Laserfiche WebLink
FBC 2004 RESIDENTIAL SECTION R320 <br />PROTECTION AGAINST TERMITES <br />R320.1 <br />TERMITE PROTECTION SHALL BE PROVIDED BY REGISTERED TERMITICIDES, <br />INCLUDING SOIL APPLIED PESTICIDES, BAITING SYSTEMS, AND PESTICIDES <br />APPLIED TO WOOD, OR OTHER APPROVED METHODS OF TERMITE <br />PROTECTION LABELED FOR USE AS A PREVENTATIVE TREATMENT TO NEW <br />CONSTRUCTION (SEE SECTION 202, REGISTERED TERMITICIDE). UPON <br />COMPLETION OF THE APPLICATION OF THE TERMITE PROTECTIVE <br />TREATMENT, A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED TO THE <br />BUILDING DEPARTMENT BY THE LICENSED PEST CONTROL COMPANY THAT <br />CONTAINS THE FOLLOWING STATEMENT: "THE BUILDING HAS RECEIVED A <br />COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN <br />TERMITES. TREATMENT IS IN ACCORDANCE WITH RULES AND LAWS <br />ESTABLISHED BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND <br />CONSUMER SERVICES." <br />CHEMICAL SOIL TREATMENT, INCLUDING SPACES BOXED OR FORMED. <br />R320.1.1 <br />IF SOIL TREATMENT USED FOR SUBTERRANEAN TERMITE PREVENTION, <br />THE INITIAL CHEMICAL SOIL TREATMENT INSIDE THE FOUNDATION <br />PERIMETER SHALL BE DONE AFTER ALL EXCAVATION, BACKFILLING AND <br />COMPACTION IS COMPLETE. <br />R320.1.2 <br />IF SOIL TREATMENT IS USED FOR SUBTERRANEAN TERMITE PREVENTION, <br />SOIL AREA DISTURBED AFTER INITIAL CHEMICAL SOIL TREATMENT SHALL <br />BE RETREATED WITH A CHEMICAL SOIL TREATMENT, INCLUDING SPACES <br />BOXED OR FORMED. <br />R320.1.3 <br />IF SOIL TREATMENT IS USED F6R SUBTERRANEAN TERMITE PREVENTION, <br />SPACE IN CONCRETE FLOORS BOXED OUT OR FORMED FOR THE <br />SUBSEQUENT INSTALLATION OF PLUMBING TRAPS, DRAINS OR ANY OTHER <br />PURPOSE SHALL BE CREATED BY USING PLASTIC OR METAL <br />PERMANENTLY PLACED FORMS OF SUFFICIENT DEPTH TO ELIMINATE ANY <br />PLANNED SOIL DISTURBANCE AFTER INITIAL CHEMICAL SOIL TREATMENT. <br />R320.1.4 <br />IF SOIL TREATMENT IS USED FOR SUBTERRANEAN TERMITE PREVENTION, <br />CHEMICALLY TREATED SOIL SHALL BE PROTECTED WITH A MINIMUM 6 MIL <br />VAPOR RETARDER TO PROTECT AGAINST RAINFALL DILUTION. IF RAINFALL <br />OCCURS BEFORE VAPOR RETARDER PLACEMENT, RETREATMENT IS <br />REQUIRED. ANY WORK, INCLUDING PLACEMENT OF REINFORCING STEEL, <br />CHEMICAL TREATMENT UNTIL THE CONCRETE FLOOR IS <br />OURED, SHALL BE DONE IN SUCH MANNER AS TO AVOID PENETRATING <br />OR DISTURBING TREATED SOIL. <br />R320.1.5 <br />IF SOIL TREATMENT IS USED FOR SUBTERRANEAN TERMITE PREVENTION, <br />CONCRETE OVERPOUR OR MORTAR ACCUMULATED ALONG THE EXTERIOR <br />FOUNDATION PERIMETER SHALL BE REMOVED PRIOR TO EXTERIOR <br />CHEMICAL SOIL TREATMENT, TO ENHANCE VERTICAL PENETRATION OF <br />THE CHEMICALS. <br />R320.1.6 <br />IF SOIL TREATMENT IS USED FOR SUBTERRANEAN TERMITE PREVENTION, <br />CHEMICAL SOIL TREATMENTS SHALL ALSO BE APPLIED UNDER ALL <br />EXTERIOR CONCRETE OR GRADE WITHIN 1 FOOT (305 MM) OF THE <br />PRIMARY STRUCTURE SIDEWALLS. ALSO, A VERTICAL CHEMICAL BARRIER <br />SHALL BE APPLIED PROMPTLY AFTER CONSTRUCTION IS COMPLETED, <br />INCLUDING INITIAL LANDSCAPING AND IRRIGATION/SPRINKLER <br />INSTALLATION. ANY SOIL DISTURBED AFTER THE CHEMICAL VERTICAL <br />BARRIER IS APPLIED SHALL BE PROMPTLY RETREATED. <br />R320.1.7 <br />IF A REGISTERED TERMITICIDE FORMULATED AND REGISTERED AS A BAIT <br />SYSTEM IS USED FOR SUBTERRANEAN TERMITE PREVENTION, SECTIONS <br />ROUGH R320.1.6 DO NOT APPLY; HOWEVER, A SIGNED <br />ONTRACT ASSURING THE INSTALLATION, MAINTENANCE AND MONITORING <br />OF THE BAITING SYSTEM FOR A MINIMUM OF FIVE YEARS FROM THE <br />ISSUE OF THE CERTIFICATE OF OCCUPANCY SHALL BE PROVIDED TO THE <br />BUILDING OFFICIAL PRIOR TO THE POURING OF THE SLAB, AND THE <br />SYSTEM MUST BE INSTALLED PRIOR TO FINAL BUILDING APPROVAL. IF <br />THE BAITING SYSTEM DIRECTIONS FOR USE REQUIRE A MONITORING <br />PHASE PRIOR TO INSTALLATION OF THE PESTICIDE ACTIVE INGREDIENT, <br />THE INSTALLATION OF THE MONITORING PHASE COMPONENTS SHALL BE <br />DEEMED TO CONSTITUTE INSTALLATION OF THE SYSTEM. <br />R320.1.8 <br />I A I TERED <br />TREATMENT IS USED FOR SUBTERRANEAN TERMITE PREVENTION, <br />SECTIONS R320.1.1 THROUGH R320.1.6 DO NOT APPLY. APPLICATION OF <br />THE WOOD TREATMENT TERMITICIDE SHALL BE AS REQUIRED BY LABEL <br />DIRECTIONS FOR USE, AND MUST BE COMPLETED PRIOR TO FINAL <br />BUILDING APPROVAL. <br />R320.2 PENETRATION. <br />PROTECTIVE SLEEVES AROUND METALLIC PIPING PENETRATING CONCRETE <br />SLAB -ON -GRADE FLOORS SHALL NOT BE OF CELLULOSE- CONTAINING <br />MATERIALS AND, IF SOIL TREATMENT IS USED FOR SUBTERRANEAN <br />TERMITE PROTECTION, SHALL RECEIVE APPLICATION OF A TERMITICIDE IN <br />ANNULAR SPACE BETWEEN SLEEVE AND PIPE. <br />R320.3 CLEANING. <br />CELLS AND CAVITIES IN MASONRY UNITS AND AIR GAPS BETWEEN BRICK, <br />STONE OR MASONRY VENEERS AND THE STRUCTURE SHALL BE CLEANED <br />OF ALL INIONPRESERVATIVE TREATED OR NONNATURALLY DURABLE WOOD, <br />OR OTHER CELLULOSE -CONTAINING MATERIAL PRIOR TO CONCRETE <br />PLACEMENT. <br />EXCEPTION: INORGANIC MATERIAL MANUFACTURED FOR CLOSING CELLS IN <br />FOUNDATION CONCRETE MASONRY UNIT CONSTRUCTION OR CLEAN EARTH <br />FILL PLACED IN CONCRETE MASONRY UNIT VOIDS BELOW SLAB LEVEL <br />BEFORE TERMITE TREATMENT IS PERFORMED. <br />R320.4 CONCRETE BEARING LEDGE. <br />BRICK, STONE OR OTHER VENEER SHALL BE SUPPORTED BY A <br />CONCRETE BEARING LEDGE AT LEAST EQUAL TO THE TOTAL THICKNESS <br />OF THE BRICK, STONE OR OTHER VENEER, WHICH IS POURED INTEGRALLY <br />WITH THE CONCRETE FOUNDATION. NO SUPPLEMENTAL CONCRETE <br />FOUNDATION POURS WHICH WILL CREATE A HIDDEN COLD JOINT SHALL <br />BE USED WITHOUT SUPPLEMENTAL TREATMENT IN THE FOUNDATION <br />UNLESS THERE IS AN APPROVED PHYSICAL BARRIER. AN APPROVED <br />PHYSICAL BARRIER SHALL ALSO BE INSTALLED FROM BELOW THE WALL <br />SILL PLATE OR FIRST BLOCK COURSE HORIZONTALLY TO EMBED IN A <br />MORTAR JOINT, IF MASONRY VENEER EXTENDS BELOW GRADE, A TERMITE <br />PROTECTIVE TREATMENT MUST BE APPLIED TO THE CAVITY CREATED <br />BETWEEN THE VENEER AND THE FOUNDATION, IN LIEU OF A PHYSICAL <br />BARRIER. <br />EXCEPTION: VENEER SUPPORTED BY A SHELF ANGLE OR LINTEL <br />SECURED TO THE FOUNDATION SIDEWALL IN ACCORDANCE WITH ACI <br />530/ASCE 5/TMS 402, PROVIDED AT LEAST A 6-INCH (152 MM) CLEAR <br />INSPECTION SPACE OF THE FOUNDATION SIDEWALL EXTERIOR EXIST <br />BETWEEN THE VENEER AND THE TOP OF ANY SOIL, SOD, MULCH OR <br />OTHER ORGANIC LANDSCAPING COMPONENT, DECK, APRON, PORCH, WALK <br />OR ANY OTHER WORK IMMEDIATELY ADJACENT TO OR ADJOINING THE <br />STRUCTURE. <br />R320.5 PRESSURE PRESERVATIVELY TREATED AND NATURALLY <br />RESISTANT WOOD. <br />HEARTWOOD OF REDWOOD AND EASTERN RED CEDAR SHALL BE <br />CONSIDERED TERMITE RESISTANT. PRESSURE PRESERVATIVELY TREATED <br />WOOD AND NATURALLY TERM[ TE- RESISTANT WOOD SHALL NOT BE USED <br />AS A PHYSICAL BARRIER UNLESS A BARRIER CAN BE INSPECTED FOR <br />ANY TERMITE SHELTER TUBES AROUND THE INSIDE AND OUTSIDE EDGES <br />AND JOINTS OF A BARRIER. <br />R320.5.1 FIELD TREATMENT. <br />FIELD CUT ENDS, NOTCHES AND DRILLED HOLES OF PRESSURE <br />PRESERVATIVELY TREATED WOOD SHALL BE RETREATED IN THE FIELD IN <br />ACCORDANCE WITH AWPA M4. <br />R320.6 FOAM PLASTIC PROTECTION. <br />EXTRUDED AND EXPANDED POLYSTYRENE, POLYISOCYANU RATE AND <br />OTHER FOAM PLASTICS SHALL NOT BE INSTALLED ON THE EXTERIOR <br />FACE OR UNDER INTERIOR OR EXTERIOR FOUNDATION WALLS OR SLAB <br />FOUNDATIONS LOCATED BELOW GRADE. THE CLEARANCE BETWEEN FOAM <br />PLASTICS INSTALLED ABOVE GRADE AND EXPOSED EARTH SHALL BE AT <br />LEAST 6 INCHES (152 MM). <br />EXCEPTIONS: <br />1. BUILDINGS WHERE THE STRU U AL F WALLS, FLOORS, <br />CEILINGS AND ROOFS ARE ENTIRELY OF NONCOMBUSTIBLE MATERIALS OR <br />PRESSURE PRESERVATIVELY TREATED WOOD. <br />2. WHEN IN ADDITION TO THE REQUIREMENTS OF SECTION R320.1, AN <br />APPROVED METHOD OF PROTECTING THE FOAM PLASTIC AND STRUCTURE <br />FROM SUBTERRANEAN TERMITE DAMAGE IS PROVIDED. <br />3. ON THE INTERIOR SIDE OF BASEMENT WALLS. <br />GENERAL NOTES <br />Bathroom #2 - Hall <br />- Demo existing door and frame. <br />- Re-frome opening for a 36" wide door. <br />- Install new 3'0" x 6'8" pre -hung, hollow core door unit with lever <br />lock. <br />- Mortise trim on inside of door to fit against wall and vanity. <br />- Point door and frame completely. <br />- Install horizontal grab bar in front of toilet at height suitable to <br />owner. <br />- Remove and replace regular toilet with new handicap toilet and <br />seat. <br />Kitchen <br />Cut the west countertop, south end, back approximately 20" <br />removing the south door of that base cabinet. Using the west <br />side and the south end, make two side legs to hold top, Lower <br />countertop height down to 31" high, 29" clear height. Install <br />splash between 36" countertop height and new 31" height. <br />Reinstall end panel 20" north. Patch as necessary wood floor in <br />20" x 25" area where base cabinet was removed for a roll -under <br />area. <br />Utility Room <br />- Demo southwest corner of existing utility room. <br />- Demo from edge of door in room, northwest at an angle <br />approximately 7 LF from southwest existing corner. By removing <br />90 degree corner and installing an angle wall approximately 7 LF <br />long, you will create a walkway approximately 42" wide so that a <br />wheelchair con travel from back patio to carport and be under <br />roof and out of weather. <br />- Relocate one wall light, one light switch, and one wall outlet. <br />- Re -frame new angle wall and reinstall existing vinyl lap siding. <br />- Provide all necessary vinyl lop components to tie new design into <br />existing design. <br />Interior will remain as is with exposed studs. <br />Remove existing block skirting on west side of sidewalk for <br />approximately 12 LF and install vinyl in place of block to gain 4" <br />of width. <br />Master Bathroom <br />- Demo toilet. <br />- Demo bathroom door and frame. <br />- Demo two toilet room walls (west and south), <br />- Demo vanity top, sinks, faucets, and base cabinets. <br />- Demo mirror above vanity. <br />- Save sinks, faucets, and mirror to reinstall. <br />- Demo shower walls, shower valve, shower floor and floor drain. <br />- Demo wall cabinet - reinstall in bedroom closet. <br />- Demo floor covering in bathroom. <br />- Demo north wall, east end, for a new 36" door. <br />- Frame in new door opening. Frame to close up old door opening. <br />- Rough in plumbing: Install toilet water line, east wall, south end, <br />(corner of room) and its 4" drain line in floor. <br />- Rough in new shower valve and center drain in 5x5 shower floor <br />area in old shower area southwest corner of bathroom. Vanity area <br />remains as is with rough plumbing. <br />- Install pressure treated 2x4's north and south and spaced 12" <br />apart across all of bathroom floor. 2x4's will lay flat on 3-1/2" <br />side and will not be installed in shower area. <br />- In front of new door, 36" wide and 36" into bathroom, cut <br />sleepers (2x4's) at on angle to create a 1 to 12 slope for a <br />ramp. <br />install ?" pressure treated plywood on top of sleepers. <br />I nsz a 11 16" durarock on top of plywood. This will be done <br />throughout oil of bathroom floor except in shower area which will <br />remain at existing floor height. <br />Rough in electric: Remove fan/light from toilet room and its two <br />switches. Balonc,- of electric remains the some. <br />Install shower pan. <br />Install durarock on three walls of shower area up 6 LF above floor. <br />- Install mud set on shower floor; slope all four sides to center <br />drain. <br />- Install moisture rcsistant drywall on walls of bathroom as <br />necessary due to demo, plumbing and electric relocation. <br />- Install ceramic tile on three walls of shower up 6 LF above floor. <br />- Install ceramic tile on shower floor. <br />- Install marble sills on two open faces of shower floor to stop <br />flowing water. <br />- Install new 3'0" x 6'8" hollow core, pre -hung door unit with lever <br />lock in bathroom. <br />- Install ceramic tile floor on balance of floor outside of shower. <br />- Install marble sill at door. <br />- Point bathroom walls, doors, and trim completely. <br />- Install 36" vanity cabinet. <br />- Install 72" long x 22" deep countertop. South 36" of vanity will <br />be a roll -under area. Countertop will hove three wall splashes. <br />- Install new handicap toilet and seat. <br />- Reinstall two existing sinks and faucets in vanity area. <br />- Reinstall existing mirror above vanity. <br />- Trim out sho-.,,er valve. Install hand-held shower wand and slide <br />bar. <br />- Install three wall mounted grab bars in shower. <br />- Install one wall mounted grab bar on wall beside toilet and one <br />fold -down bar on opposite side of toilet. <br />- Install ceiling track and shower curtain. Track to have one radius <br />turn <br />- Install 3' handrail on west side of romp to protect edge. <br />Master Bedroom <br />- Move furniture. <br />- Demo carpet, pod, and tack strip. <br />- Install new wood floors in 13' x 16' bedroom. <br />- Reinstall furniture. <br />Livinci Room <br />- Move furniture. <br />- Demo carpet, pod, and tack strips. <br />- Install new wood floors in 16' x 26' living room. <br />.�,nin-Q-Room <br />Move furniture. <br />Demo carpet, pGd, and tack strips. <br />install new wood floors in 8x13 dining room. <br />Reinstall furniture. <br />Hallway <br />- Demo carpet, pod, and tack strips. <br />- Install wood floors in 4x8 hallway. <br />Comouter Room <br />- Move furniture. <br />- Demo carpet, pod, and tack strips. <br />- Install new wood floor in 11 x 13 room. <br />- Reinstall furniture. <br />Guest Bedroom <br />- Move furniture. <br />- Demo carpet, pod and tack strips. <br />- Install wood floors in 12 x 13 room. <br />- Reinstall furniture. <br />Familv Room <br />- Remove sliding gloss doors and frame. <br />- Install pre -hung French doors with lever lock and deadbolt. <br />Install trim both sides. <br />- Paint new French doors and frame completely. <br />- Move furniture. <br />- Demo carpet, pod, and tack strips. <br />- Install wood floors in 13 x 16 room. <br />- Reinstall furniture. <br />Sun Room <br />- Demo carpet from floor; save to reinstall. <br />- Demo aluminum pan roof, fan beam, and fan. <br />- Demo vinyl lop siding on west wall, and north on the <br />exterior of the sun room. <br />- Demo lap siding from all inside walls; save to reinstall. <br />- Demo five windows and one door; save to reinstall. <br />- Demo A/C unit; save to reinstall. <br />- Install new 3" elite panel roof in sun room approximately 13 <br />x 13. North and west walls to hove a 12" overhang with a <br />gutter and downspout on north wall. Elite panel to hove a <br />fan beam. <br />- Install nine plasters on existing floor of sun room <br />approxim Plasters are concrete block filled <br />otely 6' centers. <br />solid. <br />- Install double 2x8 pressure treated beam, north and south, <br />on top of three rows of plasters. Center row of plasters will <br />be 7-1/2" lower in height. <br />- Install pressure treated 2x8 floor joist on 16" center <br />perpendicular to beams. End of each joist to sit in joist <br />hangers attached to east and west beams and will rest on <br />top of center beam. <br />- Install ?" pressure treated plywood on top of 2x8 joist. <br />- Install 36" tongue and groove plywood on top of ?" plywood. <br />- Re -frame five windows and one exterior door to new floor <br />height approximately 20" up from existing floor; frame for <br />A/C relocation. <br />- Reinstall the five existing windows - three on west wall and <br />two on north wall, west end. <br />- Reinstall existing door and frame in north wall, east end. <br />- Reinstall A/C unit north wall. <br />- Relocate three wall outlets to new floor height and add one <br />outlet for a total of <br />- four - one each wall, <br />- Install R-19 insulation in west and north walls. <br />- Install moisture barrier on exterior of both walls. <br />- Reinstall vinyl lop siding on both walls. Trim around windows <br />and door as necessary for a water tight installation. <br />- Install 112" drywoll floor to ceiling on all four interior walls; <br />tape and finish drywall. <br />- Install wood baseboard. <br />- Point walls and trim completely. <br />- Reinstall carpet on top of tongue and groove plywood. <br />Exterior Door Sun Room <br />Form, pour, and finish a 4x4 landing flush with floor of sun <br />room. Stem wall on four sides of landing to be poured <br />solid and have two #5 steel re -bars in each wall. Floor of <br />landing to have wire mesh. <br />From 4x4 landing on east side, form, pour, and finish a 4 <br />LF wide set of steps down to sidewalk. <br />Install handroils on landing and both sides of steps. <br />Roils are to match existing rails as closely as possible. <br />Front Door <br />- Demo existing rails on porch steps and sidewalk; save to <br />reinstall. <br />- Form, pour, and finish a cop on porch level with floor of <br />home. <br />- Form, pour, and finish a 4x19 LF romp from east side of <br />landing toward the driveway. Finish ramp flush with new cop <br />height and existing sidewalk. <br />- Remove lost 4 LF of sidewalk at base of romp so that <br />concrete pour will be 4" in thickness. <br />- Reinstall hand roil on porch and romp that was removed. <br />Carport <br />- On east side of carport, remove plant bed. <br />- From copping around plant bed west, back to carport, pour <br />area solid and level with carport area approximately 3x27. <br />110 ENCLOSED EXP B <br />WIND - THIS PLAN HAS BEEN DESIGNED TO COMPLY WITH ALL PROVISIONS OFF <br />FBC-2004 INCLUSIVE OF ASCE 7-05 WIND PROVISIONS FOR A NOMINAL DESIGN 3-SEC <br />GUST OF 110 MPH. AS 15EFINED IN �ECTION 1609.2, DEFINITION (2), THIS STRUCTURE <br />DOES MEET THE REQUIREMENTS FOR AN ENCLOSED BUILDING AND AS SUCH <br />HAS BEEN DESIGNED NTH AN INTERNAL PRESSURE COEFFICIENT OF +18 AND -.'8, <br />UNADJUSTED FOR ZONES 1,2, AND 3. DESIGN HAS UTILIZED A WIND IMPORTANCE <br />FACTOR OF 1.00 FOR BUILDING CK-TAGORY 11 IN AN EXPOSURE B AREA AND COMPLIES <br />WITH END SPEED MAPS AS ADOPTED BY COUNTY JURISDICTION. <br />WINDOWS, DOORS, COMPONENTS <br />DESIGN WIND PRESSURES <br />ENCLOSED BUILDING <br />DESIGN WIND PRESSURE (PSF) <br />Zone <br />Effective <br />Basic Wind Speed <br />Zone <br />Effective <br />Basic Wind Speed <br />110 MPH 3-wc. Gust <br />110 MPH <br />3-sec. Gust <br />4 <br />Wind Area <br />5 <br />Wind Area <br />SQ FT <br />+ <br />- <br />SQ FT <br />+ <br /><10 <br />21.8 <br />23.6 <br /><10 <br />21.8 <br />29.1 <br />15 <br />21.3 <br />23.1 <br />is <br />21.3 <br />33.6 <br />--1 <br />0_1 <br />20 <br />20.8 <br />22.6 <br />20 <br />20.8 <br />27.2 <br />25 <br />20.6 <br />22A <br />25 <br />20.6 <br />26.8 <br />30 <br />20.4 <br />22.2 <br />30 <br />20.4 <br />26.4 <br />1 <br />1 <br />35 <br />20.2 <br />22.0 <br />35 <br />20.2 <br />26.0 <br />IT <br />L0 <br />40 <br />20.0 <br />21.8 <br />40 <br />20.0 <br />25.5 <br />45 <br />19.7 <br />21.5 <br />45 <br />19.7 <br />25.1 <br />Li <br />z <br />LLJ <br />z <br />50 <br />19.5 <br />21.3 <br />50 <br />19.5 <br />24.6 <br />75 <br />19.0 <br />20.9 <br />75 <br />19.0 <br />23.6 <br />0 <br />E3 <br />N <br />100 <br />j 18.5 <br />20.4 <br />N <br />I 100 <br />18.5 <br />22.6 <br />GARAGE DOOR <br />9'-O"WIDE 7'-O"HEIGHT <br />19.1 <br />21.6 <br />16'-O"WIDE 7'-O"HEIGHT <br />18.3 <br />20.4 <br />ROOF WIND ZONES <br />DESIGN PRESSURES FOR THE ROOF ZONES ARE TAKEN FROM THE MOST <br />CONSERVATIW CASE. (INCLUDING ROOF SLOPE, EFFECTIVE AREA AND <br />ZONEI <br />19.9 <br />21.8 <br />- <br />ZONE2 <br />19.9::::l <br />42.1 <br />OVERHANG COND11IONS) <br />ZONE3 <br />19.9 <br />1 55.0 <br />NOTES! <br />1. ANY WINDOW, ALL OR PART, WHICH IS WITHIN 6' OF A CORNER <br />SHALL BE CONSIDERED ZONE 5 PER CHART ABOVE, ALL OTHER <br />WINDOWS ARE CLASSIFIED IN ZONE 4. <br />2. ROUND AREA DOWN TO THE LARGEST PRESSURE <br />IN THE CHART ABOVE, <br />- DESIGN PRESSURES ABOVE REPRESENT THE NET PRESSURE (SUM OF EXTERNAL AND <br />INTERNAL PRESSURES) APPLIED NORMAL TO ALL SURFACES. COMPONENT MANUFACTURER <br />SHALL USE THE HIGHER OF THE TWO NUMBERS FOR APPLICABLE SQUARE FOOTAGE <br />5.05' <br />SITE PLAN <br />CODE REFERENCE NOTES <br />ALL CONSTRUCTION SHALL COMPLY WTH CURRENTLY <br />ADOPTED CODES, WHICH INCLUDE, BUT ARE NOT <br />LIMITED TO: <br />FLORIDA BUILDING CODE, 2004 EDITION. <br />FLORIDA FIRE PREVENTION CODE, 2000 EDITION. <br />NFPA LIFE SAFETY CODE, 2006 EDITION <br />NFPA 1 UNIFORM FIRE CODE, FLORIDA 2005 EDITION <br />FLORIDA STATUTE 633, WHICH INCLUDES. - <br />STATE FIRE MARSHALL'S RULES AND <br />REGULATIONS <br />ALL LOCAL CODES AND ORDINANCES. <br />TABLE OF CONTENT <br />A1.0 SITE PLAN <br />A2.0 EXISTING/ DEMOLITION PLAN <br />A2.1 FLOOR PLAN <br />A3.0 PRODUCT APPROVAL <br />A3.1 PRODUCT APPROVAL <br />PRODUCT APPROVAL SEE A3.0 AND A3.11 FOR DETAILS <br />PRODUCT CATEGORY <br />SUB CATEGORY <br />MANUFACTURE <br />STATE OF FLORIDA <br />EXPIRATION <br />APPORVAL NUMBER <br />NUMBER <br />ROOFING <br />METAL ROOFING <br />ELITE ALUMINUM <br />FL15OO-R1 <br />01/11/07 <br />CORPORATION <br />5.05' 5.05' 52.87' <br />NEW HORIZONON BLVD, <br />LEGAL DESCRIPTION <br />LOTS 50 AND 51, GRAND HORIZONS PHASE ONE, AS PER PLAT <br />THEREOF RECORDED IN PLAT BOOK 34, PAGES 99-102, PUBLIC <br />RECORDS OF PASCO COUNTY, FLORIDA <br />PARCEL #34-25-21-0090-00000-0500 AND <br />34-25-21-0090-00000-0510 <br />10.57' <br />SUBJECT TO RESTRICTIONS FILED IN OFFICIAL RECORD BOOK 3753, <br />FIT <br />J <br />H <br />G <br />E <br />Ic <br />Chris <br />A/ <br />V rren <br />DRAFTING <br />6226 GREENLEAF <br />TAMPA, FLORIDA 33617 <br />PHONE 813.362.7415 <br />IERRA <br />RESIDENTIAL <br />CONSTRUCTION <br />PAUL J. SIERRA CONSTRUCTION, INC. <br />912 W. MARTIN LUTHER KING BLVD. <br />TAMPA, FLORIDA 33603 <br />PHONE (813) 228-6661 <br />FAX (813) 223-5328 <br />REVIEW DATE <br />Y�_Hll_ <br />GITYOF ZEFIH' LL§ <br />t_-)XAI`v",INER <br />AI_T_'�, ORK SHALL CON �pi Y WTT�l ALL, <br />'-'REVAILVING CODFS, FLORIDA BUILD!`- <br />0 IC CODE A�'__� <br />zDE, NATIONAL rLLLCTR <br />0F,7E-?11yR11,ILLc O1PD1'NNNCES <br />> <br />J <br />z <br />00 .4t <br />0 <br />LO <br />UJ co <br />(J 0 co <br />Z N j <br />0 UJ W U- <br />z Q 0 <br />U) <br />UJ _J <br />W _J <br />UJ DRAWN BY: <br />0 Z Z CW <br />>_ <br />DATE: <br />11/07/07 <br />UJ LO <br />�. LU U-) <br />W REVISED: <br />Cn N <br />Al m0 <br />(4 <br />19 18 17 <br />16 15 14 <br />13 12 11 <br />10 9 <br />1001 <br />7 <br />5 <br />Ell <br />3 <br />2 <br />CONSTRUCTION DOCUMENTS <br />