <br />a. ELECTRIC, SOLID STATE, <br />MICROCOMPUTER -BASED ROOM <br />THERMOSTAT WITH REMOTE SENSOR. <br />b. AUTOMATIC SWITCHING FROM HEATING TO <br />COOLING. <br />3. LOW VOLTAGE ON OFF THERMOSTATS <br />a. 24-VAC, BIMETAL -OPERATED, SNAP -ACTING, <br />MERCURY FREE, WITH ANTICIPATION <br />HEATER, SET -POINT ADJUSTMENT, AND 3 <br />DEG F MAXIMUM DIFFERENTIAL. <br />D. LOW VOLTAGE CONTROL WIRING <br />1. JACKETED, INDIVIDUALLY SHIELDED TWISTED <br />PAIRS OF STRANDED INSULATED TINNED <br />COPPER CONDUCTORS. <br />2. STRANDED TINNED COPPER DRAIN WIRE. <br />3. PLENUM -RATED JACKET FOR PLENUM <br />APPLICATIONS. <br />4. CONDUCTOR SIZES BASED ON 10% MAXIMUM <br />VOLTAGE DROP. <br />5. MINIMUM WIRE SIZE: 22 AWG, MAXIMUM WIRE <br />SIZE: 14 GAUGE. <br />PART 3 - EXECUTION <br />3.1 GENERAL <br />A. UNLESS OTHERWISE DICTATED BY APPLICABLE <br />CODES OR THE AUTHORITY HAVING JURISDICTION, <br />ALL MATERIALS WITHIN RETURN AIR PLENUM MUST <br />BE NONCOMBUSTIBLE AND/OR HAVE A FLAME <br />SPREAD INDEX OF NOT MORE THAN 25 AND A <br />SMOKE -DEVELOPED INDEX NOT MORE THAN 50 IN <br />ACCORDANCE WITH ASTM E 84 TESTING. <br />B. PROTECT WORK, EQUIPMENT AND MATERIAL TO <br />PREVENT OBSTRUCTION, DAMAGE OR BREAKAGE. <br />CLOSE PIPE OPENINGS WITH CAPS OR PLUGS <br />DURING INSTALLATION. COVER AND PROTECT <br />EQUIPMENT AGAINST DIRT, WATER, CHEMICAL OR <br />MECHANICAL INJURY. AT THE COMPLETION OF <br />WORK, THOROUGHLY CLEAN ALL EQUIPMENT AND <br />DELIVER THE ENTIRE SYSTEM IN AN UNBLEMISHED <br />CONDITION. <br />C. MAKE CHANGES IN PULLEYS, BELTS, DUCTWORK, <br />AND DAMPERS AS REQUIRED FOR CORRECT <br />BALANCE AS RECOMMENDED BY AIR BALANCE <br />AGENCY. <br />D. PROVIDE PENETRATION FIRESTOPPING THAT IS <br />PRODUCED AND INSTALLED TO MAINTAIN <br />ORIGINAL FIRE -RESISTANCE RATING OF <br />CONSTRUCTION PENETRATED. PENETRATION <br />FIRESTOPPING SYSTEMS SHALL BE COMPATIBLE <br />WITH ONE ANOTHER, WITH THE SUBSTRATES <br />FORMING OPENING, AND WITH PENETRATING <br />ITEMS IF ANY. <br />1. COORDINATE SIZING OF SLEEVES, OPENINGS <br />CORE -DRILLED HOLES, OR CUT OPENINGS TO <br />ACCOMMODATE PENETRATION FIRESTOPPING. <br />2. INSTALL PENETRATION FIRESTOPPING TO <br />COMPLY WITH MANUFACTURER'S WRITTEN <br />INSTALLATION INSTRUCTIONS AND PUBLISHED <br />DRAWINGS FOR PRODUCTS AND APPLICATIONS <br />INDICATED. <br />3.2 DUCT INSTALLATION <br />A. INSTALL DUCTS ACCORDING TO SMACNA <br />STANDARDS. <br />B. PROTECT DUCT INTERIORS FROM MOISTURE, <br />CONSTRUCTION DEBRIS, AND OTHER FOREIGN <br />MATERIALS. <br />C. FABRICATE, ERECT, AND INSTALL DUCTWORK FOR <br />HEATING, VENTILATING, AND AIR CONDITIONING <br />PER SMACNA STANDARDS AND THE <br />REQUIREMENTS OF THE AUTHORITY HAVING <br />JURISDICTION. <br />D. MAKE JOINTS AIR TIGHT ON ALL DUCTWORK. SEAL <br />EXHAUST DUCTWORK WITH EXTERIOR SEAL AS <br />REQUIRED TO ASSURE POS'TIVE SEAL. COMPLY <br />WITH SMACNA DUCT CLASS A. <br />E. INSTALL FACTORY FABRICATED FITTINGS FOR <br />CHANGES IN DIRECTION, SIZE, AND SHAPE AND <br />FOR BRANCH CONNECTIONS. <br />3.3 HANGERS AND SUPPORT INSTALLATION <br />A. COMPLY WITH SMACNA STANDARDS. <br />B. INSTALL HANGERS AND SUPPORTS WITHIN 24" OF <br />EACH ELBOW AND WITH 48" OF EACH BRANCH <br />INTERSECTION. <br />C. DO NOT USE FASTENERS THAT PENETRATE ROOF <br />DECK. <br />3.4 MECHANICAL EQUIPMENT <br />A.INSTALL PER MANUFACTURER'S <br />RECOMMENDATIONS. <br />3.5 CONTROLS <br />A. COORDINATE LOCATION OF THERMOSTATS, <br />HUMIDISTATS, AND OTHER EXPOSED CONTROL <br />SENSORS WITH PLANS AND ROOM DETAILS <br />BEFORE INSTALLATION. <br />B. CONNECT AND CONFIGURE EQUIPMENT AND <br />SOFTWARE TO ACHIEVE SEQUENCE OF <br />OPERATIONS. <br />C.LOW VOLTAGE CONTROL WIRING. <br />1. COMPLY WITH NECA 1. <br />MECHANICAL SPECS. (CONT): <br />2. COMPLY WITH TIA/EIA-568-B.1. <br />3. BUNDLE AND HARNESS MULTICONDUCTOR <br />INSTRUMENT CABLE IN PLACE OF SINGLE <br />CABLES WHERE SEVERAL CABLES FOLLOW A <br />COMMON PATH. <br />4. NUMBER -CODE OR COLOR -CODE CONDUCTORS <br />FOR FUTURE IDENTIFICATION AND SERVICE OF <br />CONTROL SYSTEM, EXCEPT LOCAL INDIVIDUAL <br />ROOM CONTROL CABLES. <br />5. CONCEAL CABLE, EXCEPT IN MECHANICAL <br />ROOMS AND AREAS WHERE OTHER CONDUIT <br />AND PIPING ARE EXPOSED. <br />6. INSTALL PLENUM -RATED CABLE IN <br />ENVIRONMENTAL AIR SPACES INCLUDING <br />PLENUM CEILINGS. <br />7. WIRING WITHIN ENCLOSURES <br />a. BUNDLE, LACE, AND TRAIN CONDUCTORS <br />TO TERMINAL POINTS WITH NO EXCESS. <br />b. INSTALL CONDUCTORS PARALLEL, WITH OR <br />AT RIGHT ANGLES TO SIDES AND BACK OF <br />ENCLOSURE. <br />D. AFTER ELECTRICAL CIRCUITRY HAS BEEN <br />ENERGIZED, START UNITS TO CONFIRM PROPER <br />UNIT OPERATION. REMOVE AND REPLACE <br />MALFUNCTIONING UNITS AND RETEST. <br />E. TEST EACH SYSTEM FOR COMPLIANCE WITH <br />SEQUENCE OF OPERATION. <br />F. OCCUPANCY ADJUSTMENTS, WHEN REQUESTED <br />WITHIN 12 MONTHS OF DATE OF SUBSTANTIAL <br />COMPLETION, PROVIDE ON -SITE ASSISTANCE IN <br />ADJUSTING SYSTEM TO SUIT ACTUAL OCCUPIED <br />CONDITIONS. PROVIDE UP TO THREE VISITS TO <br />PROJECT DURING OTHER THAN NORMAL <br />OCCUPANCY HOURS FOR THIS PURPOSE. <br />3.6 EQUIPMENT LABEL INSTALLATION <br />A. INSTALL OR PERMANENTLY FASTEN LABELS ON <br />EACH MAJOR ITEM OF MECHANICAL EQUIPMENT. <br />B. LABEL ACCESS DOORS TO INDICATE THE <br />PURPOSE OF ACCESS DOOR. <br />C.LOCATE EQUIPMENT LABELS WHERE ACCESSIBLE <br />AND VISIBLE. <br />D. WHERE EQUIPMENT, SUCH AS A VAV BOX, IS <br />CONCEALED BY ACCESSIBLE DROP OR LAY -IN <br />CEILINGS OR OTHER ACCESSIBLE BARRIER, <br />ATTACH LABEL TO CEILING GRID OR A VISIBLE <br />LOCATION TO IDENTIFY LOCATION OF HIDDEN <br />EQUIPMENT. <br />3.7 TESTING, ADJUSTING, AND BALANCING <br />A. PERFORM TESTING AND BALANCING <br />PROCEDURES ON EACH SYSTEM ACCORDING TO <br />THIS SECTION AND THE PROCEDURES CONTAINED <br />IN ONE OF THE FOLLOWING: <br />1. AABGS "NATIONAL STANDARDS FOR TOTAL <br />SYSTEM BALANCE" <br />2. NEBB'S "PROCEDURAL STANDARDS FOR <br />TESTING, ADJUSTING, AND BALANCING OF <br />ENVIRONMENTAL SYSTEMS." <br />B. COMPLY WITH REQUIREMENTS IN ASHRAE 62.1 <br />SECTION 7.2.2 - "AIR BALANCING." <br />C. AIRFLOW VALUES ARE TO BE ADJUSTED TO PLUS <br />OR MINUS 5% OF DESIGN FLOW. <br />D. SET DAMPERS TO FAIL SAFE POSITION BEFORE <br />TESTING, ADJUSTING, AND BALANCING. <br />E. MARK EQUIPMENT AND BALANCING DEVICES, <br />INCLUDING DAMPER -CONTROL POSITIONS, VALVE <br />POSITION INDICATORS, FAN -SPEED -CONTROL <br />LEVERS, AND SIMILAR CONTROLS AND DEVICES, <br />WITH PAINT OR OTHER SUITABLE, PERMANENT <br />IDENTIFICATION MATERIAL TO SHOW FINAL <br />SETTINGS. <br />F. ADJUST FANS TO DELIVER DESIGN AIRFLOW <br />WITHIN THE DESIGN FAN SPEED LISTED BY FAN <br />MANUFACTURER. <br />G. AFTER TESTING AND BALANCING IS COMPLETE, <br />OPERATE EACH SYSTEM AND RANDOMLY CHECK <br />MEASUREMENTS TO VERIFY THAT THE SYSTEMS <br />ARE OPERATING IN ACCORDING TO THE FINAL <br />TEST AND BALANCE READINGS. <br />3.8 OPERATION PRIOR TO ACCEPTANCE <br />A. CONTRACTOR MAY OPERATE ANY EQUIPMENT <br />PROVIDED THAT THE OPERATION IS SUPERVISED <br />AND THE CONTRACTOR RETAINS FULL <br />RESPONSIBILITY FOR PROPERLY MAINTAINING <br />EQUIPMENT AND THE FULL MANUFACTURER'S <br />WARRANTY REMAINS UNAFFECTED FROM THE <br />TIME OF OWNER'S POSSESSION. <br />GENERAL NOTES: <br />A. PROVIDE ALL MATERIALS AND EQUIPMENT AND <br />PERFORM ALL LABOR REQUIRED TO INSTALL <br />COMPLETE AND OPERABLE MECHANICAL <br />SYSTEMS AS INDICATED ON THE DRAWINGS, AS <br />SPECIFIED AND AS REQUIRED BY CODE. <br />B. CONTRACT DOCUMENT DRAWINGS FOR <br />MECHANICAL WORK (HVAC, PLUMBING, AND FIRE <br />PROTECTION) ARE DIAGRAMMATIC AND ARE <br />INTENDED TO CONVEY SCOPE AND GENERAL <br />ARRANGEMENT ONLY. <br />C. INSTALL ALL MECHANICAL EQUIPMENT AND <br />APPURTENANCES IN ACCORDANCE WITH <br />MANUFACTURERS' RECOMMENDATIONS, <br />CONTRACT DOCUMENTS, AND APPLICABLE <br />CODES AND REGULATIONS. <br />GENERAL NOTES (CONT): <br />D. PROVIDE VIBRATION ISOLATION FOR ALL <br />MECHANICAL EQUIPMENT TO PREVENT <br />1 RANSMISSION OF VIBRATION TO BUILDING <br />STRUCTURE. <br />E. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING <br />SUPPORTS CONNECTED TO AND WITHIN 50 FEET <br />OF ISOLATED EQUIPMENT (EXCEPT AT BASE <br />ELBOW SUPPORTS AND ANCHOR POINTS) <br />THROUGHOUT MECHANICAL EQUIPMENT ROOMS. <br />DO THE SAME FOR SUPPORTS OF STEAM MAINS <br />WITHIN 50 FEET OF BOILER OR PRESSURE <br />REDUCING VALVES. <br />F. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING <br />SUPPORTS OF STEAM MAINS WITHIN 50 FEET OF <br />BOILERS AND PRESSURE REDUCING VALVES. <br />G. THE LOCATION OF EXISTING UNDERGROUND <br />UTILITIES IS SHOWN IN AN APPROXIMATE WAY <br />ONLY. THE CONTRACTOR SHALL DETERMINE THE <br />EXACT LOCATION OF ALL EXISTING UTILITIES <br />BEFORE COMMENCING WORK. THE CONTRACTOR <br />SHALL PAY FOR AND REPAIR ALL DAMAGES <br />CAUSED BY FAILURE TO EXACTLY LOCATE AND <br />PRESERVE ANY AND ALL UNDERGROUND <br />UTILITIES UNLESS OTHERWISE INDICATED. <br />H. COORDINATE CONSTRUCTION OF ALL <br />MECHANICAL WORK WITH ARCHITECTURAL, <br />STRUCTURAL, CIVIL., ELECTRICAL WORK, ETC., <br />SHOWN ON OTHER CONTRACT DOCUMENT <br />DRAWINGS. <br />I. MAINTAIN A MINIMUM OF 6-8" CLEARANCE TO <br />UNDERSIDE OF PIPES, DUCTS, CONDUITS, <br />SUSPENDED EQUIPMENT, ETC.. THROUGHOUT <br />ACCESS ROUTES IN MECHANICAL ROOMS. <br />J. ALL TESTS SHALL BE COMPLETED BEFORE ANY <br />MECHANICAL EQUIPMENT OR PIPING INSULATION <br />IS APPLIED. <br />K. LOCATE ALL TEMPERATURE, PRESSURE, AND <br />FLOW MEASURING DEVICES IN ACCESSIBLE <br />LOCATIONS WITH STRAIGHT SECTION OF PIPE OR <br />DUCT UP- AND DOWNSTREAM AS RECOMMENDED <br />BY THE MANUFACTURER FOR GOOD ACCURACY. <br />L. TESTING, ADJUSTING, AND BALANCING AGENCY <br />SHALL BE A MEMBER OF THE ASSOCIATED AIR <br />BALANCE COUNCIL (AABC) OR THE NATIONAL <br />ENVIRONMENTAL BALANCING BUREAU (NEBB). <br />TESTING, ADJUSTING, AND BALANCING SHALL BE <br />PERFORMED IN ACCORDANCE WITH THE AABC <br />STANDARDS. <br />M. WHERE TWO OR MORE ITEMS OF THE SAME TYPE <br />OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF <br />ONE MANUFACTURER SHALL BE USED. <br />N. REINFORCEMENT, DETAILING, AND PLACEMENT <br />OF CONCRETE SHALL CONFORM TO ASTM 315 <br />AND ACI 318. CONCRETE SHALL CONFORM TO <br />ASTM C94. CONCRETE WORK SHALL CONFORM TO <br />ACI 318, PART ENTITLED "CONSTRUCTION <br />REQUIREMENTS." COMPRESSIVE STRENGTH IN 28 <br />DAYS SHALL BE 3,000 PSI. TOTAL AIR CONTENT OF <br />EXTERIOR CONCRETE SHALL BE BETWEEN 5 AND <br />7 PERCENT BY VOLUME. SLUMP SHALL BE <br />BETWEEN 3 AND 4 INCHES. CONCRETE SHALL BE <br />CURED FOR 7 DAYS AFTER PLACEMENT. <br />0. COORDINATE ALL EQUIPMENT CONNECTIONS <br />WITH MANUFACTURERS' CERTIFIED DRAWINGS. <br />COORDINATE AND PROVIDE ALL DUCT AND PIPING <br />TRANSITIONS REQUIRED FOR FINAL EQUIPMENT <br />CONNECTIONS TO FURNISHED EQUIPMENT. FIELD <br />VERIFY AND COORDINATE ALL. DUCT AND PIPING <br />DIMENSIONS BEFORE FABRICATION. <br />P. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY <br />WITH THE NATIONAL ELECTRIC CODE AND <br />DIVISION 16 OF THE SPECIFICATION. <br />Q. CONCRETE HOUSEKEEPING PADS TO SUIT <br />MECHANICAL EQUIPMENT SHALL BE SIZED AND <br />LOCATED BY THE MECHANICAL CONTRACTOR. <br />MINIMUM CONCRETE PAD THICKNESS SHALL BE 6 <br />INCHES. PAD SHALL EXTEND BEYOND THE <br />EQUIPMENT A MINIMUM OF 6 INCHES ON EACH <br />SIDE. CONCRETE HOUSEKEEPING PADS SHALL BE <br />PROVIDED BY THE GENERAL CONTRACTOR. IT <br />SHALL BE THE RESPONSIBILITY OF THE <br />MECHANICAL CONTRACTOR TO COORDINATE SIZE <br />AND LOCATION OF CONCRETE HOUSEKEEPING <br />PADS WITH GENERAL CONTRACTOR. <br />R. ALL MECHANICAL ROOM DOORS SHALL BE A <br />MINIMUM OF 4'-0" WIDE. <br />S. WHERE BEAMS ARE INDICATED TO BE <br />PENETRATED WITH DUCTWORK OR PIPING, <br />COORDINATE DUCTWORK AND PIPING LAYOUT <br />WITH BEAM OPENING SIZE AND OPENING <br />LOCATIONS. COORDINATION SHALL BE DONE <br />PRIOR TO FABRICATION OF DUCTWORK, CUTTING <br />OF PIPING, OR FABRICATION OF BEAMS. <br />T. WHEN MECHANICAL WORK (HVAC, PLUMBING, <br />SHEET METAL, FIRE PROTECTION, ETC.) IS <br />SUBCONTRACTED, IT SHALL BE THE MECHANICAL <br />CONTRACTOR'S RESPONSIBILITY TO COORDINATE <br />SUBCONTRACTORS AND THE ASSOCIATED <br />CONTRACTS. WHEN DISCREPANCIES ARISE <br />PERTAINING TO WHICH CONTRACTOR PROVIDES <br />A PARTICULAR ITEM OF THE MECHANICAL <br />CONTRACT OR WHICH CONTRACTOR PROVIDES <br />FINAL CONNECTIONS FOR A PARTICULAR ITEM OF <br />THE MECHANICAL CONTRACT, IT SHALL BE <br />BROUGHT TO THE ATTENTION OF THE <br />MECHANICAL CONTRACTOR, WHOSE DECISION <br />SHALL BE FINAL. <br />GENERAL NOTES (CONT.): <br />U. THE LOCATIONS OF ALL ITEMS SHOWN ON THE <br />DRAWINGS OR CALLED FOR IN THE <br />SPECIFICATIONS THAT ARE NOT DEFINITELY <br />FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. <br />THE EXACT LOCATIONS NECESSARY TO SECURE <br />THE BEST CONDITIONS AND RESULTS MUST BE <br />DETERMINED BY THE PROJECT SITE CONDITIONS <br />AND SHALL HAVE THE APPROVAL OF THE <br />ENGINEER BEFORE BEING INSTALLED. DO NOT <br />SCALE DRAWINGS. <br />V. ALL MISCELLANEOUS STEEL REQUIRED TO <br />ENSURE PROPER INSTALLATION AND AS SHOWN <br />IN DETAILS FOR PIPING, DUCTWORK, AND <br />EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL <br />BE FURNISHED AND INSTALLED BY THE <br />MECHANICAL CONTRACTOR. <br />W. PROVIDE ACCESS PANELS FOR INSTALLATION IN <br />WALLS AND CEILINGS, WHERE REQUIRED, TO <br />SERVICE DAMPERS, VALVES, SMOKE DETECTORS, <br />AND OTHER CONCEALED MECHANICAL <br />EQUIPMENT. ACCESS PANELS SHALL BE TURNED <br />OVER TO GENERAL CONTRACTOR FOR <br />INSTALLATION. <br />X. ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL <br />BE SUPPORTED AS DETAILED, SPECIFIED, AND <br />REQUIRED TO PROVIDE A VIBRATION FREE <br />INSTALLATION. <br />Y. ALL DUCTWORK, PIPING AND EQUIPMENT <br />SUPPORTED FROM STRUCTURAL STEEL SHALL BE <br />COORDINATED WITH GENERAL CONTRACTOR. ALL <br />ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, <br />OR JOIST GIRDERS SHALL BE AT PANEL POINTS. <br />PROVIDE BEAM CLAMPS MEETING MSS <br />STANDARDS. WELDING TO STRUCTURAL <br />MEMBERS SHALL NOT BE PERMITTED. THE USE OF <br />C-CLAMPS SHALL NOT BE PERMITTED. <br />Z. MECHANICAL EQUIPMENT, DUCTWORK, AND <br />PIPING SHALL NOT BE SUPPORTED FROM METAL <br />DECK. <br />AA. ALL ROOF MOUNTED EQUIPMENT CURBS FOR <br />EQUIPMENT PROVIDED BY THE MECHANICAL <br />CONTRACTOR SHALL BE FURNISHED BY THE <br />MECHANICAL CONTRACTOR AND INSTALLED BY <br />THE GENERAL CONTRACTOR. <br />AB. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND <br />ROOF OPENINGS SHALL BE COORDINATED WITH <br />ALL OTHER TRADES INVOLVED. <br />AC. ALL OPENINGS IN FIRE WALLS DUE TO <br />DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE <br />FIRE STOPPED WITH A PRODUCT SIMILAR TO 3M <br />OR APPROVED EQUAL. <br />AD. ALL AIR CONDITIONING CONDENSATE DRAIN <br />LINES FROM EACH AIR HANDLING UNIT AND <br />ROOFTOP UNIT SHALL BE PIPED FULL SIZE OF THE <br />UNIT DRAIN OUTLET, WITH "P" TRAP, AND PIPED <br />TO NEAREST DRAIN. SEE DETAILS SHOWN ON THE <br />DRAWINGS OR THE CONTRACT SPECIFICATIONS <br />FOR DEPTH OF AIR CONDITIONING CONDENSATE <br />TRAP. <br />AE. REFER TO TYPICAL DETAILS FOR DUCTWORK, <br />PIPING, AND EQUIPMENT INSTALLATION. <br />C <br />o <br />0 <br />w <br />CU <br />W <br />o <br />2 <br />U. <br />M <br />w <br />a', <br />U <br />D <br />z <br />INFINITY ENGINEERING <br />GROUP, LLC <br />1208 East Kennedy Boulevard <br />Suite 230 <br />Tampa, Florida 33602 <br />[p]: 813.434.4770 <br />[f]: 813.445.4211 <br />www.iegroup.net <br />Cert. of Auth. No. 27889 <br />Client Name and Address <br />1201 OAKFIELD DRIVE, NO. 109 <br />BRANDON, FLORIDA 33509 <br />Rid <br />G �r r <br />- N <br />U <br />7 �r <br />S <br />OF <br />Arb <br />", Lm <br />0 <br />(A <br />Z <br />N <br />It <br />to <br />WO <br />J <br />O <br />I - <br />v6 <br />z <br />a <br />J <br />J <br />= <br />J <br />J <br />} <br />a <br />U <br />a <br />N <br />C� <br />- <br />V <br />u> <br />as <br />W <br />m <br />J <br />= <br />N <br />J <br />" <br />0 <br />Q <br />N <br />Q <br />N <br /><LO <br />° <br />W <br />2 <br />z <br />a <br />ca <br />ca <br />M <br />z <br />'o <br />s <br />a <br />cn <br />Project No. <br />Sheet <br />140-88.00 <br />M-001 <br />Date <br />05/03/2019 <br />Scale <br />AS NOTED <br />