C.2ENERAL NOTES
<br />CONTACT
<br />SPRINKLER SYMBOL LEGEND
<br />GENERAL PIPING
<br />INFORMATION
<br />AND DEMOLITION NOTES
<br />SYMBOL SIZE MFR MAKE S.I.N. FINISH STYLE TEMP K-FACTOR SYMBOL DESCRIPTION
<br />1. THE DESIGN SHOWN ON THESE CONTRACT
<br />DOCUMENTS INCLUDE JURISDICTIONAL REQUIREMENTS
<br />1 MA CH MATH MA CH MA CH MATC PENDENT MA CH 5.6 HYDRAULIC REFERENCE NODE POINT PROVIDED BY THE FOLLOWING CONTACTS:
<br />O
<br />1. CONTRACTOR MUST VISIT THE BUILDING TO
<br />DETERMINE THE FULL EXTENT OF THE EXISTING FIRE
<br />DOCUMENTS HAS BEEN PREPARED FOR APPROVAL BY
<br />EXISTING EXISTING EXISTING EXISTING EXISTING EXiSTIN
<br />PROTECTION WORK AND THE EXISTING CONDITIONS,
<br />THE AUTHORITY HAVING JURISDICTION AND TO
<br />FIRE SPRINKLER REVIEWING AUTHORITY:
<br />BECOME TOTALLY FAMILIAR WITH DISCONNECTIONS,
<br />PROVIDE GUIDANCE FOR BIDDING. THE CONTRACTOR
<br />Q 1" TYCO DS-C TY3555 WHITE CONCEAL 200 5.6 [- CAP VERNE RIGGALL, FIRE MARSHAL
<br />REMOVALS, RELOCATIONS AND/OR RECONNECTIONS
<br />SHALL SUBMIT COMPLETE FIRE SPRINKLER SHOP
<br />(813) 780-0041
<br />OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED,
<br />DRAWINGS AS REQUIRED BY SPECIFICATION SECTION
<br />' VARIES VARIES VARIES ---- BRASS EXISTING
<br />® RISER NIPPLE/DROP NIPPLE
<br />AND COND111ONS IN THE PROPOSAL FOR THIS
<br />01330. CONTRACTOR SHALL BASE SHOP DRAWING
<br />UPRIGHT
<br />PROJECT. NO EXTRA COMPENSATION WILL BE PAID
<br />DESIGN ON THE. FIRE PROTECTION DRAWINGS AND
<br />CHROME EXISTING
<br />FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION,
<br />SPECIFICATIONS. SPRINKLER SHOP DRAWINGS SHALL
<br />___ __
<br />VARIES VARIES VARIES ---- WHITE PENDENT - m SPRINKLER RISER
<br />APPLICABLE CODES
<br />AND/OR ALLOWANCE.
<br />INCLUDE ALL NECESSARY ELEVATIONS, HANGER
<br />LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATION
<br />DEMO VARIES VARIES ---- ___ EXISTING --- --- o--F- INSPECTOR'S TEST/AUXILIARY DRAIN
<br />2. UNLESS NOTED OTHERWISE, DISCONNECT AND REMOVE
<br />METHODS/NOTES, MATERIAL DATA, AND ANY OTHER
<br />PENDENT
<br />ALL EXISTING FiRE PROTECTION COMPONENTS NOT
<br />INFORMATION NECESSARY TO CLARIFY THE INTENT OF
<br />CONTRACTOR MAY SUBSTITUTE SPRINKLERS OF SAME SIZE, K-FACTOR AND NFPA STANDARDS EDITION
<br />\ HANGER NFPA 13 2007
<br />INTENDED TO BE REUSED.
<br />INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE
<br />TEMPERATURE CLASSIFICATION UNLESS PROHIBITED BY THE SPECIFICATIONS.
<br />3. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS TO
<br />SIZES, SPRINKLER SPACING, AND ALL SYSTEM
<br />CONFIGURATIONS AS SHOWN. ANY ALTERNATES iN
<br />\\\ TRAPEZE HANGER PERPENDICULAR TO JOIST REFER TO SHEET Cl FOR APPLICABLE BUILDING CODES
<br />AN APPROVED DUMPING SITE AND CLEAN ALL FIRE
<br />DESIGN OF THE SYSTEM OR IN MATERIALS OR
<br />PROTECTION WORK PRIOR TO PROJECT COMPLETION.
<br />EQUIPMENT USED MUST BE APPROVED IN WRITING VIA
<br />TRAPEZE HANGER PARALLEL TO JOIST
<br />THE REQUEST FOR INFORMATION PROCESS BY THE
<br />4. PERFORM ALL WORK ACCORDING TO THE PROJECT
<br />FIRE PROTECTION ENGINEER OF RECORD PRIOR TO
<br />PHASING SCHEDULE INFORMATION FOR THiS PROJECT.
<br />ANY BIDDING, FABRICATION, OR INSTALLATION.
<br />9 NEW CONNECTION
<br />PROVIDE ALL NECESSARY FIRE PROTECTION WORK,
<br />TEMPORARY AND/OR OTHERWISE, AND USE WHATEVER
<br />2. CONTRACTOR SHALL COORDINATE LOCATIONS OF FIRE
<br />NEW SPRINKLER PIPE
<br />MEANS NECESSARY, TO CONFORM TO THE REQUIRED
<br />PROTECTION COMPONENTS INCLUDING PiPING, ALARMS,
<br />CONSTRUCTION PHASING OF THE PROJECT.
<br />DRAINS, TEST POINTS, ETC., WITH ALL
<br />ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND
<br />- - EXISTING SPRINKLER PIPE
<br />5. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR
<br />ELECTRICAL COMPONENTS. OBSTRUCTIONS TO
<br />REPLACING ITEMS DAMAGED DURING DEMOLITION AND
<br />SPRINKLER DISCHARGE MUST BE CONSIDERED DURING
<br />- - DEMO SPRINKLER PIPE
<br />CONSTRUCTION.
<br />SHOP DRAWING PRODUCTION AND INSTALLATION.
<br />EXTRA SPRINKLERS MAY BE REQUIRED AT NO
<br />PROVIDE ADDITIONAL SPRINKLERS AS
<br />6. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH
<br />ADDITIONAL COST TO WAL-MART. REFER TO
<br />REQUIRED PER NFPA 13 IN EXISTING
<br />ADJACENT SURFACES LEFT UNUSED AFTER EXISTING
<br />SPECIFICATION FOR ADDITIONAL REQUIREMENTS.
<br />SPRINKLER CABINET FOR ANY NEW
<br />SPRINKLER PiPING OR EQUIPMENT IS REMOVED AND
<br />VACATED FROM THESE HOLES.
<br />3. SUBMIT A REQUEST FOR INFORMATION (RFI), FOR
<br />SPRINKLERS INSTALLED.
<br />QUESTIONS RELATED TO THE FIRE PROTECTION
<br />7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND
<br />DOCUMENTS.
<br />MAINTAINING FIRE DEPARTMENT ACCESS ROADS
<br />THROUGHOUT THE PROJECT.
<br />4. ROUTE ALL SPRINKLER MAINS ABOVE THE BOTTOM
<br />CHORD OF THE BAR JOISTS.
<br />8. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE
<br />DEMOLITION SHALL BE LEFT IN SERVICE.
<br />5. PROVIDE FIRE PROTECTION AS REQUIRED BY CODE
<br />FOR ANY TEMPORARY STRUCTURES BUILT DURING
<br />9. ALL WORK SHALL BE PERFORMED SO AS TO NOT
<br />CONSTRUCTION.
<br />INTERRUPT SERVICE: THE CONTRACTOR SHALL
<br />PROPERLY NOTIFY THE LANDLORD, THE LESSOR AND
<br />6. SPRINKLER SYSTEMS ARE MONITORED BY AN
<br />ADJACENT TENANTS A MINIMUM OF 48 HOURS IN
<br />OFF -SITE CENTRAL STATION INCLUDING TAMPER
<br />ADVANCE BEFORE PROCEEDING WITH THIS WORK.
<br />SWITCHES ON ALL CONTROL VALVES AND FLOW
<br />ALL WORK SHALL BE SCHEDULED iN ADVANCE.
<br />SWITCHES.
<br />10. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE
<br />7. IF APPLICABLE, THE CONTRACTOR SHALL ASSUME
<br />END OF EACH WORKDAY.
<br />THAT ANY CURTAIN BOARDS OR DRAFT CURTAINS
<br />WILL BE INSTALLED PRIOR TO THE SPRINKLER PIPING.
<br />11, ONLY THE PORTIONS OF THE BUILDING AFFECTED BY
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER
<br />THE SCOPE OF THE PROJECT HAVE BEEN SHOWN.
<br />PENETRATIONS OF THE CURTAIN BOARDS OR DRAFT
<br />INFORMATION SHOWN AS EXISTING TO REMAIN IS NOT
<br />CURTAINS AND SEALING WiTH APPROVED FIRE
<br />BEING MODIFIED AS A PART OF THIS PROJECT.
<br />CAULKING.
<br />12. SPRINKLER CONTRACTOR TO SUBMIT AND RECEIVE
<br />8. PENETRATIONS OF RATED WALLS OR ASSEMBLIES
<br />APPROVAL OF FULL SHOP DRAWINGS TO HENDERSON
<br />SHALL BE "FIRE CAULKED" WITH APPROVED CAULKING
<br />ENGINEERS PRIOR TO FABRICATION AND
<br />PER METHODS REQUIRED BY THE AUTHORITY HAVING
<br />INSTALLATION
<br />JURSDICTION AND PROJECT SPECIFICATIONS
<br />} } } } } { f } } } 1 ( } I
<br />9. THE FIRE PROTECTION ENGINEER OF RECORD WILL
<br />NOT BE RESPONSIBLE FOR THE CONTRACTOR'S
<br />FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN
<br />ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR
<br />SHALL THEY BE REQUIRED TO SUPERVISE THE
<br />CONDUCT OF THE WORK THE CONSTRUCTION
<br />PROCEDURES AS SET FORTH BY THE GENERAL
<br />Ij CONTRACTOR, SUB -CONTRACTORS, THEIR RESPECTIVE
<br />ul EMPLOYEES, OR ANY OTHER PERSON AT THE JOBSITE
<br />OTHER THAN THE ENGINEERING FIRM,S OWN
<br />!
<br />- .g . _-_ _ EMPLOYEES.
<br />,
<br />_t:.w.... _., r, x;,z^�^^acnm m a.-n-a..«rs:,.^.. "•z.�a.:.��.: _...
<br />�' �;: ��.�.,.-,��r_.. 1.��....wI,�.1 } � i � 10. SPRINKLER PROTECTION IS REQUIRED ABOVE THE
<br />I �� �f i. °. i I t i ELECTRICAL ROOMS. NO MAIN PIPING SHALL
<br />1 ? } I
<br />PENETRATE OR PASS ABOVE THE ELECTRICAL ROOMS.
<br />1 f 0
<br />THE CONTRACTOR MUST REVIEW ALL CONSTRUCTION
<br />}I.-...'^....=..a;.s:f.'e'»=:+•<,C:s's+--.3 , i. •' td I �I i i74 I _ _ - DOCUMENTS PRIOR TO BID. SHOULD MODIFICATION TO
<br />+ � i � i a + THESE PLANS BECOME NECESSARY TO PROPERLY
<br />I COORDINATE THE SYSTEM WITH, OTHER TRADES, IT
<br />WILL BE THE CONTRACTOR'S RESPONSIBILITY TO
<br />: �I + r _ w_ _ ' __ _ _ -_ _ i __� _ __ OBTAIN APPROVAL OF THESE CHANGES BY THE AHJ,
<br />I I AND THE FIRE PROTECTION ENGINEER. OF RECORD. IN
<br />ADDITION TO OBTAINING THE NECESSARY APPROVALS,
<br />� .. n.THE CONTRACTOR MUST MAKE NOTE- OF ALL FIELD
<br />OR COORDINATION CHANGES ON THE INSTALLATION
<br />DRAWINGS. ONCE COMPLETE, THE CONTRACTOR SHALL
<br />SUPPLY ONE COPY OF AS -BUILT DRAWINGS TO THE
<br />+ _ FIRE PROTECTION ENGINEER OF RECORD FOR THEIR
<br />USE.
<br />+ # + 5 5 } 5
<br />n
<br />FP3 FP3 FP3 12. THE CONTRACTOR SHALL DIVERT ALL DRAIN AND
<br />i_,_._...._._._...__—_._. - _ _. � � __ _ _ � � __ ._ _ _ __ ___ _ _ _ `a _ _ _ _ .. - -..._.._—_...___._..;.... - ------- G INSPECTORS TEST CONNECTION DISCHARGE AWAY
<br />FROM FINISHED SURFACES AND PIPE TO APPROVED
<br />( 1 } f - - } I � ,,,:,,10 } }I - - DRAIN LOCATIONS. THE CONTRACTOR WILL BE
<br />IS3) � } � � j } I ( ) } � � � PPP i � � BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR
<br />-- -- -- -- -- -- CLEANING OF RUST STAINS ON PAVEMENT/CONCRETE
<br />DUE TO WATER DISCHARGE FROM SPRINKLER SYSTEM
<br />I I DRAIN DOWNS.
<br />i } i 4
<br />3 7
<br />}°' a FP2 FP2
<br />} { f
<br />5 1 i i + 1 5 - I
<br />FP3 } } FP3 } FP3 }# }
<br />I
<br />i
<br />«i� _
<br />tI I } I I } } I I {
<br />_ _ ,� ______.__ __ �,. _ _ ________..__�__� _. ____-_____ ___ _�__ �_ __�_._- _ ___- _. _..-._mow._ .....-__._ _____..__._._....__.._.._..._._._._._._._...._—�_______
<br />5 } a } } }
<br />FP3 y 3 } }
<br />} } } 5 } } 5 } 5 } } } } m l } } }
<br />i i f i Y - [ 7 0 � � : •— +
<br />FP3 FP3 FP3
<br />a
<br />1 L e FP2 FP2 } } } f ® 1 } f 1 } f ® 1
<br />0�)
<br />1
<br />1
<br />........«.. _.._...»... . ....... .....�,. .. «..,.. ...«....._.,._. ..... ....,.,.......__.,_..> .....:C .m�mo.. a. - ._._�.,..-r�....,.;..r..:.-sa .w.._..cr^._c_^.:•ssa...^v-- ,.cc-» -- •_Y-.^ ""�'��_T_..^__..-._.._..K�. .�._..............:snmazi. 3 ,��ku✓.<.�� ., w:.ar r:-r°`��_ 'y.'-......_.._._..«._....».,�..«..-�..».__.,..r........__....d........,.......,,..»..........,.., �...,_....+.__�
<br />5
<br />FP2 FP2 } } } } # I
<br />! 3 t }
<br />c
<br />4 k
<br />a
<br />_ ! i
<br />�t ri i
<br />.».,.... _......, -,.. .»....,.. _....,_......._.. >_ .. ...., u..,. ,.,.� «s.,.,..� . ., ...> ,. .� _ �.,...._._ � .....» .y..:�.. - . ..... ... v.,ac,aw..a.,.� ...71
<br />_ ..._.e.:? 3.v,:..�..n � ?t 4.i v. *x-�.�v i-�_ - ar�...mm-rr..� � i.............._... _.«.. _..._.. _....»........ _„.. i{.,,..
<br />i t i t , �.. s ; i i � t a� t i t �+�^i&tS'ti�'�X�`5��."��:'".S�i�:'. •�ix�,.er,rs au.tm,.r:�, .;;�.w.s
<br />;
<br />OU2 O O �� J O 10 1f1 ?2 13 3.6 14 15
<br />,-OVER•SPRINKLER.
<br />..
<br />fp
<br />0.,
<br />SHEET INDEX
<br />FP1 OVERALL FiRE SPRINKLER PLAN
<br />FP2 ENLARGED FIRE SPRINKLER PLAN
<br />FP3 FIRE PROTECTION DETAILS
<br />FP4 STOCKROOM HYDRAULIC PLACARD INFORMATION
<br />EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
<br />DRAWINGS AND MAY NOT REFLECT EXACT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
<br />"AS -BUILT" CONDITIONS. CONTRACTOR SHALL FIELD SPECIFICATIONS IN THEIR RELATED FIELD. THE
<br />VERIFY ALL EXISTING CONDITIONS PRIOR TO FAILURE TO ACQUAINT THEMSELF WITH THIS
<br />SUBMITTING FINAL BIDS. CONTRACTOR SHALL KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY
<br />CAREFULLY COORDINATE NEW WORK AND DEMOLITION OF PERFORMING THE WORK PROPERLY. NO
<br />WITH ALL OTHER DISCIPLINES AND EXISTING ADDITIONAL COMPENSATION SHALL BE ALLOWED
<br />CONDITIONS. BECAUSE OF CONDITIONS THAT OCCUR DUE
<br />TO FAILURE TO FAMILIARIZE WORKERS WITH THIS
<br />KNOWLEDGE.
<br />w
<br />w �� >�� O
<br />_ =o
<br />Woa>.
<br />OWV. 0ZC4Z
<br />aL v)i- 4Z�°i7g
<br />tu a�
<br />OLL
<br />XL
<br />tAa °;( ;>Wtt
<br />f4"
<br />J
<br />212u 2 O ILL-,
<br />Pc-.lo'--
<br />w
<br />mOJ�auj CDow0
<br />°it}uoOx
<br />d0:
<br />mQ
<br />ox
<br />�
<br />voaa�I
<br />zWIS Owaw:=F
<br />xmwaiw-
<br />oNjocoa..0
<br />Z)NI
<br />J
<br />w
<br />a
<br />�\ O
<br />d �� �
<br />D� w
<br />U) z
<br />w
<br />O
<br />m
<br />o
<br />o
<br />o
<br />n/ W to
<br />{„L it 0 0
<br />w
<br />N W
<br />m
<br />D
<br />z
<br />0
<br />ISSUE BLOCK
<br />1 05/09/14 1 CCD # f
<br />CHECKED BY:
<br />SRD/JEC
<br />DRAWN BY:
<br />OAF
<br />PROTO:
<br />192 SC
<br />PROTO CYCLE:
<br />122013
<br />DOCUMENT DATE.
<br />01/30/14
<br />DARRELL E. STEIN
<br />LICENSE # 58463
<br />OVERALL
<br />FIRE
<br />SPRINKLER
<br />PLAN
<br />SHEET:
<br />FP1
<br />
|