Laserfiche WebLink
1. ALL AREAS SHALL COMPLY WITH FEDERAL, STATE, LOCAL CODE, AND REGULATORY <br />9. <br />THE INTERIOR STORE LAYOUT MAY BE FIELD VERIFIED BY THE ROSS CONSTRUCTION <br />17. GLAZING WITHIN 24" OF A DOORWAY AND LESS THAN 60" ABOVE A WALK WAY SHALL <br />REQUIREMENTS. <br />MANAGER PRIOR TO THE START OF FRAMING. THE GENERAL CONTRACTOR IS TO <br />BE SAFETY GLAZING. SEE SHEET A201. <br />PROVIDE THE ROSS CONSTRUCTION DEPARTMENT (ATTN: CONSTRUCTION <br />2. G.C. TO MAINTAIN A CLEAN WORK SITE ON A DAILY BASIS. <br />COORDINATOR, FAX 510-505-4260) WITH A 14-DAY PRIOR WRITTEN NOTICE OF THE <br />18. ANY SURFACES, FINISHES, EQUIPMENT, ETC. INDICATED AS "EXISTING TO REMAIN" <br />PROPOSED DATE FOR THIS FIELD VERIFICATION. <br />OR "RELOCATED" SHALL BE REFURBISHED OR REPAIRED AS NECESSARY TO LIKE <br />3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATE ALL TRADES. <br />NEW CONDITION. <br />10. <br />SEE SHEET A501 FOR WALL TYPES AND TYP. DETAILS <br />4. DIMENSIONS ARE TO FINISH SURFACES UNLESS NOTED OTHERWISE. <br />11. <br />SEE SHEET A601 FOR ROOM FINISH SCHEDULE AND DOOR & HARDWARE SCHEDULE. <br />5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CONFIRMING OVERALL <br />DIMENSIONS AND STRUCTURAL CONDITIONS PRIOR TO BEGINNING WORK. ANY <br />12. <br />MAINTAIN 44" MINIMUM CLEAR CORRIDOR WIDTH LEADING TO ANY SPACE OR ROOM <br />DISCREPANCIES OR POTENTIALLY PROBLEMATIC CONDITIONS SHALL BE BROUGHT <br />WITH AN OCCUPANT LOAD OF TEN (10) OR MORE. <br />TO THE IMMEDIATE ATTENTION OF THE CONSTRUCTION MANAGER. <br />13. <br />NO OBJECT CREATING AN OBSTRUCTION TO CIRCULATION OR TO VISIBILITY IS TO BE <br />6. FINISH ELEVATIONS REFERENCED ON ARCHITECTURAL DRAWINGS ARE DATUM <br />PLACED IN FRONT OF THE ROSS ELEVATION WITHOUT THE SPECIFIC WRITTEN <br />ELEVATIONS ABOVE THE FINISH FLOOR ELEVATION. THE CONTRACTOR MUST <br />APPROVAL OF THE CPM FOR EACH OBSTRUCTION. <br />COORDINATE DATUM -BASED ARCHITECTURAL ELEVATIONS SHOWN WITH <br />SITE -SPECIFIC ELEVATIONS. <br />14. <br />PROVIDE REQUIRED AREA OF LEVEL LANDING AT ALL EXTERIOR DOORS, MAX. 2% <br />SLOPE IN ANY DIRECTION. <br />7. AISLE AND ENTRY LAYOUT, BACK -AREA AND OBJECT LOCATIONS ARE SUBJECT TO <br />CHANGE BASED ON ROSS SITE SPECIFIC REQUIREMENTS, SEE ROSS SITE -SPECIFIC <br />15. <br />ROSS STORES DOES SELL PREPACKAGED FOODS, TYPICALLY 100 TO 125 LINEAL <br />AE1 TENANT'S PLAN FOR SITE -SPECIFIC REQUIREMENTS. THE GENERAL <br />FEET OF SHELVING AS SHOWN. ENSURE THAT PLUMBING DESIGN AND BUILDING <br />CONTRACTOR MUST VERIFY THROUGH THE ROSS CONSTRUCTION REPRESENTATIVE <br />FINISHES MEET LOCAL PERMIT REQUIREMENTS FOR THE SALE OF SUCH <br />PRIOR TO INSTALLING FLOORING AND LOCATING OBJECTS REQUIRING VERIFICATION <br />MERCHANDISE AND THAT THE FINAL CERTIFICATE OF OCCUPANCY PERMITS SUCH <br />(VL). <br />RETAIL SALES. ANY SUCH REQUIRED CHANGE MUST BE SPECIFICALLY APPROVED IN <br />WRITING BY THE ROSS C.R. PRIOR TO INTRODUCTION. <br />8. ALL WALLS ARE TO BE DESIGNED IN ACCORDANCE WITH GOVERNING CODES TO <br />PROVIDE NECESSARY SUPPORT AND BRACING TO SAFELY CARRY ALL IMPOSED <br />16. <br />ITEMS TO BE VERIFIED: WITH THE EXCEPTION OF EXTINGUISHER LOCATIONS (WHICH <br />VERTICAL AND LATERAL LOADS (INCLUDING FIXTURE & SHELVING LOADS). <br />MUST BE VERIFIED THROUGH LOCAL AUTHORITY & THE ROSS STORE MANAGER), <br />VERIFICATION FOR THE LOCATIONS OF THOSE ITEMS MARKED (VL) OR "TO BE <br />VERIFIED" <br />WALL <br />LEGEND <br />EXISTING WALL <br />CONSTRUCTION. <br />NEW STUD FRAMING. SEE <br />SHEET A501 FOR MORE INFO. <br />NEW FULL HEIGHT STUD <br />FRAMING. SEE SHEETA501 <br />FOR MORE INFO. <br />N.I.C. SPACE <br />SYMBOL LEGEND <br />O <br />DOOR NUMBER MARKER. <br />SEE SHEET A601 FOR <br />DOOR SCHEDULE. <br />FLOOR FINISH MARKER. <br />SEE SHEET A601 FOR <br />ROOM FINISH SCHEDULE. <br />FLOOR TRANSITION STRIP. <br />SEE SHEET A601 FOR <br />MATERIAL DESCRIPTION. <br />VERIFY LOCATION WITH <br />V.L. <br />ROSS CPM <br />P# <br />WALL TYPE. SEE SHEET A501 <br />NOTES SCALE 3 LEGENDS SCALE <br />NONE NONE <br />I <br />\ II <br />I <br />7 6 5 4 2 1 <br />I <br />NEW DOOR IN NEW <br />OPENING - BY LANDLORD <br />34'-5" loo, 40'-4" 26-7" 35'-8" 1' " <br />5 <br />__ <br />7i P1 I 125' P1 I P1 3" <br />2 LIGHT VALANCE LINE ABOVE <br />A202 - SEE DETAIL 12/A202. FRONT-END CASEWORK SUPPLIED AND EXISTING SIDEWALK <br />NP INSTALLED BY ROSS MILLWORK VENDOR I TO REMAIN <br />INCLUDING'PLUG-IN' CONNECTION TO g <br />FASTLANE SYSTEM. G.C. TO HARDWIRE IF <br />I I LIGHT VALANCE LINE ABOVE I I REQUIRED BY LOCAL CODE, SEE G100 <br />P1 - SEE DETAIL 12/A202. SECTION 12. G.C. PROVIDED AND N EWE IQ <br />INSTALLED FASTLANE AND ROSS <br />INSTALLED CASEWORK CONFIGURATION POWER POLE V.L. <br />ARE BOTH GOVERNED BY AND MUST1,(E) <br />- <br />CONFORM TO THE BOSTON RETAIL - D.5 <br />I I I SITE -SPECIFIC MDB LOCATION AND -� <br />co <br />CIRCUIT PLAN CONFORMS TO THAT PLAN. <br />SEE ELECTRICAL SHEETS. o L <br />EXIST. COLUMN TO <br />i <br />NOTE: REMAIN <br />CHECKOUT SHOWN FOR CONCEPTUAL <br />SCOPE OF WORK ONLY; LOCATIONS WILL <br />BE PROVIDED FROM ROSS CONSTRUCTION <br />REPRESENTATIVE; CHECKOUT AND <br />CUSTOMER SERVICE COUNTERS WILL BE <br />PROVIDED AND INSTALLED TO THE TENANT 10 11 <br />10 11 TYP SPACE BY ROSS. P. 501 501 TYP. I <br />P. 501 501 u.N.o. <br />U.N.O. K <br />FLOOR OUTLET — SEE I FLOOR OUTLET — SEE I a ODj <br />ELECT. DWGS. NEW CONC. " u e `� <br />ELECT. DWGS. NEW CONC. <br />J INFILL TO BE FLUSH & INFILL TO BE FLUSH & L w s <br />01) LEVEL W/ EXIST. CONC. LEVEL W1 EXIST. CONC. <br />1 SLAB " <br />SLAB <br />40 "��� <br />NOTE: FLOOR NOTES: k <br />e I SEE ROOM FINISH SCHEDULE ON SHEET A601 FOR FLOOR I ROSS C.M. MUST BE GIVEN THE OPPORTUNITY TO I " <br />COVERING MATERIALS. INSPECT THE CONDITION OF EVERY FLOOR SLAB <br />e <br />I OR SUB FLOOR PRIOR TO INSTALLATION OF FLOORr <br />— I FINISH. A 14 DAY PRIOR NOTICE MUST BE GIVEN s <br />SALES AREA: <br />J a FIELD TILE 'A' DIRECTION OF TILE OTHE ROSS INSTALLATION.CONSTRUCTION TENDED FLOOR FIN SH IR OF <br />INo <br />ACCENT TILE'B' DIRECTION OF TILE POWER POLE V.L.Nt <br />I 1 \ I I I o AN INSPECTION OR NOT OF A SLAB OR SUBSTRATE <br />FITTING ROOM TILED' DIRECTION OF TILE m BY THE CONSTRUCTION REPRESENTATIVE WILL <br />I 1 } NOT IN ANY WAY RELIEVE THE CONTRACTOR OF NEW CONC. INFILL AT TRENCHING = ^� <br />LOCATIONS - SEE STRUCT. DWGS.---4 O <br />pM€N� — — SALES FLOOR IS TO BE LAID THROUGH -OUT IN A — 0 THE RESPONSIBILITY TO PROVIDE THE SPECIFIED — — — <br />I CHECKERBOARD PATTERN OF 24"X24" ACCENT AND 24"X24" O SLAB AND FINISHED FLOOR FREE OF INSTALLATION EXIT <br />CLOSET FIELD TILE BLOCKS - CONTROL FROM CENTER SALES FLOOR. AND PERFORMANCE DEFECTS. SECURITY PEDESTALS <br />B 5.1 110 p INSTALLED BY ROSS AT G.C. <br />w PREPARED LOCATIONS.UJ <br />LOCKER I G.C. TO CONTACT ROSS CONSTRUCTION REP. PRIOR TO TF E o I SEE ELECTRICAL DWGS. e a O <br />I I TILE A START OF TILE INSTALLATION. r O <br />I I I I ROOM RAILINGS AND STOPS <br />I I I 1 O9 " 1 = INSTALLED BY ROSS FIXTURE � o <br />I 39 6 o VENDOR a 00 <br />I I I 401 0 Cl)LU <br />TILE 'A' P1 P1 <br />OFFICE �dncEz eon�wEl eonswEl m GRAND ENTRANC "HELIX" HIGH TRAFFIC ENTRANCE p 0 w <br />I I I HALL I o SALES FLOOR SYSTEM OER VCT WITH HELIX Z1 VINYL GRID c� z U) <br />I� — AREA (230 BLACK) DESI NSTEP ENTRANCE CARPET o a <br />I I r � <br />O0 <br />J i P6 WROUGHT IRON ND TEMPORARY PLYWOOD Cr m <br />I L J 119 � ( ) ��j w 0 <br />i I I — - o J 101 PROTECTION PRO IDED BY G.C. SEE CRITERIA SHEET m o <br />I P1 7 1 TILE 'A' � G100 NOTE 5.10 o10 <br />O z <br />FLOOR OUTLET SEE ELECT. DWGS. g O <br />P6 CASH o <br />� � � NEW CONC. INFILL TO BE FLUSH & 8 <br />OFFICE I LEVEL W/ EXIST. CONC. SLAB I I SECURITY PEDESTALS I i Lo <br />o 00 ENTRY <br />WOMENS olll <br />I RESTROOM 105 10 11 FINISH FLOOR INSTALLED BY ROSS AT G.C. <br />TYP. 9 10 PREPARED LOCATIONS. <br />0 I '' 12 I�r 9 TILE 'A' TYP. 501 501 20 ELEV. 0' o° <br />114 , a a � 8 U.N.O. SEE ELECTRICAL DWGS. <br />I CT I 1B �, .° \ / w ��> �� P6 MANAGERS <br />` ! 11 M <br />FLOOR OUTLET SEE ELECT. DWGS. LP STATION AND POWER <br />IC <br />I <br />N <br />i� <br />II <br />II <br />w <br />= J <br />O <br />w <br />z <br />J <br />w <br />co <br />w <br />J <br />co <br />0 <br />mcg architecture <br />O 216.520.1551 O 216.520.1567 <br />7100 E. Pleasant Valley Rd., Suite 320, Cleveland, OH 44131 <br />Seal: <br />0a.?-I•!3 <br />A Project for: <br />Client: <br />ROSS STORES, INC. <br />4440 ROSEWOOD DRIVE <br />PLEASANTON, CA 94588 <br />Revisions: <br />I <br />N <br />i� <br />II <br />II <br />w <br />= J <br />O <br />w <br />z <br />J <br />w <br />co <br />w <br />J <br />co <br />0 <br />mcg architecture <br />O 216.520.1551 O 216.520.1567 <br />7100 E. Pleasant Valley Rd., Suite 320, Cleveland, OH 44131 <br />Seal: <br />0a.?-I•!3 <br />A Project for: <br />Client: <br />ROSS STORES, INC. <br />4440 ROSEWOOD DRIVE <br />PLEASANTON, CA 94588 <br />Revisions: <br />w <br />= J <br />O <br />w <br />z <br />J <br />w <br />co <br />w <br />J <br />co <br />0 <br />mcg architecture <br />O 216.520.1551 O 216.520.1567 <br />7100 E. Pleasant Valley Rd., Suite 320, Cleveland, OH 44131 <br />Seal: <br />0a.?-I•!3 <br />A Project for: <br />Client: <br />ROSS STORES, INC. <br />4440 ROSEWOOD DRIVE <br />PLEASANTON, CA 94588 <br />Revisions: <br />AB ADDENDUM B <br />04-12-13 <br />BID/PERMIT <br />02-14-13 <br />No. Description <br />Date <br />Project No.: <br />11.594.01 <br />Drawn By: <br />LMS <br />Reviewed By: <br />BB <br />Scale: <br />AS NOTED <br />Date: <br />01-28-2013 <br />Filename: 11594 A101 <br />Sheet Title: <br />FLOOR <br />PLAN <br />Sheet #: <br />Al 01 <br />© MCG ARCHITECTS 2011 ALL RIGHTS RESERVED <br />-- -- - - — - <br />