Laserfiche WebLink
C.2ENERAL NOTES <br />CONTACT <br />SPRINKLER SYMBOL LEGEND <br />GENERAL PIPING <br />INFORMATION <br />AND DEMOLITION NOTES <br />SYMBOL SIZE MFR MAKE S.I.N. FINISH STYLE TEMP K-FACTOR SYMBOL DESCRIPTION <br />1. THE DESIGN SHOWN ON THESE CONTRACT <br />DOCUMENTS INCLUDE JURISDICTIONAL REQUIREMENTS <br />1 MA CH MATH MA CH MA CH MATC PENDENT MA CH 5.6 HYDRAULIC REFERENCE NODE POINT PROVIDED BY THE FOLLOWING CONTACTS: <br />O <br />1. CONTRACTOR MUST VISIT THE BUILDING TO <br />DETERMINE THE FULL EXTENT OF THE EXISTING FIRE <br />DOCUMENTS HAS BEEN PREPARED FOR APPROVAL BY <br />EXISTING EXISTING EXISTING EXISTING EXISTING EXiSTIN <br />PROTECTION WORK AND THE EXISTING CONDITIONS, <br />THE AUTHORITY HAVING JURISDICTION AND TO <br />FIRE SPRINKLER REVIEWING AUTHORITY: <br />BECOME TOTALLY FAMILIAR WITH DISCONNECTIONS, <br />PROVIDE GUIDANCE FOR BIDDING. THE CONTRACTOR <br />Q 1" TYCO DS-C TY3555 WHITE CONCEAL 200 5.6 [- CAP VERNE RIGGALL, FIRE MARSHAL <br />REMOVALS, RELOCATIONS AND/OR RECONNECTIONS <br />SHALL SUBMIT COMPLETE FIRE SPRINKLER SHOP <br />(813) 780-0041 <br />OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, <br />DRAWINGS AS REQUIRED BY SPECIFICATION SECTION <br />' VARIES VARIES VARIES ---- BRASS EXISTING <br />® RISER NIPPLE/DROP NIPPLE <br />AND COND111ONS IN THE PROPOSAL FOR THIS <br />01330. CONTRACTOR SHALL BASE SHOP DRAWING <br />UPRIGHT <br />PROJECT. NO EXTRA COMPENSATION WILL BE PAID <br />DESIGN ON THE. FIRE PROTECTION DRAWINGS AND <br />CHROME EXISTING <br />FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, <br />SPECIFICATIONS. SPRINKLER SHOP DRAWINGS SHALL <br />___ __ <br />VARIES VARIES VARIES ---- WHITE PENDENT - m SPRINKLER RISER <br />APPLICABLE CODES <br />AND/OR ALLOWANCE. <br />INCLUDE ALL NECESSARY ELEVATIONS, HANGER <br />LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATION <br />DEMO VARIES VARIES ---- ___ EXISTING --- --- o--F- INSPECTOR'S TEST/AUXILIARY DRAIN <br />2. UNLESS NOTED OTHERWISE, DISCONNECT AND REMOVE <br />METHODS/NOTES, MATERIAL DATA, AND ANY OTHER <br />PENDENT <br />ALL EXISTING FiRE PROTECTION COMPONENTS NOT <br />INFORMATION NECESSARY TO CLARIFY THE INTENT OF <br />CONTRACTOR MAY SUBSTITUTE SPRINKLERS OF SAME SIZE, K-FACTOR AND NFPA STANDARDS EDITION <br />\ HANGER NFPA 13 2007 <br />INTENDED TO BE REUSED. <br />INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE <br />TEMPERATURE CLASSIFICATION UNLESS PROHIBITED BY THE SPECIFICATIONS. <br />3. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS TO <br />SIZES, SPRINKLER SPACING, AND ALL SYSTEM <br />CONFIGURATIONS AS SHOWN. ANY ALTERNATES iN <br />\\\ TRAPEZE HANGER PERPENDICULAR TO JOIST REFER TO SHEET Cl FOR APPLICABLE BUILDING CODES <br />AN APPROVED DUMPING SITE AND CLEAN ALL FIRE <br />DESIGN OF THE SYSTEM OR IN MATERIALS OR <br />PROTECTION WORK PRIOR TO PROJECT COMPLETION. <br />EQUIPMENT USED MUST BE APPROVED IN WRITING VIA <br />TRAPEZE HANGER PARALLEL TO JOIST <br />THE REQUEST FOR INFORMATION PROCESS BY THE <br />4. PERFORM ALL WORK ACCORDING TO THE PROJECT <br />FIRE PROTECTION ENGINEER OF RECORD PRIOR TO <br />PHASING SCHEDULE INFORMATION FOR THiS PROJECT. <br />ANY BIDDING, FABRICATION, OR INSTALLATION. <br />9 NEW CONNECTION <br />PROVIDE ALL NECESSARY FIRE PROTECTION WORK, <br />TEMPORARY AND/OR OTHERWISE, AND USE WHATEVER <br />2. CONTRACTOR SHALL COORDINATE LOCATIONS OF FIRE <br />NEW SPRINKLER PIPE <br />MEANS NECESSARY, TO CONFORM TO THE REQUIRED <br />PROTECTION COMPONENTS INCLUDING PiPING, ALARMS, <br />CONSTRUCTION PHASING OF THE PROJECT. <br />DRAINS, TEST POINTS, ETC., WITH ALL <br />ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND <br />- - EXISTING SPRINKLER PIPE <br />5. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR <br />ELECTRICAL COMPONENTS. OBSTRUCTIONS TO <br />REPLACING ITEMS DAMAGED DURING DEMOLITION AND <br />SPRINKLER DISCHARGE MUST BE CONSIDERED DURING <br />- - DEMO SPRINKLER PIPE <br />CONSTRUCTION. <br />SHOP DRAWING PRODUCTION AND INSTALLATION. <br />EXTRA SPRINKLERS MAY BE REQUIRED AT NO <br />PROVIDE ADDITIONAL SPRINKLERS AS <br />6. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH <br />ADDITIONAL COST TO WAL-MART. REFER TO <br />REQUIRED PER NFPA 13 IN EXISTING <br />ADJACENT SURFACES LEFT UNUSED AFTER EXISTING <br />SPECIFICATION FOR ADDITIONAL REQUIREMENTS. <br />SPRINKLER CABINET FOR ANY NEW <br />SPRINKLER PiPING OR EQUIPMENT IS REMOVED AND <br />VACATED FROM THESE HOLES. <br />3. SUBMIT A REQUEST FOR INFORMATION (RFI), FOR <br />SPRINKLERS INSTALLED. <br />QUESTIONS RELATED TO THE FIRE PROTECTION <br />7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND <br />DOCUMENTS. <br />MAINTAINING FIRE DEPARTMENT ACCESS ROADS <br />THROUGHOUT THE PROJECT. <br />4. ROUTE ALL SPRINKLER MAINS ABOVE THE BOTTOM <br />CHORD OF THE BAR JOISTS. <br />8. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE <br />DEMOLITION SHALL BE LEFT IN SERVICE. <br />5. PROVIDE FIRE PROTECTION AS REQUIRED BY CODE <br />FOR ANY TEMPORARY STRUCTURES BUILT DURING <br />9. ALL WORK SHALL BE PERFORMED SO AS TO NOT <br />CONSTRUCTION. <br />INTERRUPT SERVICE: THE CONTRACTOR SHALL <br />PROPERLY NOTIFY THE LANDLORD, THE LESSOR AND <br />6. SPRINKLER SYSTEMS ARE MONITORED BY AN <br />ADJACENT TENANTS A MINIMUM OF 48 HOURS IN <br />OFF -SITE CENTRAL STATION INCLUDING TAMPER <br />ADVANCE BEFORE PROCEEDING WITH THIS WORK. <br />SWITCHES ON ALL CONTROL VALVES AND FLOW <br />ALL WORK SHALL BE SCHEDULED iN ADVANCE. <br />SWITCHES. <br />10. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE <br />7. IF APPLICABLE, THE CONTRACTOR SHALL ASSUME <br />END OF EACH WORKDAY. <br />THAT ANY CURTAIN BOARDS OR DRAFT CURTAINS <br />WILL BE INSTALLED PRIOR TO THE SPRINKLER PIPING. <br />11, ONLY THE PORTIONS OF THE BUILDING AFFECTED BY <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER <br />THE SCOPE OF THE PROJECT HAVE BEEN SHOWN. <br />PENETRATIONS OF THE CURTAIN BOARDS OR DRAFT <br />INFORMATION SHOWN AS EXISTING TO REMAIN IS NOT <br />CURTAINS AND SEALING WiTH APPROVED FIRE <br />BEING MODIFIED AS A PART OF THIS PROJECT. <br />CAULKING. <br />12. SPRINKLER CONTRACTOR TO SUBMIT AND RECEIVE <br />8. PENETRATIONS OF RATED WALLS OR ASSEMBLIES <br />APPROVAL OF FULL SHOP DRAWINGS TO HENDERSON <br />SHALL BE "FIRE CAULKED" WITH APPROVED CAULKING <br />ENGINEERS PRIOR TO FABRICATION AND <br />PER METHODS REQUIRED BY THE AUTHORITY HAVING <br />INSTALLATION <br />JURSDICTION AND PROJECT SPECIFICATIONS <br />} } } } } { f } } } 1 ( } I <br />9. THE FIRE PROTECTION ENGINEER OF RECORD WILL <br />NOT BE RESPONSIBLE FOR THE CONTRACTOR'S <br />FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN <br />ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR <br />SHALL THEY BE REQUIRED TO SUPERVISE THE <br />CONDUCT OF THE WORK THE CONSTRUCTION <br />PROCEDURES AS SET FORTH BY THE GENERAL <br />Ij CONTRACTOR, SUB -CONTRACTORS, THEIR RESPECTIVE <br />ul EMPLOYEES, OR ANY OTHER PERSON AT THE JOBSITE <br />OTHER THAN THE ENGINEERING FIRM,S OWN <br />! <br />- .g . _-_ _ EMPLOYEES. <br />, <br />_t:.w.... _., r, x;,z^�^^acnm m a.-n-a..«rs:,.^.. "•z.�a.:.��.: _... <br />�' �;: ��.�.,.-,��r_.. 1.��....wI,�.1 } � i � 10. SPRINKLER PROTECTION IS REQUIRED ABOVE THE <br />I �� �f i. °. i I t i ELECTRICAL ROOMS. NO MAIN PIPING SHALL <br />1 ? } I <br />PENETRATE OR PASS ABOVE THE ELECTRICAL ROOMS. <br />1 f 0 <br />THE CONTRACTOR MUST REVIEW ALL CONSTRUCTION <br />}I.-...'^....=..a;.s:f.'e'»=:+•<,C:s's+--.3 , i. •' td I �I i i74 I _ _ - DOCUMENTS PRIOR TO BID. SHOULD MODIFICATION TO <br />+ � i � i a + THESE PLANS BECOME NECESSARY TO PROPERLY <br />I COORDINATE THE SYSTEM WITH, OTHER TRADES, IT <br />WILL BE THE CONTRACTOR'S RESPONSIBILITY TO <br />: �I + r _ w_ _ ' __ _ _ -_ _ i __� _ __ OBTAIN APPROVAL OF THESE CHANGES BY THE AHJ, <br />I I AND THE FIRE PROTECTION ENGINEER. OF RECORD. IN <br />ADDITION TO OBTAINING THE NECESSARY APPROVALS, <br />� .. n.THE CONTRACTOR MUST MAKE NOTE- OF ALL FIELD <br />OR COORDINATION CHANGES ON THE INSTALLATION <br />DRAWINGS. ONCE COMPLETE, THE CONTRACTOR SHALL <br />SUPPLY ONE COPY OF AS -BUILT DRAWINGS TO THE <br />+ _ FIRE PROTECTION ENGINEER OF RECORD FOR THEIR <br />USE. <br />+ # + 5 5 } 5 <br />n <br />FP3 FP3 FP3 12. THE CONTRACTOR SHALL DIVERT ALL DRAIN AND <br />i_,_._...._._._...__—_._. - _ _. � � __ _ _ � � __ ._ _ _ __ ___ _ _ _ `a _ _ _ _ .. - -..._.._—_...___._..;.... - ------- G INSPECTORS TEST CONNECTION DISCHARGE AWAY <br />FROM FINISHED SURFACES AND PIPE TO APPROVED <br />( 1 } f - - } I � ,,,:,,10 } }I - - DRAIN LOCATIONS. THE CONTRACTOR WILL BE <br />IS3) � } � � j } I ( ) } � � � PPP i � � BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR <br />-- -- -- -- -- -- CLEANING OF RUST STAINS ON PAVEMENT/CONCRETE <br />DUE TO WATER DISCHARGE FROM SPRINKLER SYSTEM <br />I I DRAIN DOWNS. <br />i } i 4 <br />3 7 <br />}°' a FP2 FP2 <br />} { f <br />5 1 i i + 1 5 - I <br />FP3 } } FP3 } FP3 }# } <br />I <br />i <br />«i� _ <br />tI I } I I } } I I { <br />_ _ ,� ______.__ __ �,. _ _ ________..__�__� _. ____-_____ ___ _�__ �_ __�_._- _ ___- _. _..-._mow._ .....-__._ _____..__._._....__.._.._..._._._._._._._...._—�_______ <br />5 } a } } } <br />FP3 y 3 } } <br />} } } 5 } } 5 } 5 } } } } m l } } } <br />i i f i Y - [ 7 0 � � : •— + <br />FP3 FP3 FP3 <br />a <br />1 L e FP2 FP2 } } } f ® 1 } f 1 } f ® 1 <br />0�) <br />1 <br />1 <br />........«.. _.._...»... . ....... .....�,. .. «..,.. ...«....._.,._. ..... ....,.,.......__.,_..> .....:C .m�mo.. a. - ._._�.,..-r�....,.;..r..:.-sa .w.._..cr^._c_^.:•ssa...^v-- ,.cc-» -- •_Y-.^ ""�'��_T_..^__..-._.._..K�. .�._..............:snmazi. 3 ,��ku✓.<.�� ., w:.ar r:-r°`��_ 'y.'-......_.._._..«._....».,�..«..-�..».__.,..r........__....d........,.......,,..»..........,.., �...,_....+.__� <br />5 <br />FP2 FP2 } } } } # I <br />! 3 t } <br />c <br />4 k <br />a <br />_ ! i <br />�t ri i <br />.».,.... _......, -,.. .»....,.. _....,_......._.. >_ .. ...., u..,. ,.,.� «s.,.,..� . ., ...> ,. .� _ �.,...._._ � .....» .y..:�.. - . ..... ... v.,ac,aw..a.,.� ...71 <br />_ ..._.e.:? 3.v,:..�..n � ?t 4.i v. *x-�.�v i-�_ - ar�...mm-rr..� � i.............._... _.«.. _..._.. _....»........ _„.. i{.,,.. <br />i t i t , �.. s ; i i � t a� t i t �+�^i&tS'ti�'�X�`5��."��:'".S�i�:'. •�ix�,.er,rs au.tm,.r:�, .;;�.w.s <br />; <br />OU2 O O �� J O 10 1f1 ?2 13 3.6 14 15 <br />,-OVER•SPRINKLER. <br />.. <br />fp <br />0., <br />SHEET INDEX <br />FP1 OVERALL FiRE SPRINKLER PLAN <br />FP2 ENLARGED FIRE SPRINKLER PLAN <br />FP3 FIRE PROTECTION DETAILS <br />FP4 STOCKROOM HYDRAULIC PLACARD INFORMATION <br />EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />DRAWINGS AND MAY NOT REFLECT EXACT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />"AS -BUILT" CONDITIONS. CONTRACTOR SHALL FIELD SPECIFICATIONS IN THEIR RELATED FIELD. THE <br />VERIFY ALL EXISTING CONDITIONS PRIOR TO FAILURE TO ACQUAINT THEMSELF WITH THIS <br />SUBMITTING FINAL BIDS. CONTRACTOR SHALL KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY <br />CAREFULLY COORDINATE NEW WORK AND DEMOLITION OF PERFORMING THE WORK PROPERLY. NO <br />WITH ALL OTHER DISCIPLINES AND EXISTING ADDITIONAL COMPENSATION SHALL BE ALLOWED <br />CONDITIONS. BECAUSE OF CONDITIONS THAT OCCUR DUE <br />TO FAILURE TO FAMILIARIZE WORKERS WITH THIS <br />KNOWLEDGE. <br />w <br />w �� >�� O <br />_ =o <br />Woa>. <br />OWV. 0ZC4Z <br />aL v)i- 4Z�°i7g <br />tu a� <br />OLL <br />XL <br />tAa °;( ;>Wtt <br />f4" <br />J <br />212u 2 O ILL-, <br />Pc-.lo'-- <br />w <br />mOJ�auj CDow0 <br />°it}uoOx <br />d0: <br />mQ <br />ox <br />� <br />voaa�I <br />zWIS Owaw:=F <br />xmwaiw- <br />oNjocoa..0 <br />Z)NI <br />J <br />w <br />a <br />�\ O <br />d �� � <br />D� w <br />U) z <br />w <br />O <br />m <br />o <br />o <br />o <br />n/ W to <br />{„L it 0 0 <br />w <br />N W <br />m <br />D <br />z <br />0 <br />ISSUE BLOCK <br />1 05/09/14 1 CCD # f <br />CHECKED BY: <br />SRD/JEC <br />DRAWN BY: <br />OAF <br />PROTO: <br />192 SC <br />PROTO CYCLE: <br />122013 <br />DOCUMENT DATE. <br />01/30/14 <br />DARRELL E. STEIN <br />LICENSE # 58463 <br />OVERALL <br />FIRE <br />SPRINKLER <br />PLAN <br />SHEET: <br />FP1 <br />