PLUMBING SPECIFICATIONS
<br />SCOPE: THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS BEFORE SUBMITTING A PROPOSAL. ALL WORK SHALL BE IN ACCORDANCE
<br />WITH THE FLORIDA BUILDING CODES SEVENTH EDITION (2020), WITH AMENDMENTS, AND LOCAL CODES AND ORDINANCES. INSTALLATION SHALL COMPLY WITH THE CODE
<br />REFERENCED STANDARDS SET BY NFPA, ASHRAE, ASPE, SMACNA, NEC AND UL. THE SYSTEMS, EQUIPMENT, DEVICES AND ACCESSORIES SHALL BE INSTALLED, FINISHED,
<br />TESTED AND ADJUSTED FOR CONTINUOUS AND PROPER OPERATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS WORK FITTING IN PLACE AND SHALL COORDINATE
<br />WITH OTHER TRADES TO AVOID INTERFERENCE WITH THEIR WORK. THE INFORMATION GIVEN HEREIN AND ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED, BUT ITS
<br />EXTREME ACCURACY IS NOT GUARANTEED. THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO SHOW GENERAL ARRANGEMENT, CAPACITY AND LOCATION OF VARIOUS
<br />COMPONENTS, EQUIPMENTS, AND DEVICES. IF WORK IS REQUIRED IN A MANNER TO MAKE IT IMPOSSIBLE TO PRODUCE FIRST CLASS WORK, OR SHOULD DISCREPANCIES
<br />APPEAR AMOUNG THE CONTRACT DOCUMENTS, OR BETWEEN THE CONTRACT DOCUMENTS AND THE MANUFACTURER'S RECOMMENDATIONS,THE CONTRACTOR SHALL REQUEST
<br />INTERPRETATION BEFORE PROCEDING WITH WORK. CONTRACTOR SHALL FURNISH AND INSTALL ALL MINOR ITEMS WHICH ARE OBVIOUSLY AND REASONABLY NECESSARY TO
<br />COMPLETE THE INSTALLATION WHETHER OR NOT SPECIFIED IN THE DOCUMENTS.
<br />REQUIRED COORDINATION: ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS AND PIPING (INCLUDING DIVIDED DUCTS) AND TRANSITIONS
<br />AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
<br />CONSTRUCTION PLANS: IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED.
<br />REQUIRED ACCESS: CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT AND DEVICES THAT REQUIRE REPLACEMENT, SERVICING, ADJUSTING OR MAINTENANCE SHALL BE
<br />LOCATED TO ALLOW EASY ACCESS AND SPACE FOR REMOVAL OF INTERNAL ASSMBLIES, IF REQUIRED. CONTRACTOR SHALL PROVIDE ACCESS PANELS WHERE REQUIRED TO
<br />ALLOW ACCESS, EVEN IF NOT INDICATED ON THE DRAWINGS AT NO ADDITIONAL COST TO OWNER.
<br />WIND RESISTANCE: ALL EQUIPMENT, APPLIANCE AND SUPPORTS LOCATED EXTERIOR OF THE FACILITY SHALL BE INSTALLED TO RESIST WIND LOADS AS DETAILED IN THE
<br />BUILDING CODE.
<br />CUTTING AND PATCHING: ALL OPENINGS AROUND DUCT OR PIPE PENETRATIONS THROUGH SMOKE OR FIRE RATED FLOORS, CEILINGS OR WALLS SHALL BE SEALED AIRTIGHT
<br />WITH MATERIALS HAVING A RATING EQUAL TO THE MATERIAL OF THE WALL, CEILING OR FLOOR PENETRATED.
<br />EQUIPMENT TAGS: ALL EQUIPMENT WILL HAVE A PERMANENTLY FIXED TAG CORRESPONDING TO THE EQUIPMENT TAG ON THE ENGINEER'S DRAWINGS.
<br />FIRESTOPPING: UL APPROVED MATERIALS AND METHODS SHALL PROTECT THE PENETRATIONS OF FIRE AND/OR SMOKE RATED WALLS, CEILINGS OR FLOORS. THE RATING OF
<br />THE FIRESTOPPING SHALL EQUAL THE RATING OF THE RATED ASSEMBLY. ALL INSULATION SHALL HAVE COMPOSITE FIRE AND SMOKE HAZARD RATINGS AS TESTED BY
<br />PROCEDURE ASTM E-84, NFPA-225, UL-723 NOT EXCEEDING:
<br />FLAME SPREAD 25
<br />SMOKE DEVELOPED 50
<br />FUEL DISTRIBUTED 50
<br />ACCESSORIES SUCH AS ADHESIVE, MASTIC, CEMENTS AND TAPES SHALL HAVE THE SAME COMPONENT RATING AS LISTED ABOVE.
<br />SERVICE AND PERMITS: CONTRACTOR SHALL MAKE ALL ARRANGEMENTS WITH UTILITY COMPANIES FOR SERVICE AND CONNECTIONS AND SHALL PAY FOR PERMITS.
<br />SHOP DRAWINGS: EACH TRADE SHALL PREPARE AND SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH PROCEDURES OUTLINED IN DIVISION 1. RESPONSIBILITY FOR ERRORS OR
<br />OMISSIONS IN THE SUBMITTALS SHALL NOT BE RELIEVED BY THE ARCHITECT'S OR ENGINEER'S REVIEW. ENGINEER'S PROCESSING WILL NOT CONSTITUTE A COMPLETE CHECK
<br />BUT WILL INDICATE ONLY THAT A GENERAL METHOD OF CONSTRUCTION AND DETAILING IS SATISFACTORY. AT A MINIMUM SUBMITTALS SHALL INCLUDE FIXTURES, VALVES,
<br />PIPING, INSULATION AND ACCESSORIES.
<br />START-UP: CONTRACTOR SHALL STARTUP ALL EQUIPMENT AND FOLLOW THE MANUFACTURER'S START-UP PROCEDURES.
<br />OPERATING AND MAINTENANCE DATA: SUBMIT THREE COPIES OF MANUFACTURER'S OPERATING AND MAINTENANCE INSTRUCTIONS AND SPARE PARTS LIST FOR EACH PIECE OF
<br />EQUIPMENT.
<br />SUPPLEMENTARY SUPPORTS: CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL EQUIPMENT AND MATERIALS, IN ORDER TO
<br />PROVIDE A "VIBRATION- FREE" RIGID INSTALLATION.
<br />DIELECTRIC UNIONS: PROVIDE DIELECTRIC UNIONS OR FLANGES AT CONNECTIONS OR CONTACT BETWEEN PIPES OF DISSIMILAR METALS.
<br />MEDICAL GAS Z VACUUM PIPING: COMPRESSED AIR PIPING SHALL BE OIL -FREE TYPE-L COPPER IN ACCORDANCE WITH ASTM-B75 / ASTM-B819, AND IN ACCORDANCE WITH
<br />NFPA-99 (2015 ED.). COMPRESSED AIR PIPING SHALL BE WRAPPED WITH SHURTAPE BRAND TAPE WHERE IN CONTACT WITH SOIL. VACUUM PIPING SHALL BE SCHEDULE
<br />40-PVC WITH SOLVENT FITTINGS.
<br />WATER PIPING: WATER PIPING SHALL BE CPVC TUBING. TUBING, FITTINGS AND CEMENT SHALL MEET ASTM D-2846, 100 PSI 0 180*17 CONTINUOUS RATING. CPVC TUBING
<br />AND FITTINGS SHALL MEET 25/50 FLAME SPREAD/SMOKE DEVELOPED REQUIREMENTS FOR PLENUMS. CONTRACTOR SHALL INSTALL CPVC IN ACCORDANCE WITH
<br />MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL PROVIDE FOR EXPANSION AND CONTRACTION OF TUBING. TUBING SHALL BE SLEEVED AT PENETRATION OF CONCRETE
<br />SLABS OR WALLS. CPVC TUBING SHALL BE BFGOODRICH FLOWGUARD GOLD OR APPROVED EQUAL. INSTALL PIPE SUPPORTS AT 3-FOOT INTERVALS FOR SIZES 1" OR
<br />SMALLER; INSTALL PIPE SUPPORTS AT 4-FOOT INTERVALS FOR 1-1/4" AND LARGER.
<br />WATER HAMMER ARRESTORS: INSTALL WATER HAMMER ARRESTERS AT EACH HOT AND COLD FIXTURE SUPPLY.
<br />EXPOSED PIPING: EXPOSED PIPING SHALL BE POLISHED CHROMIUM ON EITHER BRASS OR BRONZE. PROVIDE ADA INSULATED WATER AND WASTE LINE COVERINGS FOR WALL
<br />HUNG SINKS AND LAVATORIES.
<br />VALVES: ALL VALVES SHALL HAVE A MINIMUM OF 125 PSIG WORKING PRESSURE. VALVES AND COCKS MAY NOT BE INDICATED IN EVERY INSTANCE ON THE DRAWINGS, BUT
<br />WHETHER OR NOT SHOWN, ALL VALVES, COCKS AND CHECK VALVES NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM SHALL BE FURNISHED AND INSTALLED.
<br />INSTALL ISOLATION/SHUT-OFF VALVES AT ALL MAIN RISERS, AND MAIN BRANCH TAKEOFFS. INSTALL ISOLATION/SHUT-OFF VALVES ON EACH INLET AND OUTLET OF EACH
<br />PIECE OF EQUIPMENT. PROVIDE A FLANGE OR UNION BETWEEN THE VALVE AND THE EQUIPMENT TO PERMIT DISCONNECTION, REMOVAL AND SERVICE.
<br />STERILIZATION OF DOMESTIC WATER SYSTEM: THE ENTIRE DOMESTIC WATER DISTRIBUTION SYSTEM SHALL BE THOROUGHLY STERILIZED AS REQUIRED BY THE HEALTH
<br />AUTHORITY OR WATER PURVEYOR HAVING JURISDICTION, OR IN THE ABSENCE OF A PRESCRIBED METHOD, THE PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652,
<br />OR AS DESCRIBED IN SECTION 610 FBC-P.
<br />VENTING: THE STACKS SHALL BE EXTENDED THROUGH ROOF OF BUILDING TO POINTS NOT LESS THAN 12" ABOVE ROOF. VENTS SHALL BE OFFSET AS REQUIRED TO
<br />PENETRATE ROOFS AT LEAST 3 FEET FROM THE RIDGE OR EDGE OF BUILDING AND 10 FEET FROM ANY FRESH AIR INTAKE OR OPERABLE WINDOW OR DOOR.
<br />SANITARY,
<br />WASTE, AND VENT PIPING:
<br />ALL BURIED AND UNBURIED
<br />PIPING AND FITTINGS SHALL BE SCHEDULE 40 PVC-DWV. (SOLID CORE) SLOPE OF SANITARY OR DRAINAGE
<br />PIPING 2-1/2"
<br />AND SMALLER SHALL
<br />BE A MINIMUM OF 1/4" PER
<br />FOOT; PIPING 3" AND LARGER SHALL BE SLOPED A MINIMUM OF 1/8" PER FOOT. CLEANOUTS WILL BE
<br />LOCATED
<br />NOT MORE THAN 100 FEET
<br />APART AND AT EACH CHANGE
<br />OF DIRECTION GREATER THAN 45* ALONG THE HORIZONTAL DRAIN. CLEANOUTS SHALL BE INSTALLED AT
<br />BASE OF
<br />EACH STACK. CONCEALED
<br />CLEANOUTS SHALL HAVE CAST
<br />BRASS CHROMIUM PLATED FLAT ACCESS COVER PLATE.
<br />FLOOR DRAINS/SINKS: FLOOR DRAINS SHALL BE CAST IRON AND ADJUSTABLE TO ACCOMMODATE THE FINISHED FLOOR. FLOOR SINKS SHALL HAVE AN ACID -RESISTANT
<br />ENAMELED INTERIOR. STRAINERS SHALL BE PROVIDED WITH BARRIER -TYPE TRAP SEAL PROTECTION (ASSE 1072) AND FLASHING FLANGE OR CLAMP, UNLESS OTHERWISE
<br />INDICATED.
<br />DOMESTIC WATER HEATERS (ELECTRIC): WATER HEATER SHALL BE CERTIFIED BY THE NATIONAL SANITATION FOUNDATION & UL-LISTED. UNITS SHALL BE EQUIPPED WITH
<br />CODE -APPROVED TEMPERATURE AND PRESSURE RELIEF VALVES. TANKS SHALL BE GLASS -LINED AND SHALL HAVE MANUFACTURIER'S STANDARD FIVE-YEAR WARRANTY.
<br />PLUMBING FIXTURES AND TRIM: PLUMBING FIXTURES SHALL BE FURNISHED AND INSTALLED IN A NEAT AND WORKMANLIKE MANNER WITH PROPER CONNECTIONS TO SUPPLY
<br />AND DRAINAGE PIPING. ALL FIXTURES SHALL BE FREE OF FLAWS AND DEFECTS OF ANY SORT IN MATERIAL AND WORKMANSHIP AND SHALL OPERATE PERFECTLY WHEN
<br />INSTALLED IN ACCORDANCE WITH MANUFACTURER'S DIRECTIONS. CONTRACTOR SHALL PROVIDE ROUGH -IN, AND SHALL CONNECT ALL FIXTURES TO THE PLUMBING SYSTEMS.
<br />ALL FIXTURES TO BE PROVIDED WITH CHROME -PLATED SUPPLIES AND STOPS. PROVIDE 17 GAUGE CHROME -PLATED BRASS TRAPS FOR ALL FIXTURES WITHOUT INTEGRAL
<br />TRAPS. PROVIDE CONCEALED ARM CARRIERS AND SUPPORTS FOR ALL FIXTURES REQUIRING SAME.
<br />PIPE INSULATION: INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. SEAL
<br />ALL JOINTS, BREAKS, TEARS AND PENETRATIONS WITH FIRE RETARDENT, VAPOR BARRIER MASTIC. COVER VALVES, FITTINGS AND SIMILAR ITEMS IN EACH PIPING SYSTEMS.
<br />INSULATE ALL DOMESTIC HOT WATER AND INTERIOR STORM PIPE WITH 1" THICK FIBERGLASS SECTIONAL PIPE COVERING WITH CANVAS JACKET OR ARMAFLEX AP (ASTM E-84).
<br />PIPE INSULATION: INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. SEAL
<br />ALL JOINTS, BREAKS, TEARS AND PENETRATIONS WITH FIRE RETARDENT, VAPOR BARRIER MASTIC. COVER VALVES, FITTINGS AND SIMILAR ITEMS IN EACH PIPING SYSTEMS.
<br />INSULATE ALL DOMESTIC HOT WATER AND ALL PIPING EXPOSED IN RESIDENCE UTILITY ROOMS WITH 1" THICK PLENUM RATED ARMAFLEX AP SECTIONAL PIPE COVERING (ASTM
<br />E-84).
<br />TESTING: TEST ALL WASTE AND VENT PIPING FOR A PERIOD OF NOT LESS THAN 8 HOURS BY CAPPING OR PLUGGING. ALL JOINTS TO A LEVEL OF THE HIGHEST FIXTURE OR
<br />FITTINGS. FILLING THE SYSTEM WITH WATER, AND OBSERVING FOR LEAKS. TEST WATER PIPING AT 100 PSIG FOR A PERIOD OF 8 HOURS, OBSERVING FOR ANY VISIBLE
<br />LEAKS. TEST PIPING AGAIN WITH FIXTURES INSTALLED. REPAIR ANY LEAKS FOUND BY REMAKING JOINT. DO NOT USE CAULKING OR SIMILAR METHODS TO CORRECT LEAKS.
<br />UPON REPAIRING ANY LEAKS FOUND. AGAIN TEST THAT PORTION OF THE SYSTEM AS DESCRIBED ABOVE.
<br />EQUIPMENT FURNISHED BY OTHERS: WHERE SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL MAKE ALL PIPING CONNECTIONS TO EQUIPMENT FURNISHED BY OTHERS.
<br />THIS WORK SHALL INCLUDE FURNISHING AND INSTALLATION OF ALL WATER AND DRAIN PIPING. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH RECOMMENDATIONS OF
<br />EQUIPMENT MANUFACTURER.
<br />GUARANTEE: THE ONE-YEAR GUARANTEE PERIOD SHALL NOT START UNTIL THE PROJECT IS FULLY COMPLETED AND THE CONTRACTOR HAS RECEIVED THE FINAL PAYMENT AND
<br />CERTIFICATION OF COMPLETION. ALL EQUIPMENT AND ALL WORK SHALL BE FULLY GUARANTEED, PARTS AND LABOR, FOR ONE YEAR FROM THE DATE OF THE CERTIFICATE OF
<br />COMPLETION. REPAIRS MADE DURING THIS PEROID MUST BE FULLY GUARANTEED FOR AN ADDITIONAL ONE YEAR PERIOD FROM THE DATE OF REPAIRS. IN ADDITION, THE
<br />CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING, AND ITS CONTENTS OR OTHER EQUIPMENT, CAUSED BY DEFECTS OR IMPROPER
<br />INSTALLATION OF EQUIPMENT OR MATERIAL INSTALLED.
<br />SUBSTITUTIONS: CONTRACTOR SHALL PAY FOR ANY AND ALL ADDED COSTS ASSOCIATED WITH ANY SUBSTITUTION, INCLUDING SUBSTITUTIONS THAT REQUIRE CHANGES TO THE
<br />OTHER BUILDING COMPONENTS, SUCH AS ELECTRICAL, STRUCTURAL REINFORCING, CEILINGS, WALLS, ROOFS, ETC. THIS WILL INCLUDE ANY ENGINEERING/ARCHITECTURAL
<br />RE -DESIGN COSTS AS A RESULT OF SAID SUBSTITUTION. THESE COSTS SHALL NOT BE BORNE BY THE OWNER, ARCHITECT, NOR ENGINEER, REGARDLESS OF ACCEPTABILITY
<br />OF SUBSTITUTION. ENGINEER RESERVES THE RIGHT TO ACCEPT OR DENY ANY SUBSTITUTION THAT HE DOES NOT DEEM TO BE EQUIVALENT, AND CONTRACTOR SHALL
<br />PROVIDE SPECIFIED OR EQUIVALENT MATERIALS/EQUIPMENT AT NO ADDITIONAL COST TO OWNER, SHOULD A SUBSTITUTION BE DENIED.
<br />FIXTURE & CONNECTION SCHEDULE
<br />BRANCH SIZE
<br />I
<br />FIXTURE
<br />TAG
<br />MANUFACTURER/MODEL
<br />REMARKS
<br />DRAINAGE
<br />WATE
<br />WASTE
<br />VENT
<br />COLD
<br />HOT
<br />WATER CLOSET
<br />WC-11
<br />3"
<br />2"
<br />1/2"
<br />AMERICAN STANDARD CADET #2467.016
<br />PRESSURE -ASSISTED TANK, VITREOUS CHINA, ELONGATED BOWL, SIPHON JET, FLOOR
<br />(HANDICAPPED)
<br />SEAT: BEMIS # 1655SSCT
<br />MOUNTED. FLUSH HANDLE ON WIDE SIDE OF STALL. 16-1/2" BOWL RIM HEIGHT, &
<br />FULLY GLAZED 2-1/8" TRAPWAY. SOLID WHITE PLASTIC SEAT WITH OPEN FRONT &
<br />SELF-SUSTAINING CHECK HINGES. ALSO, PROVIDE 3/8" SUPPLY AND STOP, CLOSET
<br />FLANGE, WAX SEAL RING, NUTS, BOLTS AND WASHERS AS REQUIRED.
<br />LAVATORY
<br />LAV- 1
<br />2"
<br />2"
<br />1/2"
<br />1/2"
<br />AMERICAN STANDARD LUCERNE #0355.012
<br />LAVATORY: 20"x`18", VITREOUS CHINA, WITH FAUCET LEDGE AND INTEGRAL
<br />(ADA)
<br />DELTA SINGLE LEVER FAUCET #523LF-HGMHDF
<br />OVERFLOW. PROVIDE ARM CHAIR FLOOR CARRIER. SINGLE LEVER FAUCET
<br />WITH 4" CENTERS, O.5-GPM AERATOR, & GRID DRAIN ASSEMBLY. PROVIDE
<br />MIXING VALVE: LAWLER # TMM-1070
<br />ASSE 1070 LISTED MIXING VALVE SET TO 109*F, TAILPIECE, P-TRAP, SUPPLY
<br />CARRIER: ZURN #Z1231
<br />& STOPS. INSULATE EXPOSED PIPING WITH TRUEBRO LAV GUARD KIT.
<br />DRINKING FOUNTAIN
<br />EWC-1
<br />2"
<br />2
<br />1/2"
<br />--
<br />ELKAY # EZSTL8C
<br />DRINKING FOUNTAIN: ELECTRIC WATER COOLER, 2-STATION,
<br />(HI-LO = ADA)
<br />CARRIER: ZURN #Z1225
<br />STAINLESS STEEL BASINS, WITH MANIFOLD WATER/SANITARY CONNECTIONS,
<br />FLOOR CARRIER. 120-V/1-PH. DISCONNECT BY ELECTRICIAN
<br />MOP SINK
<br />MS-1
<br />2"
<br />2"
<br />1/2"
<br />1/2"
<br />FIAT # MSB 2424
<br />MOP SINK: MOLDED PLASTIC, 10" LIP EDGE, 2" DRAIN & BASKET STRAINER.
<br />ACCESSORIES: FIAT #830AA, 832AA & 889CC
<br />PROVIDE WALL MOUNTED FAUCET WITH BRACKET ARM & PAIL HOOK, MOP
<br />HANGER, HOSE AND HOSE BRACKET.
<br />RECIRC PUMP
<br />RP-1
<br />1/2"
<br />TACO 003
<br />HOT WATER RECIRCULATION PUMP. 115 V, 0.43 AMP, 1/40 HP, 1/2" CONNECTIONS,
<br />5 FT HEAD. PROVIDE BALANCE VALVE, AQUASTAT & 7-DAY PROGRAMMABLE TIMER.
<br />ICE BOX
<br />IB-1
<br />--
<br />1/2"
<br />--
<br />GUY GRAY # BIM875
<br />ICE MAKER BOX: GALVANIZED STEEL, 18 GA. FACEPLATE, 1/4-TURN STOP,
<br />COMBINATION MIP OR SWEAT CONNECTION. PROVIDE WATER HAMMER ARRESTOR.
<br />PROVIDE ASSE 1022 CHECK VALVE AFTER STOP FOR VISUAL INDICATION FOR FAILURE.
<br />EXAM SINK
<br />ES-1
<br />2"
<br />2"
<br />1/2"
<br />1/2"
<br />DAYTON # D11515
<br />COUNTERTOP MOUNT, 12"XlO"X5"BOWL, STAINLESS STEEL. PROVIDE STOPS,
<br />ZURN # Z812B4-3F
<br />SUPPLIES, TRAP, ETC., TO MAKE A COMPLETE INSTALLATION.
<br />FAUCET: DUAL WRIST BLADE HANDLES, DECK MOUNT GOOSENECK FAUCET WITH
<br />GRID STRAINER, & 0.5GPM AERATOR.
<br />HAND SINK
<br />S-1
<br />2-
<br />2"
<br />1/2"
<br />1/2"
<br />JUST MFG # WHL-14-S
<br />WALL MOUNT, ROUND BOWL, STAINLESS STEEL. PROVIDE STOPS, SUPPLIES, TRAP,
<br />ETC., TO MAKE A COMPLETE INSTALLATION.
<br />FAUCET: SENSOR OPERATED, 120-VOLT WALL PLUG.
<br />SINK
<br />LS-1
<br />2"
<br />2"
<br />1/2"
<br />1/2"
<br />DAYTON ELITE # D12521
<br />COUNTER MOUNT, 1-COMPARTMENT STAINLESS STEEL SINK, COATED UNDERSIDE
<br />FAUCET: ZURN #Z812C4-3F
<br />SELF -RIMMING, 6" DEEP, 2" DRAIN & BASKET STRAINER, WITH FAUCET HOLES ON
<br />GUARDIAN # G1200 EYEWASH
<br />4 IN. CENTERS. FAUCET: GOOSENECK FAUCET WITH 4" WRIST BLADES HANDLES.
<br />PROVIDE STOPS, SUPPLIES, TRAP, ETC., TO MAKE A COMPLETE INSTALLATION.
<br />MIXING VALVE: LAWLER # 911E/F
<br />PROVIDE UNDER COUNTER ASSE 1071 MIXING VALVE SET TO 95*F. PROVIDE
<br />FAUCET MOUNTED EYEWASH WITH SINGLE MOTION CONTROL.
<br />BREAK SINK
<br />BS-1
<br />2"
<br />2"
<br />1/2"
<br />1/2"
<br />DAYTON ELITE # D12521
<br />SINK: 25"X21"; 1-COMPARTMENT STAINLESS STEEL, COATED UNDERSIDE
<br />FAUCET: ZURN # Z87lC4-XL
<br />SELF -RIMMING, 2" DRAIN & BASKET STRAINER, WITH TWO FAUCET HOLE.
<br />8"GOOSENECK FAUCET, 4;;WRISTBLADE HANDLE. PROVIDE STOPS, SUPPLIES, TRAP,
<br />ETC., TO MAKE A COMPLETE INSTALLATION.
<br />FLOOR DRAIN
<br />FD-1
<br />3'
<br />2"
<br />�7 '7 -7 77 v � 7, 7 T, 77 v
<br />ZURN # Z415E
<br />6URA-COATED CAST IRON-66DY, '6"D'lAa�rER'13_R6`NZ_E -AD-JU-STA-BL-E-ST-RAI-NE-R-WI-TH�
<br />ZURN # Z1072
<br />FUNNEL. PROVIDE 4" DEEP TRAP AND TRAP GUARD (ASSE 1072 CERTIFIED).
<br />WALL CLEANOUT
<br />WCO
<br />SEE
<br />ZURN 0 Z1468
<br />WALL CLEANOUT - ROUND STAINLESS STEEL WALL ACCESS COVER
<br />PLANI
<br />WITH SECURING SCREW AND BRONZE RAISED HEX HEAD PLUG.
<br />I
<br />PLUMBING LEGEND
<br />DESCRIPTION
<br />ABBREV.
<br />SYMBOL
<br />SANITARY PIPING
<br />SAN
<br />VENT PIPING
<br />V
<br />------------------
<br />DOMESTIC COLD WATER
<br />CW
<br />DOMESTIC HOT WATER
<br />HW
<br />COMPRESSED AIR PIPING
<br />CA
<br />---CA-----
<br />VACUUM PIPING
<br />VAC
<br />----VAC-----
<br />FILTERED WATER PIPING
<br />FW
<br />— - -FW-
<br />NITROUS PIPING
<br />N
<br />_N
<br />OXYGEN PIPING
<br />Ox
<br />Ox
<br />BALL/ISOLATION VALVE
<br />BV
<br />__d)l_
<br />DUAL -CHECK BACKFLOW
<br />N
<br />PREVENTER
<br />GRADE CLEAN OUT
<br />COTG
<br />COTG
<br />WALL CLEAN OUT
<br />WCO
<br />Wco 1! 0
<br />FLOOR CLEAN OUT
<br />FCO
<br />FCO 0—
<br />PIPE TURNING UP
<br />0— -
<br />PIPE TURNING DOWN
<br />C
<br />CAPPED PIPING
<br />Er— - —
<br />TYPICAL ITEM
<br />TYP
<br />CONNECTION BETWEEN
<br />NEW & EXISTING
<br />EXISTING
<br />(E)
<br />NEW
<br />(N)
<br />I BALANCE VALVE
<br />BV
<br />NOTE ON EXISTING UTILITIES:
<br />CONTRACTOR SHALL FIELD VERIFY LOCATIONS & INVERTS
<br />OF ALL EXISTING UTILITY MAINS INSIDE BUILDING (I.E.
<br />SEWER, GAS, DOMESTIC WATER, ETC.) PRIOR TO ANY
<br />DEMOLITION OR CONSTRUCTION. ADVISE ENGINEER OF
<br />ANY DISCREPANCIES BEFORE PROCEEDING ANY FURTHER.
<br />** CCTV VIDEO CAMERA INVESTIGATION REQUIRED BY PLUMBER
<br />(PRIOR TO ANY WORK) TO VERIFY INVERT ADEQUATE AT MOST
<br />REMOTE AREA OF NEW SANITARY UNDERGROUND CONNECTION.
<br />NOTIFY ENGINEER OF RESULTS OF CAMERA WORK.
<br />IALL ROOF DRAINAGE IS EXISTING TO REMAIN. I
<br />NOTE TO CONTRACTOR
<br />ON EXISTING CONDITIONS:
<br />CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID AND
<br />SURVEY ALL EXISTING CONDITIONS AND EQUIPMENT
<br />PRIOR TO SUBMITTING BID FOR WORK REQUIRED BY
<br />THESE DOCUMENTS. THIS INCLUDES ABOVE THE
<br />CEILING AND ON TOP OF THE ROOF.
<br />2. CONTRACTOR SHALL REFER TO AND READ THROUGH
<br />ALL OF THE "CONTRACTOR'S SCOPE OF WORK" AS
<br />DEFINED IN THE BID SPECIFICATIONS AND DOCUMENTS
<br />AS PART OF THE BID PROCESS.
<br />3. IF AT ANY TIME,- THERE IS DISCREPANCY BETWEEN THE
<br />PLANS & SPECS, OR CONFUSION /CONCERN OVER
<br />REQUIRED WORK, CONTRACTOR SHALL IMMEDIATELY
<br />NOTIFY ARCHITECT, ENGINEER, &/OR OWNER AND GET
<br />DIRECTION BEFORE PROCEEDING WITH WORK IN
<br />QUESTION.
<br />4. FOR ALL NEW ROOF PENETRATIONS, CONTRACTOR
<br />SHALL INCLUDE IN HIS BID THE COST TO HIRE THE
<br />ROOFING FIRM HOLDING THE WARRANTY TO PROVIDE
<br />ROOF PENETRATIONS.
<br />5. FOR ALL EXISTING EQUIPMENT TO BE RE -LOCATED
<br />&/OR RE -USED, CONTRACTOR SHALL BE RESPONSIBLE
<br />FOR DISCONNECTION, SAFE STORAGE, &
<br />RE -CONNECTION OF SAID EQUIPMENT COMPLETELY.
<br />6. FOR ALL EXISTING EQUIPMENT TO BE DEMOLISHED (I.E.
<br />DEMO) CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />DISCONNECTION, REMOVAL, & DISPOSAL OFF -SITE PER
<br />CODE, OF SAID EQUIPMENT COMPLETELY.
<br />STEPANEK-L
<br />ANDASSOCIATES
<br />k9r,-7 TWrl Vr OAKS WAY, SUITE 103
<br />WESLEY CHAPEL, FL 33544
<br />PH (813) 991-1248
<br />REGISTRY # 8397 21-143
<br />6
<br />c:
<br />(0
<br />Q) 00
<br />Z M_j
<br />Z C. LL
<br />E
<br />co C.0
<br />�_ (0
<br />c,
<br />00 0
<br />CO
<br />0)
<br />0
<br />Job Number
<br />�_-\N D
<br />No 56189
<br />STATE A
<br />R
<br />ON A
<br />I, I I I I i
<br />[a
<br />MATTHEW D. LEWIS, P.E. FL LIC#56189
<br />
|