rn
<br />LLj
<br />t=
<br />20
<br />pu
<br />5
<br />z
<br />:D
<br />V)
<br />Z 0
<br />a Z
<br />z M
<br />Lj I=
<br />U) 0
<br />0
<br />IL
<br />w
<br />0- V)
<br />z
<br />0
<br />:3
<br />uo_ I L
<br />0 0
<br />a z
<br />uj Z
<br />0
<br />0
<br />Lu Q
<br />gs
<br />LLJ M
<br />F-
<br />L!
<br />00
<br />V)
<br />=ul
<br />UJI
<br />On
<br />oz 9
<br />uj
<br />t x
<br />:3 w
<br />ou
<br />R 9
<br />a- <
<br />w
<br />Ld
<br />w M
<br />W V)
<br />L� z
<br />00
<br />CL
<br />V)
<br />112 w
<br />z Ir
<br />W
<br />2
<br />5 ;e
<br />z
<br />w
<br />w
<br />_j
<br />w
<br />I
<br />_j
<br />_j
<br />LLj V)
<br />(10 w
<br />z 0
<br />w
<br />C.)
<br />x
<br />W
<br />>-,
<br />0 En
<br />0
<br />Lu
<br />V)
<br />:3 LLI
<br />_j 0
<br />Q 0
<br />6 C.)
<br />z
<br />W Li
<br />= M
<br />F-
<br />w
<br />w
<br />iE o
<br />Lu Q
<br />o
<br />z
<br />09
<br />0
<br />ZQ
<br />Lj M
<br />M _j
<br />66
<br />L) 0,
<br />z
<br />w
<br />M 0�
<br />0
<br />00
<br />z
<br />z
<br />w 0
<br />W N
<br />0-
<br />0 >-
<br />M Z
<br />(L <
<br />Ld W
<br />L)
<br />z
<br />Uj M
<br />(L
<br />M
<br />0
<br />0
<br />w
<br />L) Cr
<br />� Le
<br />U)
<br />L.
<br />0
<br />La Z
<br />M w
<br />Lu
<br />w
<br />Ld
<br />= Ld
<br />F-
<br />w
<br />LL
<br />0
<br />0 z
<br />8w
<br />2
<br />M
<br />w
<br />U Li
<br />2 F
<br />0
<br />LLJ
<br />0 Lj
<br />z
<br />c)
<br />Lj
<br />Z cr
<br />LL; 6
<br />Z
<br />V)
<br />LLJ LLI
<br />(f) 0
<br />0
<br />80
<br />L)
<br />f2 z
<br />LLJ
<br />z M
<br />LLI
<br />M ci
<br />x => Ig
<br />�i Ln
<br />LLI IL
<br />o
<br />V)
<br />0
<br />u) (L
<br />z
<br />0
<br />CL
<br />V)
<br />ui z
<br />0 <
<br />z z
<br />0
<br />z 150
<br />5 z.
<br />(L
<br />GENERAL NOTES
<br />PR03ECT NAME
<br />& LOCATION
<br />GENERAL CONDITIONS
<br />1 ,
<br />ALL DIMENSIONS AND FIELD CONDITIONS WILL BE VERIFIED BY THE GENERAL CONTRACTOR.
<br />1. SUMMARY OF WORK
<br />THE ACCURACY OF THE FIELD MEASUREMENTS IS THE RESPONSIBILITY OF THE GENERAL
<br />CONTRACTOR.
<br />DIVISION OF RESPONSIBILITIES TERMINOLOGY:
<br />2.
<br />THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS WILL COMPLY WITH ALL FEDERAL,
<br />"CONTRACTOR": WHERE REFERENCED ON THE DRAWINGS, THE TERM "CONTRACTOR
<br />STATE, AND LOCAL LAWS AND ORDINANCES PERTAINING TO THE CONSTRUCTION OF THIS
<br />REFERS TO THE PERSON OR ENTITY RESPONSIBLE FOR PROVIDING ALL CONSTRUCTION
<br />DENTAL OFFICE.
<br />WORK.
<br />3.
<br />MILLWORK SHALL BE DESIGNED BY THE MILLWORK SUPPLIER AND/OR DENTAL CABINETRY
<br />CONSTRUCTION DRAWINGS:
<br />SUPPLIER EXCEPT AS NOTED.
<br />* CONSTRUCTION DRAWINGS SHALL NOT BE SCALED IN ORDER TO DETERMINE LOCATIONS
<br />4.
<br />BENCO SUGGESTS COMPLIANCE WITH CDC/OSHA RECOMMENDATIONS AGAINST INSTALLING
<br />OF ITEMS OF CONSTRUCTION. LARGER SCALE DETAILS TAKE PRECEDENCE OVER
<br />CARPETING IN TREATMENT ROOMS.
<br />SMALLER SCALE DETAILS. DIMENSIONED DETAILS TAKE PRECEDENCE OVER
<br />NON —DIMENSIONED DETAILS.
<br />5.
<br />ALL HAZARDS, TEMPORARY OR OTHERWISE SHALL BE PROTECTED TO PRESERVE PUBLIC
<br />SAFETY.
<br />- THE WORD "FURNISH" IS USED TO MEAN "SUPPLY" COMPLETE WITH ALL ESSENTIAL
<br />ACCESSORIES SO THAT THE WORK WHEN INSTALLED FUNCTIONS FOR ITS INTENDED
<br />6.
<br />BENCO WILL SUPPLY ALL DETAILED TEMPLATES AND/OR DETAIL MANUFACTURER'S
<br />USE, AND DELIVERY TO THE PROJECT SITE, READY FOR UNLOADING, UNPACKING,
<br />INSTRUCTIONS. SUCH TEMPLATES AND INSTRUCTIONS WILL DEFINE THE LOCATIONS,
<br />ASSEMBLY, INSTALLATION, AND SIMILAR OPERATIONS.
<br />CONNECTIONS, AND SERVICES REQUIRED BY THE DENTAL EQUIPMENT. ERRORS RESULTING
<br />FROM THE FAILURE OF THE GENERAL CONTRACTOR TO FOLLOW THE INSTRUCTIONS
<br />o THE WORD "INSTALL" IS USED TO DESCRIBE OPERATIONS AT THE PROJECT SITE
<br />AND/OR TEMPLATES WILL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
<br />INCLUDING THE UNLOADING, UNPACKING, ASSEMBLY, ERECTION, PLACING, ANCHORING,
<br />APPLYING, WORKING TO DIMENSION, FINISHING, CURING, CONNECTING, PROTECTING,
<br />7.
<br />DIMENSIONS FOR ALL DENTAL EQUIPMENT ARE CRITICAL AND MUST COMPLY WITH THE
<br />CLEANING, AND SIMILAR OPERATIONS NECESSARY FOR THE WORK TO FUNCTION FOR
<br />MANUFACTURER'S SPECIFICATIONS, AS SUPPLIED BY BENCO. BENCO WILL NOT ASSUME
<br />ITS INTENDED USE.
<br />RESPONSIBILITY FOR UNAUTHORIZED VARIATIONS TO THE PLANS AND/OR THE
<br />MANUFACTURER'S SPECIFICATIONS.
<br />Premier Communi ty
<br />o THE WORD "PROVIDE" MEANS "FURNISH AND INSTALL", AS DEFINED ABOVE, COMPLETE
<br />IN —PLACE AND READY FOR INTENDED USE. THE WORD "PROVIDE" THUS REQUIRES
<br />8.
<br />WHERE NEW MATERIALS ARE TO BE APPLIED IN EXISTING AREAS, THE GENERAL
<br />INCLUSION OF ALL ACCESSORIES, ATTACHMENTS, SUPPORTS AND SERVICES NECESSARY
<br />CONTRACTOR WILL REMOVE EXISTING MATERIALS, AS REQUIRED, AND PROPERLY PREPARE
<br />TO COMPLY WITH THIS DEFINITION, WHETHER OR NOT SPECIFICALLY IDENTIFIED OR
<br />AREA TO RECEIVE THE NEW WORK.
<br />DESCRIBED IN THE CONSTRUCTION DOCUMENTS.
<br />9.
<br />THE GENERAL CONTRACTOR WILL INSPECT ALL AREAS OF CONSTRUCTION AFTER
<br />ENVIRONMENTAL ASSESSMENT:
<br />COMPLETION OF THE WORK AND PROVIDE "REPAIR" AND "TOUCH—UP" PAINTING, IN ORDER
<br />H a the re
<br />e
<br />Z p hyrh
<br />e I lis
<br />* REMOVAL OF HAZARDOUS MATERIALS, IF IDENTIFIED BY ANY ENVIRONMENTAL
<br />TO RETURN AREA TO ORIGINAL CONDITION.
<br />ASSESSMENT PERFORMED BY AN ENVIRONMENTAL ENGINEER CONTRACTED BY THE
<br />10.
<br />ALL WORK FOR ALL TRADES WILL BE GUARANTEED FOR A PERIOD OF ONE YEAR MINIMUM
<br />OWNER, SHALL BE COMPLETED BY WAY OF A HAZARDOUS MATERIALS REMOVAL
<br />FROM THE DATE OF ITS ACCEPTANCE.
<br />CONTRACT EXECUTED BY THE OWNER INDEPENDENT FROM AND PRIOR TO THE DATE
<br />OF COMMENCEMENT.
<br />11.
<br />ALL MATERIALS INCORPORATED INTO THE WORK WILL BE NEW, UNLESS OTHERWISE NOTED.
<br />DADE CITY,
<br />FL
<br />2. PERMIT SUBMISSION, REVIEWS, APPROVALS & FEES
<br />INSPECTIONS BY A BENCO REPRESENTATIVE ARE AN INTEGRAL PART OF OFFICE
<br />CONSTRUCTION.
<br />PERMIT SUBMISSION BY CONTRACTOR:
<br />12.
<br />IT IS RESPONSIBILITY OF THE CUSTOMER OR HIS GENERAL CONTRACTOR TO ARRANGE FOR
<br />* THE CONTRACTOR SHALL SUBMIT THE APPLICATION FOR THE BUILDING PERMIT
<br />ALL MEETINGS, INCLUDING THE INITIAL REVIEW OF THE PLANS, SPECIFICATIONS, AND
<br />SUBMISSION, AND SHALL INCLUDE ALL REQUIRED DESIGN AND ENGINEERING DRAWINGS
<br />TEMPLATES AND ALL SUBSEQUENT INSPECTIONS.
<br />AND OTHER REQUIRED DOCUMENTS.
<br />BENCO DENTAL INSPECTIONS
<br />* THE CONTRACTOR SHALL COORDINATE WITH THE ARCHITECT TO PROVIDE FOLLOW—UP
<br />COORDINATION WITH THE LOCAL JURISDICTION, AS REQUIRED, WITH RESPECT TO
<br />• INITIAL REVIEW OF THE PLANS, SPECIFICATIONS, AND FIELD CONDITIONS WITH THE
<br />BU ILDI NG— RELATED ISSUES THAT IMPACT THE APPROVAL AND RELEASE OF THE
<br />GENERAL CONTRACTOR, CARPENTER, PLUMBER, AND ELECTRICIAN BEFORE
<br />BUILDING PERMIT.
<br />RENOVATIONS BEGIN.
<br />o THE COST OF ARCHITECT/ENGINEER SIGNED/SEALED CONSTRUCTION DRAWINGS AND
<br />• INSPECTION AFTER FRAMING AND BLOCKING ARE COMPLETE, PLUMBING AND
<br />OTHER REQUIRED DOCUMENTS, AND TRANSMITTAL TO THE CONTRACTOR WILL BE THE
<br />ELECTRICAL LINES ARE INSTALLED, AND BEFORE WALLS AND/OR FLOORS ARE
<br />OWNER'S RESPONSIBILITY.
<br />CLOSED.
<br />a TIME AND MATERIAL COSTS FOR THE CONTRACTOR'S DELIVERY TO AND PICKUP FROM
<br />• FINAL INSPECTION AFTER FINISH WORK IS COMPLETE, TWO (2) DAYS PRIOR TO THE
<br />THE LOCAL JURISDICTION, AS APPLICABLE, WILL BE THE CONTRACTOR'S
<br />INSTALLATION OF DENTAL EQUIPMENT.
<br />RESPONSIBILITY.
<br />13.
<br />BENCO WILL BE PROVIDED FIVE (5) DAYS ADVANCE NOTICE OF ALL MEETINGS.
<br />BUILDING PERMIT FEES:
<br />TO ARRANGE THE ABOVE, PLEASE CALL THE EQUIPMENT SPECIALIST LISTED UNDER THE
<br />PROJECT TEAM SECTION OF THE COVER SHEET.
<br />ALL BUILDING PERMIT FEES SHALL BE THE —CONTRACTOR'S RESPONSIBILITY, SHALL BE
<br />DUE AND PAYABLE TO THE LOCAL JURISDICTION ACCORDING TO THE LOCAL
<br />14.
<br />CONTRACTOR SHALL CONSULT DOCTOR AND/OR BUILDING OWNER AND, WHERE APPLICABLE,
<br />JURISDICTION'S REQUIREMENTS, AND SHALL BE INCLUDED BY THE CONTRACTOR IN THE
<br />BE RESPONSIBLE FOR THE SUPPLY AND INSTALLATION OF THE FOLLOWING:
<br />BASE BID.
<br />PR03ECT
<br />TEAM
<br />a. UPGRADING AND INSTALLATION OF ELECTRICAL SERVICE TO DENTAL OFFICE
<br />CONTRACTOR LICENSE OR LOCAL SUBCONTRACTOR PERMITS:
<br />b. COMPLETE HVAC SYSTEM
<br />c. HOT WATER SYSTEM
<br />IF THE CONTRACTOR OR ANY SUBCONTRACTOR IS REQUIRED BY THE STATE OR LOCAL
<br />d. FIRE SAFETY DEVICES INCLUDING: ALARMS, DETECTORS, EXTINGUISHERS, ETC.
<br />JURISDICTION TO OBTAIN AN APPLICABLE CONTRACTOR LICENSE, OR ANY OTHER LOCAL
<br />e. ILLUMINATED EXIT SIGNS
<br />SUBCONTRACTOR PERMITS, SO AS TO PERMIT LEGAL WORK TO BE PROVIDED FOR THIS
<br />f. GENERAL AND EMERGENCY LIGHTING
<br />PROJECT, THEN THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS INCURRED TO
<br />g. TELEPHONE SYSTEM AND WIRING
<br />SATISFY THESE JURISDICTIONAL REQUIREMENTS.
<br />h. SOUND SYSTEM
<br />MATT
<br />LEA
<br />i. COMPUTER SYSTEM WIRING
<br />EQUIPMENT SPECIALIST ML8117@BENCO.COM
<br />o THE COST OF ANY AND ALL CONTRACTOR LICENSE(S), SUBCONTRACTOR TRADE
<br />(407) 488-2159
<br />PERMITS, SERVICES AND INSPECTIONS SHALL BE THE CONTRACTOR'S RESPONSIBILITY
<br />AND SHALL BE INCLUDED IN THE BASE BID.
<br />a THE PRINTING COST FOR DRAWINGS AND OTHER CONSTRUCTION DOCUMENTS REQUIRED
<br />PROJECT DESIGNER RONNIE
<br />LALUNIO
<br />FOR ANY CONTRACTOR LICENSE(S) OR SUBCONTRACTOR TRADE PERMITS SHALL BE
<br />THE CONTRACTOR'S RESPONSIBILITY, AND SHALL BE INCLUDED IN THE BASE BID.
<br />RMICTICE
<br />FINAL CERTIFICATE OF OCCUPANCY:
<br />ISOLUTIONS1
<br />THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE LOCAL JURISDICTION FINAL
<br />CERTIFICATE OF OCCUPANCY, OR ITS EQUIVALENT PERMIT, SO TO ALLOW THE OWNER
<br />TO COMMENCE FULL OPERATIONS, ON OR BEFORE THE DATE OF FINAL COMPLETION.
<br />3. SITE UTILITIES
<br />295 Centerpoint Blvd. 1-800-go-benco
<br />* APPLICATIONS FOR SITE UTILITY SERVICE TO THE TENANT SPACE SHALL BE
<br />Piffston, PA 18640 www.benco.com
<br />COORDINATED BY THE CONTRACTOR WITH THE OWNER. LOCAL SITE UTILITY PROVIDERS'
<br />POINTS OF CONTACT MAY BE INCLUDED IN THE DRAWINGS FOR REFERENCE PURPOSES.
<br />• THE CONTRACTOR SHALL COORDINATE THE ISSUANCE OF ALL LETTERS OF REQUEST
<br />FOR SITE UTILITY SERVICES WITH THE OWNER WITHOUT DELAY FOLLOWING THE AWARD
<br />OF THE CONTRACT FOR GENERAL CONSTRUCTION, SO AS TO CONFIRM SITE UTILITY
<br />SERVICES AND SCHEDULE CONNECTIONS AT THE EARLIEST POSSIBLE CALENDAR DATE.
<br />• ALL COORDINATION OF PROVISIONS FOR THE SITE UTILITY SERVICES BY THE
<br />CONTRACTOR SHALL BE INCLUDED IN THE BASE BID. FEES DUE AND PAYABLE TO THE
<br />LOCAL UTILITY SO AS TO FACILITATE PROVISIONS FOR SITE UTILITY SERVICES WILL BE
<br />DRAWING
<br />LIST
<br />EITHER THE OWNERS RESPONSIBILITY, OR THE OWNER MAY COORDINATE WITH THE
<br />CONTRACTOR FOR PAYMENT BY THE CONTRACTOR, WITH REIMBURSEMENT BY THE
<br />OWNER TO THE CONTRACTOR AT DIRECT COST.
<br />SHEET DRAWING TITLE
<br />ISSUED
<br />DATE
<br />QO. 1 COVER SHEET
<br />DENTAL CONST. DOCUMENTS
<br />07/23/21
<br />Q1.1 DENTAL EQUIPMENT PLAN
<br />DENTAL CONST. DOCUMENTS
<br />07/23/21
<br />Q2.1 DENTAL CARPENTRY PLAN
<br />DENTAL CONST. DOCUMENTS
<br />07/23/21
<br />Q2.2 DENTAL CARPENTRY DETAILS
<br />DENTAL CONST. DOCUMENTS
<br />07/23/21
<br />Q3.1 DENTAL ELECTRICAL PLAN
<br />DENTAL CONST. DOCUMENTS
<br />07/23/21
<br />Q3.2 DENTAL ELECTRICAL DETAILS
<br />DENTAL CONST. DOCUMENTS
<br />07/23/21
<br />SYMBOLS LEGEN D
<br />Q4.1 DENTAL PLUMBING PLAN
<br />DENTAL CONST. DOCUMENTS
<br />07/23/21
<br />WALL LEGEND
<br />Q4.2 DENTAL PLUMBING DETAILS
<br />DENTAL CONST. DOCUMENTS
<br />07/23/21
<br />DETAIL/SHEET TAG SINK TAG
<br />EXISTING
<br />WALL
<br />NEW WALL
<br />EQUIPMENT TAG NOTE TAG
<br />OAM a RACTICE
<br />�Auft I PSOLUTIONS
<br />PITTSTON, PA - DALLAS, TX - COSTA MESA, CA
<br />11 . 8 0 0 . 4 6 2 . 3 6 2 6 / B E N 0 0 . C 0 M1
<br />00 HermanMitter
<br />-6-1
<br />IN
<br />E
<br />E
<br />0
<br />yj
<br />M
<br />N
<br />co
<br />co
<br />.j
<br />U.
<br />ISSUED: DATE:
<br />ZONE STUDY MM/DD/YY
<br />DESIGN SCHEMATIC
<br />07/07121
<br />DCD (FOR REVIEW)
<br />P7/23/21
<br />DCD
<br />IMMIDD/YY
<br />C121070-RL
<br />DRAWN BY: I REVIEWED �CHECKED BY:
<br />OTHERS,RL I TH
<br />DRAWING TITLE
<br />COVER SHEET
<br />SHEET:
<br />Q0.1
<br />I'_ " 1., -
<br />
|