Laserfiche WebLink
�R1R11111�rIR�����A►!' I 1�-Illp �'ApgwgRpml ��IJI_'_�����'L�� �uI�III+IIII�1�1�11 '1!I� '��'IIII II►rr►���r�N�Rh'll�►� �'_ P �1 IR�� hII�R '�1R1��►r ' - -# I .!1 <br />r prim IF <br />2 <br />** DENOTES THOSE E.M.S. DEVICES <br />THAT ARE FIELD INSTALLED. THE <br />REST ARE FACTORY INSTALLED. <br />CIM ONE -LINE REFLECTS THE INTENDED DESIGN <br />BASED ON NEW CASES AND EXISTING SYSTEM <br />NUMBERS. VERIFY ALL EXISTING CONDITION AND <br />LOCATION OF ALL EMS EQUIPMENT PRIOR TO <br />ROUGH -IN. <br />EXISTING CASE INPUT MODULES NOTE: <br />"(E)" DENOTES EXISTING CIM FOR REUSE. <br />R(R) DENOTES EXISTING CIM TO RELOCATE AND <br />ECONNECT. <br />ALL OTHERS ARE "NEW" <br />COMPRESSOR HOUSE #1 <br />RACK 'A' <br />CONTROLLER <br />J (CIM-Al) <br />] (CIM-A2) <br />(CIM-A3) <br />(CIM-A4) <br />M I (CIM-A5) <br />NTS <br />REFRI, <br />RACK 'B' <br />CONTROLLER <br />J (CIM-B1) <br />(CIM-B2) <br />(CIM-B3) <br />MI (CIM-134) <br />(CIM-B5) <br />J (CIM-66) <br />M] (CIM-137) <br />CIM—D1 <br />SCHEDULE (E <br />1 <br />MTD—la <br />SENSOR <br />2 <br />MTD—lb <br />(SENSOR) <br />3 <br />MTD—lc <br />SENSOR <br />4 <br />MTD-2a <br />SENSOR <br />5 <br />MTD-2b <br />SENSOR <br />6 <br />MTD-2c <br />SENSOR <br />7 <br />MTD-3 <br />(SENSOR) <br />8 <br />MTD-4 <br />(SENSOR) <br />AUX <br />COMPRESSOR HOUSE #2 <br />RACK 'C' <br />CONTROLLER <br />J (CIM-Cl) <br />(CIM-C2) <br />(CIM-C3) <br />(CIM-C4) <br />(CIM-05) <br />] (CIM-C6) <br />M I (CIM-C7) <br />RACK 'D' <br />CONTROLLER <br />M (CIM-D1) <br />S TEMPERATURE SENSOR (TYP) <br />SEE CIM SCHEDULES <br />WIR-2020 (TYP) <br />(CIM-D2) <br />M I (CIM-D3) <br />MS ONE -LINE DIAGRAM <br />GENERAL REFRIGERATION <br />09.06.11 EMS NOTES <br />1. COORDINATE THE EXTENT OF EMS DEMOLITION WITH <br />FIXTURE PLANS. REMOVE ENTIRE LENGTH OF CONDUIT <br />AND EMS CABLES. DO NOT ALLOW DEMOLITION TO <br />AFFECT ACTIVE EMS CIRCUITS. LABEL TERMINATION <br />POINTS OF DEMOLISHED CABLES IN EMS EQUIPMENT AS <br />'SPARE'. <br />2. CONTACT THE CURRENT EMS VENDOR TO OBTAIN A <br />CURRENT MODULE CONFIGURATION PRINTOUT PRIOR TO <br />INSTALLING EMS CABLES. TERMINATE EMS CABLES <br />ACCORDING TO THE EMS CONFIGURATION SHEETS. <br />3. THE EMS SUPPLIER RESERVES THE RIGHT TO CHANGE <br />AND/OR MODIFY ANY/ALL COMPONENTS AND TO MAKE <br />CHANGES TO EQUIPMENT DESIGN. <br />4. PROVIDE CABLE ACCORDING TO DRAWINGS. NO <br />DEVIATION FROM DRAWINGS WILL ACCEPTED. LABEL <br />EACH END OF EMS CABLES WITH TERMINATION POINT OF <br />THE OPPOSITE END OF THE EMS CABLE. <br />5. TERMINATE EMS CABLES IN ACCORDANCE WITH WALMART <br />AND EMS SUPPLIER INSTALLATION INSTRUCTIONS. DO <br />NOT EXPOSE MORE THAN 3" OF WIRE(S). COVER THE <br />END OF THE INSULATING JACKET OF ALL EMS CABLES <br />WITH HEAT SHRINK TUBING. DO NOT ALLOW EXPOSURE <br />OF FOIL OR UNUSED WIRES) AFTER APPLICATION OF <br />HEAT SHRINK TUBING. <br />6. MINOR CHANGES IN MATERIALS OR TERMINATIONS WILL, IN <br />NO CASE, CAUSE AN INCREASE IN COST TO OWNER OR <br />SERVE CAUSE TO GENERATE CHANGE ORDER PAPERWORK. <br />WALMART OR EMS SUPPLIER WILL NOT ACCEPT CHANGE <br />ORDER PAPERWORK PERTAINING TO EMS INSTALLATION <br />OR TERMINATION AS DESIGNATED ON DRAWINGS. <br />7. ROUTE EMS CABLES IN CONDUIT WHEN BELOW BAR JOIST <br />LEVEL OR IF EXPOSED TO VIEW FROM THE SALES AREA. <br />EMS CABLES MAY BE STRUNG ALONG OR PERPENDICULAR <br />BAR JOISTS IF SUPPORTED AT LEAST EVERY 36" OR <br />MINIMUM DISTANCE OF BAR JOIST SPACING. <br />8. CONCEAL SALES AREA EMS CONDUIT UNDER <br />REFRIGERATED CASES, THROUGH TUNNELS, WALLS, PIPE <br />RACKS, AND/OR CHASES, WHERE APPLICABLE. <br />9. INSTALL CODE APPROVED PENETRATIONS THROUGH FIRE <br />WALLS. <br />10. PROVIDE COMPLETED REFRIGERATION SENSOR INPUT <br />VERIFICATION FORMS TO WALMART ENERGY MANAGEMENT <br />DEPARTMENT AND THE EMS SUPPLIER AT THE BEGINNING <br />OF THE REFRIGERATION EQUIPMENT START-UP. PROVIDE <br />ASSISTANCE TO THE EMS SUPPLIER FOR CHECKING <br />SENSOR ACCURACY. <br />F 11 BE PRESENT AND AVAILABLE AT REFRIGERATION <br />' - - - - - - - - - - — START-UP TO RESOLVE ISSUES AND PROVIDE <br />- _ <br />ASSISTANCE UNTIL RELEASED BY THE EMS SUPPLIER AND <br />WALMART MECHANICAL SERVICES CONSTRUCTION <br />MANAGER. <br />_ RACK D <br />ICE <br />CONTROLLER CREAM ►; - 12. COMPLETE ALL UNRESOLVED REFRIGERATION WORK, <br />FREEZER 1 DURING THE REFRIGERATION START-UP, PRIOR TO <br />114 <br />i WORKING ON OTHER EMS INSTALLATION ITEMS. <br />, 13. PERFORM ALL CHECKS AND TESTS TO ENSURE A FULLY <br />8 - - - - - - - - - - - - FUNCTIONAL REFRIGERATION CONTROL SYSTEM WHEN THE <br />EMS SUPPLIER IS NOT SCHEDULED TO PERFORM THE <br />ON -SITE REFRIGERATION START-UP. CONTACT THE EMS <br />RACK C-SUPPLIER FOR BLANK TEST VERIFICATION FORMS AND <br />CONTROLUER ► INSTRUCTIONS FOR COMPLETING. RETURN ALL <br />EMI AT 8 - COMPLETED TEST VERIFICATION FORMS TO THE EMS <br />} DELI SUPPLIER. <br />0� OLEIC' i <br />TT— _ — — — — — —ENERGY MANAGEMENT SYMBOLS <br />at t <br />"COMPRESSOR I I NOT ALL SYMBOLS ARE NECESSARILY USED ON THE DRAWINGS. <br />HOUSE #2 L.. �_ ' 03.28.11 <br />EP/2 EXECUTIVE PROCESSOR/2 <br />s s d I <br />COMPRESSOR RACK B EMS ENERGY MANAGEMENT SYSTEM <br />HOUSE 11 _C0NTR0tJ�tR <br />_. <br />,u EXC EXECUTIVE CONTROLLER <br />m EXISTING CIM BACKBOARD CIM CASE INPUT MODULE <br />LOCATED ABOVE MEAT PREP. IOM INPUT/OUTPUT MODULE <br />I MEAT <br />PREP <br />.�. I ',F TEMP TEMPERATURE <br />_... _ _- } <br />LT?-? LOW TEMPERATURE RACK SYSTEM <br />RACK A <br />r <br />CONTROLLER MEAT Fes_ _ _ .v.� MT?-? MEDIUM TEMPERATURE RACK SYSTEM <br />D.5 T'll <br />HOLDING_ fd VFD VARIABLE FREQUENCY DRIVE <br />Eli <br />RIM RACK INPUT MODULE <br />LL <br />=� d ROM RACK OUTPUT MODULE <br />_. LL . <br />PLM PHASE LOSS MONITOR <br />ANALOG INPUT MODULE <br />AUDIO\VISUAL ALARM <br />�s SEAFO <br />Ir i <br />- - - � :=. s - . ;- BACKBOARD <br />E <br />z -_LS::__..- J CASE CONTROLLER '❑ J.4 <br />MTD-la MTD-lb <br />MTD-1c MTD-2a MTD-2b MTD-2c © ROLLER MODULE <br />` MD CASE INPUT MODULE <br />Al <br />�— - - - - - - - - - - - - - - M® CASE MANAGEMENT SYSTEM MODULE/ ENCLOSURE <br />► �� <br />DIS DIGITAL INPUT SWITCH (DUAL -TEMPERATURE) <br />J4_ <br />1 2 3 4 TS DUAL TEMP SWITCH <br />© LEAK DETECTION SENSOR <br />REFRIGERATION ENERGY MANAGEMENT PLAN- DP LEAK DETECTION PANEL <br />1 1 /16" = 1'-O" © REFRIGERATION EMS CONTROLLER <br />RIB RELAY IN BOX <br />`S IREMOTE TEMPERATURE SENSOR (RTS-10) <br />EXISTING CONDITIONS WERE TAKEN EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />FROM ORIGINAL DRAWINGS AND MAY A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />NOT REFLECT EXACT "AS -BUILT" SPECIFICATIONS IN THEIR RELATED FIELD. THE <br />CONDITIONS. CONTRACTOR SHALL FAILURE TO ACQUAINT HIMSELF WITH THIS <br />FIELD VERIFY ALL EXISTING CONDITIONS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY <br />NOTE: ALL WORK ON THIS SHEET IS PRIOR TO SUBMITTING FINAL BIDS. OF PERFORMING HIS WORK PROPERLY. NO <br />TO BE COMPLETED BY WALMART CONTRACTOR SHALL CAREFULLY ADDITIONAL COMPENSATION SHALL BE ALLOWED <br />APPROVED CONTRACTOR. COORDINATE NEW WORK AND BECAUSE OF CONDITIONS THAT OCCUR DUE <br />DEMOLITION WITH ALL OTHER TO FAILURE TO FAMILIARIZE WORKERS WITH THIS <br />DISCIPLINES AND EXISTING CONDITIONS. I KNOWLEDGE. <br />_O&A <br />o <br />N � <br />o <br />W <br />� <br />q! WM <br />WW <br />z <br />a. <br />GGN <br />m ADC\ <br />OLD <br />z�i <br />wY <br />�zo <br />W <br />�Z� <br />r ��o` <br />g <br />m <br />a <br />W <br />r <br />Ld <br />LLI O J N O W WO Z :2�wcn- ac�� aN,o <br />� p=rr zpWtn�wz <br />Q. W�ZQa�aSW0�0o <br />W a LLI <br />60 O w Q N 3 <br />aN}NL N=Z Q <br />Q W��\W JWKFOOJ <br />aWa�o=, <br />N~W\��—�afnWONO� <br />� 3via�0��w�Za�FFO <br />H (L,,0w 2zz_-. wr <br />ujx <br />0 Ir <br />irvaizo�wFwc~imwzc~)z <br />O` oavWv'wxwLja?�LU0 <br />�0L,Nz0_jm0-awoam <br />cz co <br />00 <br />v1 <br />O <br />owl <br />o <br />o <br />0 <br />C,.-) Co <br />w <br />z <br />0 <br />ISSUE BLOCK <br />CHECKED BY: RDF/NJS <br />DRAWN BY: RDF <br />DOCUMENT DATE: 01 /03/12 <br />REFRIGERATION <br />ENERGY <br />MANAGEMENT <br />PLAN AND <br />DETAIL <br />I <br />E FREM 11 <br />