Laserfiche WebLink
16 <br />SHOP DRAWINGS <br />FFERY D. BURNHAM <br />#83153100012006 <br />3 <br />SPRINKLER SYMBOL LEGEND <br />CONTACT <br />INFORMATION <br />GENERAL PIPING <br />AND DEMOLITION NOTES <br />GENERAL NOTES <br />SYMBOL <br />SIZE <br />MFR <br />MAKE <br />S.I.N. <br />FINISH <br />STYLE <br />TEMP <br />K-FACTOR <br />SYMBOL <br />DESCRIPTION <br />DOCUMENTS INCLUDE JURISDICTIONAL REQUIREMENTS <br />PROVIDED BY THE FOLLOWING CONTACTS: <br />FIRE SPRINKLER REVIEWING AUTHORITY: <br />VERNE RIGGALL, FIRE MARSHAL <br />(813) 780-0041 <br />1. CONTRACTOR MUST VISIT THE BUILDING TO <br />DETERMINE THE FULL EXTENT OF THE EXISTING FIRE <br />PROTECTION WORK AND THE EXISTING CONDITIONS, <br />BECOME TOTALLY FAMILIAR WITH DISCONNECTIONS, <br />REMOVALS, RELOCATIONS AND/OR RECONNECTIONS <br />OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, <br />AND CONDITIONS IN THE PROPOSAL FOR THIS <br />PROJECT. NO EXTRA COMPENSATION WILL BE PAID <br />FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, <br />AND/OR ALLOWANCE. <br />2. UNLESS NOTED OTHERWISE, DISCONNECT AND REMOVE <br />ALL EXISTING FIRE PROTECTION COMPONENTS NOT <br />INTENDED TO BE REUSED. <br />3. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS TO <br />AN APPROVED DUMPING SITE AND CLEAN ALL FIRE <br />PROTECTION WORK PRIOR TO PROJECT COMPLETION. <br />4. PERFORM ALL WORK ACCORDING TO THE PROJECT <br />PHASING SCHEDUIE INFORMATION FOR THIS PROJECT. <br />PROVIDE All NECESSARY FIRE PROTECTION WORK, <br />TEMPORARY AND/OR OTHERWISE, AND USE WHATEVER <br />MEANS NECESSARY, TO CONFORM TO THE REQUIRED <br />CONSTRUCTION PHASING OF THE PROJECT. <br />5. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR <br />REPLACING ITEMS DAMAGED DURING DEMOLITION AND <br />CONSTRUCTION. <br />1. THE DESIG3N SHOWN ON THESE CONTRACT <br />DOCUMENTES HAS BEEN PREPARED FOR APPROVAL BY <br />THE AUTHCJRITY HAVING JURISDICITON AND TO <br />PROVIDE GUIDANCE FOR BIDDING. THE CONTRACTOR <br />SHALL SUMMIT COMPLETE FIRE SPRINKLER SHOP <br />DRAWINGS AS REQUIRED BY SPECIFICATION SECTION <br />01330. CONTRACTOR SHALL BASE SHOP DRAWING <br />DESIGN ON THE FIRE PROTECTION DRAWINGS AND <br />SPECIFICATIONS. SPRINKLER SHOP DRAWINGS SHALL <br />INCLUDE ALL NECESSARY ELEVATIONS, HANGER <br />LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATION <br />METHODS/NOTES, MATERIAL DATA, AND ANY OTHER <br />INFORMATION NECESSARY TO CLARIFY THE INTENT OF <br />INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE <br />SIZES, SPRINKLER SPACING, AND ALL SYSTEM <br />CONFIGURATIONS AS SHOWN. ANY ALTERNATES IN <br />DESIGN OF THE SYSTEM OR IN MATERIALS OR <br />EQUIPMENT USED MUST BE APPROVED IN WRITING VIA <br />THE REQUEST FOR INFORMATION PROCESS BY THE <br />FIRE PROTECTION ENGINEER OF RECORD PRIOR TO <br />ANY BIDDING, FABRICATION, OR INSTALLATION. <br />2. CONTRACTOR SHALL COORDINATE LOCATIONS OF FIRE <br />PROTECTION COMPONENTS INCLUDING PIPING, ALARMS, <br />DRAINS, TEST POINTS, ETC., WITH ALL <br />ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND <br />ELECTRICAL COMPONENTS. OBSTRUCTIONS TO <br />SPRINKLER DISCHARGE MUST BE CONSIDERED DURING <br />SHOP DRAWING PRODUCTION AND INSTALLATION. <br />EXTRA SPRINKLERS MAY BE REQUIRED AT NO <br />Q 1 /2" <br />TYCO <br />TY-B TY3231 WHITE <br />PENDENT <br />401 ESC <br />I 155 i <br />5.6 <br />HYDRAULIC REFERENCE NODE POINT <br />Q <br />1" <br />TYCO <br />DS-C <br />TY3555 <br />WHITE <br />CONCEAL <br />200 <br />5.6 <br />[- <br />CAP <br />VARIES <br />VARIES <br />VARIES <br />---- <br />BRASS <br />EXISTING <br />UPRIGHT <br />® <br />RISER NIPPLE/DROP NIPPLE <br />APPLICABLE CODES <br />VARIES <br />VARIES <br />VARIES <br />---- <br />CHROME <br />wHITE <br />EXISTING___ <br />PENDENT <br />--- <br />m <br />SPRINKLER RISER <br />DEMO <br />VARIES <br />VARIES <br />---- <br />-__ <br />EXISTING <br />PENDENT <br />F__ <br />INSPECTOR'S TEST/AUXILIARY DRAIN <br />NFPA STANDARDS EDITION <br />NFPA 13 2007 <br />REFER TO SHEET Cl FOR APPLICABLE BUILDING CODES <br />CONTRACTOR MAY SUBSTITUTE SPRINKLERS OF SAME SIZE, K-FACTOR AND <br />TEMPERATURE CLASSIFICATION UNLESS PROHIBITED BY THE SPECIFICATIONS. <br />\ <br />HANGER <br />\\\ <br />TRAPEZE HANGER PERPENDICULAR TO JOIST <br />TRAPEZE HANGER PARALLEL TO JOIST <br />B <br />NEW CONNECTION <br />NEW SPRINKLER PIPE <br />- -- <br />EXISTING SPRINKLER PIPE <br />- - <br />DEMO SPRINKLER PIPE <br />PROVIDE <br />REQUIRED <br />SPRINKLER <br />SPRINKLERS <br />ADDITIONAL SPRINKLERS AS <br />PER NFPA 13 IN EXISTING <br />CABINET FOR ANY NEW <br />INSTALLED. <br />6. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH <br />ADJACENT SURFACES LEFT UNUSED AFTER EXISTING <br />SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND <br />VACATED FROM THESE HOLES. <br />ADDITIONAL COST TO WAL-MART. REFER TO <br />SPECIFICATION FOR ADDITIONAL REQUIREMENTS. <br />3. SUBMIT A REQUEST FOR INFORMATION (RFI), FOR <br />QUESTIONS RELATED TO THE FIRE PROTECTION <br />7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND <br />DOCUMENTS. <br />MAINTAINING FIRE DEPARTMENT ACCESS ROADS <br />THROUGHOUT THE PROJECT 4 ROUTE ALL SPRINKLER MAINS ABOVE THE BOTTOM <br />CHORD OF THE BAR JOISTS. <br />8. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE <br />DEMOLITION SHALL BE LEFT IN SERVICE. 5. PROVIDE FIRE PROTECTION AS REQUIRED BY CODE <br />FOR ANY TEMPORARY STRUCTURES BUILT DURING <br />9. ALL WORK SHALL BE PERFORMED SO AS TO NOT CONSTRUCTION. <br />INTERRUPT SERVICE. THE CONTRACTOR SHALL <br />PROPERLY NOTIFY THE LANDLORD, THE LESSOR AND 6. SPRINKLER SYSTEMS ARE MONITORED BY AN <br />W <br />w <br />Ch <br />r <br />.- <br />9 <br />N <br />N <br />n <br />a <br />r <br />LL <br />co <br />Z <br />co <br />- <br />Q <br />T <br />C <br />X <br />� <br />N <br />d <br />i <br />ADJACENT TENANTS A MINIMUM OF 48 HOURS IN <br />ADVANCE BEFORE PROCEEDING WITH THIS WORK. <br />ALL WORK SHALL BE SCHEDULED IN ADVANCE. <br />OFF -SITE CENTRAL STATION INCLUDING TAMPER <br />SWITCHES ON ALL CONTROL VALVES AND FLOW <br />SWITCHES, <br />�- <br />10. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE <br />7. <br />IF APPLICABLE, THE CONTRACTOR SHALL ASSUME <br />END OF EACH WORKDAY. <br />THAT ANY CURTAIN BOARDS OR DRAFT CURTAINS <br />° <br />M <br />WILL BE INSTALLED PRIOR TO THE SPRINKLER PIPING. <br />o o � <br />r <br />1 <br />11. ONLY THE PORTIONS OF THE BUILDING AFFECTED BY <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER <br />a a Z <br />0 <br />a <br />THE SCOPE OF THE PROJECT HAVE BEEN SHOWN. <br />PENETRATIONS OF THE CURTAIN BOARDS OR DRAFT <br />0 <br />° <br />z <br />o <br />CL <br />INFORMATION SHOWN AS EXISTING TO REMAIN IS NOT <br />CURTAINS AND SEALING WITH APPROVED FIRE <br />_ <br />a <br />` <br />BEING MODIFIED AS A PART OF THIS PROJECT. <br />CAULKING. <br />a v � U. <br />78 <br />2 <br />U- <br />' •..��' <br />;, <br />12. SPRINKLER CONTRACTOR TO SUBMIT AND RECEIVE <br />8. <br />PENETRATIONS OF RATED WALLS OR ASSEMBLIES <br />c c <br />o �j o <br />c <br />_ <br />�l <br />APPROVAL OF FULL SHOP DRAWINGS TO HENDERSON <br />SHALL BE "FIRE CAULKED" WITH APPROVED CAULKING <br />o <br />I� <br />o <br />B <br />ali <br />c <br />ENGINEERS PRIOR TO FABRICATION AND <br />PER METHODS REQUIRED BY THE AUTHORITY HAVING <br />m <br />m <br />? <br />a <br />y <br />J <br />p <br />i <br />INSTALLATION. <br />JURSDICTION, AND PROJECT SPECIFICATIONS. <br />Z <br />v <br />y <br />9. <br />THE FIRE PROTECTION ENGINEER OF RECORD WILL <br />= <br />42 <br />v <br />=-6 <br />c <br />_ <br />NOT BE RESPONSIBLE- FOR THE CONTRACTOR'S <br />c <br />� � <br />c <br />o <br />2 <br />� � <br />_ <br />' <br />� <br />FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN <br />� <br />CCI <br />i <br />{ € <br />ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR <br />( <br />E <br />D <br />a <br />SHALL THEY BE REQUIRED TO SUPERVISE THE <br />a o <br />,_ <br />CONDUCT OF THE WORK, THE CONSTRUCTION <br />a a <br />, <br />rn <br />a.a <br />' <br />} <br /># <br />PROCEDURES AS SET FORTH BY THE GENERAL <br />a Ii <br />a O <br />= <br />a <br />s <br />CONTRACTOR, SUB -CONTRACTORS, THEIR RESPECTIVE <br />r <br />cv <br />c*i <br />v <br />ui <br />I <br />EMPLOYEES, OR ANY OTHER PERSON AT THE JOBSITE <br />L <br />OTHER THAN THE ENGINEERING FIRM'S OWN <br />} <br />r <br />_..�.._-- <br />4 F <br />-..,m...__.,._�._�__ <br />EMPLOYEES. <br />L <br />{ <br />i <br />10. <br />SPRINKLER PROTECTION IS REQUIRED ABOVE THE <br />5 <br />0 <br />�° <br />m <br />i , <br />! <br />ELECTRICAL ROOMS. NO MAIN PIPING SHALL <br />85 <br />m <br />0 <br />3 <br />PENETRATE OR PASS ABOVE THE ELECTRICAL ROOMS. <br />c <br />a <br />� <br />a <br />° <br />y <br />o <br />o= <br />rn <br />L <br />rn$ <br />o <br />Q- <br />CDH.6 <br />m e <br />7 <br />i <br />3 11. THE CONTRACTOR MUST REVIEW ALL CONSTRUCTION H 3 a Q- c o- o <br />DOCUMENTS PRIOR TO BID. SHOULD MODIFICATION TO m > a - _ 0 v <br />I I: o m <br />$ COORDINATETHESYSTEM WITH, 4 OTHER TRADES, IT Ca v > w v c <br />WILL BE THE CONTRACTOR'S RESPONSIBILITY TO = w o <br />__ _� ___ ___ i i { a € F1 OBTAIN APPROVAL OF THESE CHANGES BY THE AHJ, <br />_ -__.�_.__.._...._._._..�.._...__.�, �.�.._._,�.._.._._ - � ___ __ . _�_.�,...._.._._._._.__,_.._._.w.�..__.........__.__.._.�.._.r.,.... __m__ <br />{ _ F { } AND THE FIRE PROTECTION ENGINEER OF RECORD. IN <br />j 1 ADDITION TO OBTAINING THE NECESSARY APPROVALS, <br />THE CONTRACTOR MUST MAKE NOTE OF ALL FIELD o T .r <br />OR COORDINATION CHANGES ON THE INSTALLATION 1 0' o [ a <br />DRAWINGS. ONCE COMPLETE, THE CONTRACTOR SHALL rn u - <br />G 5 SUPPLY ONE COPY OF AS -BUILT DRAWINGS TO THE + <br />j <br />FIRE PROTECTION ENGINEER OF RECORD FOR THEIR <br />I i ' USE. m <br />} # 5 i i 5 � � 5 � � l <br />FP3 FP3 FP3 } <br />12. THE CONTRACTOR SHALL DIVERT ALL DRAIN AND a <br />_ _- _ . _- _ - _ _ v _ . __ _ _ �#_ - _ _ _ _ - a -_ - _ _..--_.,.�,_....._ _ . � - ---------- <br />FROM -- - - .. _- _ � - _ _ - a - -. - _ _ _ _ _ _- � � __ _ . _ - _� _ _ _ ®i _� _ _. _ _ _ _ __ _ � _ _ �_� INSPECTORS TEST CONNECTION DISCHARGE AWAY <br />_ _ _ __ __ _„� _ - �� --_ - _ - - _ ^ ^ _ `_ __ i _ FROM FINISHED SURFACES AND PIPE TO APPROVED <br />1 ( I DRAIN LOCATIONS. THE CONTRACTOR WILL BE <br />m) m BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR <br />€ 3 r CLEANING OF RUST STAINS ON PAVEMENT/CONCRETE <br />' O DUE TO WATER DISCHARGE FROM SPRINKLER SYSTEM <br />i F 5 DRAIN DOWNS. <br />4 I I §I 1 <br />a d a } <br />FP2 FP2 E <br />g 1 p 55 <br />FP3 FP3 FP3 <br />- - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - -- L -- - - - - - - - - - - - - - - - _ - - - - - - - - - --- J_ - - - - - - - - - - - - - --- - - - - - - - - - - - --- L - - - - - - - - -- - - - - - <br />k t t F # £ a 4 E £ € $ <br />€ - - - - - --- - - - - - - - - - - - - --S <br />( S I 1 I I I i i I D <br />i i -- --I - -----0 <br />c 1 i <br />--- - - - - - - - - - - i --- - - - - - -- <br />£ <br />5 I 1 # <br />I i ? FP3 I j [ <br />s b £ µ� <br /># 3 <br />i 5 5 <br />2 6 FP3 FP3 FP3------$-_. <br />3 <br />� -- -- FP2 <br />s a d # # # # <br />1 OVERALL FIRE SPRINKLE. <br />-30 0 <br />€ i { <br />3 <br />p)i 3 2 <br />€ <br />f 3 <br />} € <br />.1...........................-,.,...........-...._...............»....,,.,....,_.._--»......... <br />uo <br />SHEET INDEX <br />FP1 OVERALL FIRE SPRINKLER PLAN <br />FP2 ENLARGED FIRE SPRINKLER PLAN <br />FP3 FIRE PROTECTION DETAILS <br />FP4 STOCKROOM HYDRAULIC PLACARD INFORMATION <br />I11 <br />Y <br />� <br />Z <br />W <br />CD <br />cc <br />u_ <br />r <br />coQ <br />c <br />M <br />N <br />ca <br />i <br />J <br />Q <br />cc <br />0 <br />c <br />z° <br />i <br />° <br />m <br />.. <br />m <br />.. <br />Q <br />(W(� <br />i-' <br />U) <br />W <br />o <br />Z <br />Z <br />W <br />> <br />j <br />� <br />_ <br />cc <br />_ <br />cr.' <br />o <br />L <br />Z <br />a <br />Q <br />M <br /><_ <br />L <br />w <br />N <br />CC <br />J <br />r m <br />J <br />CC <br />(n <br />W <br />Cr <br />FL0 <br />cc <br />co <br />~ <br />EE <br />LL <br />Q <br />� <br />> <br />a <br />O <br />Q <br />Iir <br />a <br />Q <br />w <br />o <br />a <br />O <br />N <br />Z <br />V <br />cc <br />' <br />H <br />DWG <br />FP1 <br />