My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7631 Gall Blvd (32)
Zephyrhills
>
Building Department
>
Building Plans
>
7631 Gall Blvd (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 10:01:31 AM
Creation date
2/25/2025 4:18:07 PM
Metadata
Fields
Template:
Building Plans
Street #
7631
Location
Gall Blvd
Contractor
Bandes Construction
Building Plans - Permit #
17842
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOT WATER INSTALL THERMOMETER <br />RECIRCULATION TO SET BALL VALVE _ <br />MAIN — <br />THERMOMETER <br />TEE FITTING <br />REDUCER) PIPE <br />FULL PORT BALL VALVE, W/ INSULATION <br />LOCKING HANDLE, 1 PIPE SIZE <br />SMALLER THAN LINE SIZE. <br />ADJUST BALL VALVE TO MAINTAIN A 57 DROP IN HOT WATER LOOP. <br />PERMANENTLY MARK BALL VALVE SETPOINT. <br />REFER TO SPECIFICATIONS, SCHEDULES, AND NOTES FOR MORE <br />INFORMATION. MAKE CONNECTIONS AND PROVIDE INSTALLATION PER <br />MANUFACTURER'S RECOMMENDATIONS. ARRANGEMENT SHOWN IS <br />SCHEMATIC: PROVIDE REDUCERS AND ADAPTERS AS REQUIRED. <br />Q ALANCING VALVE ASSEW <br />9 NTS 11/06/13 PLUMB2-17 <br />NOTE: THIS DETAIL APPLIES ONLY <br />TO KEYNOTED RESTROOM FLOOR <br />DRAINS AND SHALL NOT BE USED IF FLOOR IS TO HAVE TILE, SET <br />FOR DRAINS AND CLEANOUTS ON TOP OF DRAIN TO BE FLUSH <br />THE SALES FLOOR WITH TOP OF TILE. COORDINATE <br />FINISH TILE ELEVATION WITH <br />SQUARE TOP FLOOR DRAIN GENERAL CONTRACTOR. <br />DO NOT SLOPE FLOOR TILE ON MORTAR BED (WHERE TILE <br />TO DRAIN. ---- <br />RAIN. IS INDICATED ON ARCHITECTURAL <br />FLOOR FLOOR FINISH PLAN) <br />d d A" ° °°" ° d J - aer <br />FLOOR DRAIN BODY WITH 3" <br />OUTLET (CAULK OR PUSH —ON), <br />MEMBRANE CLAMPING COLLAR <br />DEEP —SEAL P—TRAP <br />LOCATE FLOOR DRAIN WHERE SHOWN ON DIMENSIONED PLUMBING FLOOR PLAN. <br />R�P�F5 06/01/07 PLUMB2-5 <br />Qc <br />MANUFACTURER'S <br />EXTENSION COLLAR <br />TO SUIT DEPTH <br />OF INTERCEPTOR <br />YCO & <br />INSPECTION PORT <br />TYP OF 2 <br />SLOPE PAVEMENT \ <br />OR GRADE <br />AWAY FROM SLAB ---- <br />CONNECT TANK <br />TOP VENTS (2) <br />TO VENTING SYSTEM <br />SEAL WATER TIGHT <br />WITH FIBERGLASS SIKAFLEX <br />CAULKING ADHESIVE <br />TYP ---- <br />INLET <br />3" VENT <br />CONNECTION <br />TYP <br />LIQUID <br />LEVEL ° <br />BAFFLE <br />TYP a <br />CONTRACTOR SHALL FURNISH AND INSTALL <br />PROCEPTOR MODEL GMC 1000 IPC <br />CONTACT: QUOTATIONS DEPARTMENT <br />GREEN TURTLE AMERICA <br />201 S TRYON ST, SUITE 1475, <br />CHARLOTTE, NC, 28202. 1-877-428-8187 <br />NOTES: <br />1. INSTALL INTERCEPTOR PER MANUFACTURER INSTRUCTIONS. <br />2. PROVIDE INTERCEPTOR INSTALLATION THAT COMPLIES WITH <br />AASHTO H-20 LOAD RATING. <br />3. FROST LINE DEPTH TAKES PRECEDENCE OVER MINIMUM BURIAL <br />DEPTH. CONTACT MANUFACTURER IF FROST LINE IS DEEPER <br />THAN THE MAX DEPTH. BEFORE INSTALLING, VERIFY THE INVERT <br />WILL WORK AT THE CONNECTION TO CIVIL LINE WHILE <br />MAINTAINING PROPER SLOPE. <br />4. PROVIDE SAMPLING PORT, REFER TO PLUMBING PLAN FOR <br />LOCATION. <br />5. REFER TO PLUMBING PLAN FOR PIPE SIZES. <br />6. NO SUBSTITUTIONS ALLOWED. <br />GREASE INTERCEPT( <br />11 <br />HOT WATER RECIRCULATION BRANCH UNIONS PIPE INSULATION <br />v <br />TYPICAL FULL —PORT I— CHECK VALVE <br />BALL TYPE LSTRAINER FLOW CONTROL VALVE; REFER <br />SHUT—OFF VALVE TO FLOOR PLANS AND <br />SCHEDULES FOR FLOW RATE <br />AND PIPE SIZE. <br />REFER TO SPECIFICATIONS, SCHEDULES, AND NOTES FOR MORE <br />INFORMATION. MAKE CONNECTIONS AND PROVIDE INSTALLATION <br />y PER MANUFACTURER'S RECOMMENDATIONS. ARRANGEMENT <br />SHOWN IS SCHEMATIC: PROVIDE REDUCERS AND ADAPTERS AS <br />REQUIRED. <br />FLOW CONTROL VALVE TRAIN <br />8 NTS 11 /05/13 PLUMB2-16 <br />)F HUB DRAIN 1 1 /2" <br />ISHED FLOOR. <br />EP-SEAL P-TRAP <br />LOCATE HUB DRAIN WHERE SHOWN ON DIMENSIONED PLUMBING FLOOR PLAN. <br />a4HUB DRAIN <br />NTS O4.28.06 PLUMB277 <br />° <br />KAAKii Ip*ACTURER'S <br />IVER, GASKETED <br />4SHTO H-20 <br />ZATED TYP <br />ORTS <br />2 <br />OUTLET <br />)LD TIGHT <br />RCEPTOR <br />2 <br />MANUFACTURER'S <br />24" COVER, GASKETED <br />AND AASHTO H-20 <br />LOAD RATED TYP <br />REINFORCED CONCRETE <br />RELIEVING SLAB <br />REF STRUCTURAL <br />YCO, HOLD TIGHT <br />TO INTERCEPTOR <br />TYP OF 2 <br />° <br />m7 <br />COMBINATION WYE AND <br />1/8 BEND TYP OF 2 <br />COMPACTED <br />GRAVEL BACKFILL <br />FIBERGLASS <br />REINFORCED <br />PLASTIC TANK <br />CONCRETE EXTENDED AROUND <br />TANKS AND INTO TIE DOWN RODS <br />REF STRUCTURAL <br />BED OF COMPACTED <br />GRAVEL BACKFILL <br />REF STRUCTURAL <br />NTS 09.10.10 IPC PLUMB2.12-4 <br />FINISHED GRADE <br />16" SQUARE CONCRETE PAD <br />TROWEL TOP SMOOTH AND EDGE. <br />OMIT IF IN SIDEWALK <br />° d° ° <br />CO e d e <br />tl O ° d <br />YARD CLEANOUT i <br />NTS 06.29.01 <br />yGO <br />PLUMB2-3 <br />ALL DRAINS AND CLEANOUTS <br />ON THE SALES FLOOR SHALL <br />BE FLUSH WITH THE TOP OF <br />CONCRETE SLAB; DO NOT <br />SLOPE FLOOR TO THESE DRAINS <br />CASE CONDENSATE DRAIN <br />REF REFRIGERATION. <br />PROVIDE AIR GAP.-1 <br />d <br />a <br />d. <br />d <br />e <br />ACCESS TO CONDENSATE <br />DRAIN IS THRU REMOVABLE <br />PANEL ON FRONT OF <br />REFRIGERATED CASE <br />REFRIGERATED <br />CASE KICKPLATE <br />FLOOR <br />d d <br />e <br />a.Q <br />.a ..e d <br />y.- ° <br />FLOOR DRAIN BODY <br />PIPE INCREASER FOR <br />COMBINATION WASTE <br />& VENT <br />DEEP —SEAL <br />P—TRAP <br />LOCATE FLOOR DRAIN WHERE SHOWN ON DIMENSIONED PLUMBING FLOOR PLAN <br />REFRIGERATED CASE DRAIN <br />10 NTS O4.28.06 PLUMB2-8 <br />GRADE OR FLOOR SLAB <br />° — <br />TRENCH AND <br />BACKFILL PLASTIC <br />° ° <br />°PIPE <br />PER SPECS. LINE <br />/F4 <br />WARNINGMARKER <br />DING FOOTING \ <br />TAPE <br />OR FOUNDATION <br />(EXTERIOR <br />BEWARE OF UNDERMINING BUILDING TO <br />FOUNDATIONS. VERIFY WITH THE <br />BUILDING.) <br />ARCHITECT HOW CLOSE YOU MAY <br />\ <br />TRENCH TO THE FOUNDATIONS. <br />PIPE <br />PARALLEL TO FOOTING <br />CONCRETE <br />FLOOR SLAB <br />°A <br />GRADE, PAVING, OR FLOOR. <br />PROVIDE PVC SLEEVE FOR ALL <br />NO PIPE SHALFOUNDATION <br />WALL PENETRATIONS. <br />PASS THROUG <br />FOOTING PAD.VERIFY <br />WITH ARCHITECT WHAT <br />PLUMBINGTO <br />DO IF PIPE MUST PASS <br />CONTRACTORBELOW <br />FOUNDATION FOOTING <br />IS <br />PAD. DO NOT TRENCH UNDER <br />RESPONSIBLEDRIP <br />LINE OF TREES. <br />FOR LOCATIONAND <br />ELEVATIOANSVERSE <br />TO FOOTING <br />OFSLEEVES. <br />VERIFY EXCAVATION CONDITIONS <br />(SOIL/ROCK) WITH GEOTECHNICAL REPORT <br />AND/OR SITE INVESTIGATION. REFER TO SPECS FOR OTHER CONDITIONS. <br />PIPE <br />AND <br />PIPE MAY EXTEND <br />AS WASTE OR VENT. <br />TRENCH LOCATION. <br />NTS 06/01/07 PLUMB2.15-3 <br />PLUMBING SYMBOLS <br />SS <br />SANITARY SEWER <br />GW <br />GREASE WASTE <br />OW <br />OIL WASTE <br />ST <br />STORM SEWER <br />RD <br />ROOF DRAIN LINE <br />ORD <br />OVERFLOW ROOF DRAIN LINE <br />- <br />DOMESTIC COLD WATER <br />— — <br />DOMESTIC HOT WATER <br />— — — <br />DOMESTIC HOT WATER RETURN <br />IW <br />IRRIGATION WATER <br />T <br />TEPID OR TEMPERED WATER <br />F <br />FILTERED WATER <br />G <br />NATURAL GAS <br />A <br />COMPRESSED AIR <br />CD <br />CONDENSATE DRAIN <br />RO <br />REVERSE OSMOSIS WATER <br />PLUMBING VENT <br />V <br />VAC <br />PLUMBING VACUUM <br />UNION <br />i <br />(I <br />GAS PRESSURE REGULATOR <br />—{�— <br />GAS COCK <br />C <br />ELBOW — TURNED DOWN <br />ELBOW — TURNED UP <br />TEE — TURNED DOWN <br />TEE — TURNED UP <br />BALL VALVE <br />PLUG VALVE <br />CHECK VALVE <br />SHUT—OFF VALVE IN VERTICAL LINE <br />BACKFLOW PREVENTER <br />M <br />WATER METER <br />WHA <br />WATER HAMMER ARRESTOR <br />T & P RELIEF VALVE <br />_[�_TMV <br />THERMOSTATIC MIXING VALVE <br />FD1 <br />FLOOR DRAIN <br />O <br />ROOF DRAIN/OVERFLOW ROOF DRAIN <br />—0 FC01 <br />FLOOR CLEANOUT <br />—� FCO <br />FLOOR CLEANOUT (SQUARE) <br />—� YCO <br />YARD CLEANOUT <br />FPWH <br />FREEZE PROOF WALL HYDRANT <br />—� HB <br />HOSE BIBB <br />— ill WCO <br />WALL CLEANOUT <br />IS <br />CONNECT TO EXISTING <br />ETR <br />EXISTING TO REMAIN <br />DEMO PIPE <br />----VBF---- <br />VENT BELOW FLOOR <br />EXPOSED VENT PROVIDE LEAD SHEETING PROVIDE CLEANOUT TEE COLUMN OR <br />PIPE THRU ROOF I I AROUND EXPOSED VENT WITH SCREWED COUNTER— PARTITION <br />SHALL BE PVC. ABOVE FLASHING. TURN SUNK ABS PLASTIC PLUG: AS SHOWN <br />HEIGHT ABOVE ROOF DOWN INTO PIPE OPENING. TAPERED —THREAD WITH ON FLOOR <br />SHALL EXCEED LOCAL CLAMP TFE JOINT COMPOUND. PLAN. <br />MAXIMUM SNOW DEPTH VENT FLASHING SHALL BE PER ROOF MANUFACTURER'S WHERE CLEANOUT TEE ROUND SECURED GASKETED NICKEL BRONZE ADJUSTABLE <br />(CONTRACTOR SHALL AND ROOFING IS CONCEALED IN A CLEANOUT TOP WITH "CO" CAST IN COVER. PROVIDE CLEANOUT TOP <br />VERIFY), 12" MINIMUM. I CONTRACTOR'S CHASE OR PARTITION, FACE SHALL WITH VARIATIONS SUITABLE FOR FLOOR COVERING (CARPET <br />RECOMMENDATION. PROVIDE A ROUND 18 BE WITHIN MARKER, RECESSED FOR TILE, SCORIATED FOR UNFINISHED <br />ROOF INSULATION GAUGE STAINLESS 4" OF WALL FLOORS). PROVIDE GASKETED PLASTIC PLUG IN CAST IRON <br />STEEL COVER WITH SURFACE. BODY. USE TEFLON JOINT COMPOUND ON PLUG THREADS. <br />ROOF DECK BEVELED EDGES AND PROVIDE CLEAN THE TOP OF EXPOSED FCO AFTER INSTALLATION. <br />FLATHEAD MACHINE EXTENSION <br />CORE DRILL ROOF OR 17 ANCHOR PIPE TO ROOF SCREW. IF REQUIRED. MEMBRANE CLAMP FLOOR SLAB ON GRADE <br />PROVIDE SLEEVE IF DECK WITH U—BOLT AROUND ° <br />REQUIRED BY TYPE OF PIPE AND ANGLE IRON ° d ��i <br />ROOF DECK. PROVIDE WELDED OR SCREWED TO d AS REQUIRED FOR <br />FIRE STOP SEAL BETWEEN ROOF DECK OR JOIST. CONCRETE HUB AT FLOOR REFER TO PLUMBING DEPTH OF SEWER SAME SIZE AS SEWER <br />PIPE AND SLEEVE OR DECK. MINIMUM 12" BELOW ROOF FLOOR FIXTURE SCHEDULE UP TO 4" MAXIMUM <br />SLAB RISER LENGTH AND SPECIFICATIONS PVC PIPE OR LONG SWEEP ELBOW AT <br />PROVIDE PIPE INCREASER PIPE CONNECTORS SUITABLE AS REQUIRED HUB AND SPIGOT <br />FOR FURTHER END OR TURN OF RUN <br />IF/WHERE CODE REQUIRES A FOR TYPE OF PIPE USED LONG SWEEP AT END OF LINE INFORMATION. WCO CAST IRON PIPE — <br />MINIMUM 3" VENT THRU ROOF. OR COMBINATION WYE AND BELOW FLOOR COMBINATION WYE AND <br />jj EIGHTH BEND IN DIRECTION EIGHTH BEND IN RUN. <br />REFER TO PLANS FOR VTR PIPE SIZES AND LOCATIONS. LOCATE VTR RUN OF LINE. SANITARY ENTER TOP OF PIPE. <br />MINIMUM THREE FEET FROM PROPERTY LINE, OR TEN FEET HORIZONTAL UOF FLOW SEWER LINE <br />OR THREE FEET VERTICAL ABOVE ANY BUILDING OPENING OR FRESH AIR DIRECTION <br />INTAKE, OR ONE FOOT FROM ANY VERTICAL SURFACE. LOCATE VTR PROVIDE WCO WHERE SHOWN ON PLAN, AND ON SANITARY OF FLOW <br />MINIMUM 18" FROM PARAPET, EXPANSION JOINT, EQUIPMENT CURB, ETC. WASTE BRANCHES NOT SERVED WITH A FLOOR CLEANOUT: LOCATE AT BUILDING EXIT, AT ENDS OF RUNS, AT TURNS <br />OFFSET IN CEILING SPACE WHERE REQUIRED TO MEET THESE CONDITIONS. LOCATE ABOVE FIXTURE FLOOD RIM WITHIN 4' OF FLOOR. OF PIPE GREATER THAN 45 DEGREES, AT 50' INTERVALS <br />CONSULT LOCAL CODES FOR OTHER WCO REQUIREMENTS. ON STRAIGHT RUNS, AND/OR WHERE SHOWN ON PLANS. <br />PROVIDE BACKFILL PER ARCHITECTURAL SPECIFICATIONS. <br />VENTTHRU ROOF VTR WALL CLEAN 0 U T LOCATE CLEANOUTS WHERE THERE IS 18" CLEAR AROUND. <br />3CONSULT LOCAL CODES FOR OTHER FCO REQUIREMENTS. <br />NTS 06/01/07 PLUMB2-10 L NTS 06/01/07 PLUM132-2 <br />FLOOR CLEANOUT, <br />1 NTS 03/28/08 PLUMB2-1 <br />N <br />� � <br />o <br />drC W U°� <br />w <br />2 o <br />o� <br />°•' a 3 <br />Uj w W 6- O <br />; �o <br />� F �Z <br />O N Z w Z U F~ W Q 'S <br />W o rNwm <br />¢ <br />� ' SUoo <br />Q¢ S't¢mOw-Zz <br />w <br />W <br />ct a ~p¢JRWNUF <br />0 wZ ¢ JwMUO <br />LL_ aN >-¢z0�-z��¢�w�o <br />J <br />z ¢li <br />O �w�wo�Uo��ZLa <br />z 0 <br />~Q zNJ<NOFNOw= 00z <br />.__IN2�WUK}NL.—U <br />o0O��OmwOwwW'W'Zwm <br />a �' ¢ z <br />1= Nwazk�ow�oo�ao} <br />m�rwi�ov=ia�waawoa< <br />U) <br />z <br />Q <br />J <br />z <br />cl) <br />z <br />0 <br />U <br />z <br />O <br />O O <br />E+ <br />Q <br />� <br />© cm <br />� <br />0 <br />oa <br />00 <br />CD <br />0 <br />z <br />�y� <br />h—+—� <br />LIJ <br />O <br />a' <br />0 <br />0 <br />cat <br />w <br />W <br />Z <br />0 <br />ISSUE BLOCK <br />CHECKED BY: <br />JJD <br />DRAWN BY: <br />DM <br />PROTO: <br />LBA <br />PROTO CYCLE: <br />051514 <br />DOCUMENT DATE: <br />120415 <br />\10, 11111r/jl/ <br />No. 7$47 <br />Q' TE OF <br />i� CORIDP. ' N <br />S <br />1 NAL liloO\,�� <br />Jul 14, 2016 <br />PLUMBING <br />DETAILS <br />I <br />HEET: <br />P 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.