16
<br />SHOP DRAWINGS
<br />FFERY D. BURNHAM
<br />#83153100012006
<br />3
<br />SPRINKLER SYMBOL LEGEND
<br />CONTACT
<br />INFORMATION
<br />GENERAL PIPING
<br />AND DEMOLITION NOTES
<br />GENERAL NOTES
<br />SYMBOL
<br />SIZE
<br />MFR
<br />MAKE
<br />S.I.N.
<br />FINISH
<br />STYLE
<br />TEMP
<br />K-FACTOR
<br />SYMBOL
<br />DESCRIPTION
<br />DOCUMENTS INCLUDE JURISDICTIONAL REQUIREMENTS
<br />PROVIDED BY THE FOLLOWING CONTACTS:
<br />FIRE SPRINKLER REVIEWING AUTHORITY:
<br />VERNE RIGGALL, FIRE MARSHAL
<br />(813) 780-0041
<br />1. CONTRACTOR MUST VISIT THE BUILDING TO
<br />DETERMINE THE FULL EXTENT OF THE EXISTING FIRE
<br />PROTECTION WORK AND THE EXISTING CONDITIONS,
<br />BECOME TOTALLY FAMILIAR WITH DISCONNECTIONS,
<br />REMOVALS, RELOCATIONS AND/OR RECONNECTIONS
<br />OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED,
<br />AND CONDITIONS IN THE PROPOSAL FOR THIS
<br />PROJECT. NO EXTRA COMPENSATION WILL BE PAID
<br />FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION,
<br />AND/OR ALLOWANCE.
<br />2. UNLESS NOTED OTHERWISE, DISCONNECT AND REMOVE
<br />ALL EXISTING FIRE PROTECTION COMPONENTS NOT
<br />INTENDED TO BE REUSED.
<br />3. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS TO
<br />AN APPROVED DUMPING SITE AND CLEAN ALL FIRE
<br />PROTECTION WORK PRIOR TO PROJECT COMPLETION.
<br />4. PERFORM ALL WORK ACCORDING TO THE PROJECT
<br />PHASING SCHEDUIE INFORMATION FOR THIS PROJECT.
<br />PROVIDE All NECESSARY FIRE PROTECTION WORK,
<br />TEMPORARY AND/OR OTHERWISE, AND USE WHATEVER
<br />MEANS NECESSARY, TO CONFORM TO THE REQUIRED
<br />CONSTRUCTION PHASING OF THE PROJECT.
<br />5. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR
<br />REPLACING ITEMS DAMAGED DURING DEMOLITION AND
<br />CONSTRUCTION.
<br />1. THE DESIG3N SHOWN ON THESE CONTRACT
<br />DOCUMENTES HAS BEEN PREPARED FOR APPROVAL BY
<br />THE AUTHCJRITY HAVING JURISDICITON AND TO
<br />PROVIDE GUIDANCE FOR BIDDING. THE CONTRACTOR
<br />SHALL SUMMIT COMPLETE FIRE SPRINKLER SHOP
<br />DRAWINGS AS REQUIRED BY SPECIFICATION SECTION
<br />01330. CONTRACTOR SHALL BASE SHOP DRAWING
<br />DESIGN ON THE FIRE PROTECTION DRAWINGS AND
<br />SPECIFICATIONS. SPRINKLER SHOP DRAWINGS SHALL
<br />INCLUDE ALL NECESSARY ELEVATIONS, HANGER
<br />LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATION
<br />METHODS/NOTES, MATERIAL DATA, AND ANY OTHER
<br />INFORMATION NECESSARY TO CLARIFY THE INTENT OF
<br />INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE
<br />SIZES, SPRINKLER SPACING, AND ALL SYSTEM
<br />CONFIGURATIONS AS SHOWN. ANY ALTERNATES IN
<br />DESIGN OF THE SYSTEM OR IN MATERIALS OR
<br />EQUIPMENT USED MUST BE APPROVED IN WRITING VIA
<br />THE REQUEST FOR INFORMATION PROCESS BY THE
<br />FIRE PROTECTION ENGINEER OF RECORD PRIOR TO
<br />ANY BIDDING, FABRICATION, OR INSTALLATION.
<br />2. CONTRACTOR SHALL COORDINATE LOCATIONS OF FIRE
<br />PROTECTION COMPONENTS INCLUDING PIPING, ALARMS,
<br />DRAINS, TEST POINTS, ETC., WITH ALL
<br />ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND
<br />ELECTRICAL COMPONENTS. OBSTRUCTIONS TO
<br />SPRINKLER DISCHARGE MUST BE CONSIDERED DURING
<br />SHOP DRAWING PRODUCTION AND INSTALLATION.
<br />EXTRA SPRINKLERS MAY BE REQUIRED AT NO
<br />Q 1 /2"
<br />TYCO
<br />TY-B TY3231 WHITE
<br />PENDENT
<br />401 ESC
<br />I 155 i
<br />5.6
<br />HYDRAULIC REFERENCE NODE POINT
<br />Q
<br />1"
<br />TYCO
<br />DS-C
<br />TY3555
<br />WHITE
<br />CONCEAL
<br />200
<br />5.6
<br />[-
<br />CAP
<br />VARIES
<br />VARIES
<br />VARIES
<br />----
<br />BRASS
<br />EXISTING
<br />UPRIGHT
<br />®
<br />RISER NIPPLE/DROP NIPPLE
<br />APPLICABLE CODES
<br />VARIES
<br />VARIES
<br />VARIES
<br />----
<br />CHROME
<br />wHITE
<br />EXISTING___
<br />PENDENT
<br />---
<br />m
<br />SPRINKLER RISER
<br />DEMO
<br />VARIES
<br />VARIES
<br />----
<br />-__
<br />EXISTING
<br />PENDENT
<br />F__
<br />INSPECTOR'S TEST/AUXILIARY DRAIN
<br />NFPA STANDARDS EDITION
<br />NFPA 13 2007
<br />REFER TO SHEET Cl FOR APPLICABLE BUILDING CODES
<br />CONTRACTOR MAY SUBSTITUTE SPRINKLERS OF SAME SIZE, K-FACTOR AND
<br />TEMPERATURE CLASSIFICATION UNLESS PROHIBITED BY THE SPECIFICATIONS.
<br />\
<br />HANGER
<br />\\\
<br />TRAPEZE HANGER PERPENDICULAR TO JOIST
<br />TRAPEZE HANGER PARALLEL TO JOIST
<br />B
<br />NEW CONNECTION
<br />NEW SPRINKLER PIPE
<br />- --
<br />EXISTING SPRINKLER PIPE
<br />- -
<br />DEMO SPRINKLER PIPE
<br />PROVIDE
<br />REQUIRED
<br />SPRINKLER
<br />SPRINKLERS
<br />ADDITIONAL SPRINKLERS AS
<br />PER NFPA 13 IN EXISTING
<br />CABINET FOR ANY NEW
<br />INSTALLED.
<br />6. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH
<br />ADJACENT SURFACES LEFT UNUSED AFTER EXISTING
<br />SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND
<br />VACATED FROM THESE HOLES.
<br />ADDITIONAL COST TO WAL-MART. REFER TO
<br />SPECIFICATION FOR ADDITIONAL REQUIREMENTS.
<br />3. SUBMIT A REQUEST FOR INFORMATION (RFI), FOR
<br />QUESTIONS RELATED TO THE FIRE PROTECTION
<br />7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND
<br />DOCUMENTS.
<br />MAINTAINING FIRE DEPARTMENT ACCESS ROADS
<br />THROUGHOUT THE PROJECT 4 ROUTE ALL SPRINKLER MAINS ABOVE THE BOTTOM
<br />CHORD OF THE BAR JOISTS.
<br />8. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE
<br />DEMOLITION SHALL BE LEFT IN SERVICE. 5. PROVIDE FIRE PROTECTION AS REQUIRED BY CODE
<br />FOR ANY TEMPORARY STRUCTURES BUILT DURING
<br />9. ALL WORK SHALL BE PERFORMED SO AS TO NOT CONSTRUCTION.
<br />INTERRUPT SERVICE. THE CONTRACTOR SHALL
<br />PROPERLY NOTIFY THE LANDLORD, THE LESSOR AND 6. SPRINKLER SYSTEMS ARE MONITORED BY AN
<br />W
<br />w
<br />Ch
<br />r
<br />.-
<br />9
<br />N
<br />N
<br />n
<br />a
<br />r
<br />LL
<br />co
<br />Z
<br />co
<br />-
<br />Q
<br />T
<br />C
<br />X
<br />�
<br />N
<br />d
<br />i
<br />ADJACENT TENANTS A MINIMUM OF 48 HOURS IN
<br />ADVANCE BEFORE PROCEEDING WITH THIS WORK.
<br />ALL WORK SHALL BE SCHEDULED IN ADVANCE.
<br />OFF -SITE CENTRAL STATION INCLUDING TAMPER
<br />SWITCHES ON ALL CONTROL VALVES AND FLOW
<br />SWITCHES,
<br />�-
<br />10. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE
<br />7.
<br />IF APPLICABLE, THE CONTRACTOR SHALL ASSUME
<br />END OF EACH WORKDAY.
<br />THAT ANY CURTAIN BOARDS OR DRAFT CURTAINS
<br />°
<br />M
<br />WILL BE INSTALLED PRIOR TO THE SPRINKLER PIPING.
<br />o o �
<br />r
<br />1
<br />11. ONLY THE PORTIONS OF THE BUILDING AFFECTED BY
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER
<br />a a Z
<br />0
<br />a
<br />THE SCOPE OF THE PROJECT HAVE BEEN SHOWN.
<br />PENETRATIONS OF THE CURTAIN BOARDS OR DRAFT
<br />0
<br />°
<br />z
<br />o
<br />CL
<br />INFORMATION SHOWN AS EXISTING TO REMAIN IS NOT
<br />CURTAINS AND SEALING WITH APPROVED FIRE
<br />_
<br />a
<br />`
<br />BEING MODIFIED AS A PART OF THIS PROJECT.
<br />CAULKING.
<br />a v � U.
<br />78
<br />2
<br />U-
<br />' •..��'
<br />;,
<br />12. SPRINKLER CONTRACTOR TO SUBMIT AND RECEIVE
<br />8.
<br />PENETRATIONS OF RATED WALLS OR ASSEMBLIES
<br />c c
<br />o �j o
<br />c
<br />_
<br />�l
<br />APPROVAL OF FULL SHOP DRAWINGS TO HENDERSON
<br />SHALL BE "FIRE CAULKED" WITH APPROVED CAULKING
<br />o
<br />I�
<br />o
<br />B
<br />ali
<br />c
<br />ENGINEERS PRIOR TO FABRICATION AND
<br />PER METHODS REQUIRED BY THE AUTHORITY HAVING
<br />m
<br />m
<br />?
<br />a
<br />y
<br />J
<br />p
<br />i
<br />INSTALLATION.
<br />JURSDICTION, AND PROJECT SPECIFICATIONS.
<br />Z
<br />v
<br />y
<br />9.
<br />THE FIRE PROTECTION ENGINEER OF RECORD WILL
<br />=
<br />42
<br />v
<br />=-6
<br />c
<br />_
<br />NOT BE RESPONSIBLE- FOR THE CONTRACTOR'S
<br />c
<br />� �
<br />c
<br />o
<br />2
<br />� �
<br />_
<br />'
<br />�
<br />FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN
<br />�
<br />CCI
<br />i
<br />{ €
<br />ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR
<br />(
<br />E
<br />D
<br />a
<br />SHALL THEY BE REQUIRED TO SUPERVISE THE
<br />a o
<br />,_
<br />CONDUCT OF THE WORK, THE CONSTRUCTION
<br />a a
<br />,
<br />rn
<br />a.a
<br />'
<br />}
<br />#
<br />PROCEDURES AS SET FORTH BY THE GENERAL
<br />a Ii
<br />a O
<br />=
<br />a
<br />s
<br />CONTRACTOR, SUB -CONTRACTORS, THEIR RESPECTIVE
<br />r
<br />cv
<br />c*i
<br />v
<br />ui
<br />I
<br />EMPLOYEES, OR ANY OTHER PERSON AT THE JOBSITE
<br />L
<br />OTHER THAN THE ENGINEERING FIRM'S OWN
<br />}
<br />r
<br />_..�.._--
<br />4 F
<br />-..,m...__.,._�._�__
<br />EMPLOYEES.
<br />L
<br />{
<br />i
<br />10.
<br />SPRINKLER PROTECTION IS REQUIRED ABOVE THE
<br />5
<br />0
<br />�°
<br />m
<br />i ,
<br />!
<br />ELECTRICAL ROOMS. NO MAIN PIPING SHALL
<br />85
<br />m
<br />0
<br />3
<br />PENETRATE OR PASS ABOVE THE ELECTRICAL ROOMS.
<br />c
<br />a
<br />�
<br />a
<br />°
<br />y
<br />o
<br />o=
<br />rn
<br />L
<br />rn$
<br />o
<br />Q-
<br />CDH.6
<br />m e
<br />7
<br />i
<br />3 11. THE CONTRACTOR MUST REVIEW ALL CONSTRUCTION H 3 a Q- c o- o
<br />DOCUMENTS PRIOR TO BID. SHOULD MODIFICATION TO m > a - _ 0 v
<br />I I: o m
<br />$ COORDINATETHESYSTEM WITH, 4 OTHER TRADES, IT Ca v > w v c
<br />WILL BE THE CONTRACTOR'S RESPONSIBILITY TO = w o
<br />__ _� ___ ___ i i { a € F1 OBTAIN APPROVAL OF THESE CHANGES BY THE AHJ,
<br />_ -__.�_.__.._...._._._..�.._...__.�, �.�.._._,�.._.._._ - � ___ __ . _�_.�,...._.._._._._.__,_.._._.w.�..__.........__.__.._.�.._.r.,.... __m__
<br />{ _ F { } AND THE FIRE PROTECTION ENGINEER OF RECORD. IN
<br />j 1 ADDITION TO OBTAINING THE NECESSARY APPROVALS,
<br />THE CONTRACTOR MUST MAKE NOTE OF ALL FIELD o T .r
<br />OR COORDINATION CHANGES ON THE INSTALLATION 1 0' o [ a
<br />DRAWINGS. ONCE COMPLETE, THE CONTRACTOR SHALL rn u -
<br />G 5 SUPPLY ONE COPY OF AS -BUILT DRAWINGS TO THE +
<br />j
<br />FIRE PROTECTION ENGINEER OF RECORD FOR THEIR
<br />I i ' USE. m
<br />} # 5 i i 5 � � 5 � � l
<br />FP3 FP3 FP3 }
<br />12. THE CONTRACTOR SHALL DIVERT ALL DRAIN AND a
<br />_ _- _ . _- _ - _ _ v _ . __ _ _ �#_ - _ _ _ _ - a -_ - _ _..--_.,.�,_....._ _ . � - ----------
<br />FROM -- - - .. _- _ � - _ _ - a - -. - _ _ _ _ _ _- � � __ _ . _ - _� _ _ _ ®i _� _ _. _ _ _ _ __ _ � _ _ �_� INSPECTORS TEST CONNECTION DISCHARGE AWAY
<br />_ _ _ __ __ _„� _ - �� --_ - _ - - _ ^ ^ _ `_ __ i _ FROM FINISHED SURFACES AND PIPE TO APPROVED
<br />1 ( I DRAIN LOCATIONS. THE CONTRACTOR WILL BE
<br />m) m BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR
<br />€ 3 r CLEANING OF RUST STAINS ON PAVEMENT/CONCRETE
<br />' O DUE TO WATER DISCHARGE FROM SPRINKLER SYSTEM
<br />i F 5 DRAIN DOWNS.
<br />4 I I §I 1
<br />a d a }
<br />FP2 FP2 E
<br />g 1 p 55
<br />FP3 FP3 FP3
<br />- - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - -- L -- - - - - - - - - - - - - - - - _ - - - - - - - - - --- J_ - - - - - - - - - - - - - --- - - - - - - - - - - - --- L - - - - - - - - -- - - - - -
<br />k t t F # £ a 4 E £ € $
<br />€ - - - - - --- - - - - - - - - - - - - --S
<br />( S I 1 I I I i i I D
<br />i i -- --I - -----0
<br />c 1 i
<br />--- - - - - - - - - - - i --- - - - - - --
<br />£
<br />5 I 1 #
<br />I i ? FP3 I j [
<br />s b £ µ�
<br /># 3
<br />i 5 5
<br />2 6 FP3 FP3 FP3------$-_.
<br />3
<br />� -- -- FP2
<br />s a d # # # #
<br />1 OVERALL FIRE SPRINKLE.
<br />-30 0
<br />€ i {
<br />3
<br />p)i 3 2
<br />€
<br />f 3
<br />} €
<br />.1...........................-,.,...........-...._...............»....,,.,....,_.._--».........
<br />uo
<br />SHEET INDEX
<br />FP1 OVERALL FIRE SPRINKLER PLAN
<br />FP2 ENLARGED FIRE SPRINKLER PLAN
<br />FP3 FIRE PROTECTION DETAILS
<br />FP4 STOCKROOM HYDRAULIC PLACARD INFORMATION
<br />I11
<br />Y
<br />�
<br />Z
<br />W
<br />CD
<br />cc
<br />u_
<br />r
<br />coQ
<br />c
<br />M
<br />N
<br />ca
<br />i
<br />J
<br />Q
<br />cc
<br />0
<br />c
<br />z°
<br />i
<br />°
<br />m
<br />..
<br />m
<br />..
<br />Q
<br />(W(�
<br />i-'
<br />U)
<br />W
<br />o
<br />Z
<br />Z
<br />W
<br />>
<br />j
<br />�
<br />_
<br />cc
<br />_
<br />cr.'
<br />o
<br />L
<br />Z
<br />a
<br />Q
<br />M
<br /><_
<br />L
<br />w
<br />N
<br />CC
<br />J
<br />r m
<br />J
<br />CC
<br />(n
<br />W
<br />Cr
<br />FL0
<br />cc
<br />co
<br />~
<br />EE
<br />LL
<br />Q
<br />�
<br />>
<br />a
<br />O
<br />Q
<br />Iir
<br />a
<br />Q
<br />w
<br />o
<br />a
<br />O
<br />N
<br />Z
<br />V
<br />cc
<br />'
<br />H
<br />DWG
<br />FP1