Laserfiche WebLink
EQUIPMENT SCHEDULE <br />CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERY DATES/TIMES WITH EVERY VENDOR LISTED BELOW. THIS IS UNIQUE TO <br />CAPITAL EXPENDITURES PROJECTS. DATE CHANGE REQUESTS MUST BE SENT TO BOTH <br />sharon.ha jdauftal—mart.00m AND <br />duane.davieftal—mart.00m <br />MARK <br />DESCRIPTION <br />MANUFACTURER <br />MODEL # <br />SUPPLIED <br />INSTALLED <br />FINAL <br />BY <br />BY <br />CONNECT <br />R214 <br />M/D PRODUCE (EXTENDED KICKPLATE) <br />KYSOR WARREN <br />DX6LN <br />WM <br />C <br />C <br />P007C <br />PRODUCE MISTING SYSTEM(AL,AR,AZ,CA,CO,CT,FL,GA,KS,KY,LA,MS,MT,NC,ND,NE,NM,NV, <br />PRODEW <br />- <br />WM <br />C <br />C <br />OK, PA, SC, SD, TN, TX, U T, VA, WV, WY) <br />— <br />REFRIGERATED SYSTEMS <br />IHILL PHOENIX <br />— <br />WM <br />C <br />C <br />— <br />INOVAR EQUIPMENT <br />INOVAR <br />— <br />WM <br />4—C <br />C <br />C <br />— <br />IPRODUCE SHELVES <br />IMARCO <br />— <br />WM <br />C <br />ABBREVIATION KEY <br />C — CONTRACTOR <br />WM — WAL—MART <br />V — VENDOR <br />VER 6.2.05 <br />0 <br />C.7 <br />------- ----- -- <br />ROOF DECK <br />DO NOT USE DUSTWALL <br />CONTINUE PLYWOOD TO SHORE ROOF JOISTS <br />TO DECK <br />WALL TO <br />BE REMOVED <br />SALES <br />1 /2" CD PLYWOOD 6'-0" LOAD BEARING <br />4x8x8'—O" HORIZONTAL, 4'-0" ELSEWHERE <br />PROVIDE 2X4 NAILER 0 <br />ALL JOINTS <br />INSTALL CONTINUOUS <br />LAYER 6 MIL. POLY <br />SHEETS. TAPE ALL <br />JI JI LIYI, 1\LI I LVIYI UIIYV - <br />CONTRACTOR SHALL FURNISH AND <br />INSTALL STAINLESS STEEL TRIM TO <br />CLOSE ANY GAPS THAT ARE LEFT <br />BETWEEN THE END CASES AND <br />LONG CASE RUNS AFTER THE CASES <br />CASES FURNISHED BY WALMART, INSTALLED <br />BY CONTRACTOR. ALL NEW EQUIPMENT MUST ALL EXISTING REFRIGERATED <br />BE ON SITE PRIOR TO STARTING ANY CASES ARE TO REMAIN <br />ARE SET IN THEIR FINAL POSITION. DEMOLITION OR CONSTRUCTION. UNLESS OTHERWISE NOTED <br />O <br />a2FIXTURE PLAN - <br />SCALE: 1 /8" = 1'-0" <br />JOINTS <br />NOTES: <br />i <br />I I <br />1. <br />INSTALL TEMPORARY WALL IN <br />— <br />FOR WALLS UP TO <br />SECTIONS APPROXIMATELY <br />REACH <br />14'-0", USE 4" 22 <br />�� <br />40 —0 PER DAY <br />EXISTING <br />COFFIN <br />EXISTING —IN <br />CASES TO REMAIN <br />GAUGE METAL <br />(COORDINATE W/STORE <br />w. ,r..-....__....._; CASES <br />TO REMAIN <br />STUDS 24" O.C. <br />MANAGER) <br />OR 2X4 016" O.C; <br />FOR WALLS HIGHER <br />2. <br />LOCATE VERTICAL STUDS AS <br />„ <br />THAN 14 —0 USE6" <br />NOT TO INTERFERE W/CEIL. <br />_� E I <br />I ; I <br />20 GAUGE <br />GRID OR LIGHT FIXTURES <br />=----_ ' <br />=----_------_---—_----= j'T— <br />— — <br />METAL STUDS 0'f <br />T---=---T <br />24" O.C. OR 2X6 <br />3. <br />LOCATE HORIZONTAL 2X4 ® <br />r J <br />016" O.C. <br />2" ABOVE CEILING EXCEPT <br />-'_-_—.____.----=="--_----------.-----=--...- <br />------._. <br />LIGHT FIXTURE LOCATIONS <br />PAINT SALES SIDE <br />OF WALL 0 FRONT <br />4. <br />SCREW PLYWOOD (MAXIMUM <br />REMOVE EXISTING <br />PRODUCE CASE <br />REMOVE EXISTING M/D PRODUCE CASES TO BE REPLACED <br />OF STORE, CASH <br />SPACING: 12" O.C.) <br />MISTING SYSTEM TO <br />REGISTER & SNACK <br />BE REPLACED <br />BAR - <br />SEALANT UNDER <br />BOTTOM PLATE ! <br />CONTINUOUS SEALANT <br />AGAINST PLATE <br />3 4 <br />ANCHOR 0 24" O.C. <br />3 DUST WALL <br />NTS 09. ol. I <br />DEMOLITION PLAN <br />SCALE: 1 /8" = 1'—O" <br />GENERAL NOTES <br />1. DIMENSIONS OF REFRIGERATED CASES ARE TO THE <br />OUTERMOST POINTS OF THE CASES; ENDCAPS AND <br />BUMPERS ARE CONSIDERED PART OF THE CASE, <br />WHERE THEY OCCUR. DIMENSIONS ON THE FIXTURE <br />PLANS ARE FOR LAYOUT OF OWNER —FURNISHED ITEMS <br />ONLY AND ARE NOT TO BE USED FOR LOCATION OF <br />WALLS AND OTHER CONTRACTOR BUILT ITEMS. <br />2. CONTRACTOR SHALL FURNISH AND INSTALL STAINLESS <br />STEEL TRIM TO CLOSE ANY GAPS THAT ARE LEFT <br />BETWEEN THE END CASES AND LONG CASE RUNS <br />AFTER THE CASES ARE SET IN THEIR FINAL POSITION. <br />3. CASES FURNISHED BY WALMART, INSTALLED BY <br />CONTRACTOR. ALL NEW EQUIPMENT MUST BE ON SITE <br />PRIOR TO STARTING ANY DEMOLITION OR <br />CONSTRUCTION. <br />4. WALK—IN COOLERS/FREEZERS FURNISHED AND <br />INSTALLED BY COOLER PANEL MANUFACTURER. ALL <br />NEW EQUIPMENT MUST BE ON SITE PRIOR TO <br />STARTING ANY DEMOLITION OR CONSTRUCTION. <br />5. CONTRACTOR SHALL BE RESPONSIBLE FOR <br />MISCELLANEOUS WALK—IN COOLER/FREEZER WORK <br />INCLUDING BUT NOT LIMITED TO EVAPORATORS, <br />ELECTRICAL, EMS, SPRINKLER PENDANTS, CURBS, <br />SANITARY COVE BASE, THRESHOLDS, FLOOR REPAIR <br />AND RACKING. <br />6. CONTRACTOR SHALL PAINT ALL NEW CONDUIT <br />EXPOSED TO SALES FLOOR. MATCH CEILING OR <br />ADJACENT WALL COLOR (WHERE APPLICABLE). CQNDUIT <br />SHALL BE PAINTED PRIOR TO INSTALLATION. <br />CONSTRUCTION LEGEND <br />_v EXISTING TO REMAIN <br />- - - DEMOLISHED <br />AREA TO BE DEMOLISHED <br />DEMOLITION REQUIREMENTS <br />09.01.11 <br />1. ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE <br />MANNER AND IN STRICT ACCORDANCE WITH OSHA <br />REGULATIONS. <br />2. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF <br />DEMOLITION. THE WORK INCLUDES, BUT IS NOT LIMITED <br />TO, THE DEMOLITION AND REMOVAL OF WALLS, DOORS, <br />FLOORS, AND ELECTRICAL ITEMS INCLUDING CONDUITS AS <br />SHOWN ON DRAWING OR AS REQUIRED FOR THE <br />INSTALLATION OF NEW WORK FOR A COMPLETE JOB. <br />3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL A <br />MINIMUM OF 8" BELOW FINISH FLOOR OR A MINIMUM OF <br />6" ABOVE FINISHED CEILING. SHOW ALL ABANDONED AND <br />CAPPED UTILITIES ON AS—BUILTS, DRAWINGS, AND <br />RECORDED DOCUMENTS. <br />4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE <br />ADEQUATE SHORING, BRACING, AND SUPPORT SYSTEMS <br />AND TO KEEP THE EXISTING STRUCTURE INTACT AND IN <br />A SAFE CONDITION DURING THE REMOVAL OF <br />STRUCTURAL ITEMS AND NEW CONSTRUCTION. <br />5. THE CONTRACTOR SHALL RETAIN A REGISTERED <br />PROFESSIONAL ENGINEER TO DESIGN THE SHORING AND <br />SPECIFY DEMOLITION PROCEDURES. <br />6. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR MEANS <br />AND METHODS OF DEMOLITION AND NEW CONSTRUCTION. <br />PRIOR TO THE EXCAVATION OF FOUNDATIONS ADJACENT <br />TO THE EXISTING STRUCTURE, PROVIDE ADEQUATE <br />SUPPORT FOR THE SUB —BASE TO PREVENT <br />UNDERMINING. <br />7. DURING DEMOLITION AND RECONSTRUCTION, THE <br />CONTRACTOR SHALL COORDINATE WITH THE WALMART <br />MECHANICAL SERVICES CONSTRUCTION MANAGER ANY <br />REQUIRED SAFETY BARRIERS OR BARRICADES AND DUST <br />WALLS. REFER TO THE WALMART MECHANICAL SERVICES <br />CONSTRUCTION MANAGER FOR PHASING AND SCHEDULING <br />DEMOLITION AND NEW CONSTRUCTION. <br />8. IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL <br />DECOMMISSIONED EQUIPMENT SHALL BE THE <br />RESPONSIBILITY OF THE CONTRACTOR. AT THE <br />DISCRETION OF THE WALMART MECHANICAL SERVICES <br />CONSTRUCTION MANAGER WALMART SHALL RETAIN THE <br />OPTION TO OCCASIONALLY SALVAGE EMS EQUIPMENT, <br />VARIABLE FREQUENCY DRIVE EQUIPMENT, COMPRESSORS, <br />WALK—IN DOORS, EVAPORATORS, REFRIGERATED CASES, <br />ETC. FROM REFRIGERATION EQUIPMENT TO BE REPLACED <br />DURING THE CAP—X PROJECT. THE CONTRACTOR SHALL <br />COORDINATE WITH THE WALMART MECHANICAL SERVICES <br />CONSTRUCTION MANAGER ALL ITEMS TO BE RETAINED BY <br />WALMART PRIOR TO REMOVAL OF THE EQUIPMENT SHOWN <br />ON THE DEMOLITION PLANS. THE CONTRACTOR SHALL <br />CAREFULLY REMOVE ANY ITEMS TO BE RETAINED BY <br />WALMART AND DELIVER THOSE ITEMS, READY FOR <br />SHIPMENT, TO THE WALMART MECHANICAL SERVICES <br />CONSTRUCTION MANAGER. ALL REMOVED ITEMS NOT <br />ALLOCATED FOR SALVAGE BY WALMART SHALL BE THE <br />CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY REMOVE <br />FROM THE JOB SITE AND ARRANGE DISPOSAL IN <br />ACCORDANCE WITH LOCAL CODES. <br />DEMOLITION NOTES <br />1. THE CONTRACTOR SHALL REMOVE EXISTING <br />REFRIGERATED CASES AND EQUIPMENT AS SHOWN ON <br />DEMOLITION PLAN. PROPERLY PUMP DOWN AND <br />RECYCLE REFRIGERANT. PREPARE FOR DISPOSAL. <br />PROMPTLY HAUL OFF AND PROPERLY DISPOSE OF <br />AND/OR RECYCLE ALL EQUIPMENT REMOVED FROM <br />STORE. <br />2. WHERE APPLICABLE COOLER PANEL MANUFACTURER <br />SHALL DEMOLISH AND PROMPTLY HAUL OFF WALK—IN <br />PANELS AND DOORS TO BE REPLACED. <br />3. DURING DEMOLITION AND RECONSTRUCTION PHASES, <br />COORDINATE LOCATION OF ALL DUST WALLS AND <br />SECURITY ENCLOSURES WITH WALMART STORE <br />MANAGER. REFER TO DUST WALL DETAIL. <br />4. ALL NEW EQUIPMENT MUST BE ON SITE PRIOR TO <br />STARTING ANY DEMOLITION OR CONSTRUCTION. <br />5. PATCH/REPAIR FLOOR COVERING AS REQUIRED AFTER <br />INSTALLATION OF NEW CASES. MATCH EXISTING <br />FLOORING TYPE, COLOR, PATTERN, AND FINISH. <br />Ld o a <br />W err; 1 <br />22JFF aZ�Wtl1��Z <br />W � ~4ao� �a <br />o a <br />o � <br />%W 04 ,0MyZ QN3 <br />O wQMN,g>-,cwna``'avoog <br />�nk'Z��v`oXcnw$�a <br />cr <br />3in�Z���w�Zaw�Fo <br />0 �� 0w <br />1— o�aowoc�is:2mwzr <br />$ W' w� viwv_ia <br /><�Zo�WFwr�W"~Z <br />WWZU <br />F- Wavwoc�ao <br />w000-co <br />,� <br />Mjwo�awwwzn'irw <br />wTzo_jwo awo0_m <br />ISSUE BLOCK <br />CHECKED BY: - RDF/JAL <br />DRAWN BY: RDF <br />DOCUMENT DATE: 01 /03/12 <br />FIXURE <br />PLANS <br />AND <br />DETAIL <br />SHEET: <br />Fl <br />