Laserfiche WebLink
ELECTRICAL CONDUITS <br />MOUNTED ON UNISTRUT <br />REFRIGERATION SUCTION LINES SPACED <br />8" OC MOUNTED ON UNISTRUT TYP— <br />LINE RACKING E <br />REFRIGERATED i <br />N TS <br />DO NOT ATTACH <br />UNISTRUT TO CASE <br />REFRIGERATED CASE <br />(TYPICAL) <br />BOLTS TO FLOOR ONLY <br />-ES <br />09.01.11 <br />REFER TO GENERAL PIPING <br />_ <br />; <br />31 <br />- RE -INSULATION NOTES (TYP') j PF <br />J 2 <br />-- - - <br />N . B 2_ <br />iti <br />i L <br />15.609 <br />14" , MTD-1 <br />36'-DX6LN <br />(REPLACE) <br />RECONNECT TO EXISTING <br />REFRIGERATION CIRCUITS WHERE <br />SHOWN. REF REFRIGERATION <br />LEGENDS FOR PIPE SIZE AND <br />VALVE REQUIREMENTS. <br />3 <br />G ERATIO1 <br />Y <br />U <br />a <br />0 <br />U <br />V) <br />i <br />SUPPORT REFRIGERATION 15.609 <br />PIPING ON EXISTING UNISTRUT MTD-2 <br />MOUNTED BEHIND CASES (TYP) 36'-DX6LN <br />2 15.601 (REPLACE) <br />R1 15.602 <br />- - - - - i <br />d <br />REFRIGERATION KEYNOTES <br />DEMOLITION NOTES <br />09.01.11 <br />15.601 SLOPE REFRIGERANT LINES BACK TO <br />1. <br />THE CONTRACTOR SHALL REMOVE EXISTING REFRIGERATED <br />COMPRESSORS AT 1" PER 20' OF RUN. LOCATE <br />CASES AND EQUIPMENT AS SHOWN ON DEMOLITION PLAN. <br />HIGHEST POINT OF REFRIGERATION LINES JUST <br />PROPERLY PUMP DOWN AND RECYCLE REFRIGERANT. <br />BELOW BOTTOM CHORD OF JOIST OR BEAM. <br />PREPARE FOR DISPOSAL. PROMPTLY HAUL OFF AND <br />COORDINATE ELEVATION TO AVOID CONFLICTS WITH <br />PROPERLY DISPOSE OF AND/OR RECYCLE ALL <br />DUCTWORK, LIGHTING, SKYLIGHTS, ETC. <br />EQUIPMENT REMOVED FROM STORE. <br />15.602 SUPPORT HORIZONTAL RUNS OF REFRIGERANT <br />2. <br />WHERE APPLICABLE COOLER PANEL MANUFACTURER <br />LINES ON 1-5/8" x 1-5/8" UNISTRUT <br />SHALL DEMOLISH AND PROMPTLY HAUL OFF WALK-IN <br />CHANNELS ON MAXIMUM OF 10 FOOT CENTERS. <br />PANELS AND DOORS TO BE REPLACED. <br />15.6 99 PROVIDE PVC DRAIN LINE FROM EACH CASE <br />3. <br />IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL <br />DRAIN CONNECTION SAME SIZE AS CASE OUTLET, <br />DECOMMISSIONED EQUIPMENT SHALL BE THE <br />AND END OVER FLOOR DRAIN W/AIR GAP; PITCH <br />RESPONSIBILITY OF THE CONTRACTOR. AT THE DISCRETION <br />DRAINS 1" PER 10'. PROVIDE DRAIN COVER <br />OF THE WALMART MECHANICAL SERVICES CONSTRUCTION <br />GRATE TO MATCH EXISTING. <br />MANAGER WALMART SHALL RETAIN THE OPTION TO <br />OCCASIONALLY SALVAGE EMS EQUIPMENT, VARIABLE <br />FREQUENCY DRIVE EQUIPMENT, COMPRESSORS, WALK-IN <br />GENERAL PIPING <br />DOORS, EVAPORATORS, REFRIGERATED CASES, ETC. FROM <br />RE -INSULATION NOTES <br />TO BEDURING <br />CAP-XERATION PROJJECT.QUNT T EECONTRACTOR ESHALLDCOORDINATES <br />01.05.12 <br />WITH THE WALMART MECHANICAL SERVICES CONSTRUCTION <br />RE -INSULATION NOTES ARE ONLY APPLICABLE FOR PIPING <br />MANAGER ALL ITEMS TO BE RETAINED BY WALMART PRIOR <br />THAT IS INDICATED ON THE DRAWINGS TO BE RE -INSULATED. <br />TO REMOVAL OF THE EQUIPMENT SHOWN ON THE <br />REFER TO SPECIFICATIONS FOR NEW PIPING INSULATION <br />DEMOLITION PLANS. THE CONTRACTOR SHALL CAREFULLY <br />REQUIREMENTS. <br />REMOVE ANY ITEMS TO BE RETAINED BY WALMART AND <br />DELIVER THOSE ITEMS, READY FOR SHIPMENT, TO THE <br />1. INSULATION SHALL BE EITHER: AEROCEL-SSPT BY <br />WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER. <br />AEROFLEX USA, INC (AVAILABLE IN BLACK OR WHITE) <br />ALL REMOVED ITEMS NOT ALLOCATED FOR SALVAGE BY <br />OR AP ARMAFLEX SS (FOR BLACK) OR AP ARMAFLEX <br />WALMART SHALL BE THE CONTRACTOR'S RESPONSIBILITY <br />WHITE LAPSEAL (FOR WHITE) BOTH BY ARMACELL. <br />TO IMMEDIATELY REMOVE FROM THE JOB SITE AND <br />COLOR INDICATED ON DRAWINGS. IF NO COLOR <br />ARRANGE DISPOSAL IN ACCORDANCE WITH LOCAL CODES. <br />INDICATED AND INSULATION IS CONCEALED FROM <br />PUBLIC VIEW USE BLACK. <br />4. <br />RECLAIMED REFRIGERANT WILL REMAIN IN THE <br />POSSESSION OF WALMART STORES, INC. ON APPLICABLE <br />2. INSULATION THICKNESS SHALL BE 1" FOR ALL SUCTION <br />PROJECTS INVOLVING GAS CONVERSION. THE CONTRACTOR <br />PIPING EXCEPT FOR LOCATIONS IN FLORIDA. (IN FLORIDA, <br />SHALL ASSIST WALMART IN THE SCHEDULING OF <br />PROVIDE 1-1/2" INSULATION ON ALL SUCTION PIPING <br />APPROPRIATE CYLINDERS FOR THE COLLECTION OF <br />GREATER THAN 1" IN DIAMETER.) INSULATION THICKNESS <br />REFRIGERANTS, WHICH WALMART WILL PROCESS THROUGH <br />SHALL BE 1/2" FOR ALL LIQUID PIPING. INSIDE <br />THEIR VENDOR RECLAMATION PROGRAM, OR USE IN <br />DIAMETER OF INSULATION SHALL MATCH PIPE DIAMETER <br />OTHER WALMART EQUIPMENT, AT THE DISCRETION OF THE <br />TO MINIMIZE AIR GAPS BETWEEN PIPING AND <br />WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER. <br />INSULATION. PROVIDE FACTORY PRE -MANUFACTURED <br />THE CONTRACTOR AND WALMART INSPECTOR MUST <br />FITTINGS AT ALL TRAPS AND ELBOWS. WHERE <br />RECORD THE USAGE OR DECOMMISSIONING OF THE <br />PRE -MANUFACTURED FITTINGS ARE UNAVAILABLE, MITER <br />REFRIGERANT IN THE REFRIGERANT LOGS AT THE <br />CUT ALL FITTINGS TO ENSURE PROPER SEAL BETWEEN <br />COMPRESSOR RACKS. <br />INSULATION SEGMENTS. IF LOCAL CODE CALLS FOR <br />THICKER INSULATION, COMPLY WITH LOCAL CODE. REFER <br />TO REFRIGERATION LEGENDS FOR EXISTING PIPE SIZES <br />AND APPROXIMATE LENGTHS. <br />GENERAL NOTES <br />3. <br />REPLACE PVC PIPE SLEEVES ON EXISTING HORIZONTAL <br />09.01.11 <br />TRAPEZE -TYPE SUPPORTS WITH NEW PVC SLEEVES OF <br />ADEQUATE SIZE TO ACCOMMODATE NEW INSULATION 1. <br />REFER TO DEMOLITION PLANS FOR ADDITIONAL <br />THICKNESS. COORDINATE WITH WALMART MECHANICAL <br />DEMOLITION, REPAIRS, OR CONSTRUCTION OF <br />SERVICES CONSTRUCTION MANAGER TO EXTENT OF <br />REFRIGERATION EQUIPMENT. <br />SLEEVE REPLACEMENT. <br />2. <br />PLAN INDICATES GENERAL ROUTING OF REFRIGERANT <br />4. <br />PUMP DOWN, DEFROST, AND CLEAN OLD COPPER <br />LINES, WITH A SINGLE LINE SHOWN INDICATING BOTH <br />BEFORE RE -INSULATING. IF POSSIBLE, DO NOT CUT <br />SUCTION AND LIQUID LINE ROUTING FOR EACH SYSTEM. <br />ANY COPPER. CONTACT WALMART MECHANICAL SERVICES <br />CONSTRUCTION MANAGER IF COPPER MUST BE CUT. 3. <br />REFRIGERATION SYSTEM INSTALLATION SHALL BE IN <br />COMPLETE CONFORMANCE WITH SPECIFICATIONS, AND <br />5. <br />INSTALL WITH VAPOR STOPS EVERY 18' OF INSULATION <br />WITH ALL REQUIREMENTS OF REFRIGERATION EQUIPMENT <br />RUN. (GLUE INSULATION TO PIPE BY APPLYING A 2" <br />MANUFACTURER. <br />BAND OF INSULATION ADHESIVE TO THE COPPER PIPING <br />EVERY 18'). KEEP HORIZONTAL SEAMS AT OR NEAR 12 4. <br />REFRIGERATION DRAWINGS ARE PROVIDED AS AN AID TO <br />O'CLOCK POSITION. INSTALL PIPE INSULATION IN STRICT <br />BIDDERS AND TO INDICATE DESIRED ROUTING OF <br />ACCORDANCE WITH MANUFACTURERS INSTALLATION <br />REFRIGERATION LINES; CONTRACTOR SHALL ASSUME <br />INSTRUCTIONS. <br />FULL RESPONSIBILITY FOR CORRECT INSTALLATION OF <br />PIPING AND ACCESSORIES TO PROVIDE A COMPLETE <br />6. <br />FREEZER WALK-INS AND LOW TEMP CASE <br />AND FULLY OPERATING SYSTEM. <br />PENETRATIONS REQUIRE THE OPENING TO BE FOAM <br />SEALED AND TRIMMED FLUSH, THEN COATED WITH 5. <br />CONTRACTOR SHALL COORDINATE REFRIGERATION <br />SILICONE SEALANT. <br />DEMOLITION ISSUES WITH THE FIXTURE DRAWINGS. <br />REFER TO FIXTURE PLANS FOR REFRIGERATION <br />7. <br />PROVIDE WHITE 0.20" THICK PVC JACKETING ON ALL <br />EQUIPMENT DEMOLITION AND COOLER REPAIR AND <br />EXPOSED INSULATION WITHIN PREP AREAS. <br />REMODELING. <br />6. <br />REFRIGERATION SYSTEM SHALL REMAIN OPERATIONAL <br />DURING REMODELING. CONTRACTOR SHALL COORDINATE <br />INSTALLATION OF THE NEW EQUIPMENT WITH THE <br />WALMART MECHANICAL SERVICES CONSTRUCTION <br />MANAGER. DURING THE PHASING OF OLD TO NEW <br />SYSTEMS, BOTH NEW AND OLD REFRIGERATION SYSTEMS <br />- — <br />MAY BE REQUIRED TO OPERATE AT THE SAME TIME FOR <br />A SHORT PERIOD. <br />7. <br />CONTRACTOR SHALL REPLACE CORRESPONDING RACK <br />SUCTION CORES AND OIL FILTER FOR ANY <br />SYSTEM/REFRIGERATION CIRCUIT OPENED DURING <br />PROJECT. <br />8. <br />PROVIDE REFRIGERATION CIRCUIT IDENTIFICATION TAG, <br />OF 2" BY 3" ENGRAVED PLASTIC, AT EACH <br />REFRIGERATED CASE AND WALK-IN EVAPORATOR. REF <br />SPECIFICATIONS. <br />9. <br />AT WALMART MECHANICAL SERVICES CONSTRUCTION <br />MANAGER'S OPTION, EXISTING REFRIGERATION PIPING <br />- — <br />MAY BE RE -USED. REF REFRIGERATION LEGENDS FOR <br />PIPE SIZE REQUIREMENTS. <br />EXISTING CONDITIONS WERE TAKEN <br />EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />FROM ORIGINAL DRAWINGS AND MAY <br />A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />NOT REFLECT EXACT "AS -BUILT" <br />SPECIFICATIONS IN THEIR RELATED FIELD. THE <br />CONDITIONS. CONTRACTOR SHALL <br />FAILURE TO ACQUAINT HIMSELF WITH THIS <br />FIELD VERIFY ALL EXISTING CONDITIONS <br />KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY <br />NOTE: ALL WORK ON THIS SHEET IS PRIOR TO SUBMITTING FINAL BIDS. <br />OF PERFORMING HIS WORK PROPERLY. NO <br />TO BE <br />COMPLETED BY WALMART CONTRACTOR SHALL CAREFULLY <br />ADDITIONAL COMPENSATION SHALL BE ALLOWED <br />APPROVED CONTRACTOR. COORDINATE NEW WORK AND <br />BECAUSE OF CONDITIONS THAT OCCUR DUE <br />DEMOLITION WITH ALL OTHER <br />TO FAILURE TO FAMILIARIZE WORKERS WITH THIS <br />DISCIPLINES AND EXISTING CONDITIONS. I KNOWLEDGE. <br />o�' <br />og <br />0 <br />N WN <br />o <br />GCN <br />� �O GL� <br />yy <br />z0 <br />JYO <br />M oZ0 <br />�o <br />� <br />NM4 <br />WZ <br />�z� <br />rOX <br />=W <br />co <br />00�� <br />KW <br />M <br />a <br />J <br />M <br />(11 <br />} <br />(n <ZF- <Two <br />Ld v� wa <br />W=_Z<<asc)OOo <br />Rw�<zs,oW Z<N3 <br />aN}NO <br />O wF�\wF �LHLLJX OJ <br />'lQxoovwi�� <br />ZO 3�amO�ww�Zd��o <br /><cLz ,p ywxo 2__rLc2z} <br />m.wow <br />n oo wcnxmwwmwzuz <br /><0�rwzW,Wzvgo <br />Fo�NzoaMaawo0aM <br />cm 4= <br />00 <br />0 <br />O �1 <br />owl <br />co <br />�w W <br />�N� <br />z <br />0 <br />ISSUE BLOCK <br />CHECKED BY: RDF/JAL <br />DRAWN BY: ASM <br />DOCUMENT DATE: 01 /03/12 <br />REFRIGERATION <br />PLAN AND <br />DETAIL <br />SHEET: <br />Rl <br />