GENERAL NOTES:
<br />1. PRE -BID SITE VISIT: CONTRACTOR PROPOSING TO UNDERTAKE WORK UNDER THIS DIVISION SHALL
<br />VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES OF ALL CONDITIONS THAT EFFECT THE
<br />WORK AND COST THEREOF AND EXAMINE THE DRAWINGS AS RELATED TO THE SITE CONDITIONS.
<br />BIDDERS WHO DO NOT VISIT THE SITE MAY BE UNILATERALLY NOT PERMITTED TO SUBMIT A BID IF THE
<br />OWNER SO DESIGNATES.
<br />2. BID TERMS AND CONDITIONS: THE ELECTRICAL CONTRACTOR SHALL OBTAIN A FULL SET OF PLANS AND
<br />SPECIFICATIONS FROM THE GENERAL CONTRACTOR PRIOR TO BID. CONSIDERATION WILL NOT BE
<br />GRANTED FOR ANY ALLEGED MISUNDERSTANDINGS OF THE AMOUNT OF WORK TO BE PERFORMED.
<br />TENDER OF PROPOSAL SHALL CONVEY FULL AGREEMENT TO THE ITEMS AND CONDITIONS INDICATED
<br />IN THE PLANS AND SPECIFICATIONS. ANY DISCREPANCIES OR OMISSIONS FOUND IN THE CONTRACT
<br />DOCUMENTS OR DOUBT AS TO THE INTENT THEREOF, SHALL BE IMMEDIATELY BROUGHT TO THE
<br />ATTENTION OF THE ARCHITECT IN WRITING TO OBTAIN CLARIFICATION FROM THE ENGINEER AND/OR
<br />OWNER'S REPRESENTATIVE PRIOR TO SUBMITTING PROPOSAL FOR WORK. WHERE CLARIFICATION
<br />CANNOT BE PROVIDED PRIOR TO BID, THE CONTRACTOR SHALL ASSUME THE MORE EXPENSIVE
<br />METHOD FOR THE BID. WITHOUT FORMAL AUTHORIZATION, THE ARCHITECT AND OWNER RESERVE THE
<br />RIGHT TO REQUIRE THE MORE RESTRICTIVE SPECIFICATION.
<br />3. EXCLUSIONS: MATERIAL AND LABOR EXCLUDED BY THE ELECTRICAL CONTRACTOR SHALL NOT RELIEVE
<br />THE GENERAL CONTRACTOR FROM PROVIDING SAME.
<br />4. COMPLETE SYSTEM: FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, TRANSPORTATION,
<br />SUPERINTENDENTS AND SERVICES REQUIRED TO CONSTRUCT, INSTALL, AND MODIFY THE ELECTRICAL
<br />SYSTEMS AS HEREIN SPECIFIED AND SHOWN ON THESE DRAWINGS FOR A COMPLETE AND FULLY
<br />OPERATIONAL SYSTEM. COORDINATE WORK TO BE PERFORMED OR INSTALLED BY OTHERS AFFECTING
<br />THE ELECTRICAL WORK AND FURNISH AND INSTALL ALL NECESSARY STEEL SHAPES, BLOCKING,
<br />ANCHORS, SLEEVES, HANGERS, ETC. FOR ATTACHING OR CONNECTING ELECTRICAL WORK TO
<br />RELATED WORK OF OTHER TRADES. ALL ITEMS NOT SPECIFICALLY MENTIONED HEREIN OR NOT
<br />INDICATED IN THE DRAWINGS, WHICH ARE NECESSARY TO MAKE A COMPLETE WORKING INSTALLATION,
<br />SHALL BE PROVIDED WITHOUT ADDITIONAL EXPENSE TO THE OWNER. DRAWINGS AND SPECIFICATIONS
<br />DO NOT UNDERTAKE TO INDICATE EVERY ITEM OF MATERIAL, EQUIPMENT, OR LABOR REQUIRED TO
<br />PRODUCE A COMPLETE AND PROPERLY OPERATING INSTALLATION.
<br />5. PERMITS: OBTAIN ALL NECESSARY PERMITS, LICENSES, AND INSPECTIONS AS REQUIRED BY ANY OF
<br />THE FOREGOING AUTHORITIES AND PAY FOR ALL OTHER COSTS IN CONNECTION WITH THE WORK.
<br />6. INSPECTIONS: CONTRACTOR SHALL NOT CONCEAL ANY WORK UNTIL INSPECTED AND APPROVED BY
<br />ELECTRICAL INSPECTOR AND/OR ARCHITECT/ENGINEER.
<br />7. REGULATIONS: ALL ELECTRICAL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
<br />LATEST ADOPTED NATIONAL ELECTRICAL CODE (NEC) AND ALL OTHER APPLICABLE FEDERAL, STATE,
<br />AND LOCAL BUILDING CODES, RULES, REGULATIONS AND AUTHORITIES HAVING JURISDICTION.
<br />8. WORKMANSHIP: ALL WORK SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER IN
<br />ACCORDANCE WITH APPLICABLE NECA STANDARDS SUBJECT TO THE APPROVAL OF THE OWNER OR
<br />OWNER'S AUTHORIZED REPRESENTATIVE. RACEWAY, FIXTURES, AND WIRING DEVICES SHALL BE
<br />PROPERLY ALIGNED, LEVELED, PLUMBED AND SUPPORTED. RACEWAY SHALL BE GROUPED AND
<br />INSTALLED IN RUNS WHICH ARE PARALLEL AND PERPENDICULAR WITH BUILDING LINES.
<br />9. COORDINATION: PRIOR TO COMMENCEMENT OF WORK, EXAMINE ALL CONSTRUCTION DRAWINGS AND
<br />SPECIFICATIONS AND COORDINATE WITH ALL OTHER TRADES INCLUDING GENERAL CONTRACTOR,
<br />MECHANICAL CONTRACTOR, LOW VOLTAGE CONTRACTOR, AND SECURITY CONTRACTOR IN ORDER TO
<br />BECOME FAMILIAR WITH ALL ASPECTS OF THE DESIGN AFFECTING THE ELECTRICAL WORK AND TO
<br />CONFIRM SITE SPECIFIC INSTALLATION REQUIREMENTS. REFER TO ARCHITECTURAL DRAWINGS AND
<br />EQUIPMENT CUT SHEETS FOR EQUIPMENT POWER/CONTROL REQUIREMENTS, CONNECTIONS, WIRING
<br />DEVICE TYPE, MOUNTING HEIGHTS, MEANS OF ATTACHMENT, AND LOCATIONS OF ALL NEW EQUIPMENT
<br />AND ELECTRICAL DEVICES. FIELD VERIFY EXACT NAMEPLATE DATA ON ALL EQUIPMENT FURNISHED
<br />UNDER OTHER DIVISIONS AND/OR BY THE OWNER PRIOR TO THE INSTALLATION OF ELECTRICAL WORK
<br />AND MAKE ANY ADJUSTMENTS TO OUTLETS, CONDUITS, WIRE, AND/OR CIRCUIT BREAKER/FUSE
<br />RATINGS AS REQUIRED TO MATCH EQUIPMENT ACTUALLY FURNISHED.
<br />10. EQUIPMENT AND DEVICE LOCATIONS: LOCATIONS ON THE ELECTRICAL PLANS ARE APPROXIMATE.
<br />EXACT LOCATIONS SHALL BE DETERMINED FROM ARCHITECTURAL PLANS, SECTIONS, AND
<br />ELEVATIONS. FINAL LOCATION OF EQUIPMENT AND DEVICES TO BE COORDINATED WITH ARCHITECT,
<br />OWNER, AND/OR OWNER'S REPRESENTATIVE. VERIFY STUB -UP LOCATION FOR ALL UNDER SLAB
<br />CONDUITS PRIOR TO ROUGH -IN.
<br />11. UTILITIES: UTILITY COORDINATION INFORMATION SHOWN ON THE DRAWINGS SHALL BE CONSIDERED
<br />PRELIMINARY. COORDINATE WITH LOCAL POWER COMPANY AND TELCO (TELEPHONE/CABLE/INTERNET)
<br />PROVIDERS FOR SERVICE REQUIREMENTS AND VERIFY FINAL POINT OF CONNECTION PRIOR TO
<br />MOBILIZATION IN THE FIELD. NOTIFY UTILITIES OF COMMENCEMENT OF WORK AND MAKE ALL
<br />ARRANGEMENTS FOR TEMPORARY AND PERMANENT SERVICES. PROVIDE ALL EQUIPMENT, MATERIAL,
<br />AND LABOR TO MEET UTILITY REQUIREMENTS. INCLUDE ALL ASSOCIATED COSTS TO SET-UP AND
<br />COORDINATE TEMPORARY AND PERMANENT ELECTRIC AND TELCO SERVICES IN BID. ALL MATERIALS
<br />MUST BE APPROVED BY THE LOCAL UTILITY. IF REQUIRED, THE ELECTRICAL CONTRACTOR SHALL
<br />PROVIDE CONDUIT SYSTEMS FOR UTILITY MEDIUM VOLTAGE FROM UTILITY PRIMARY TO POINT OF
<br />12.
<br />13.
<br />14
<br />15.
<br />17
<br />W
<br />21
<br />INTERCEPTION AT EDGE OF PROPERTY LINE.
<br />TEMPORARY POWER: PROVIDE TEMPORARY SERVICE FOR LIGHTING, POWER EQUIPMENT (DRILLS,
<br />SAWS, ETC.), AND CONTRACTOR MOBILIZED WORK TRAILERS. VERIFY TEMPORARY SERVICE
<br />REQUIREMENTS WITH GENERAL CONTRACTOR. TEMPORARY LIGHTING AND POWER SHALL MEET OSHA
<br />REQUIREMENTS AND LOCAL CODE.
<br />INTERRUPTION OF SERVICE: COORDINATE ALL WORK REQUIRING INTERRUPTION OF SERVICE (POWER,
<br />SECURITY, DATA, FIRE ALARM, ETC) WITH ALL AFFECTED PARTIES, INCLUDING BUT NOT LIMITED TO
<br />GENERAL CONTRACTOR, BUILDING OWNER AND/OR LANDLORD, TENANT(S), AND OWNER AND/OR
<br />OWNER'S REPRESENTATIVE AND OBTAIN WRITTEN PERMISSION FROM SAID PARTIES AT LEAST 48
<br />HOURS PRIOR TO SHUT DOWN. PROVIDE NOTICE TO ALL OTHER TRADES OF ALL SCHEDULED
<br />INTERRUPTIONS. ALL OUTAGES OR INTERRUPTIONS SHALL BE KEPT TO MINIMUM DURATION. PROVIDE
<br />TEMPORARY SERVICE DURING OUTAGE WHEN REQUIRED BY AFFECTED PARTIES. CONTRACTOR SHALL
<br />BE RESPONSIBLE TO PROVIDE PERSONNEL FOR FIRE AND SECURITY WATCH DURING OUTAGES TO FIRE
<br />AND SECURITY SYSTEMS.
<br />PRODUCTS: ALL ELECTRICAL MATERIALS SHALL BE NEW EXCEPT WHERE SPECIFICALLY NOTED AS
<br />EXISTING TO BE REUSED. MATERIAL AND METHODS OF INSTALLATION SHALL CONFORM TO THE
<br />STANDARDS OF UNDERWRITERS LABORATORIES, INC. (UL), ANSI, NFPA, ADA, AND ALL OTHER
<br />APPLICABLE LOCAL ORDINANCES. DEFECTIVE EQUIPMENT AND/OR EQUIPMENT DAMAGED DURING
<br />INSTALLATION AND/OR TESTING SHALL BE REPLACED OR REPAIRED IN A MANNER MEETING THE
<br />APPROVAL OF THE ARCHITECT AND THE ENGINEER. PROPOSED EQUIPMENT SHALL BE NRTL LISTED,
<br />LABELED, OR APPROVED.
<br />SHOP DRAWINGS AND SUBMITTALS: SUBMIT MANUFACTURER'S STANDARD PRODUCT INFORMATION,
<br />PERFORMANCE SPECIFICATIONS, ELECTRICAL RATINGS, PHYSICAL DIMENSIONS, AND OTHER
<br />INFORMATION NECESSARY FOR ENGINEER TO ENSURE COMPLIANCE WITH SPECIFICATIONS. SHOP
<br />DRAWINGS SHALL BE SUBMITTED FOR APPROVAL PRIOR TO ORDERING AND INSTALLING ANY
<br />EQUIPMENT. SUBMITTALS AND SHOP DRAWINGS SHALL CLEARLY INDICATE ITEMS TO BE REVIEWED BY
<br />HIGHLIGHTING, AND ITEMS NOT TO BE REVIEWED SHALL BE CROSSED OUT. SUBMITTALS WITHOUT
<br />HIGHLIGHTING AND CROSSED OUT ITEMS SHALL NOT BE REVIEWED. ALL SUBMITTALS MUST BE
<br />RECEIVED BY THE ENGINEER WITHIN 30 DAYS OF CONTRACT AWARD TO THE GENERAL CONTRACTOR;
<br />NO EXCEPTIONS. EQUIPMENT ORDERED OR INSTALLED WITHOUT A FAVORABLY REVIEWED SUBMITTAL
<br />IS DONE AT THE CONTRACTOR'S OWN RISK.
<br />VALUE ENGINEERING SUBMITTALS: VALUE ENGINEERING SUBMITTALS SHALL BE LABELED AS SUCH AND
<br />INDICATE A 'DEDUCT' OR CREDIT BACK TO THE OWNER. VE SUBMITTALS NOT CLEARLY LABELED OR
<br />NOT INCLUDING A DEDUCT SHALL BE REJECTED.
<br />SUBSTITUTION AND ALTERATIONS: THERE SHALL BE NO DEVIATION FROM THE REQUIREMENTS HEREIN
<br />WITHOUT THE WRITTEN APPROVAL OF THE ENGINEER. CONTRACTOR SHALL ASSUME RESPONSIBILITY
<br />FOR ALL COSTS INCURRED RESULTING FROM SUBSTITUTION OF EQUIPMENT AS WELL AS THE
<br />PERFORMANCE AND SPACE REQUIREMENTS OF SUCH EQUIPMENT.
<br />SUBSTITUTIONS AND ALTERATIONS OF OTHER DISCIPLINE'S EQUIPMENT: SUBSTITUTED AND ALTERED
<br />EQUIPMENT BY OTHER DISCIPLINES SHALL INCLUDE ALL MATERIAL AND LABOR COSTS FOR
<br />ELECTRICAL CONTRACTOR TO PROVIDE COMPLETE AND FULLY FUNCTIONAL SYSTEMS TO
<br />ACCOMMODATE THESE SUBSTITUTED AND ALTERED EQUIPMENT. THESE ADDITIONAL ELECTRICAL
<br />COSTS MUST BE ABSORBED BY THE OTHER DISCIPLINE'S CONTRACTOR IN ORDER FOR THE
<br />SUBSTITUTED OR ALTERED GEAR TO BE ACCEPTED.
<br />FAULT CURRENT PROTECTION: ALL EQUIPMENT SHORT CIRCUIT CURRENT RATINGS (SCCR) AND
<br />OVERCURRENT PROTECTIVE DEVICE AMPERE INTERRUPTING CAPACITY (AIC) RATINGS SHALL BE
<br />GREATER THAN THE AVAILABLE FAULT CURRENT AT EACH RESPECTIVE PIECE OF EQUIPMENT.
<br />COORDINATE EQUIPMENT SCCR AND OVERCURRENT PROTECTIVE DEVICE AIC RATINGS WITH POWER
<br />COMPANY. OBTAIN THE AVAILABLE FAULT CURRENT AT TRANSFORMER SECONDARY FROM THE POWER
<br />COMPANY AND PROVIDE PROPOSED EQUIPMENT SCCR AND OVERCURRENT PROTECTIVE DEVICE AIC
<br />RATINGS FOR ENGINEER APPROVAL. OVERCURRENT PROTECTIVE DEVICES AIC RATINGS SHALL BE
<br />FULLY RATED WITH A MINIMUM 10% MARGIN BETWEEN THE CALCULATED FAULT LEVEL AND THE
<br />SPECIFIED SHORT CIRCUIT RATING OF THE EQUIPMENT UNO ON PLANS.
<br />VOLTAGE DROP: WIRE SIZES SPECIFIED IN THESE PLANS ARE MINIMUM WIRE SIZES. THE ELECTRICAL
<br />CONTRACTOR IS RESPONSIBLE FOR INCREASING WIRE SIZES BASED ON ACTUAL CIRCUIT LENGTH TO
<br />MAINTAIN VOLTAGE DROP AT A MAXIMUM OF 3% FOR BRANCH CIRCUITS AND 2% FOR FEEDERS, THE
<br />CUMULATIVE VOLTAGE DROP FROM THE SOURCE TO THE END DEVICE SHALL NOT EXCEED 5% OF
<br />NOMINAL SYSTEM VOLTAGE.
<br />WIRING: ALL CONDUCTORS CARRYING 50 VOLTS OR MORE SHALL BE MINIMUM #12 AWG, CU, UNO.
<br />PROVIDE DUAL RATED TYPE THHN-THWN FOR ABOVE GROUND AND TYPE THWN OR XHHW FOR BELOW
<br />GROUND, COORDINATE INSULATION TYPES WITH ENVIRONMENTAL CONDITIONS, NEC REQUIREMENTS,
<br />AND CONDUIT FILL REQUIREMENTS. CONDUCTORS #12 AND #10 SHALL BE SOLID, CONDUCTORS #8 AND
<br />LARGER SHALL BE STRANDED. ALL CONDUCTOR SIZES ARE BASED ON COPPER WITH 600C INSULATION
<br />FOR CIRCUITS RATED 100A OR LESS AND 750C FOR CIRCUITS RATED MORE THAN 100A.
<br />22. LOW VOLTAGE WIRING: LOW VOLTAGE WIRING FOR SPECIAL SYSTEMS IS PERMITTED TO BE
<br />FREE -WIRED ONLY ABOVE ACCESSIBLE CEILINGS AND BELOW RAISED FLOOR SYSTEMS, UNO,
<br />FREE -WIRED CABLE SHALL BE UL LISTED, PLENUM RATED. LOW VOLTAGE WIRING IN OPEN CEILINGS,
<br />HARD CEILINGS, WALLS, PASSING THROUGH ADJACENT TENANT SPACES, OR ROUTED UNDERGROUND
<br />OR BELOW SLAB SHALL BE INSTALLED IN CONDUIT. LOW VOLTAGE WIRING IS NOT SHOWN ON PLANS,
<br />UNLESS SPECIFICALLY CALLED OUT.
<br />23, COLOR CODING: FOR EXISTING WIRING SYSTEMS, COLOR CODING SHALL FOLLOW EXISTING SITE
<br />REQUIREMENTS. FOR NEW INSTALLATIONS OR WHERE EXISTING INSTALLATIONS DO NOT HAVE A
<br />COLOR CODING CONVENTION, THE FOLLOWING SYSTEMS OF COLOR CODING SHALL BE STRICTLY
<br />ADHERED TO AND FOLLOWED THROUGHOUT:
<br />CONDUCTOR 480Y/277V, 3-PH 2O8Y/120V, 3-PH 240D/12OV, 3-PH 240/120V, 1-PH
<br />PHASE A: BROWN BLACK BLACK BLACK
<br />PHASE B: ORANGE RED ORANGE RED
<br />PHASE C: YELLOW BLUE BLUE ---
<br />NEUTRAL: GRAY WHITE WHITE WHITE
<br />EQUIPMENT GROUND: GREEN GREEN GREEN GREEN
<br />ISOLATED GROUND: --- GREENNELLOW GREENNELLOW GREENNELLOW
<br />24. SHARED CIRCUIT NEUTRALS: SHARED CIRCUIT NEUTRALS SHALL NOT BE USED UNLESS INDICATED
<br />OTHERWISE ON PANEL SCHEDULE. WHERE USED, CIRCUIT BREAKER HANDLE TIES SHALL BE PROVIDED
<br />TO DISCONNECT POWER TO EACH PHASE CONDUCTOR OF THE SHARED NEUTRAL CIRCUIT.
<br />25. GROUNDING: ALL CIRCUITS SHALL BE PROVIDED WITH AN INSULATED GREEN COPPER EQUIPMENT
<br />GROUND CONDUCTOR SIZED PER NEC. THE EQUIPMENT GROUND CONDUCTOR SHALL BE INCREASED
<br />IN SIZE BY EQUAL PROPORTION TO THE PHASE CONDUCTORS WHENEVER THE PHASE CONDUCTORS
<br />HAVE BEEN UPSIZED TO MAINTAIN ACCEPTABLE VOLTAGE DROP LEVELS. EQUIPMENT GROUNDS SHALL
<br />BE BONDED TO ALL EQUIPMENT AND DEVICES. USE OF METALLIC CONDUIT SHALL NOT TAKE THE PLACE
<br />OF AN EQUIPMENT GROUND CONDUCTOR.
<br />26. CONDUIT: ALL WIRING SHALL BE INSTALLED IN CONDUIT, MINIMUM 1/2" FOR INDOOR AND 3/4" FOR
<br />OUTDOOR AND UNDER SLAB. EMT IS ACCEPTABLE WITH COMPRESSION FITTINGS ONLY. ALL
<br />HOMERUNS SHALL BE HARD PIPED. MC IS ACCEPTABLE FOR FIXTURE WHIPS ONLY. ALL CONDUIT AND
<br />WIRING SHALL BE CONCEALED IN FLOORS, WALLS, AND/OR CEILINGS UNLESS SPECIFICALLY NOTED
<br />OTHERWISE OR WHERE APPROVED BY ARCHITECT, LANDLORD AND/OR OWNER / OWNER'S
<br />REPRESENTATIVE. CHANNEL EXISTING WALLS WHERE REQUIRED. WHERE CONDUITS ARE UNABLE TO
<br />BE CONCEALED, HARD PIPED CONDUIT SHALL BE USED AND PAINTED TO MATCH ADJOINING SURFACE.
<br />27. UNDERGROUND CONDUITS: MINIMUM BURIAL DEPTH SHALL BE 24" TO TOP OF CONDUIT. PROVIDE
<br />DETECTABLE WARNING TAPE WHERE REQUIRED BY AHJ OR CODE.
<br />28. ROUTING: FOR CLARITY, CONDUIT ROUTING SHOWN IS SYMBOLIC AND DIAGRAMMATIC. INSTALL
<br />CONDUIT TO FIT ACTUAL FIELD CONDITIONS.
<br />29. OPEN CEILINGS: IN AREAS WITHOUT CEILINGS OR WHERE ANY CONDUITS, CONDUCTORS, FEEDERS, OR
<br />LOW VOLTAGE CABLING IS VISIBLE, ALL WIRING SHALL BE HARD PIPED IN CONDUIT. BX, AC, AND MC
<br />CABLE OR FLEX CONDUIT ARE NOT PERMITTED. CONDUITS SHALL BE ROUTED TIGHT TO DECK EITHER
<br />PARALLEL OR PERPENDICULAR TO BUILDING LINES, GROUPED ALONG STRUCTURAL MEMBERS, AND
<br />DROP AT POINT OF CONNECTION. MAINTAIN 1-1/2" CLEARANCE FROM ROOF DECK PER NEC 300.4(E).
<br />WHERE EXPOSED TO VIEW, ALL MATERIALS (CONDUIT, JUNCTION BOXES, ETC.) SHALL BE INSTALLED IN
<br />AN ORDERLY FASHION AND SHALL BE CLEAN, FREE FROM ALL VISIBLE MARKINGS, AND PAINTED TO
<br />MATCH ADJOINING SURFACE. JUNCTION BOXES SHALL HAVE CIRCUIT NUMBERS WRITTEN ON THE
<br />INSIDE OF THE JUNCTION BOX COVER.
<br />30. PENETRATIONS: CONTRACTOR SHALL INSPECT AREA OF WORK AND PERFORM GROUND PENETRATING
<br />RADAR (GPR) SCAN OR X-RAY ALL PROPOSED PENETRATIONS PRIOR TO WORK TO DETERMINE EXACT
<br />LOCATIONS OF STRUCTURAL REINFORCEMENT OR EMBEDDED SYSTEMS. COORDINATE FLOOR AND
<br />WALL PENETRATIONS WITH STRUCTURAL ENGINEER. ALL PENETRATIONS SHALL BE SEALED BY
<br />APPROVED MEANS TO PREVENT ENERGY LOSS AND MOISTURE AND RODENT INTRUSION.
<br />31. FIRE -RATED PENETRATIONS: ALL PENETRATIONS THROUGH FIRE -RATED SLABS AND/OR PARTITIONS
<br />SHALL BE SEALED WITH A UL LISTED FIRE -RATED ASSEMBLY OF EQUAL OR GREATER RATING THAN
<br />THAT OF THE EXISTING SLAB OR PARTITION.
<br />32. TRENCHING: FIELD VERIFY UNDERGROUND UTILITIES PRIOR TO TRENCHING. ALL PROPOSED
<br />EXCAVATION IN THE VICINITY OF EXISTING UTILITIES, PIPING SYSTEMS, OR SIMILAR SHALL BE HAND
<br />EXCAVATED. HAND EXCAVATE IN THE VICINITY OF EXISTING TREES WHERE TRENCHING MAY DAMAGE
<br />TREE ROOT SYSTEM.
<br />33. SLEEVES: SLEEVES AND SLEEVE SEALS SHALL BE PROVIDED AT PENETRATIONS OF WALL ASSEMBLIES.
<br />34. SUPPORTS: ALL CONDUIT AND CABLING SHALL BE PROPERLY SUPPORTED AS REQUIRED BY CODE.
<br />35. REPAIRS: THE CONTRACTOR SHALL REPAIR ALL WALL, CEILING, FLOOR, OR ROOF OPENINGS WHICH
<br />ARE CREATED BY DEMOLITION OR PENETRATION. THE REPAIRS SHALL BE WITH MATERIAL AND
<br />FINISHES TO MATCH EXISTING ADJACENT UNDISTURBED FINISHED SURFACES.
<br />36. IDENTIFICATION: ALL ELECTRICAL DISTRIBUTION EQUIPMENT, TRANSFORMERS, PANELBOARDS, AND
<br />OTHER ENCLOSED EQUIPMENT SHALL BE IDENTIFIED AS INDICATED IN THE CONTRACT DOCUMENTS.
<br />SAID IDENTIFICATION SHALL CONSIST OF PERMANENTLY ATTACHED ENGRAVED LAMINATED PLASTIC
<br />NAMEPLATES. EACH BRANCH CIRCUIT OVERCURRENT PROTECTION DEVICE SHALL BE IDENTIFIED BY
<br />CIRCUIT NUMBER AND SCHEDULED INSIDE PANEL DOOR WITH A TYPEWRITTEN CIRCUIT DIRECTORY.
<br />EACH BRANCH CIRCUIT SPLICE OR TERMINATION SHALL BE IDENTIFIED BY PANEL AND CIRCUIT
<br />DESIGNATION SHOWN ON THE JUNCTION OR OUTLET BOX, OR UPON INDIVIDUAL WIRES IN CASES
<br />WHERE MORE THAN ONE OF EACH PHASE CONDUCTOR OCCUR. RECEPTACLES AND SWITCH COVER
<br />PLATES SHALL BE LABELED WITH PANEL AND CIRCUIT DESIGNATION USING TYPEWRITTEN
<br />CHARACTERS OF CONTRASTING COLOR (BLACK OR WHITE) ON CLEAR ADHESIVE BACKED LABELS OR
<br />FACTORY ENGRAVED COVER PLATES.
<br />37. PANEL CLEARANCE: MAINTAIN ALL WORKING SPACE AND DEDICATED EQUIPMENT SPACE CLEARANCES
<br />AS REQUIRED BY ARTICLE 110 OF THE NEC. GENERAL CONTRACTOR SHALL COORDINATE BETWEEN
<br />TRADES SO THAT NO FOREIGN SYSTEMS ARE LOCATED IN THE DEDICATED EQUIPMENT SPACE. IN THE
<br />EVENT THAT FOREIGN SYSTEMS ARE INSTALLED ABOVE A PANEL'S DEDICATED EQUIPMENT SPACE, THE
<br />GENERAL CONTRACTOR SHALL ABSORB THE COST TO RELOCATE THE FOREIGN SYSTEMS.
<br />38. WIRING DEVICES: WIRING DEVICES AND COVER PLATES SHALL BE DECORA STYLE OF COLORS
<br />SELECTED BY THE ARCHITECT OR INTERIOR DESIGNER. GANG ADJACENT DEVICES WITH A SINGLE
<br />ONE-PIECE COVER PLATE, UNO. FOR REMODELS, ALL DEVICES AND COVER PLATES WITHIN THE
<br />CONTRACT AREA SHALL BE REPLACED WITH NEW DECORA STYLE DEVICES AND COVER PLATES, UNO.
<br />39. CLEANING: UPON COMPLETION OF WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN THE
<br />CONTRACT AREA AND ALL OTHER AREAS USED FOR STORAGE, STAGING, ETC. ALL EQUIPMENT AND
<br />DEVICES SHALL BE CLEANED AND POLISHED IN ACCORDANCE WITH MANUFACTURER'S
<br />RECOMMENDATIONS. SOAP AND WATER CLEANING OR OTHER METHODS THAT LEAVE A FILM SHALL BE
<br />CORRECTED UPON REQUEST BY THE ENGINEER OR ARCHITECT.
<br />40. TESTING: THE CONTRACTOR SHALL TEST ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT AND
<br />DEMONSTRATE TO THE OWNER ITS PROPER OPERATION. AT THE TIME OF FINAL INSPECTION AND
<br />TESTS, ALL CONNECTIONS AT PANELBOARDS, CONTROL PANELS, DEVICES, AND EQUIPMENT AND ALL
<br />SPLICES MUST BE COMPLETED. EACH BRANCH CIRCUIT AND ITS RESPECTIVE CONNECTED EQUIPMENT
<br />MUST TEST FREE OF SHORT CIRCUITS.
<br />41. TRAINING: OWNER AND/OR OWNER'S REPRESENTATIVE SHALL BE TRAINED ON THE USE OF ANY NEW
<br />ELECTRICAL EQUIPMENT AND LIGHTING CONTROLS PRIOR TO FINAL ACCEPTANCE.
<br />42. FINAL ACCEPTANCE: AT THE END OF CONSTRUCTION, A FINAL WALK-THROUGH SHALL BE PERFORMED.
<br />ALL DEFICIENCIES IDENTIFIED DURING FINAL INSPECTION SHALL BE CORRECTED.
<br />43. CERTIFICATES OF APPROVAL: ALL CERTIFICATES OF APPROVAL SHALL BE IN DUPLICATE, DELIVERED
<br />TO THE ARCHITECT, AND BECOME THE PROPERTY OF THE OWNER.
<br />44. PROJECT RECORD DOCUMENTS: THE ELECTRICAL CONTRACTOR SHALL MAINTAIN AT THE SITE, FOR
<br />THE OWNER, ONE COPY OF ALL DRAWINGS, ADDENDA, APPROVED SHOP DRAWINGS, REVISIONS AND
<br />OTHER MODIFICATIONS IN GOOD ORDER AND MARKED TO RECORD ALL CHANGES MADE DURING
<br />CONSTRUCTION. THE SET OF DRAWINGS AND OTHER INFORMATION SHALL BE DELIVERED TO THE
<br />OWNER WITHIN 30 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE AND ONE COPY GIVEN TO THE
<br />ENGINEER UPON COMPLETION OF WORK. DRAWINGS SHALL INCLUDE AT A MINIMUM:
<br />A. A SINGLE -LINE DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM AND
<br />B. FLOOR PLANS INDICATING LOCATION AND AREA SERVED FOR ALL DISTRIBUTION.
<br />45. OPERATIONS AND MAINTENANCE (O&M) MANUALS: PROVIDE TWO COPIES OF OPERATIONS AND
<br />MAINTENANCE MANUALS TO THE BUILDING OWNER IN HARD COPY AND ELECTRONIC FORMAT. HARD
<br />COPIES SHALL BE COMPILED AND ORGANIZED IN A BINDER. THE MANUALS SHALL INCLUDE, AT A
<br />MINIMUM, THE FOLLOWING:
<br />A. SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF
<br />EQUIPMENT REQUIRING MAINTENANCE,
<br />B. OPERATING AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING
<br />MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY IDENTIFIED.
<br />C. NAMES AND ADDRESSES OF AT LEAST ONE QUALIFIED SERVICE AGENCY.
<br />D. WARRANTY INFORMATION.
<br />46. WARRANTY: THE ENTIRE ELECTRICAL SYSTEM INSTALLED UNDER THIS CONTRACT SHALL BE HANDED
<br />OVER IN PROPER WORKING ORDER. ANY WORK OR MATERIALS WHICH DEVELOP DEFECTS, EXCEPT
<br />FROM ORDINARY WEAR AND TEAR, WITHIN ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE SHALL
<br />BE REPLACED WITHOUT CHARGE. IF MATERIALS HAVE A STANDARD WARRANTY GREATER THAN ONE
<br />YEAR, THE MANUFACTURER'S STANDARD WARRANTY SHALL APPLY. BENEFICIAL USE SHALL NOT BE
<br />CONSTRUED AS FINAL ACCEPTANCE. THE ELECTRICAL CONTRACTOR SHALL, DURING THE ONE YEAR
<br />GUARANTEE PERIOD, BE RESPONSIBLE FOR THE PROPER REPAIR AND ADJUSTMENTS OF ALL
<br />ELECTRICAL SYSTEMS AND EQUIPMENT, APPARATUS, DEVICES, ETC. INSTALLED BY HIM, AND DO ALL
<br />WORK NECESSARY TO ENSURE EFFICIENT AND PROPER FUNCTIONING.
<br />N
<br />o
<br />N
<br />O
<br />m
<br />cc
<br />�
<br />z
<br />a
<br />Q
<br />In
<br />0
<br />�O
<br />.N
<br />w
<br />a
<br />>
<br />0
<br />w
<br />w
<br />U)
<br />6
<br />z
<br />INFINITY ENGINEERING
<br />GROUP, LLC
<br />1208 East Kennedy Boulevard
<br />Suite 230
<br />Tampa, Florida 33602
<br />[p]: 813.434.4770
<br />[fl: 813.445.E-2ifl
<br />www.iegroup.net
<br />FL Cert. of Auth. No. 27889
<br />d'
<br />LO
<br />m
<br />F'-
<br />L_
<br />W
<br />O
<br />�
<br />LIJ
<br />z
<br />z
<br />=
<br />W
<br />W
<br />J
<br />=
<br />W
<br />_J
<br />W
<br />J
<br />=
<br />N
<br />Q
<br />O
<br />Uz
<br />=
<br />0000
<br />NW
<br />J
<br />U
<br />N
<br />(D
<br />W
<br />Q
<br />C
<br />M
<br />o
<br />00
<br />J
<br />W
<br />M
<br />z
<br />U
<br />N
<br />o
<br />U1
<br />a`
<br /><n
<br />Project No.
<br />Sheet
<br />280-22.00
<br />C
<br />E-O.2
<br />Date
<br />AS NOTED
<br />Scale
<br />AS NOTED
<br />
|