Laserfiche WebLink
HOT WATER INSTALL THERMOMETER <br />RECIRCULATION TO SET BALL VALVE _ <br />MAIN - <br />THERMOMETER <br />TEE FITTING <br />REDUCER) PIPE <br />FULL PORT BALL VALVE, W/ INSULATION <br />LOCKING HANDLE, 1 PIPE SIZE <br />SMALLER THAN LINE SIZE. <br />ADJUST BALL VALVE TO MAINTAIN A 5°F DROP IN HOT WATER LOOP. <br />PERMANENTLY MARK BALL VALVE SETPOINT. <br />REFER TO SPECIFICATIONS, SCHEDULES, AND NOTES FOR MORE <br />INFORMATION. MAKE CONNECTIONS AND PROVIDE INSTALLATION PER <br />MANUFACTURER'S RECOMMENDATIONS. ARRANGEMENT SHOWN IS <br />SCHEMATIC: PROVIDE REDUCERS AND ADAPTERS AS REQUIRED. <br />BALANCING VALVE ASSEMBLY <br />NTS 11/06/13 PLUM82-17 <br />NOTE: THIS DETAIL APPLIES ONLY <br />TO KEYNOTED RESTROOM FLOOR <br />DRAINS AND SHALL NOT BE USED <br />FOR DRAINS AND CLEANOUTS ON <br />THE SALES FLOOR <br />SQUARE TOP FLOOR DRAIN <br />DO NOT SLOPE FLOOR <br />TO DRAIN. <br />FLOOR <br />d' e <br />d e <br />IF FLOOR IS TO HAVE TILE, SET <br />TOP OF DRAIN TO BE FLUSH <br />WITH TOP OF TILE. COORDINATE <br />FINISH TILE ELEVATION WITH <br />GENERAL CONTRACTOR. <br />TILE ON MORTAR BED (WHERE TILE <br />IS INDICATED ON ARCHITECTURAL <br />FLOOR FINISH PLAN) <br />FLOOR DRAIN BODY WITH 3" <br />OUTLET (CAULK OR PUSH -ON), <br />MEMBRANE CLAMPING COLLAR <br />DEEP -SEAL P-TRAP <br />LOCATE FLOOR DRAIN WHERE SHOWN ON DIMENSIONED PLUMBING FLOOR PLAN. <br />E)�RPEN FL06/01 /07 PLUMB2-5 <br />11 A All IrA /'DTI InrNcl <br />CONTRACTOR SHALL FURNISH AND INSTALL <br />(1) PROCEPTOR MODEL GMC 1250 FL <br />CONTACT: QUOTATIONS DEPARTMENT <br />GREEN TURTLE AMERICA <br />2709 WATER RIDGE PARKWAY, SUITE 410, <br />CHARLOTTE, NC, 28217. 1-877-428-8187 <br />MANUFACTURER'S <br />EXTENSION COLLAR <br />TO SUIT DEPTH <br />OF INTERCEPTOR TYP <br />SLOPE PAVEMENT <br />OR GRADE <br />AWAY FROM SLAB <br />3" VENT <br />CONNECTION TYP <br />SEAL WATER TIGHT <br />WITH FIBERGLASS SIKAFLEX <br />CAULKING ADHESIVE TYP -� <br />INLET <br />LIQUID LEVEL <br />a. <br />d <br />N <br />NOTES: <br />1. INSTALL INTERCEPTOR PER <br />MANUFACTURER INSTRUCTIONS. <br />2. PROVIDE INTERCEPTOR INSTALLATION <br />THAT COMPLIES WITH AASHTO H-20 LOAD RATING. <br />3. FROST LINE DEPTH TAKES <br />PRECEDENCE OVER MINIMUM BURIAL DEPTH. CONTACT <br />MANUFACTURER IF FROST <br />LINE IS DEEPER THAN THE MAX DEPTH. BEFORE INSTALLING, <br />VERIFY THE INVERT WILL WORK AT THE CONNECTION TO CIVIL LINE WHILE MAINTAINING <br />PROPER SLOPE. <br />4. PROVIDE SAMPLING PORT, <br />REFER TO PLUMBING PLAN FOR LOCATION. <br />5. REFER TO PLUMBING PLAN <br />FOR PIPE SIZES. <br />6. NO SUBSTITUTIONS ALLOWED. <br />7. COORDINATE INSTALLATION <br />DEPTH OF INTERCEPTOR WITH MANUFACTURER PRIOR TO ORDER <br />TO VERIFY THE NEED FOR <br />REINFORCEMENT OF TANK AND COLLAR WHEN UNIT INLET PIPE <br />IS TO BE INSTALLED AT A <br />DEPTH GREATER THAN 6 FT. <br />8. GREASE TRAP EFFLUENT BAFFLE PIPE NEEDS TO BE SIX INCHES FROM BOTTOM OF TANK. <br />( 010 <br />EASE I NTERCE <br />1"�GR <br />HOT WATER RECIRCULATION BRANCH UNION--\ PIPE INSULATI <br />TYPICAL FULL -PORT <br />'— CHECK VALVE <br />BALL TYPE STRAINER <br />FLOW CONTROL VALVE; REFER <br />SHUT-OFF VALVE <br />TO FLOOR PLANS AND <br />SCHEDULES FOR FLOW RATE <br />AND PIPE SIZE. <br />REFER TO SPECIFICATIONS, SCHEDULES, <br />AND NOTES FOR MORE <br />INFORMATION. MAKE CONNECTIONS AND PROVIDE INSTALLATION <br />PER MANUFACTURER'S RECOMMENDATIONS. <br />ARRANGEMENT <br />SHOWN IS SCHEMATIC: PROVIDE REDUCERS AND ADAPTERS AS <br />REQUIRED. <br />FLOW CONTROL <br />VALVE TRAI <br />8 NTS 11/05/13 <br />PLUMB2-16 <br />nrT T�� ')F HUB DRAIN 1 1/2" <br />ISHED FLOOR. <br />=P-SEAL P-TRAP <br />LOCATE HUB DRAIN WHERE SHOWN ON DIMENSIONED PLUMBING FLOOR PLAN. <br />HUB DRAIN <br />4 NTS O4.28.06 PLUMB2-7 <br />NTS <br />VENT PORTS <br />TYP OF 2 <br />YCO, HOLD TIGHT <br />TO INTERCEPTOR <br />TYP OF 2 <br />OUTLET <br />r MANUFACTURER'S <br />24" COVER, GASKETED <br />AND AASHTO H-20 <br />LOAD RATED TYP <br />—MANWAY/INSPECTION <br />PORT TYP OF 4 <br />r-REINFORCED CONCRETE <br />RELIEVING SLAB <br />REF STRUCTURAL <br />f--YCO, HOLD TIGHT <br />TO INTERCEPTOR <br />TYP OF 2 <br />OUTLET <br />F <br />COMBINATION WYE AND <br />1/8 BEND TYP OF 2 <br />COMPACTED <br />GRAVEL BACKFILL <br />FIBERGLASS <br />REINFORCED <br />PLASTIC TANK <br />CONCRETE EXTENDED <br />AROUND TANKS <br />REF STRUCTURAL <br />BED OF COMPACTED <br />GRAVEL BACKFILL <br />REF STRUCTURAL <br />INSTALL SECOND TANK <br />2" LOWER TO MATCH <br />OUTLET OF FIRST TANK <br />200 <br />09.10.10 IPC PLUMB2.12-4 <br />FINISHED GRADE <br />16" SQUARE CONCRETE PAD <br />TROWEL TOP SMOOTH AND EDGE. <br />OMIT IF IN SIDEWALK <br />YARD CLEANOUT i <br />NTS 06.29.01 <br />YCO <br />PLUMB2-3 <br />EXPOSED VENT PROVIDE LEAD SHEETING <br />f f <br />PIPE THRU ROOF <br />AROUND EXPOSED VENT <br />SHALL BE PVC. <br />ABOVE FLASHING. TURN <br />DOWN INTO PIPE OPENING. <br />HEIGHT ABOVE ROOF <br />CLAMP <br />SHALL EXCEED LOCAL <br />VENT FLASHING SHALL BE <br />MAXIMUM SNOW DEPTH <br />PER ROOF MANUFACTURER'S <br />(CONTRACTOR SHALL <br />AND ROOFING <br />VERIFY), 12" MINIMUM. <br />CONTRACTOR'S <br />RECOMMENDATION. <br />ROOF INSULATION <br />ROOF DECK <br />CORE DRILL ROOF OR <br />ANCHOR PIPE TO ROOF <br />PROVIDE SLEEVE IF <br />DECK WITH U-BOLT AROUND <br />REQUIRED BY TYPE OF <br />PIPE AND ANGLE IRON <br />ROOF DECK. PROVIDE <br />WELDED OR SCREWED TO <br />FIRE STOP SEAL BETWEEN <br />ROOF DECK OR JOIST. <br />PIPE AND SLEEVE OR DECK. <br />MINIMUM 12" BELOW ROOF <br />PROVIDE PIPE INCREASER <br />PIPE CONNECTORS SUITABLE <br />IF/WHERE CODE REQUIRES A <br />FOR TYPE OF PIPE USED <br />MINIMUM 3 VENT THRU ROOF. <br />REFER TO PLANS FOR VTR PIPE SIZES AND <br />LOCATIONS. LOCATE VTR <br />MINIMUM THREE FEET FROM PROPERTY LINE, <br />OR TEN FEET HORIZONTAL <br />OR THREE FEET VERTICAL ABOVE ANY BUILDING OPENING OR FRESH AIR <br />INTAKE, OR ONE FOOT FROM ANY VERTICAL <br />SURFACE. LOCATE VTR <br />MINIMUM 18" FROM PARAPET, EXPANSION JOINT, EQUIPMENT CURB, ETC. <br />OFFSET IN CEILING SPACE WHERE REQUIRED <br />TO MEET THESE CONDITIONS. <br />3 VLIV 1 11 11 <br />1 NTS 06/01 /07 PLUMB2-10 <br />ALL DRAINS AND CLEANOUTS <br />ON THE SALES FLOOR SHALL <br />BE FLUSH WITH THE TOP OF <br />CONCRETE SLAB; DO NOT <br />SLOPE FLOOR TO THESE DRAINS <br />CASE CONDENSATE DRAIN <br />REF REFRIGERATION. <br />PROVIDE AIR GAP. <br />e e <br />° <br />d <br />d <br />d <br />° <br />d <br />ACCESS TO CONDENSATE <br />DRAIN IS THRU REMOVABLE <br />PANEL ON FRONT OF <br />REFRIGERATED CASE <br />/-REFRIGERATED <br />CASE KICKPLATE <br />FLOOR <br />Ad <br />G a <br />d.°. <br />a ' <br />FLOOR DRAIN BODY <br />PIPE INCREASER FOR <br />COMBINATION WASTE <br />& VENT <br />DEEP -SEAL <br />P-TRAP <br />LOCATE FLOOR DRAIN WHERE SHOWN ON DIMENSIONED PLUMBING FLOOR PLAN <br />000 REFRIGERATED CASE DRAIN- <br />10 NTS O4.28.06 PLUMB2-8 <br />GRADE OR FLOOR SLAB <br />TRENCH AND <br />LASTIC <br />BACKFILL PJj <br />a 4 <br />d <br />PER SPECS. LINE <br />MARKER <br />PIPE WARNING <br />BUILDING FOOTING \ TAPE <br />OR FOUNDATION (EXTERIOR <br />BEWARE OF UNDERMINING BUILDING TO <br />FOUNDATIONS. <br />VERIFY WITH THE BUILDING.) <br />ARCHITECT HOW <br />CLOSE YOU MAY \ <br />TRENCH TO THE <br />FOUNDATIONS. <br />PIPE <br />PARALLEL TO FOOTING <br />CONCRETE <br />FLOOR SLAB <br />GRADE, PAVING, OR FLOOR. <br />e <br />PROVIDE PVC SLEEVE FOR ALL <br />NO PIPE SHALZ"< <br />FOUNDATION WALL PENETRATIONS. <br />PASS THROUG <br />FOOTING PAD.VERIFY <br />WITH ARCHITECT WHAT <br />PLUMBINGTO <br />DO IF PIPE MUST PASS <br />CONTRACTORBELOW <br />FOUNDATION FOOTING <br />IS <br />PAD. DO NOT TRENCH UNDER <br />RESPONSIBLEDRIP <br />LINE OF TREES. <br />FOR LOCATION <br />AND ELEVATIOANSVERSE <br />TO FOOTING <br />OF SLEEVES. <br />VERIFY EXCAVATION CONDITIONS (SOIL/ROCK) WITH GEOTECHNICAL REPORT <br />AND/OR SITE INVESTIGATION. <br />REFER TO SPECS FOR OTHER CONDITIONS. <br />PIPE AND <br />TRENCH LOCATION <br />6 <br />NTS 06/01/07 PLUMB2.15-3 <br />PIPE MAY EXTEND <br />AS WASTE OR VENT. <br />PROVIDE CLEANOUT TEE <br />COLUMN OR <br />WITH SCREWED COUNTER- <br />PARTITION <br />SUNK ABS PLASTIC PLUG: <br />AS SHOWN <br />TAPERED -THREAD WITH <br />ON FLOOR <br />TFE JOINT COMPOUND. --]PLAN, <br />WHERE CLEANOUT TEE <br />IS CONCEALED IN A <br />CLEANOUT <br />CHASE OR PARTITION, <br />FACE SHALL <br />PROVIDE A ROUND 18 <br />BE WITHIN <br />GAUGE STAINLESS <br />4" OF WALL <br />STEEL COVER WITH <br />SURFACE. <br />BEVELED EDGES AND <br />PROVIDE <br />FLATHEAD MACHINE <br />XTENSION <br />SCREW. <br />F REQUIRED. <br />dCONCRETE <br />4JfT <br />HUB AT FLOO <br />PLUMBING <br />FLOOR RISER LENG <br />SCHEDULESLAB <br />AS REQUIREECIFICATIONSRTHERWLONG <br />SWEEP AT END OF <br />ATION.OR <br />COMBINATION WYE AN <br />EIGHTH BEND IN <br />DIRECTION <br />RUN OF LINE. <br />3 -00 <br />OF FLOW <br />PROVIDE WCO WHERE SHOWN ON PLAN, AND ON SANITARY <br />WASTE BRANCHES NOT SERVED WITH <br />A FLOOR CLEANOUT: <br />LOCATE ABOVE FIXTURE FLOOD RIM <br />WITHIN 4' OF FLOOR. <br />CONSULT LOCAL CODES FOR OTHER <br />WCO REQUIREMENTS. <br />WALL CLEANOUT <br />NTS 06/01 /07 PLUM132-2 <br />PLUMBING SYMBOLS <br />SS <br />SANITARY SEWER <br />GW <br />GREASE WASTE <br />OW <br />OIL WASTE <br />ST <br />STORM SEWER <br />RD <br />ROOF DRAIN LINE <br />ORD <br />OVERFLOW ROOF DRAIN LINE <br />- <br />DOMESTIC COLD WATER <br />- - <br />DOMESTIC HOT WATER <br />- - - <br />DOMESTIC HOT WATER RETURN <br />IW <br />IRRIGATION WATER <br />T <br />TEPID OR TEMPERED WATER <br />F <br />FILTERED WATER <br />G <br />NATURAL GAS <br />A <br />COMPRESSED AIR <br />CD <br />CONDENSATE DRAIN <br />RO <br />REVERSE OSMOSIS WATER <br />V <br />PLUMBING VENT <br />VAC <br />PLUMBING VACUUM <br />UNION <br />--III-- <br />GAS PRESSURE REGULATOR <br />--��— <br />GAS COCK <br />C <br />ELBOW - TURNED DOWN <br />ELBOW - TURNED UP <br />TEE - TURNED DOWN <br />v <br />TEE - TURNED UP <br />BALL VALVE <br />--X> -- <br />PLUG VALVE <br />CHECK VALVE <br />SHUT-OFF VALVE IN VERTICAL LINE <br />BACKFLOW PREVENTER <br />M <br />WATER METER <br />WHA <br />WATER HAMMER ARRESTOR <br />T & P RELIEF VALVE <br />_E�_TMV <br />THERMOSTATIC MIXING VALVE <br />FD1 <br />FLOOR DRAIN <br />O <br />ROOF DRAIN/OVERFLOW ROOF DRAIN <br />—� FC01 <br />FLOOR CLEANOUT <br />-� FCO <br />FLOOR CLEANOUT (SQUARE) <br />--0 YCO <br />YARD CLEANOUT <br />FPWH <br />FREEZE PROOF WALL HYDRANT <br />�- HB <br />HOSE BIBB <br />--11 WCO <br />WALL CLEANOUT <br />CONNECT TO EXISTING <br />ETR <br />EXISTING TO REMAIN <br />DEMO PIPE <br />----VBF---- <br />VENT BELOW FLOOR <br />ROUND SECURED GASKETED NICKEL BRONZE ADJUSTABLE <br />TOP WITH "CO" CAST IN COVER. PROVIDE CLEANOUT TOP <br />WITH VARIATIONS SUITABLE FOR FLOOR COVERING (CARPET <br />MARKER, RECESSED FOR TILE, SCORIATED FOR UNFINISHED <br />FLOORS). PROVIDE GASKETED PLASTIC PLUG IN CAST IRON <br />BODY. USE TEFLON JOINT COMPOUND ON PLUG THREADS. <br />CLEAN THE TOP OF EXPOSED FCO AFTER INSTALLATION. <br />MEMBRANE CLAMP FLOOR SLAB ON GRADE <br />AS REQUIRED FOR <br />SAME SIZE AS SEWER <br />DEPTH OF SEWER <br />UP TO 4" MAXIMUM <br />PVC PIPE OR <br />LONG SWEEP ELBOW AT <br />HUB AND SPIGOT <br />END OR TURN OF RUN <br />CAST IRON PIPE <br />BELOW FLOOR <br />COMBINATION WYE AND <br />SANITARY <br />EIGHTH BEND IN RUN. <br />SEWER LINE <br />ENTER TOP OF PIPE. <br />DIRECTION <br /><-- <br /><-- OF FLOW <br />LOCATE AT BUILDING EXIT, AT ENDS OF RUNS, AT TURNS <br />OF PIPE GREATER THAN 45 <br />DEGREES, AT 50' INTERVALS <br />ON STRAIGHT RUNS, AND/OR WHERE SHOWN ON PLANS. <br />PROVIDE BACKFILL PER ARCHITECTURAL <br />SPECIFICATIONS. <br />LOCATE CLEANOUTS WHERE <br />THERE IS 18" CLEAR AROUND. <br />CONSULT LOCAL CODES FOR <br />OTHER FCO REQUIREMENTS. <br />�FLOOR <br />CLEAN O�UT, <br />C � N <br />� <br />o <br />O U <br />eVl <br />�a <br />U <br />b b <br />e <br />Ro <br />w Ww0 <br />w NF- ZM ��-O'L <br />wo Nzfr- zwo,_ <br />W 0 IN-N�� aSU6`O J <br />as ~a-'060N >oaF� <br />0 ww �- ¢ Jw�Fpo <br />a>aoF zs�a?w�o <br />J <br />NU N�wQ�SXcnWpmQ} <br />z Q� �- <br />_OHt=V% oNl- W=u-wr <br />�o <br />zo <br />zNvzz <br />NO-wo02Wd�W?O0nsm3o <br />OQ �JO_ - <br />>_ujm�Na0 <br />wwZmOww0wwww <br />waow,�oo� <br />=�LLj0<Da�waazww<N U 0O <br />z <br />Q <br />D <br />m <br />z <br />a <br />U <br />z <br />O <br />© 0 <br />►Er <br />A <br />� <br />O O <br />CE <br />� <br />cfl <br />� <br />i� <br />CD <br />� <br />�z <br />O <br />W <br />nr- <br />O <br />as <br />Q <br />o <br />� <br />r., <br />T <br />z <br />0 <br />ISSUE BLOCK <br />0 ADD#4 09/09/16 <br />CHECKED BY: <br />JJD <br />DRAWN BY: <br />DM <br />PROTO: <br />LBA <br />PROTO CYCLE: <br />051514 <br />DOCUMENT DATE: <br />120415 <br />���ttitttrr <br />CEN <br />No. 7847 <br />F< <br />ATE OF <br />OR\D P. • -'ON <br />�frl!lflllt��\ <br />Oct 19, 2016 <br />PLUMBING <br />DETAILS <br />NTS 03/28/08 PLUMB2-1 <br />SHEET: <br />P2 <br />