My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6512 Gall Blvd (9)
Zephyrhills
>
Building Department
>
Building Plans
>
6512 Gall Blvd (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 10:39:58 AM
Creation date
2/25/2025 4:13:55 PM
Metadata
Fields
Template:
Building Plans
Street #
6512
Location
Gall Blvd
Contractor
Compass Construction Management LLC
Building Plans - Permit #
4760
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALL THREADED HANGER RO <br />BEVERAGE DISPENSER <br />COLD WATER SUPPLY DOWN IN <br />FURNISHED BY OTHERS <br />LOCKING NUT <br />PARTITION WHERE SHOWN ON <br />411 ± <br />PLAN' <br />SUPPORT NUT <br />HEAVY DUTY <br />0 <br />BEVERAGE DISPENSER <br />CLEVIS HANGER <br />FURNISHED BY OTHERS — <br />1/8" D(A FLEX LINE PROVIDED <br />DUPLEX ELECTRICAL OUTLET <br />' <br />y INSULATION WITH <br />WITH MACHINE. FLEX LINE TO <br />EXTEND A MAXIMUM OF 18" TO <br />1/8" DIA FLEX LINE PROVIDED <br />FOR TAP REFRIGERATION UNIT DUPLEX ELECTRICAL <br />f <br />VAPOR BARRIER <br />e <br />HARD PIPE. <br />WITH MACHINE <br />OUTLET FOR FUTURE USE <br />(HW PIPING ONLY) <br />LOCATION OF FUTURE <br />`7 �. PIPING j; <br />■ <br />WATER CHILLER <br />1/2!! 4 ALL THREADED <br />:.......................................................: <br />HANGER ROD <br />18 GA. GALV!D <br />PROVIDE A COILED FOUR FOOT LENGTH <br />DRAIN LINE CAN NOT TRAVEL OVER <br />STEEL SADDLE <br />OF SOFT COPPER TUBING TO UNIT <br />LIP RIDGES OR OBSTRUCTIONS. LINE <br />INSULATED PIPE <br />MIN. 3 TIMES <br />WATER INLET, SAME SIZE AS UNIT INLET, CABINETRY <br />70 HAVE POSITIVE DOWN FLOW AT <br />PROVIDE DEDICATED CHROME <br />W: <br />■_ j r. <br />WITH SUPPORT SADDLE PIPE DIAMETER <br />WITH ADAPTERS AS REQUIRED. <br />ALL TIMES. <br />PLATED QUARTER TURN ANGLE <br />li E j <br />STOP VALVE BELOW COUNTER <br />IZI <br />STANDARD <br />FOR EACH MACHINE <br />j 1 <br />■ <br />PIPE SCRAP <br />PROVIDE TRAP AT BOTTOM OF <br />PLAT D CHROME <br />RUBBER <br />RISER <br />RISER FLAT AGAINST WALL. <br />FLAT INTO DRAIN. <br />UDEDICATED <br />PLATED QUARTER TURN ANGLE <br />STOP VALVE BELOW COUNTER <br />2" INDIRECT HARD <br />SINK OR FLOOR WATER <br />DRAIN PER SUPPLY TO <br />ISOLATION PAD <br />FOR EACH MACHINE <br />PIPE DRAIN LINES <br />COPE CAP UNIT. <br />LOCKING NUT <br />`'..., , ,... `. <br />FLOOR <br />UNISTRUT CHANNEL <br />2" INDIRECT HARD <br />1-1/2" x 1-1/2" MIN. <br />P(RE DRAIN LINES <br />COMMENTS: <br />SUPPORT NUT <br />1. ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST AS REQUIRED TO SUIT CONDITIONS. VERIFY CONNECTIONS WITH <br />W/WASHER <br />MANUFACTURER <br />FLOOR DRAIN <br />01 <br />TAP SYSTEM DETAIL (F •'ONT VIEW) <br />0 <br />PIPE HANGERS(D5EVERAGE <br />W1 FLOOR DRAIN PIPING <br />SCHEMATIC � ISLAND OASIS (10) <br />SCALE: NONE <br />SCALE: NONE <br />SCALE: NONE <br />10 -USE HARD COPPER PIPE °" <br />ABOVE FLOOR SLAB, OF <br />SIZE AS SHOWN ON PLANS. <br />FLOOR CsRrATE TO BE <br />PROVIDE A COILED FOUR FOOT <br />`- COPPER PIPE COUPLING <br />FASTENED DOWN WITH <br />LENGTH OF TUBING TO UNIT WATER <br />INLET, SAME SIZE A5 UNIT INLET, ( PLUMBING WATER <br />WITH ADAPTERS AS REQUIRED. SUPPLY DOWN IN <br />FLOOR SLAB r <br />SCREWS <br />DRAIN LINE <br />MOUNT FLUSH <br />DOUBLE, LOCKING <br />HANGER NUTS <br />PARTITION WHERE <br />R.ISHED ROCK <br />tL <br />WITH FINISHED D <br />BEVERAGE DISPENSER FURNISHED SHOWN ON PLAN."'"� <br />FLOOR <br />BY OTHERS. ----� 1 <br />AIR GAP = 2 <br />BOTTOM CHORD of STRUGTL{RAL JOIST <br />WATER SUPPLY FITTING: JOHN .........._ 1 BACKFLOW <br />.. ..........:_; <br />COMPACT <br />!! " " <br />X D <br />GUEST 3/8"NPT X 3/8"TU5E PREVENTOR <br />GUEST <br />EARTH <br />PROVIDE <br />ADAPTER (PART " P10112236)---___ <br />STYROFOAM OR7 PROVIDE ELASTOMERIC <br />THREADED HANGER ROD <br />PROVIDE PVC INDIRECT DRAIN <br />MASONRY SUPPORTS UNICELLULAR SEAMLESS <br />LOCKING NUT <br />PROVIDE DEDICATED CHROME 1) <br />1/2" INSULATION ON PIPE <br />PLATED QUARTER TURN ANGLE _' PROVIDE STAINLESS STEEL DRAIN <br />BELOW FLOOR SLAB, <br />USE TYPE "K" SOFT <br />HUB OUTLET <br />HEAVY DUTY CLEVIS HANGER <br />STOP VALVE BELOW COUNTER _ LUXE SP-26. SECURE 70 WALL AS <br />COPPER CUBE WITHOUT AND TO STUB ABOVE <br />................. REQUIRED <br />FLOOR..._:""=' <br />FLOOR ONE INCH. <br />::::::: .....! <br />�`" - PROVIDE 1�11 PVC INDIRECT DRAIN <br />JOINTS BELOW FLOOR <br />SUPPORT NUT <br />SECURE AS REQUITED. <br />IF NOT AND GOLD WATER <br />-.—. <br />PROVIDE SAND PIPES ARE INSTALLED IN <br />COMMENTS: <br />BACKFILL. SURROUND SAME TRENCH, SEPARATE <br />NOTE <br />INSULATED PIPE <br />1. ARRANGEMENT SHOWN 16 SCHEMATICADJUST AS REQUIRED <br />PIPE MINIMUM 4 INCHES. THEM BY MINIMUM 12". <br />A. FLOOR SINK COVER FLUSH WITH TILE. <br />TO SUIT CONDITIONS. VERIFY CONNECTIONS WITH <br />IF FLOOR SLAB 15 EXISTING, SAW CUT IT, EXCAVATE, <br />MANUFACTURER <br />BACKFIELD, REPAIR VAPOR BARRIER AND PATCH SLAB. <br />OO C, f <br />FLOOR <br />I <br />! I <br />PIPI LONGPE SADDLE <br />LE <br />AT <br />PIPE SHALL HAVE LONG RADIUS TURNS WITHOUT KINKS. <br />�✓ <br />THERE SHALL BE NO CONTACT OF COPPER TUBE WITH <br />EACH HANGER <br />OTHER PIPE, CONDUIT, OR REINFORCING STEEL. <br />0 <br />TAP SYSTEM DETAIL (SIDE VIEW) <br />0 <br />WATER PIPE UNDER SLA5 <br />6 <br />FLOOR SINK DETAIL <br />0 0 <br />CLEVIS HANGER <br />DETAIL <br />SCALE: NONE <br />SCALE: NONE <br />SCALE: NONE <br />SCALE: NONE <br />ONLY USE IF ALTERNATE FRONT LINE ESPRESSO IS <br />PART <br />OF PLANS &DELETE BACK LINE ESPRESSO <br />SANITARY PIPING. GUT <br />"FW TO EACH ESPRESSO POINT OF USE SOFTENING ESPRESSO POINT OF USE SOFTENING CARTRIDGE LOCATED <br />AND CAP SO TOP IS <br />CARTRIDGE. EXTEND %"FW FROM CARTRIDGE TO ESPRESSO. BACK OF HOUSE <br />ADJACENT TO BEVERAGE LINE WATER <br />FLUSH WITH FINISHED <br />VERIFY IF SINGLE OR TWO ESPRESSO UNITS ARE USED AT FILTRATION SYSTEM 38" FW TO ESPRESSO <br />SLAB. SEAL AIR -TIGHT. <br />OR RO OR RO WITH SOFTENER WATER THIS LOCATION PRIOR TO BID AND INSTALLATION. <br />FILTER: SEE DUNKIN' BRANDS <br />FILTER: <br />PROTOTYPE DRAWINGS ESPRESSO POINT <br />OF USE SOFTENING CARTRIDGE LOCATED <br />BACK OF HOUSE <br />ADJACENT TO BEVERAGE LINE WATER <br />FINISHED FLOOR <br />FILTRATION SYSTEM <br />%" FW TO ESPRESSO <br />r. <br />CW (CU) 34• FW <br />34" FW VALVELESS MULTIPORT TEE <br />ICE MAKER POINT OF USE FILTER CARTRIDGE LOCATED BACK <br />ESPRESSO ESPRESSO THUMB RHINO <br />OF HOUSE ADJACENT TO BEVERAGE LINE WATER FILTRATION <br />ALT @ (OPTIONAL) RINSER RINSER <br />SYSTEM <br />FRONT LINE ALT @ @ALT @ALT <br />1" HW ICU) 3/" HW (CU) <br />#96.4 FRONT LINE ESPRESSO ESPRESSO <br />#96.4 <br />1" CW (CU) 1-CW(CU) 1" CW (CU) <br />U <br />U V <br />SANITARY PIPE CAP DETAIL <br />SCALE: NONE <br />VALVED MANIFOLD <br />VALVED MANIFOLD <br />IL <br />TAP <br />SYSTEM <br />S <br />U U U <br />,�S <br />"?rLL LL. <br />LUL U- <br />lL. � LL LLL l�t. <br />3 3 3 <br />3 3 3 U v s 0 x 0 = <br />�: <br />�:+` <br />�: a: �: �: �: �: �: k a: a: is BANKFLOW <br />k �` TMV TMV <br />t <br />TMV TMV PREVENTION <br />(T�'P) <br />, <br />HOSE WATER MOP WATER LAV LAV <br />WATER ICE HOSE HAND DISH HAND HAND 3 COMP OVEN DUMP <br />THUMB THUMB RHINO BREWER BREWER <br />ESPRESSO ESPRESSO HOT <br />ISLAND ISLAND ICED COFFEE <br />BIBB HEATER SINK CLOSET <br />CLOSET MAKER BIBB SINK WASHER SINK SINK SINK (EXISTING) SINK <br />RINSER RINSER RINSER #124A #124E <br />#96.4 (OPTIONAL) CHOCOLATE <br />OASIS OASIS BREWER <br />#1501 <br />@ STACK @ DUMP @ DUMP <br />#96.4 #107A <br />#116.1 (OPTIONAL) #200A <br />COFFEE SINK SINK <br />#116.1 <br />#1500 #1501/1502 #1501/1502 <br />FW FROM <br />CARTRIDGE <br />NOTE: <br />EQUIPMENT LAYOUT VARIES FROM STORE TO STORE. OMNI <br />DIAGRAMS & DETAILS SHOW THE INTENT OF EQUIPMENT <br />CONNECTIONS. THE PLUMBING CONTRACTOR SHALL <br />PROVIDE CONNECTIONS TO EQUIPMENT BASED ON ACTUAL <br />STORE LAYOUT, COORDINATE EQUIPMENT LOCATIONS FOR <br />EACH INDIVIDUAL STORE WITH EQUIPMENT SUPPLIER PRIOR <br />TO INSTALLATION OF ANY EQUIPMENT. <br />UJATER LINE DIAGRAM <br />SCALE: NONE - DIAGRAMMATIC ONLY <br />REVISIONS <br />BY <br />M <br />n 00 <br />CO <br />o <br />o b <br />v ] N O <br />C "2 ri <br />C U • ti .3 <br />N <br />E y C <br />O <br />> CL 3 <br />— <br />v <br />,c •o <br />E - <br />v <br />� <br />o <br />RI <br />w <br />a <br />I <br />O 100 <br />0000 <br />e PE 141 <br />° <br />° <br />° <br />e STATE <br />ORtOP �o <br />���oo000000��00 <br />GARLAND PATTERSON, P.E. <br />FL Lic. No- 14175 <br />JULY 26, 2022 <br />It <br />Z rn <br />Q t�Y O Z 1c <br />rnC <br />! <br />LL 2"n N <br />obi gn <br />U <br />L <br />O <br />T a <br />00 <br />♦- c T <br />Q - <br />C �_ O <br />w <br />€: c <br />} � N <br />x V_ v <br />W h <br />LO <br />`° 0- <br />c <br />L <br />• <br />C <br />Date: 07. 26. 22 <br />Scale: AS NOTED <br />Project Mgr: JR <br />Drawn: BMD <br />Job: 21-202 <br />Sheet <br />P3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.