Laserfiche WebLink
Olt <br />E <br />FLOOR FINISH RESPONSIBILITY MATRIX <br />VCT CONVERSION/PVC CONVERSION <br />PROJECT: 0706 ZEPHYRHILLS, FL <br />SCOPE: PVC CONVERSION; VCT CONVERSION <br />ED FLOORING CONTRACTOR: RMI <br />SCOPE OF WORK <br />REMOVAL OF EXISTING AND INSTALLATION OF NEW - <br />CONTRACTOR RESPONSIBLE FOR WORK LISTED <br />PREFERRED GENERAL IREFRIGERATIONI FLOORING <br />FLOORING CONTRACTOR CONTRACTOR NOTES <br />CONTRACTOR I <br />PIECE REPLACEMENT IN BACK ROOM <br />X <br />TENANT SPACES/ THRESHOLD <br />X <br />VISION CENTER <br />X <br />APPAREL PAD - REMOVAL <br />X <br />APPAREL PAD - FLOOR STAIN <br />X <br />PHARMACY CARPET TILE <br />X <br />FLOOR FINISHES IN GROCERY PREP AREAS INCLUDING <br />THRESHOLDS (NON PUBLIC) <br />X <br />RESTROOMS - CONCRETE OVERLAY <br />X <br />RESTROOMS - TILE <br />X <br />VESTIBULE - RUBBER FLOOR <br />X <br />1 <br />REMOVAL AND INSTALLATION OF REFRG. CASE KICK <br />PLATE <br />X <br />FLOOR JOINT REPAIR (WHERE VCT IS REMOVED) <br />X <br />SLAB SURFACE ENHANCEMENT <br />X <br />SEASONAL <br />X <br />SEASONAL JOINT REPAIR <br />X <br />REMOVAL AND REPLACEMENT OF REFRIGERATED <br />CASE PROTECTION <br />X <br />REMOVAL AND/OR REPLACEMENT OF THRESHOLDS AT <br />AUTOMATIC SLIDING DOORS BY VENDOR. GC TO <br />X <br />(FLOORING NOTES <br />11. THRESHOLD AT AUTOMATIC ENTRANCE SLIDER DOOR TO REPLACED BY VENDOR. <br />DOOR AND FRAME <br />AS SCHEDULED <br />BEVELED EDGE I I <br />ONLY WHEN I I <br />ADJACENT I <br />SURFACEIS I II <br />UNFINISHED <br />CONC. <br />SLAB <br />e e <br />° - a <br />- .ee <br />2" x 1/8" ALUMINUM <br />TRANSITION STRIP. <br />T-4 THRESHOLD IN <br />LIEU OF ALUMINUM <br />TRANSITION AT FULL <br />HEIGHT TRAFFIC <br />II DOORS <br />LVT/PVC (OR VCT) <br />FLOORING - PLACE <br />EDGE OF TILE <br />BELOW DOOR <br />pa <br />FLAT HEAD <br />COUNTER -SUNK <br />ANCHORS AT 12" OC <br />TRANSITION STRIP <br />AT LVT/PVC (OR VCT) FLOORING <br />12" = V-0" RM SC: Al. 1 RM WMN: Al. 1 <br />DOOR AND ME <br />AS SCHEDULED <br />FLOOR AS I I 2" x 3/8" ALUMINUM <br />SCHEDULED, AT I I VCT FLOORING TRANSITION STRIP <br />BUTT AGAINST <br />TRANSITION STRIP I RUBBER FLOORING <br />CONC. <br />L---_-_-- I PLACE EDGE <br />I BELOW DOOR <br />SLAB <br />a• T f a <br />ee 4 <br />TRANSITION STRIP <br />AT RUBBER FLOORING <br />12" = l'-O" RM SC: Al.1 RM WMN: Al.1 <br />NOTES: <br />1. REFER TO PLUMBING PLANS <br />FOR LOCATIONS OF ANY <br />CLEANOUTS WHERE LEVELING <br />REPAIR IS NEEDED. <br />2. MAKE REPAIR PRIOR TO <br />REFINISHING CONCRETE. <br />1/2" DIA X 8" L SMOOTH <br />DOWEL AT EACH <br />QUADRANT. EMBED WITH <br />HILTI HIT HY-150 <br />REPOSITION <br />CLEANOUT AND <br />DRAIN BODY, AND <br />ADJUST LEVEL <br />WITH EXISTING FF <br />ELEVATION <br />EXISTING PIPING <br />TO REMAIN, REF <br />PLUMBING <br />DRAWINGS FOR <br />CONTINUATION - <br />a• - •-A -d . <br />CLEANOUT <br />DIAMETER <br />6" 6" REF STRUCTURAL <br />FOR NEW <br />CONCRETE. <br />POLISH TO MATCH <br />ADJACENT FLOOR <br />ADHESIVE <br />FLAT HEAD <br />COUNTER -SUNK <br />ANCHORS AT 12" OC <br />EXISTING CONCRETE <br />PROVIDE VAPOR <br />BARRIER IF EXISTING <br />OR REQUIRED <br />REMOVE, REPLACE, AND <br />RECOMPACT SLAB BASE <br />MATERIAL TO DEPTH <br />REQUIRED FOR PIPE <br />REPLACEMENT. <br />CLEANOUT LEVELING DETAIL <br />8-- <br />NOTE: UNLESS NOTED OTHERWISE THE PREFERRED FLOORING CONTRACTOR WILL BE <br />RESPONSIBLE FOR REMOVAL OF EXISTING AND INSTALLATION OF NEW (INCLUDING ALL <br />PIECE REPLACEMENTS IN BACK OF HOUSE, TENANT SPACES, ENTRY ETC.) RESILIENT <br />FLOORING, PORCELAIN ENTRANCE TILE, PHARMACY CARPET TILE, CARPET ENTRY TILE, <br />AND VESTIBULE AND RECYCLING CENTER PORCELAIN FLOOR TILE. FLOOR FINISHES IN <br />GROCERY SERVICE AND PREP AREAS (NON-PUBLIC), AND RESTROOMS ARE TO BE <br />INSTALLED BY THE GENERAL CONTRACTOR. <br />HATCH PATTERN USED FOR <br />IDENTIFICATION OF <br />DIFFERENT MATERIALS <br />ONLY. REFER TO <br />SPECIFICATIONS FOR <br />PROPER INSTALLATION <br />METHOD <br />VCT UNDER CASES THAT ARE <br />EXISTING TO REMAIN WILL NOT BE <br />REMOVED. REMOVE KICKPLATES AND <br />REMOVE VCT PAST KICK PLATES AS <br />FAR AS POSSIBLE. REINSTALL <br />KICKPLATES AFTER VCT <br />IS REMOVED. <br />INSTALLATION OF NEW UNDER SLAB <br />UTILITIES AND REPOUR OF <br />TRENCHED CONCRETE TO BE <br />COMPLETED PRIOR TO POLISHING <br />OF THE SLAB IN AREAS WHERE VCT <br />IS TO BE REMOVED AND CONCRETE <br />FLOOR IS TO BE EXPOSED. <br />T <br />T <br />3 4 5 6 7 8 9 <br />FINISH FLOOR PLAN <br />1 1" = .;�'-n" <br />LEGEND <br />CERAMIC <br />TILE <br />REMOVE <br />EXISTING <br />FLOORING - <br />�' POLISH EC - <br />,' REF SPECS <br />CONCRETE <br />4. <br />OVERLAY <br />NOTE: REPLACE ALL JOINTS <br />WHERE VCT IS REMOVED <br />REMOVE AND REINSTALL BASE IN SPACES <br />SCHEDULED FOR VCT CONVERSION IF THE <br />SPACE IN NOT NOTED TO RECIEVE NEW BASE. <br />10 11 12 <br />CARPET <br />RUBBER <br />FLOORING <br />EXISTING <br />FLOORING <br />TO REMAND <br />SHEET NOTES <br />1. REF A8 FOR SCHEDULE FINISH KEY AND GENERAL FINISH <br />NOTES <br />2. SEAL BASE OF ALL COLUMNS ON LVT/PVC PLANK FLOORING <br />W/ GRAY/BROWN SEALANT <br />3. SEAL BASE OF ALL COLUMNS ON VCT FLOORING W/ WHITE <br />SEALANT <br />4. REMOVE AND REPLACE DAMAGED TRANSITION STRIPS TO <br />MATCH EXISTING <br />5. REPAIR BOLT HOLES AND SPALLS RESULTING FROM <br />MERCHANDISE FIXTURE AND OR STORAGE RACK <br />RELOCATION OR REMOVAL. REF SPEC 03905. FILL ALL BOLT <br />HOLES AND AND SPALLS RESULTING FROM FIXTURE AND <br />OR STORAGE RACK RELOCATION OR REMOVAL IN NON <br />CUSTOMER ACCESSIBLE AREAS WITH NON SHRINK GROUT. <br />REF SHEET SA1 FOR BID ALLOWANCE OF BOLT HOLES <br />/SPALLS TO REPAIR. <br />13 14 15 <br />LOuj'j�xWx. ra <br />oZp <br />-,.ON2jinD a H�Z <br />WwmO <br />W <br />' ww~pW�' <br />a2a>oZ <br />woo <br />�' <br />� <br />LL <br />oda�wOzorwxO�i'i <br />LLN3�w—w c�E=Z-3 <br />U <br />3N8zo2=WKZa�FO <br />ZZQzq of,��yy,,11w p <br />~ <br />ZLL OQF�w 0L6Zy <br />H <br />�o�COwc~>W"'z0a aZILLLw0ao53a� <br />ui <br />=ZOaLL?w �Z�KW <br />f-OUOU�wmawomw <br />P <br />z <br />J <br />0 <br />0) <br />z <br />O <br />U <br />w <br />In <br />a <br />C4 <br />) <br />C� C3 c ) <br />0 o <br />V- LL <br />'IJN <br />O <br />co <br />0 <br />o <br />a <br />\/ <br />W O <br />N <br />N Z <br />o <br />N <br />LU <br />i m 0- <br />V <br />W00 <br />N "' <br />W <br />m <br />D <br />z <br />in <br />O <br />ISSUE BLOCK <br />1 JCCD4 06/21/21 <br />2 1 CCD6 10/04/21 <br />CHECKED BY: <br />RD <br />DRAWN BY: <br />LR <br />PROTO CYCLE: <br />09/25/20 <br />DOCUMENT DATE: <br />11/06/20 <br />10/05/21 <br />FLOOR <br />FINISH PLAN <br />SHEET - <br />Al. 1 <br />3/4" = l'-O" RM SC: A1.3 RM WMN: --- <br />