Laserfiche WebLink
STEW 3 <br />Ridge 'dent Installation <br />Tear a 1' sect on to be used as a template for <br />laft the went out (Figure E-G) and coWeir Ow <br />templateAocator over the arse carp shingles at <br />the beginning of the vent W. Note the location <br />art the baffle (Figure H). Make sere to do this at <br />troth ends of the Insallatl. <br />Measure the distance from the edge of the mot slot <br />to the exterior baffle (D). Establish a chalk line along <br />one side of the ridge (Figure 1). <br />Unroll the vent and use the included W pneumatic <br />roofing nails to attach the first sW of the ridge vent <br />with the exterior of the Wle attgned with the chalk <br />fire (Figum J). Nail gun targets are embossed on the <br />part as a guide for prop+ettY attaching vW to the <br />roof. The vent should be fasted an 6}' cars <br />(Figure K). <br />Froosed with attachftrg the other side of the vent_ <br />When beginning to nail down the second stele, <br />der NOT begin at the end. Begin hahmen, the first <br />and second ow -fool, sections nand then return to <br />fasten #m first one -foot section. This will allow <br />for proper fit. <br />NOTE., For proper aptawance, pull 1ha the vent snugly <br />across ffie ridge and flat oR tfre rota before sftavtir <br />h crab,. <br />NOTE. For a unitorm appeararxv, install Cobra Ridge <br />Runner Went over the entire length of the ridge, maicmg <br />sure that tfre vlenr extends past the slot opening by at <br />least 6" <br />NOTE. ,For appi icalrarxs o ver laminaledoinglas, apply a <br />tact of slti>~tinne catxWiV of root court to tfw undiersfdl <br />of Me auki baffle a1mg the entira ridge and at exposed <br />edges so Pat the gaps are eompktely faded <br />MOTE. W4a venting vaulted and catkodral ceilings, <br />eXh j0i5006f cavity must be mwled N both ends <br />arrd hayp of least lY' crearane:e. <br />STEW 4 <br />Cap Shingle Installation <br />Install the ridge cap shingles directly to the vent <br />using pneumatic nail gun and int hxled 1%" nails. <br />A nail line Is Inscribed on the top of the vent to <br />serve as a guide (Figure L). <br />Fig. F ,,� Fig. F <br />Ull <br />Fig. G Fig H <br />i <br />Fig. I F,'"" ""�.� Fig. J <br />Fig. K '"l� Fig. L <br />�► "*.f �'�` � � ,fir �� <br />.A f <br />Quality You Carl Trust .Since 1886... from North America's Largest Roofing filanufacturer <br />005 GAF Ualartafs Co pcxab an 1Z% • 1361 Alps Road Wayne N.1, 07470 • v %w gai.tom R- ESCS804 <br />Copyright 2000 Windward Homes No portion may be copied or reproduced without the prior written pennission of Windward Homes <br />Share drive W: Quality Control Checklist/Roofing (680)/ Roofing Install Shingle Final Group 680 rev 03-16-07 /Page 4 of 4 <br />Windward-j Homes <br />PLAN © 2003 WINDWARD HOMES. ALL RIGHTS RESERVED <br />