Laserfiche WebLink
2 <br />y_GPl <br />1 <br />I � <br />II OOU�Y_ <br />� <br />-RECEIVING-pR'== - <br />II CUSTOMER <br />OMEN'S <br />BREAK ROOMIL <br />® 4 1I P1 <br />BREAK ROOM #2 CUSTOMER III IME <br />N'S <br />O _ <br />- I <br />Cn <br />-- — ———— — — — — —— -- <br />I I <br />I I I I I 1 I I <br />' GR1 <br />1 I <br />r - - - I- - _F i - I I - - --�- - - - r- - <br />0 <br />KKK <br />I ' — <br />I III ' I <br />I <br />I I 1 I <br />MAC 1 <br />I I I I <br />� I <br />2 <br />MAC1 <br />I I I <br />I I I Ir <br />I LUBE & TIRE I <br />I MOUNTING AREA <br />I I I I <br />I I I I <br />° <br />I O GROCERY SALES I I <br />I I <br />I I <br />I I <br />I I I I I I I I I I I I I I <br />� o a <br />o <br />CUSTOMER 1 I� <br />WOMEN'S P1- <br />0 <br />CUSTOMER MEN'S i ® ° 0 ° <br />2 �- — — — — — — — — — — — — — — - — — — — o ® F. <br />In <br />I M 1 I I I I °0 1 I r I I I <br />I laa000 ° <br />m c1co❑ <br />I I IE==EjI IJ71 I I I I <br />0 CONTACTS 0 D <br />1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 <br />MECHANICAL AND PLUMBING PLAN <br />1 " = 30'-0" <br />L <br />1-7 <br />m <br />GENERAL <br />NOTES <br />12.20.13 <br />1. <br />GENERAL NOTES ARE APPLICABLE TO ALL <br />26. <br />WATER PIPING ABOVE GRADE SHALL BE <br />MECHANICAL/PLUMBING DRAWINGS. <br />TYPE "L" HARD DRAWN COPPER JOINED <br />WITH WROUGHT COPPER FITTINGS. MAKE <br />2. <br />PROVIDE ALL MATERIALS FOR A COMPLETE <br />JOINTS USING LEAD-FREE SOLDER AND A <br />INSTALLATION IN ALL RESPECTS AND READY <br />NON -CORROSIVE, PASTE -TYPE FLUX. <br />FOR INTENDED USE AND IN STRICT <br />MAKE PIPING CONNECTIONS TO A FIXTURE <br />ACCORDANCE WITH STATE AND LOCAL CODES <br />WITH CHROME -PLATED SEAMLESS BRASS <br />AND MANUFACTURERS RECOMMENDATIONS. <br />TUBE. INSULATE HOT & COLD WATER <br />PIPING WITH RIGID GLASS FIBER A <br />3. <br />STORE MUST BE KEPT IN OPERATION. <br />MINIMUM OF 1/2" THICK WITH WHITE ALL - <br />ARRANGE ALL WORK TO KEEP DISRUPTIONS <br />SERVICE JACKET (VAPOR RETARDER). <br />TO STORE OPERATIONS TO A MINIMUM. <br />COORDINATE WITH EXISTING AND NEW <br />27. <br />NOT USED. <br />CONSTRUCTION. PAY ALL NECESSARY <br />FEES AND PERMITS. <br />28. <br />ALL FLOOR CLEANOUTS SHALL BE <br />INSTALLED FLUSH WITH FLOOR FINISH <br />4. <br />IF NEW CONSTRUCTION DISRUPTS <br />MATERIAL OR FLUSH WITH CONCRETE SLAB <br />EXISTING UNDERGROUND SERVICES (GAS, <br />IF NO FLOOR FINISH MATERIAL IS <br />SEWER, DOMESTIC WATER, FIRE <br />CALLED OUT FOR ON ARCHITECTURAL <br />SPRINKLER, ETC.), PROVIDE ALL <br />DRAWINGS. <br />MATERIALS AND LABOR AS REQUIRED TO <br />MAINTAIN THEIR PROPER OPERATION. <br />29. <br />LOCATE ALL FLOOR CLEAN -OUTS OUT OF <br />TRAFFIC WAYS, WHILE MAINTAINING <br />5. <br />CONTRACTOR IS RESPONSIBLE FOR <br />ACCESSIBILITY. LOCATE PER <br />UTILIZING OWNER APPROVED ROOFING <br />DIMENSIONS IF SHOWN ON PLANS. <br />CONTRACTORS FOR CUTTING AND <br />PATCHING ROOF. <br />30. <br />FLOOR CUTS SHALL BE STRAIGHT AND <br />CLEAN, REPLACE REMOVED SLAB WITH <br />6. <br />CONTRACTOR SHALL FURNISH AND INSTALL <br />CONCRETE FLUSH AND SMOOTH WITH <br />EXHAUST FANS AND EXHAUST FAN CURBS. <br />ADJACENT FLOOR SLAB. REFERENCE <br />CONTRACTOR SHALL INSTALL ALL <br />ARCHITECTURAL SHEETS. COORDINATE <br />STRUCTURAL SUPPORTS FOR FANS. <br />WITH GENERAL CONTRACTOR. <br />REFERENCE ARCHITECTURAUSTRUCTURAL <br />SHEETS FOR DETAILS. <br />31. <br />CAP ALL PIPING OPENINGS DURING <br />CONSTRUCTION UNTIL FINAL CONNECTIONS <br />7-14. NOT USED. <br />TO EQUIPMENT AND ACCESSORIES ARE <br />MADE. <br />15. <br />INSTALL VTR'S A MINIMUM OF 24" AND <br />FLUES A MINIMUM OF 36" FROM ROOF <br />32. <br />CUT AND PATCH EXISTING CONCRETE <br />EDGE AND/OR PARAPET WALLS. INSTALL <br />FLOOR SLAB FOR INSTALLATION OF NEW <br />VTR'S, FLUES AND EXHAUST FANS A <br />UNDERGROUND PLUMBING PIPE. MATCH <br />MINIMUM OF 10 FT FROM OUTSIDE AIR <br />EXISTING CONSTRUCTION. <br />INTAKE OF ROOF TOP UNITS. INSTALL <br />EXHAUST FANS AND ROOF TOP UNITS A <br />33, <br />DO NOT INSTALL PIPING WITHIN COOLER <br />MINIMUM OF 10 FT FROM ROOF EDGE OR A <br />PANELS. INSTALL EXPOSED PIPING IN <br />MINIMUM OF 60" FROM PARAPET WALLS <br />PREP AREAS A MINIMUM OF 1" FROM <br />THAT ARE AT LEAST 42" HIGH. <br />PANEL WALL AND 6" ABOVE FINISHED <br />FLOOR TO ALLOW FOR CLEANING. USE <br />16-20. NOT USED. <br />ONLY NON -CORROSIVE MATERIALS FOR <br />SPACERS AND ANCHORS. <br />21. <br />EXISTING PIPE SIZES AND LOCATIONS HAVE <br />NOT BEEN FIELD VERIFIED. CONTRACTOR IS <br />34. <br />PROVIDE ESCUTCHEON PLATES FOR <br />RESPONSIBLE TO FIELD VERIFY LOCATION AND <br />PLUMBING PENETRATIONS THROUGH <br />SIZES OF ALL EXISTING PIPING THAT IS BEING <br />GROCERY CEILINGS AND WALLS. <br />CONNECTED TO OR MODIFIED, AND TO VERIFY <br />THAT PROPER SLOPES AND ELEVATIONS ARE <br />35-36. NOT USED. <br />AVAILABLE. MAINTAIN MINIMUM SLOPE OF <br />1/8" PER FOOT FOR SAN SEWER PIPING 3" <br />37. <br />INSTALL CONTINUOUS SEALANT JOINT AT <br />OR LARGER. MAINTAIN MINIMUM SLOPE OF <br />ALL EXTERIOR WALL PENETRATIONS. <br />1/4" PER FOOT FOR SAN SEWER PIPING <br />SMALLER THAN 3". REF ARCH. FOR <br />38. <br />AT CONTRACTOR'S OPTION, IN LIEU OF COPPER <br />TRENCHING REQUIREMENTS. <br />WATER PIPING, PEX OR AQUATHERM PIPING MAY <br />BE USED. REFER TO EQUIVALENT NOMINAL PIPE <br />22. <br />PLUMBING CONTRACTOR SHALL VERIFY <br />SIZES SCHEDULE AND SPECIFICATIONS. <br />EXISTING SEWER AND VENT PIPE SIZE <br />AND ELEVATION AND SHALL VERIFY THAT <br />39. <br />PROVIDE SEISMIC BRACING BASED ON <br />PROPER SLOPES ARE AVAILABLE BEFORE <br />APPROPRIATE SEISMIC ZONE REQUIREMENTS <br />CUTTING FLOOR SLAB FOR NEW SEWER <br />PER SMACNA PUBLISHED SEISMIC DETAILS, <br />PIPING. <br />LOCAL AND NATIONAL CODES. CONTRACTOR'S <br />RESPONSIBILITY INCLUDES STRUCTURAL <br />23. <br />PROVIDE ACCESS DOORS TO NEW WATER <br />ENGINEER'S CERTIFICATION ON DETAILS <br />VALVES AND CLEANOUTS AS NECESSARY <br />SUBMITTED FOR PERMITTING. <br />WHEN INSTALLED IN INACCESSIBLE AREAS. <br />40. <br />BUILDING COMPONENTS ABANDONED BY THE <br />24. <br />PLUMBING CONTRACTOR SHALL PROVIDE <br />SCOPE OF WORK SHALL BE SECURED TO <br />ONE YEAR WARRANTY FOR PROPER SEWER <br />PREVENT FALLING, LOOSENING, OR CREATING <br />SYSTEM OPERATION. <br />DAMAGE OF ANY KIND IN THE FUTURE. <br />25. <br />SANITARY DRAINAGE LINES AND FITTINGS <br />(DRAIN, WASTE AND VENT) SHALL BE <br />CAST IRON, COATED INSIDE AND <br />OUTSIDE. WHERE PERMITTED BY LOCAL <br />CODES, PVC-DWV PLASTIC SCHEDULE 40 <br />MAY BE USED IN LIEU OF CAST IRON. <br />ALL PHOTOLAB PLUMBING SHALL BE PVC. <br />ALL HVAC WORK ON THIS PROJECT IS TO BE <br />COMPLETED BY A WALMART APPROVED <br />CONTRACTOR. <br />EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL <br />DRAWINGS AND MAY NOT REFLECT EXACT "AS -BUILT" <br />CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL <br />EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL <br />BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE <br />NEW WORK AND DEMOLITION WITH ALL OTHER <br />DISCIPLINES AND EXISTING CONDITIONS. <br />EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A <br />THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE <br />TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES <br />NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE <br />WORK PROPERLY. NO ADDITIONAL COMPENSATION <br />SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT <br />OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH <br />THIS KNOWLEDGE. <br />U <br />z <br />W m <br />jY <br />F- Q <br />ww <br />�w <br />W <br />u <br />a� <br />o� <br />o <br />t <br />U <br />W <br />Er <br />1-o0 <br />U0 <br />m <br />~Q <br />U8 <br />ao <br />ui <br />w WW°o>If <br />U) <br />IDw <br />? <br />o -WU dzzNF <br />W <br />o HO�PWU1zz <br />W <br />X, <br />-w <br />LLW WOWORWO <br />w ~ag�aW. <br />O <br />dQ .0QOF-O=SU~w <br />� <br />Z <br />z <br />O <br />ww wQ'�r-�wLLw <br />3L Lj owwo W zo1:z <br />C7U Q .W QWU00Q <br />z��WS0t<Z0 _<FQo <br />Q W S a W~ 7 z N <br />a <br />O W W <br />oy�womW�a��0w0g <br />�zF�o'��vwa��w <br />S14axtrMco F-100w0wwW¢ <br />1:y <br />�� <br />o <br />W <br />WW <br />M �' <br />W <br />�+_ <br />Wo <br />I <br />zowe <br />W Y 0 <br />Z <br />0Lum <br />a <br />Q <br />=W <br />W � <br />�W <br />D <br />W <br />m <br />z <br />O <br />V <br />J <br />w <br />0 <br />%0 O <br />2 <br />CO O LLLI <br />00 <br />�^ z <br />VJ w <br />JO <br />C) <br />JO <br />ti <br />_ O <br />o = Zoo <br />Ix co <br />O co <br />F-- v <br />W <br />N w <br />w <br />m <br />2 <br />z <br />m <br />O <br />ISSUE BLOCK <br />CHECKED BY: <br />AI/LC <br />DRAWN BY: <br />JMH <br />PROTO: <br />192 SC <br />PROTO CYCLE: <br />122013 <br />DOCUMENT DATE: <br />01/30/14 <br />R <br />4 iATL OF <br />MECHANICAL <br />AND <br />PLUMBING <br />PLAN <br />SHEET: <br />mpi <br />