Laserfiche WebLink
PRESSURE <br />HYDRANT <br />SRC <br />PIPE TABLE (WET) <br />PRODUCT <br />NOMINAL <br />PIPE SIZE <br />INSIDE <br />DIAMETER <br />DYNA-F <br />.203 <br />DYNA-F <br />2.703 <br />DYNA-F <br />.314 <br />DYNA-F <br />4.310 <br />DYNA-TH <br />1 <br />80 <br />DYNA-TH <br />Eigl.639 <br />08 <br />DYNA-T <br />DYNA-TH <br />EE 2.104 <br />SCHEDULE 10 <br />2" <br />2.157 <br />SCHEDULE 10 <br />2j" <br />2.635 <br />SCHEDUL <br />3.260 <br />SCHEDULE 10 <br />4" <br />4.260 <br />SCHEDULE 10 <br />6" <br />6.357 <br />SCHEDUL <br />8.249 <br />SCHEDULE 40 <br />1" <br />1.049 <br />SCHEDULE 40 <br />1 <br />1.380 <br />SCHEDULE 40 <br />1 <br />1.610 <br />SCHEDULE 40 <br />2" <br />2.067 <br />PIPE TABLE (UNDERGROUND) <br />.•�NOMINAL <br />M <br />• <br />PIPE SIZES SHOWN ARE FOR HYDRAULIC CALCULATIONS PURPOSES ONLY. <br />REFER TO SPECIFICATIONS FOR ALLOWABLE SUBSTITUTIONS. <br />PIPE DIMENSION TABLE <br />2 NTS 10.30.07 F PLow <br />u vno n n-r <br />LA W, MA <br />.n. <br />711-jr <br />NOTE: <br />EXISTING SYSTEM SIZE: 49,443 SQ. FT. <br />LIQUOR STORE ADDITION: 3,765 SQ. FT. <br />TOTAL: 53,208 SQ. FT. <br />CONTROL VALVE ADDED TO ISOLATE THE LIQUOR <br />STORE ADDITION AND PROVIDE INDEPENDENT ALARM <br />NOTIFICATION. REF 3-FP3 <br />-- o <br />We] <br />0 <br />GENERAL PIPING <br />GENERAL NOTES <br />AND DEMOLITION NOTES <br />1. CONTRACTOR MUST VISIT THE BUILDING TO <br />1. <br />THE DESIGN SHOWN ON THESE CONTRACT <br />DETERMINE THE FULL EXTENT OF THE EXISTING <br />DOCUMENTS HAS BEEN PREPARED FOR <br />FIRE PROTECTION WORK AND THE EXISTING <br />APPROVAL BY THE AUTHORITY HAVING <br />CONDITIONS, BECOME TOTALLY FAMILIAR WITH <br />JURISDICTION AND TO PROVIDE GUIDANCE FOR <br />DISCONNECTIONS, REMOVALS, RELOCATIONS <br />BIDDING. THE CONTRACTOR SHALL SUBMIT <br />AND/OR RECONNECTIONS OF EXISTING FIRE <br />COMPLETE FIRE SPRINKLER SHOP DRAWINGS AS <br />PROTECTION EQUIPMENT REQUIRED, AND <br />REQUIRED BY SPECIFICATION SECTION 01330. <br />CONDITIONS IN THE PROPOSAL FOR THIS <br />CONTRACTOR SHALL BASE SHOP DRAWING <br />PROJECT. NO EXTRA COMPENSATION WILL BE <br />DESIGN ON THE FIRE PROTECTION DRAWINGS AND <br />PAID FOR LACK OF SUCH DETERMINATION, <br />SPECIFICATIONS. SPRINKLER SHOP DRAWINGS <br />FAMILIARIZATION, AND/OR ALLOWANCE. <br />SHALL INCLUDE ALL NECESSARY ELEVATIONS, <br />2. <br />HANGER LOCATIONS, PIPE LENGTHS, DIMENSIONS, <br />UNLESS NOTED OTHERWISE, DISCONNECT AND <br />FABRICATION METHODS/NOTES, MATERIAL DATA, <br />REMOVE ALL EXISTING FIRE PROTECTION <br />AND ANY OTHER INFORMATION NECESSARY TO <br />COMPONENTS NOT INTENDED TO BE REUSED. <br />CLARIFY THE INTENT OF INSTALLATION. <br />3. <br />CONTRACTOR SHALL PROVIDE PIPE SIZES, <br />REMOVE ALL DEMOLITION MATERIALS AND <br />SPRINKLER SPACING, AND ALL SYSTEM <br />DEBRIS TO AN APPROVED DUMPING SITE AND <br />CONFIGURATIONS AS SHOWN. ANY ALTERNATES <br />CLEAN ALL FIRE PROTECTION WORK PRIOR TO <br />IN DESIGN OF THE SYSTEM OR IN MATERIALS <br />PROJECT COMPLETION. <br />OR EQUIPMENT USED MUST BE APPROVED IN <br />4. <br />WRITING VIA THE REQUEST FOR INFORMATION <br />PERFORM ALL WORK ACCORDING TO THE <br />PROCESS BY THE FIRE PROTECTION ENGINEER OF <br />PROJECT PHASING SCHEDULE INFORMATION FOR <br />RECORD PRIOR TO ANY BIDDING, FABRICATION, <br />THIS PROJECT. PROVIDE ALL NECESSARY FIRE <br />2. <br />OR INSTALLATION. <br />PROTECTION WORK, TEMPORARY AND/OR <br />OTHERWISE, AND USE WHATEVER MEANS <br />CONTRACTOR SHALL COORDINATE LOCATIONS OF <br />NECESSARY, TO CONFORM TO THE REQUIRED <br />FIRE PROTECTION COMPONENTS INCLUDING <br />CONSTRUCTION PHASING OF THE PROJECT. <br />PIPING, ALARMS, DRAINS, TEST POINTS, ETC., <br />5. <br />WITH ALL ARCHITECTURAL, STRUCTURAL, <br />CONTRACTOR IS RESPONSIBLE FOR REPAIRING <br />MECHANICAL, AND ELECTRICAL COMPONENTS. <br />OR REPLACING ITEMS DAMAGED DURING <br />OBSTRUCTIONS TO SPRINKLER DISCHARGE MUST <br />DEMOLITION AND CONSTRUCTION. <br />BE CONSIDERED DURING SHOP DRAWING <br />6. <br />PRODUCTION AND INSTALLATION. EXTRA <br />CONTRACTOR SHALL PATCH ALL HOLES TO <br />SPRINKLERS MAY BE REQUIRED AT NO <br />MATCH ADJACENT SURFACES LEFT UNUSED <br />3. <br />ADDITIONAL COST TO WAL-MART. REFER TO <br />AFTER EXISTING SPRINKLER PIPING OR <br />SPECIFICATION FOR ADDITIONAL REQUIREMENTS. <br />EQUIPMENT IS REMOVED AND VACATED FROM <br />7. THESE HOLES. <br />SUBMIT A REQUEST FOR INFORMATION (RFI), FOR <br />4. <br />QUESTIONS RELATED TO THE FIRE PROTECTION <br />CONTRACTOR IS RESPONSIBLE FOR PROVIDING <br />DOCUMENTS. <br />AND MAINTAINING FIRE DEPARTMENT ACCESS <br />8. ROADS THROUGHOUT THE PROJECT. <br />5. <br />ROUTE ALL SPRINKLER MAINS ABOVE THE <br />BOTTOM CHORD OF THE BAR JOISTS. <br />SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE <br />9. DEMOLITION SHALL BE LEFT IN SERVICE. <br />PROVIDE FIRE PROTECTION AS REQUIRED BY <br />6. <br />CODE FOR ANY TEMPORARY STRUCTURES BUILT <br />ALL WORK SHALL BE PERFORMED SO AS TO <br />DURING CONSTRUCTION. <br />NOT INTERRUPT SERVICE. THE CONTRACTOR <br />SHALL PROPERLY NOTIFY THE LANDLORD, THE <br />SPRINKLER SYSTEMS ARE MONITORED BY AN <br />LESSOR AND ADJACENT TENANTS A MINIMUM OF <br />OFF -SITE CENTRAL STATION INCLUDING TAMPER <br />48 HOURS IN ADVANCE BEFORE PROCEEDING <br />7. <br />SWITCHES ON ALL CONTROL VALVES AND FLOW <br />10. WITH THIS WORK. ALL WORK SHALL BE <br />SWITCHES. <br />SCHEDULED IN ADVANCE. <br />IF APPLICABLE, THE CONTRACTOR SHALL <br />11. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO <br />ASSUME THAT ANY CURTAIN BOARDS OR DRAFT <br />THE END OF EACH WORKDAY. <br />CURTAINS WILL BE INSTALLED PRIOR TO THE <br />SPRINKLER PIPING. CONTRACTOR SHALL BE <br />ONLY THE PORTIONS OF THE BUILDING <br />RESPONSIBLE FOR PROPER PENETRATIONS OF <br />AFFECTED BY THE SCOPE OF THE PROJECT <br />8. <br />THE CURTAIN BOARDS OR DRAFT CURTAINS AND <br />12. HAVE BEEN SHOWN. INFORMATION SHOWN AS <br />SEALING WITH APPROVED FIRE CAULKING. <br />EXISTING TO REMAIN IS NOT BEING MODIFIED AS <br />A PART OF THIS PROJECT. <br />PENETRATIONS OF RATED WALLS OR ASSEMBLIES <br />SHALL BE "FIRE CAULKED" WITH APPROVED <br />SPRINKLER CONTRACTOR TO SUBMIT AND <br />9. <br />CAULKING PER METHODS REQUIRED BY THE <br />RECEIVE APPROVAL OF FULL SHOP DRAWINGS <br />AUTHORITY HAVING JURSDICTION, AND PROJECT <br />TO HENDERSON ENGINEERS PRIOR TO <br />SPECIFICATIONS. <br />FABRICATION AND INSTALLATION. <br />THE FIRE PROTECTION ENGINEER OF RECORD <br />WILL NOT BE RESPONSIBLE FOR THE <br />CONTACT <br />CONTRACTOR'S FAILURE TO CARRY OUT THE <br />CONSTRUCTION WORK IN ACCORDANCE WITH THE <br />N FORMATION <br />NTO SHALL <br />REEQU REDT TOSUPERVISE E CONDUCTYOFETHE <br />WORK, THE CONSTRUCTION PROCEDURES AS SET <br />DOCUMENTS INCLUDE JURISDICTIONAL <br />FORTH BY THE GENERAL CONTRACTOR, <br />REQUIREMENTS PROVIDED BY THE FOLLOWING <br />10. <br />SUB -CONTRACTORS, THEIR RESPECTIVE <br />CONTACTS: <br />EMPLOYEES, OR ANY OTHER PERSON AT THE <br />JOBSITE OTHER THAN THE ENGINEERING FIRM'S <br />FIRE SPRINKLER REVIEWING AUTHORITY: <br />OWN EMPLOYEES. <br />VERNE RIGGALL, FIRE MARSHAL <br />11. <br />(813) 780-0041 <br />SPRINKLER PROTECTION IS REQUIRED ABOVE THE <br />ELECTRICAL ROOMS. NO MAIN PIPING SHALL <br />PENETRATE OR PASS ABOVE THE ELECTRICAL <br />APPLICABLE CODES <br />ROOMS. <br />THE CONTRACTOR MUST REVIEW ALL <br />CONSTRUCTION DOCUMENTS PRIOR TO BID. <br />NFPA STANDARDS EDITION <br />SHOULD MODIFICATION TO THESE PLANS BECOME <br />NFPA 13 2007 <br />NECESSARY TO PROPERLY COORDINATE THE <br />REFER TO SHEET Cl FOR APPLICABLE BUILDING <br />SYSTEM WITH, OTHER TRADES, IT WILL BE THE <br />CODES <br />CONTRACTOR'S RESPONSIBILITY TO OBTAIN <br />OF THESE CHANGES Y <br />LFIRE <br />WATER SUPPLY <br />ANDRTHE PROTECTION ENGINEERHOFAHJ, <br />RECORD. IN ADDITION TO OBTAINING THE <br />INFORMATION <br />12. <br />NECESSARY APPROVALS, THE CONTRACTOR MUST <br />MAKE NOTE OF ALL FIELD OR COORDINATION <br />CHANGES ON THE INSTALLATION DRAWINGS. <br />STATIC: 54.0 PSI <br />ONCE COMPLETE, THE CONTRACTOR SHALL <br />RESIDUAL: 46.0 PSI AT 1712 GPM <br />SUPPLY ONE COPY OF AS -BUILT DRAWINGS TO <br />THE FIRE PROTECTION ENGINEER OF RECORD FOR <br />INFORMATION DERIVED FROM A FLOW TEST <br />THEIR USE. <br />PERFORMED BY HENDERSON ENGINEERS DURING <br />A SITE VISIT ON 09/06/13. ADDITIONAL SAFETY <br />THE CONTRACTOR SHALL DIVERT ALL DRAIN AND <br />FACTORS ARE NOT INCLUDED. <br />INSPECTORS TEST CONNECTION DISCHARGE AWAY <br />FROM FINISHED SURFACES AND PIPE TO <br />APPROVED DRAIN LOCATIONS. THE CONTRACTOR <br />WILL BE BACKCHARGED FOR ANY REPAIR, <br />REPLACEMENT, OR CLEANING OF RUST STAINS <br />ON PAVEMENT/CONCRETE DUE TO WATER <br />DISCHARGE FROM SPRINKLER SYSTEM DRAIN <br />DOWNS. <br />EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL <br />DRAWINGS AND MAY NOT REFLECT EXACT "AS -BUILT" <br />CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL <br />EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL <br />BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE <br />NEW WORK AND DEMOLITION WITH ALL OTHER <br />DISCIPLINES AND EXISTING CONDITIONS. <br />SHEET INDEX <br />FP1 OVERALL FIRE SPRINKLER PLAN <br />FP2 ENLARGED FIRE SPRINKLER PLAN <br />FP3 FIRE PROTECTION DETAILS <br />EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A <br />THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE <br />TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES <br />NOT RELIEVE THE RESPONSIBILITY OF PERFORMING THE <br />WORK PROPERLY. NO ADDITIONAL COMPENSATION <br />SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT <br />OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH <br />THIS KNOWLEDGE. <br />l � N <br />� C <br />O <br />^� <br />o <br />w <br />� <br />• ^i O <br />> O <br />C � <br />U <br />� <br />LLJ w Wwo <br />D U- NZap 2 -M,-z <br />Z < <br />LiJ p H Vl lw2 Wd' <V �U�11 la..�aa <br />WF- u- Z�F-O ZOJ <br />Q¢ 2�5<�O w=z<INw <br />W {�,,<-2wNUOZFrF- <br />O �N Z < LqwxFoo <br />LL_ a >-<p�Z&F-<?w�'-o <br />Xcnowop�ar <br />zp 3v-,��W.6gw-<w a��¢ <br />w zo <br />~ zv7�n<NO�cno����Zz <br />Q <JO�wN�ww>-Nwlno <br />x z K m o J U L w U x Z <br />W z U w <br />oO>_w aowoa::wwwwm <br />�waz,iowwooc�<o> <br />cn F_DN(_)0 V)ia�IXaawoa< <br />ZN <br />0 <br />� <br />o <br />0 <br />o E <br />�W <br />� S <br />oA <br />Wz <br />-o <br />l/1 N it <br />I <br />� Q <br />O <br />N <br />N <br />z <br />&uz <br />a <br />J <br />v c2co <br />M <br />v <br />Z <br />E3 <br />W <br />~ <br />v <br />Q <br />U <br />z <br />0 <br />O o <br />H <br />A <br />� <br />�e <br />a <br />O O <br />cr <br />c�o <br />CD <br />O <br />0 <br />0 <br />O <br />� <br />p--1 <br />co <br />0 <br />N <br />w <br />GQ <br />z <br />c� <br />0 <br />ISSUE BLOCK <br />REISSUE 120405 <br />/2\ ADD#3 07/11 /16 <br />CHECKED BY: <br />NAW/JEC <br />DRAWN BY: <br />NM <br />PROTO: <br />LBA <br />PROTO CYCLE: <br />051514 <br />DOCUMENT DATE: <br />120415 k <br />L� . <br />DARRELL E. STEIN <br />LICENSE # 58463 <br />0 <br />E. <br />�k N0.58483 *¢ <br />�. STATE OF X! <br />11H <br />OVERALL <br />FIRE <br />SPRINKLER <br />PLAN <br />Li <br />Lij <br />Li <br />ch <br />rK <br />Q <br />0 <br />SHEET: <br />FP1 <br />