GENERAL REFRIGERATION <br />09.06.11 EMS NOTES <br />1. COORDINATE THE EXTENT OF EMS DEMOLITION WITH <br />FIXTURE PLANS. REMOVE ENTIRE LENGTH OF CONDUIT <br />AND EMS CABLES. DO NOT ALLOW DEMOLITION TO <br />AFFECT ACTIVE EMS CIRCUITS. LABEL TERMINATION <br />POINTS OF DEMOLISHED CABLES IN EMS EQUIPMENT AS <br />'SPARE'. <br />2. CONTACT THE CURRENT EMS VENDOR TO OBTAIN A <br />CURRENT MODULE CONFIGURATION PRINTOUT PRIOR TO <br />INSTALLING EMS CABLES. TERMINATE EMS CABLES <br />ACCORDING TO THE EMS CONFIGURATION SHEETS. <br />3. THE EMS SUPPLIER RESERVES THE RIGHT TO CHANGE <br />AND/OR MODIFY ANY/ALL COMPONENTS AND TO MAKE <br />CHANGES TO EQUIPMENT DESIGN. <br />4. PROVIDE CABLE ACCORDING TO DRAWINGS. NO <br />DEVIATION FROM DRAWINGS WILL ACCEPTED. LABEL <br />EACH END OF EMS CABLES WITH TERMINATION POINT OF <br />THE OPPOSITE END OF THE EMS CABLE. <br />5. TERMINATE EMS CABLES IN ACCORDANCE WITH WALMART <br />AND EMS SUPPLIER INSTALLATION INSTRUCTIONS. DO <br />NOT EXPOSE MORE THAN 3" OF WIRE(S). COVER THE <br />END OF THE INSULATING JACKET OF ALL EMS CABLES <br />WITH HEAT SHRINK TUBING. DO NOT ALLOW EXPOSURE <br />OF FOIL OR UNUSED WIRES) AFTER APPLICATION OF <br />HEAT SHRINK TUBING. <br />6. MINOR CHANGES IN MATERIALS OR TERMINATIONS WILL, IN <br />NO CASE, CAUSE AN INCREASE IN COST TO OWNER OR <br />SERVE CAUSE TO GENERATE CHANGE ORDER PAPERWORK. <br />WALMART OR EMS SUPPLIER WILL NOT ACCEPT CHANGE <br />ORDER PAPERWORK PERTAINING TO EMS INSTALLATION <br />OR TERMINATION AS DESIGNATED ON DRAWINGS. <br />7. ROUTE EMS CABLES IN CONDUIT WHEN BELOW BAR JOIST <br />LEVEL OR IF EXPOSED TO VIEW FROM THE SALES AREA. <br />EMS CABLES MAY BE STRUNG ALONG OR PERPENDICULAR <br />BAR JOISTS IF SUPPORTED AT LEAST EVERY 36" OR <br />MINIMUM DISTANCE OF BAR JOIST SPACING. <br />8. CONCEAL SALES AREA EMS CONDUIT UNDER <br />REFRIGERATED CASES, THROUGH TUNNELS, WALLS, PIPE <br />RACKS, AND/OR CHASES, WHERE APPLICABLE. <br />9. INSTALL CODE APPROVED PENETRATIONS THROUGH FIRE <br />WALLS. <br />10. PROVIDE COMPLETED REFRIGERATION SENSOR INPUT <br />VERIFICATION FORMS TO WALMART ENERGY MANAGEMENT <br />DEPARTMENT AND THE EMS SUPPLIER AT THE BEGINNING <br />OF THE REFRIGERATION EQUIPMENT START-UP. PROVIDE <br />ASSISTANCE TO THE EMS SUPPLIER FOR CHECKING <br />SENSOR ACCURACY. <br />►IJ-41 <br />11. BE PRESENT AND AVAILABLE AT REFRIGERATION <br />_ _ _ _ _ _ _ START-UP TO RESOLVE ISSUES AND PROVIDE <br />! ASSISTANCE UNTIL RELEASED BY THE EMS SUPPLIER AND <br />II i WALMART MECHANICAL SERVICES CONSTRUCTION <br />MANAGER. <br />RACK D <br />CONTROLLER ICE i <br />CREAM �; ! ! 12. COMPLETE ALL UNRESOLVED REFRIGERATION WORK, <br />FREEZER , DURING THE REFRIGERATION START-UP, PRIOR TO <br />WORKING ON OTHER EMS INSTALLATION ITEMS. <br />13. PERFORM ALL CHECKS AND TESTS TO ENSURE A FULLY <br />_ _ — _ — — FUNCTIONAL REFRIGERATION CONTROL SYSTEM WHEN THE <br />EMS SUPPLIER IS NOT SCHEDULED TO PERFORM THE <br />I ON —SITE REFRIGERATION START—UP. CONTACT THE EMS <br />RACK C SUPPLIER FOR BLANK TEST VERIFICATION FORMS AND <br />! CONTROLLER INSTRUCTIONS FOR COMPLETING. RETURN ALL <br />** DENOTES THOSE E.M.S. DEVICES �� ---- COMPLETED TEST VERIFICATION FORMS TO THE EMS <br />THAT ARE FIELD INSTALLED. THE CIM—D1 SCHEDULE (E) I MEAT <br />REST ARE FACTORY INSTALLED. 1 MTD-la (SENSOR) DELI {! SUPPLIER. <br />2 MTD-lb (SENSOR) °°°LE _ ENERGY MANAGEMENT SYMBOLS <br />CIM ONE -LINE REFLECTS THE INTENDED DESIGN t t <br />BASED ON NEW CASES AND EXISTING SYSTEM 3 MTD-lc (SENSOR) COMPRESSOR I I NOT ALL SYMBOLS ARE NECESSARILY USED ON THE DRAWINGS. <br />NUMBERS. VERIFY ALL EXISTING CONDITION AND 4 MTD-2a (SENSOR) HOUSE #2 ! ' 03.28.11 <br />LOCATION OF ALL EMS EQUIPMENT PRIOR TO 5 MTD-2b (SENSOR) <br />ROUGH -IN. 6 MTD-2c (SENSOR) # -- -- EP/2 EXECUTIVE PROCESSOR/2 <br />7 MTD-3 (SENSOR) COMPRESSOR I RACK B E ! EMS ENERGY MANAGEMENT SYSTEM <br />EXISTING CASE INPUT MODULES NOTE: 8 MTD-4 (SENSOR) HOUSE #1 CONTROLLER EXC EXECUTIVE CONTROLLER <br />"(E)" DENOTES EXISTING CIM FOR REUSE. AUX E - - !- - - - - - - - _ _ _ _ <br />"(R)" DENOTES EXISTING CIM TO RELOCATE AND i EXISTING CIM BACKBOARD CIM CASE INPUT MODULE <br />RECONNECT. I' LOCATED ABOVE MEAT PREP. <br />ALL OTHERS ARE "NEW" I /MEAT IOM INPUT/OUTPUT MODULE <br />! I PREP 1 ( ! <br />TEMP TEMPERATURE <br />RACK A <br />COMPRESSOR HOUSE #1 COMPRESSOR HOUSE #2 _ LT?-? LOW TEMPERATURE RACK SYSTEM <br />_ ! � <br />CONTROLLER MEAT f MT?-? MEDIUM TEMPERATURE RACK SYSTEM <br />HOLDING -. - - - <br />! RACK 'A' RACK 'B' ! RACK 'C' RACK 'D' !; , VFD VARIABLE FREQUENCY DRIVE <br />CONTROLLER CONTROLLER CONTROLLER CONTROLLER <br />w RIM RACK INPUT MODULE <br />-IN <br />w '— - - ROM RACK OUTPUT MODULE <br />bi <br />4n ( I PLM PHASE LOSS MONITOR <br />M (CIM-Al) M (CIM-131) M (CIM-Cl) M (CIM-D1) l p - - - --� - - - - - - - + - - - - - -t - - <br />�J A18 ANALOG INPUT MODULE <br />TEMPERATURE SENSOR (TYP) <br />M (CIM-A2) M (CIM-B2) M (CIM-C2) S - SEE CIM SCHEDULES SEAFO l ---- I ___. - _r _.__-�.. I __ AUDIO\VISUAL ALARM <br />M (CIM-A3) M (CIM-B3) M (CIM-C3) WIR-2020 (TYP) C.7 <br />f - - - - - - - - - - - _ - - - BACKBOARD <br />- "�. - O I-OI-O <br />o �-� s s <br />M (CIM-A4) M (CIM-134) M (CIM-C4) M (CIM-D2) !❑ ` ! i MTD-la MTD-lb MTD-lc MTD-2a MTD-2b MTD-2c CM CASE CONTROLLER MODULE <br />M (CIM-A5) M (CIM-B5) M (CIM-05) M (CIM-D3) MO CASE INPUT MODULE <br />C.4 - - - - - - - - - - - - - 0 CASE MANAGEMENT SYSTEM MODULE/ ENCLOSURE <br />M (CIM-B6) M (CIM-C6) :. __ <br />DIS DIGITAL INPUT SWITCH (DUAL -TEMPERATURE) <br />M (CIM-B7) M (CIM-C7) 2 3 4 TS DUAL TEMP SWITCH <br />© LEAK DETECTION SENSOR <br />REFRIGERATION ENERGY MANAGEMENT PLAN- LDP LEAK DETECTION PANEL <br />� 1 /16" = 1'-0" © REFRIGERATION EMS CONTROLLER <br />REFRIGERATION EMS ONE —LINE DIAGRAM <br />NTS <br />RIB RELAY IN BOX <br />n REMOTE TEMPERATURE SENSOR (RTS-10) <br />EXISTING CONDITIONS WERE TAKEN EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />FROM ORIGINAL DRAWINGS AND MAY A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />NOT REFLECT EXACT "AS -BUILT" SPECIFICATIONS IN THEIR RELATED FIELD. THE <br />CONDITIONS. CONTRACTOR SHALL FAILURE TO ACQUAINT HIMSELF WITH THIS <br />FIELD VERIFY ALL EXISTING CONDITIONS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY <br />NOTE: ALL WORK ON THIS SHEET IS PRIOR TO SUBMITTING FINAL BIDS. OF PERFORMING HIS WORK PROPERLY. NO <br />TO BE COMPLETED BY WALMART CONTRACTOR SHALL CAREFULLY ADDITIONAL COMPENSATION SHALL BE ALLOWED <br />APPROVED CONTRACTOR. COORDINATE NEW WORK AND BECAUSE OF CONDITIONS THAT OCCUR DUE <br />DEMOLITION WITH ALL OTHER TO FAILURE TO FAMILIARIZE WORKERS WITH THIS <br />DISCIPLINES AND EXISTING CONDITIONS. I KNOWLEDGE. <br />} <br />O <br />LLJ 7 J N W O Z <br />(n d'JVI <2F- Q��O <br />O=FF zoWNZwz <br />W 09�iE2,<<<0 F- < <br />uj a' <br />w Qw,NOONON=ZQN3 <br />�O WCL<n2tS 1� _,:aO�Ow <br />Z aHZoowow-w oOz � <br />O_ 3Na w�ww�za�ro <br />zu-ao_j cy2Ewz>- <br />w wJ O <br />J <ww<<zmL) raw-x <br />�canzojL5 w0 <br />O O w U w w Z U <br />NQU 71--Iwi L'.A o,Z �� <br />_ wooc�ao <br />�ZJ NOw Q w Of�z w irw <br />oi,._zoJwaawoam <br />ISSUE BLOCK <br />CHECKED BY: RDF/NJS <br />DRAWN BY: RDF <br />DOCUMENT DATE: 01 /03/12 <br />REFRIGERATION <br />ENERGY <br />MANAGEMENT <br />PLAN AND <br />DETAIL <br />E <br />ET: <br />REM1 <br />