PRESSURE
<br />HYDRANT
<br />SRC
<br />PIPE TABLE (WET)
<br />PRODUCT
<br />NOMINAL
<br />PIPE SIZE
<br />INSIDE
<br />DIAMETER
<br />DYNA-F
<br />.203
<br />DYNA-F
<br />2.703
<br />DYNA-F
<br />.314
<br />DYNA-F
<br />4.310
<br />DYNA-TH
<br />1
<br />80
<br />DYNA-TH
<br />Eigl.639
<br />08
<br />DYNA-T
<br />DYNA-TH
<br />EE 2.104
<br />SCHEDULE 10
<br />2"
<br />2.157
<br />SCHEDULE 10
<br />2j"
<br />2.635
<br />SCHEDUL
<br />3.260
<br />SCHEDULE 10
<br />4"
<br />4.260
<br />SCHEDULE 10
<br />6"
<br />6.357
<br />SCHEDUL
<br />8.249
<br />SCHEDULE 40
<br />1"
<br />1.049
<br />SCHEDULE 40
<br />1
<br />1.380
<br />SCHEDULE 40
<br />1
<br />1.610
<br />SCHEDULE 40
<br />2"
<br />2.067
<br />PIPE TABLE (UNDERGROUND)
<br />.•�NOMINAL
<br />M
<br />•
<br />PIPE SIZES SHOWN ARE FOR HYDRAULIC CALCULATIONS PURPOSES ONLY.
<br />REFER TO SPECIFICATIONS FOR ALLOWABLE SUBSTITUTIONS.
<br />PIPE DIMENSION TABLE
<br />2 NTS 10.30.07 F PLow
<br />u vno n n-r
<br />LA W, MA
<br />.n.
<br />711-jr
<br />NOTE:
<br />EXISTING SYSTEM SIZE: 49,443 SQ. FT.
<br />LIQUOR STORE ADDITION: 3,765 SQ. FT.
<br />TOTAL: 53,208 SQ. FT.
<br />CONTROL VALVE ADDED TO ISOLATE THE LIQUOR
<br />STORE ADDITION AND PROVIDE INDEPENDENT ALARM
<br />NOTIFICATION. REF 3-FP3
<br />-- o
<br />We]
<br />0
<br />GENERAL PIPING
<br />GENERAL NOTES
<br />AND DEMOLITION NOTES
<br />1. CONTRACTOR MUST VISIT THE BUILDING TO
<br />1.
<br />THE DESIGN SHOWN ON THESE CONTRACT
<br />DETERMINE THE FULL EXTENT OF THE EXISTING
<br />DOCUMENTS HAS BEEN PREPARED FOR
<br />FIRE PROTECTION WORK AND THE EXISTING
<br />APPROVAL BY THE AUTHORITY HAVING
<br />CONDITIONS, BECOME TOTALLY FAMILIAR WITH
<br />JURISDICTION AND TO PROVIDE GUIDANCE FOR
<br />DISCONNECTIONS, REMOVALS, RELOCATIONS
<br />BIDDING. THE CONTRACTOR SHALL SUBMIT
<br />AND/OR RECONNECTIONS OF EXISTING FIRE
<br />COMPLETE FIRE SPRINKLER SHOP DRAWINGS AS
<br />PROTECTION EQUIPMENT REQUIRED, AND
<br />REQUIRED BY SPECIFICATION SECTION 01330.
<br />CONDITIONS IN THE PROPOSAL FOR THIS
<br />CONTRACTOR SHALL BASE SHOP DRAWING
<br />PROJECT. NO EXTRA COMPENSATION WILL BE
<br />DESIGN ON THE FIRE PROTECTION DRAWINGS AND
<br />PAID FOR LACK OF SUCH DETERMINATION,
<br />SPECIFICATIONS. SPRINKLER SHOP DRAWINGS
<br />FAMILIARIZATION, AND/OR ALLOWANCE.
<br />SHALL INCLUDE ALL NECESSARY ELEVATIONS,
<br />2.
<br />HANGER LOCATIONS, PIPE LENGTHS, DIMENSIONS,
<br />UNLESS NOTED OTHERWISE, DISCONNECT AND
<br />FABRICATION METHODS/NOTES, MATERIAL DATA,
<br />REMOVE ALL EXISTING FIRE PROTECTION
<br />AND ANY OTHER INFORMATION NECESSARY TO
<br />COMPONENTS NOT INTENDED TO BE REUSED.
<br />CLARIFY THE INTENT OF INSTALLATION.
<br />3.
<br />CONTRACTOR SHALL PROVIDE PIPE SIZES,
<br />REMOVE ALL DEMOLITION MATERIALS AND
<br />SPRINKLER SPACING, AND ALL SYSTEM
<br />DEBRIS TO AN APPROVED DUMPING SITE AND
<br />CONFIGURATIONS AS SHOWN. ANY ALTERNATES
<br />CLEAN ALL FIRE PROTECTION WORK PRIOR TO
<br />IN DESIGN OF THE SYSTEM OR IN MATERIALS
<br />PROJECT COMPLETION.
<br />OR EQUIPMENT USED MUST BE APPROVED IN
<br />4.
<br />WRITING VIA THE REQUEST FOR INFORMATION
<br />PERFORM ALL WORK ACCORDING TO THE
<br />PROCESS BY THE FIRE PROTECTION ENGINEER OF
<br />PROJECT PHASING SCHEDULE INFORMATION FOR
<br />RECORD PRIOR TO ANY BIDDING, FABRICATION,
<br />THIS PROJECT. PROVIDE ALL NECESSARY FIRE
<br />2.
<br />OR INSTALLATION.
<br />PROTECTION WORK, TEMPORARY AND/OR
<br />OTHERWISE, AND USE WHATEVER MEANS
<br />CONTRACTOR SHALL COORDINATE LOCATIONS OF
<br />NECESSARY, TO CONFORM TO THE REQUIRED
<br />FIRE PROTECTION COMPONENTS INCLUDING
<br />CONSTRUCTION PHASING OF THE PROJECT.
<br />PIPING, ALARMS, DRAINS, TEST POINTS, ETC.,
<br />5.
<br />WITH ALL ARCHITECTURAL, STRUCTURAL,
<br />CONTRACTOR IS RESPONSIBLE FOR REPAIRING
<br />MECHANICAL, AND ELECTRICAL COMPONENTS.
<br />OR REPLACING ITEMS DAMAGED DURING
<br />OBSTRUCTIONS TO SPRINKLER DISCHARGE MUST
<br />DEMOLITION AND CONSTRUCTION.
<br />BE CONSIDERED DURING SHOP DRAWING
<br />6.
<br />PRODUCTION AND INSTALLATION. EXTRA
<br />CONTRACTOR SHALL PATCH ALL HOLES TO
<br />SPRINKLERS MAY BE REQUIRED AT NO
<br />MATCH ADJACENT SURFACES LEFT UNUSED
<br />3.
<br />ADDITIONAL COST TO WAL-MART. REFER TO
<br />AFTER EXISTING SPRINKLER PIPING OR
<br />SPECIFICATION FOR ADDITIONAL REQUIREMENTS.
<br />EQUIPMENT IS REMOVED AND VACATED FROM
<br />7. THESE HOLES.
<br />SUBMIT A REQUEST FOR INFORMATION (RFI), FOR
<br />4.
<br />QUESTIONS RELATED TO THE FIRE PROTECTION
<br />CONTRACTOR IS RESPONSIBLE FOR PROVIDING
<br />DOCUMENTS.
<br />AND MAINTAINING FIRE DEPARTMENT ACCESS
<br />8. ROADS THROUGHOUT THE PROJECT.
<br />5.
<br />ROUTE ALL SPRINKLER MAINS ABOVE THE
<br />BOTTOM CHORD OF THE BAR JOISTS.
<br />SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE
<br />9. DEMOLITION SHALL BE LEFT IN SERVICE.
<br />PROVIDE FIRE PROTECTION AS REQUIRED BY
<br />6.
<br />CODE FOR ANY TEMPORARY STRUCTURES BUILT
<br />ALL WORK SHALL BE PERFORMED SO AS TO
<br />DURING CONSTRUCTION.
<br />NOT INTERRUPT SERVICE. THE CONTRACTOR
<br />SHALL PROPERLY NOTIFY THE LANDLORD, THE
<br />SPRINKLER SYSTEMS ARE MONITORED BY AN
<br />LESSOR AND ADJACENT TENANTS A MINIMUM OF
<br />OFF -SITE CENTRAL STATION INCLUDING TAMPER
<br />48 HOURS IN ADVANCE BEFORE PROCEEDING
<br />7.
<br />SWITCHES ON ALL CONTROL VALVES AND FLOW
<br />10. WITH THIS WORK. ALL WORK SHALL BE
<br />SWITCHES.
<br />SCHEDULED IN ADVANCE.
<br />IF APPLICABLE, THE CONTRACTOR SHALL
<br />11. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO
<br />ASSUME THAT ANY CURTAIN BOARDS OR DRAFT
<br />THE END OF EACH WORKDAY.
<br />CURTAINS WILL BE INSTALLED PRIOR TO THE
<br />SPRINKLER PIPING. CONTRACTOR SHALL BE
<br />ONLY THE PORTIONS OF THE BUILDING
<br />RESPONSIBLE FOR PROPER PENETRATIONS OF
<br />AFFECTED BY THE SCOPE OF THE PROJECT
<br />8.
<br />THE CURTAIN BOARDS OR DRAFT CURTAINS AND
<br />12. HAVE BEEN SHOWN. INFORMATION SHOWN AS
<br />SEALING WITH APPROVED FIRE CAULKING.
<br />EXISTING TO REMAIN IS NOT BEING MODIFIED AS
<br />A PART OF THIS PROJECT.
<br />PENETRATIONS OF RATED WALLS OR ASSEMBLIES
<br />SHALL BE "FIRE CAULKED" WITH APPROVED
<br />SPRINKLER CONTRACTOR TO SUBMIT AND
<br />9.
<br />CAULKING PER METHODS REQUIRED BY THE
<br />RECEIVE APPROVAL OF FULL SHOP DRAWINGS
<br />AUTHORITY HAVING JURSDICTION, AND PROJECT
<br />TO HENDERSON ENGINEERS PRIOR TO
<br />SPECIFICATIONS.
<br />FABRICATION AND INSTALLATION.
<br />THE FIRE PROTECTION ENGINEER OF RECORD
<br />WILL NOT BE RESPONSIBLE FOR THE
<br />CONTACT
<br />CONTRACTOR'S FAILURE TO CARRY OUT THE
<br />CONSTRUCTION WORK IN ACCORDANCE WITH THE
<br />N FORMATION
<br />NTO SHALL
<br />REEQU REDT TOSUPERVISE E CONDUCTYOFETHE
<br />WORK, THE CONSTRUCTION PROCEDURES AS SET
<br />DOCUMENTS INCLUDE JURISDICTIONAL
<br />FORTH BY THE GENERAL CONTRACTOR,
<br />REQUIREMENTS PROVIDED BY THE FOLLOWING
<br />10.
<br />SUB -CONTRACTORS, THEIR RESPECTIVE
<br />CONTACTS:
<br />EMPLOYEES, OR ANY OTHER PERSON AT THE
<br />JOBSITE OTHER THAN THE ENGINEERING FIRM'S
<br />FIRE SPRINKLER REVIEWING AUTHORITY:
<br />OWN EMPLOYEES.
<br />VERNE RIGGALL, FIRE MARSHAL
<br />11.
<br />(813) 780-0041
<br />SPRINKLER PROTECTION IS REQUIRED ABOVE THE
<br />ELECTRICAL ROOMS. NO MAIN PIPING SHALL
<br />PENETRATE OR PASS ABOVE THE ELECTRICAL
<br />APPLICABLE CODES
<br />ROOMS.
<br />THE CONTRACTOR MUST REVIEW ALL
<br />CONSTRUCTION DOCUMENTS PRIOR TO BID.
<br />NFPA STANDARDS EDITION
<br />SHOULD MODIFICATION TO THESE PLANS BECOME
<br />NFPA 13 2007
<br />NECESSARY TO PROPERLY COORDINATE THE
<br />REFER TO SHEET Cl FOR APPLICABLE BUILDING
<br />SYSTEM WITH, OTHER TRADES, IT WILL BE THE
<br />CODES
<br />CONTRACTOR'S RESPONSIBILITY TO OBTAIN
<br />OF THESE CHANGES Y
<br />LFIRE
<br />WATER SUPPLY
<br />ANDRTHE PROTECTION ENGINEERHOFAHJ,
<br />RECORD. IN ADDITION TO OBTAINING THE
<br />INFORMATION
<br />12.
<br />NECESSARY APPROVALS, THE CONTRACTOR MUST
<br />MAKE NOTE OF ALL FIELD OR COORDINATION
<br />CHANGES ON THE INSTALLATION DRAWINGS.
<br />STATIC: 54.0 PSI
<br />ONCE COMPLETE, THE CONTRACTOR SHALL
<br />RESIDUAL: 46.0 PSI AT 1712 GPM
<br />SUPPLY ONE COPY OF AS -BUILT DRAWINGS TO
<br />THE FIRE PROTECTION ENGINEER OF RECORD FOR
<br />INFORMATION DERIVED FROM A FLOW TEST
<br />THEIR USE.
<br />PERFORMED BY HENDERSON ENGINEERS DURING
<br />A SITE VISIT ON 09/06/13. ADDITIONAL SAFETY
<br />THE CONTRACTOR SHALL DIVERT ALL DRAIN AND
<br />FACTORS ARE NOT INCLUDED.
<br />INSPECTORS TEST CONNECTION DISCHARGE AWAY
<br />FROM FINISHED SURFACES AND PIPE TO
<br />APPROVED DRAIN LOCATIONS. THE CONTRACTOR
<br />WILL BE BACKCHARGED FOR ANY REPAIR,
<br />REPLACEMENT, OR CLEANING OF RUST STAINS
<br />ON PAVEMENT/CONCRETE DUE TO WATER
<br />DISCHARGE FROM SPRINKLER SYSTEM DRAIN
<br />DOWNS.
<br />EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL
<br />DRAWINGS AND MAY NOT REFLECT EXACT "AS -BUILT"
<br />CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL
<br />EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL
<br />BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE
<br />NEW WORK AND DEMOLITION WITH ALL OTHER
<br />DISCIPLINES AND EXISTING CONDITIONS.
<br />SHEET INDEX
<br />FP1 OVERALL FIRE SPRINKLER PLAN
<br />FP2 ENLARGED FIRE SPRINKLER PLAN
<br />FP3 FIRE PROTECTION DETAILS
<br />EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A
<br />THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
<br />SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE
<br />TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
<br />NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE
<br />WORK PROPERLY. NO ADDITIONAL COMPENSATION
<br />SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT
<br />OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH
<br />THIS KNOWLEDGE.
<br />l � N
<br />� C
<br />O
<br />^�
<br />o
<br />w
<br />�
<br />• ^i O
<br />> O
<br />C �
<br />U
<br />�
<br />LLJ w Wwo
<br />D U- NZap 2 -M,-z
<br />Z <
<br />LiJ p H Vl lw2 Wd' <V �U�11 la..�aa
<br />WF- u- Z�F-O ZOJ
<br />Q¢ 2�5<�O w=z<INw
<br />W {�,,<-2wNUOZFrF-
<br />O �N Z < LqwxFoo
<br />LL_ a >-<p�Z&F-<?w�'-o
<br />Xcnowop�ar
<br />zp 3v-,��W.6gw-<w a��¢
<br />w zo
<br />~ zv7�n<NO�cno����Zz
<br />Q <JO�wN�ww>-Nwlno
<br />x z K m o J U L w U x Z
<br />W z U w
<br />oO>_w aowoa::wwwwm
<br />�waz,iowwooc�<o>
<br />cn F_DN(_)0 V)ia�IXaawoa<
<br />ZN
<br />0
<br />�
<br />o
<br />0
<br />o E
<br />�W
<br />� S
<br />oA
<br />Wz
<br />-o
<br />l/1 N it
<br />I
<br />� Q
<br />O
<br />N
<br />N
<br />z
<br />&uz
<br />a
<br />J
<br />v c2co
<br />M
<br />v
<br />Z
<br />E3
<br />W
<br />~
<br />v
<br />Q
<br />U
<br />z
<br />0
<br />O o
<br />H
<br />A
<br />�
<br />�e
<br />a
<br />O O
<br />cr
<br />c�o
<br />CD
<br />O
<br />0
<br />0
<br />O
<br />�
<br />p--1
<br />co
<br />0
<br />N
<br />w
<br />GQ
<br />z
<br />c�
<br />0
<br />ISSUE BLOCK
<br />REISSUE 120405
<br />/2\ ADD#3 07/11 /16
<br />CHECKED BY:
<br />NAW/JEC
<br />DRAWN BY:
<br />NM
<br />PROTO:
<br />LBA
<br />PROTO CYCLE:
<br />051514
<br />DOCUMENT DATE:
<br />120415 k
<br />L� .
<br />DARRELL E. STEIN
<br />LICENSE # 58463
<br />0
<br />E.
<br />�k N0.58483 *¢
<br />�. STATE OF X!
<br />11H
<br />OVERALL
<br />FIRE
<br />SPRINKLER
<br />PLAN
<br />Li
<br />Lij
<br />Li
<br />ch
<br />rK
<br />Q
<br />0
<br />SHEET:
<br />FP1
<br />
|