Laserfiche WebLink
rn <br />3 <br />s <br />a <br />rn <br />LO <br />LO <br />0 <br />N <br />0 <br />a <br />00 <br />0 <br />J <br />T <br />0 <br />I <br />N <br />S <br />a <br />u7 <br />L0 <br />cn <br />O <br />00 <br />co <br />0 <br />0 <br />N <br />a <br />N <br />LO <br />L0 <br />L <br />0 <br />cnCr <br />0 <br />Q <br />0 <br />i <br />d <br />E <br />N <br />a� <br />E <br />O <br />a <br />c <br />t/q <br />a� <br />U <br />c� <br />c'3 <br />v <br />_o <br />O <br />0 <br />t7 <br />N <br />0 <br />ado <br />M <br />0 <br />0 <br />0 <br />d <br />C14 <br />cV <br />0 <br />0 <br />a <br />w <br />S <br />a <br />m <br />0 <br />ABBREVIATIONS <br />AB or A.B. <br />Anchor Bolt <br />FIX or FXD <br />Fixed <br />RA or R/A or R.A. <br />Return Air <br />ABV or Abv. <br />Above <br />FLR or Fir. <br />Floor <br />RAD or Rad. <br />Radius <br />AC or A/C <br />Air -Conditioner <br />FLR SYS or Fir Sys <br />Floor System <br />RAG or Rag. <br />Return Air Grill <br />ADJ or ADJ. <br />Adjustable <br />FOM or F.O.M. <br />Face Of Masonry <br />REC or Rec. <br />Recessed <br />AFF or A.F.F. <br />Above Finished Floor <br />FP or F.P. <br />Fireplace <br />RECEPT <br />Receptacle <br />AHU orA.H.U. <br />Air Handler Unit <br />FR DR <br />French Door <br />REF or Ref. <br />Refrigerator <br />ALTorALT. <br />Alternate <br />FRT <br />Front <br />REINF <br />Reinforcing <br />BC <br />Base Cabinet <br />FT or Ft. <br />Foot/ Feet <br />REQD or Req'd. <br />Required <br />BF <br />Bifold Door <br />FTG or Ftg. <br />Footing <br />RM or Rm. <br />Room <br />BK SH or Bk Sh <br />BookShelf <br />FXD GL <br />Fixed Glass <br />RND or Rnd. <br />Round <br />BLK or BLK. <br />Block <br />GALV or Galy. <br />Galvanized <br />RO or R.O. <br />Rough Opening <br />BLW or BLW. <br />Below <br />GC or G.C. <br />General Contractor <br />RS, R/S, R/SH or R&S <br />Rod and Shelf <br />BM or Bm. <br />Beam <br />GFI or G.F.I. <br />Ground Fault Interrupter <br />Sc <br />Solid Core <br />BOT or Bot. <br />Bottom <br />GT or G.T. <br />Girder Truss <br />SD or SD. <br />Smoke Detector <br />BP or B.P. <br />Bypass (door) <br />GYP BD or Gyp. Bd. <br />Gypsum Board <br />SGD <br />Sliding Glass Door <br />BRG or BRG. <br />Bearing <br />HB <br />Hose Bibb <br />SH or Sh. <br />Shelves <br />C <br />Carpet <br />HC <br />Hollow Core <br />SHT <br />Sheet <br />CAB <br />Cabinet <br />HDR or Hdr. <br />Header <br />SHWR or Shwr. <br />Shower <br />CIR or Cir. <br />Circle <br />HGT or Hgt. <br />Height <br />SL or S.L. <br />Side Lights <br />CJ or C/J <br />Control Joint <br />HH or H.H. <br />Hand Held (plumbing faucet) <br />SPECS or SPECS. <br />Specifications <br />CLG or Clg. <br />Ceiling <br />HORIZ <br />Horizontal <br />SPF or S.P.F. <br />Spruce Pine Fir <br />CMU <br />Concrete Masonry Unit <br />HS <br />Hard Surface (flooring) <br />SQ FT or SF or S.F. <br />Square Foot (feet) <br />COFF or Coff. <br />Coffered or Tray Ceiling <br />ILO <br />In Lieu Of <br />SQ or Sq. <br />Square <br />COL or Col. <br />Column <br />INSUL or Insul. <br />Insulation <br />STO <br />Storage <br />COMM or Comm. <br />Community <br />INT or Int. <br />Interior <br />SW or S.W. <br />Shear Wall <br />COMP or Comp. <br />Compressor <br />K/WALL or KNUall <br />Kneewall <br />SYP or S.Y.P. <br />Southern Yellow Pine <br />CONN or CONN. <br />Connection <br />KS or K.S. <br />Knee Space <br />TB <br />Towel Bar <br />CONT or Cont. <br />Continuous <br />LAUN or Laun. <br />Laundry <br />TEMP or Temp. <br />Tempered <br />CSMT <br />Casement <br />LAV or Lay. <br />Lavatory <br />THIKN or Thik'n. <br />Thicken <br />CT or C.T. <br />Ceramic Tile <br />LF or L.F. <br />Linear Ft. <br />TOB or T.O.B. <br />Top of Block <br />D or D. <br />Dryer <br />LL <br />Lintel Length <br />TOM or T.O.M. <br />Top of Masonry <br />DB <br />Door Bell <br />LT <br />Laundry Tub <br />TOP or T.O.P. <br />Top of Plate <br />DBL or Dbl. <br />Double <br />MAS or Mas. <br />Masonry <br />TP <br />Toilet Paper Holder <br />DCF <br />Decorative Cementitious Finish <br />MAX or Max <br />Maximum <br />TR <br />Towel Ring <br />DEC or Dec. <br />Decorative <br />MC <br />Medicine Cabinet <br />TRANS WDW or Trans. <br />Transom Window <br />DED or Ded. <br />Dedicated (outlet) <br />MFR or Mfr. <br />Manufacturer <br />TYP or Typ. <br />Typical <br />DIA or Dia. <br />Diameter <br />MGT <br />Management (room) <br />UC or u.c. <br />Under Counter <br />DISP or Disp. <br />Disposal <br />MIN or Min <br />Minimum <br />UCL <br />Under Cabinet Lighting <br />DIST or Dist. <br />Distance <br />MIR or Mir. <br />Mirror <br />LINO or U.N.O. <br />Unless Noted Otherwise <br />DMF <br />Decorative Masonry Finish <br />ML or M.L. <br />Microlam <br />V or v. <br />Valve (shower or tub/shower) <br />DS or D.S. <br />Drawer Stack <br />MONO or Mono <br />Monolithic <br />VB <br />Vanity Base <br />DTL <br />Detail <br />MW or MICRO or Micro. <br />Microwave <br />VERT or Vert. <br />Vertical <br />DV or D.V. <br />Dryer Vent <br />NTS or N.T.S. <br />Not to Scale <br />VL or V.L, <br />Versalam <br />DVP or D.V.P. <br />Diverter Valve (plumbing) <br />OE or O.E. <br />Owner's Entry <br />VTR or VTE <br />Vent through Roof / Exterior <br />DW or D.W. <br />Dishwasher <br />OPNG or Opn'g. <br />Opening <br />W or w <br />Washer <br />EA or Ea. <br />Each <br />OPT or Opt. <br />Optional <br />W/ or w/ <br />With <br />ELEC or Elec. <br />Electrical <br />PC <br />Pull Chain <br />WA or WA, <br />Wedge Anchor <br />ELEV or Elev. <br />Elevation <br />PED or Ped. <br />Pedestal <br />WC or W/C or W.C. <br />Water Closet (toilet) <br />EQ <br />Equal <br />PH <br />Phone <br />WD or Wd <br />Wood <br />EW or E.W. <br />Each Way <br />PKT or Pkt. <br />Pocket (Door) <br />WOW HDR or WDW. HDR. <br />Window Header <br />EXP or Exp. <br />Expansion <br />PL or P.L. <br />Parallam <br />WH or W.H. <br />Water Heater <br />EXT or Ext. <br />Exterior <br />PLF <br />Pounds per linear foot <br />WIC or W.I.C. <br />Walk-in Closet <br />FBC <br />Florida Building Code <br />PLNT SHLF or Pit. Sh. <br />Plant Shelf <br />WM or W.M. <br />Wall Mounted (plumbing fixture) <br />FDN or Fdn. <br />Foundation <br />PLT HT or Pit. Ht. <br />Plate Height <br />WP <br />Water Proof(ing) <br />FFB <br />Finsh Floor Break <br />PSF <br />Pounds per square foot <br />WS <br />Water Softener <br />FG <br />Fiberglass (Shower Pan) <br />PT or P.T. <br />Pressure Treated <br />WWF <br />Welded Wire Fabric (Mesh) <br />FIN Finished PW or P.W. Pre -wire <br />FIN FLR or FF or Fin. Flr. Finished Floor PWDR or Pwd. Powder Room REV, 06.23.22 <br />PLAN REVISIONS <br />DATE VERSION DESCRIPTION <br />08-20-15 1.0 NEW BASE PLAN <br />12-8-15 2.0 ADDED VAULT. CLG. <br />12-28-17 3.0 2017 FBC UPDATES <br />02-21-18 4.0 ADDED GRADE BEAM 150 MPH ENG. <br />08-27-19 4.1 ENG. REVIEW FOR 150-C MPH <br />09-20-19 4.2 ADD 8'-8" ELEV. FOR TREVESTA <br />12-12-19 4.3 ELEV. B EXTEND ENTRY SLAB <br />12-15-20 4.4 OVERHANG OVER SGD REV. TO 3' PER C.M. <br />12-19-20 <br />5.0 <br />FBC <br />2020 CODE <br />UPDATE <br />06-14-21 <br />5.1 <br />HVAC DOOR TO <br />2652 PER C.M. <br />11-29-21 6.0 ADDED ELEV KLM PER C.M. <br />E:10001::1011� <br />1: 1 F 11: 1 FE7:1 0 L I <br />I = FE INI I J Alftilk litsm <br />1941 Al B1 KLM <br />mmmm� <br />INDEX OF DRAWINGS <br />SHEET DESCRIPTION <br />SHEET <br />No. <br />MEAN ROOF 15 FT. HIGH TYPICAL <br />FOR SINGLE STORY HOMES <br />MEAN ROOF 30 FT. HIGH TYPICAL <br />FOR 2 STORY HOMES <br />THIS DRAWING AND DESIGN IS VALID <br />FOR 12 MONTHS AFTER THE DATE IT <br />IS SIGNED AND SEALED OR WHILE <br />CURRENT CODE IS VALID <br />CODE REFERENCES ARE SUMMARIES <br />OF CODE SECTIONS. <br />SEE FBCR (CURRENT VERSION) FOR <br />COMPLETE CODE INFORMATION. <br />Notice to Builder & All Subcontractors <br />It is the intent of Designer/Engineer listed in the titleblock of these <br />documents that these documents be accurate, providing Licensed <br />Professionals clear information. Every attempt has been made to <br />prevent error. The Builder and all subcontractors are required to <br />review all the information contained in these documents, prior to <br />the commencement of any work. The Designer/Engineer are not <br />responsible for any plan errors, omissions,or misinterpretations <br />undetected and not reported to the Designer / Engineer prior to <br />construction. All construction MUST be in accordance to the <br />information found in these documents. Any questions regarding <br />the information found in these plans should be directed to our <br />Office at (407) 880-2333 immediately. No backcharges will be <br />considered for reimbursement by the Designer/Engineer without <br />advanced notification and approval by the Designer/Engineer. <br />Payments will be made in accordance to the terms of the <br />agreement. <br />Control of Construction Site <br />The Designer/Architect and engineer of record (EOR) have no <br />control over the construction site and shall not be responsible in <br />any manner for control of the construction site including, but not <br />limited to, scheduling and sequencing of work, jobsite safety, and <br />ventilation of the building and thereby shall not be responsible for <br />the indoor air quality, or the effects thereof, for any reason <br />whatsoever. The Designer/Architect and FOR has no duty to <br />protect, without limitation, the residence, construction site, <br />materials, or equipment, from moisture, mold, fungus, fire, theft, <br />vandalism, trespass, or any other peril or condition, at any time, <br />expressly including, but not limited to, the period of time before <br />construction, during the construction of the project, or after <br />construction and the Designer/Architect and FOR has no duty to <br />take any action or preventive measures to protect such property <br />against any such peril at any time for any reason. <br />Care and Maintenance <br />Yearly maintenance and inspections by the builder/homeowner <br />are necessary for the (future life of this home. Care must be taken <br />to check windows and doors for caulking, remove leaves and <br />debris off roofs, make sure that water flow is away from the <br />house and have your home repainted every 3 - 5 years to protect <br />the coatings. The designer and engineer of record are not <br />responsible for the upkeep of the home and will not be held <br />liable for instances that may occur over the normal life of the <br />home without proper maintenance. <br />c <br />N <br />.ter V— <br />co , <br />CNJ (' <br />car II <br />00 V <br />•_ <br />9 WI <br />tj Q L� Q <br />C 0- <br />N <br />3 w CU <br />E <br />v <br />ID <br />cc <br />a tj <br />a: <br />M <br />tV <br />0 <br />N <br />00 <br />o <br />,``�tttiLE,W=> <br />'#s <br />i <br />e No p 7 50 ' <br />• L • ar <br />;. STATE OF <br />o• ' 3 ! <br />l.J K.�) A <br />feOF'FDSiviat""; <br />To the best of the Engineers knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential 71h Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />W d E <br />a o 8 C <br />N � <br />,+ <br />V a, J <br />0 �� 0 "LL <br />M to,"-"E-° i w ' <br />M �v ° a <br />a U ti ii Zo <br />Z O 0 <br />mQ o o <br />103z <br />2- <br />X o <br />ail 0 (d � (2IN 07 J m <br />W �2� 0 J Z <br />LL�y <br />Z uJ <br />Z _ <br />LOCl)LL <br />a O U ❑❑❑ <br />Z <br />W <br />N th <br />O � <br />z o <br />Q <br />J <br />N <br />N z <br />CD o <br />U <br />0 0 <br />N � <br />03 ~ U <br />U c <br />w <br />J E <br />U � a <br />C A <br />Q N Y <br />. <br />N m <br />c <br />o <br />M <br />M <br />J <br />w¢ <br />2 <br />w <br />Z <br />Q <br />U- <br />Q E <br />�1Z <br />0 <br />E U <br />o� <br />�`j <br />oa <br />�� <br />'..aQ <br />00 <br />Z�� <br />CC>0 <br />i <br />w� <br />g <br />wz <br />�J <br />C <br />6� <br />< <br />m� <br />o� <br />Z <br />m J <br />0 <br />< <br />aw <br />gz <br />c <br />F� <br />o< <br />aLL <br />go <br />z <br />W <br />`o <br />mao <br />o� <br />�w <br />�- <br />g3 <br />J <br />0 <br />v <br />w <br />ZR <br />a0 <br />r <br />o 3 <br />.0 = C) <br />19 <br />_. )14 -.. <br />LLo <br />0) <br />,,..� <br />p— <br />(1) <br />�-00 <br />L <br />`� <br />t0 <br />N <br />.� <br />O <br />Cr <br />O <br />Y <br />Y a <br />i— <br />Q <br />� a� <br />N <br />M <br />W <br />m L <br />LO <br />r <br />U) <br />¢� <br />C:) <br />0*) <br />Ln <br />T <br />Q <br />r— <br />E <br />M <br />o <br />m <br />Z <br />N <br />E <br />Z <br />@ <br />a <br />U Q CU <br />p <br />JOB <br />NO: 23-02469 <br />SCALE : AS NOTED <br />SHEET NO, <br />C S <br />