Laserfiche WebLink
8 I 7 <br />111 11--L11 11 1'', 11 III II <br />4 <br />3 I 2 <br />1 <br />A, <br />GENERAL NOTES: <br />1 ALL CONSTRUCTION SHALL BE EXECUTED AS SHOWN ON THESE PLANS. ANY REVISIONS AND/OR DEVIATIONS MUST BE <br />APPROVED THROUGH THE ENGINEER OF RECORD AND MAY RESULT IN ADDITIONAL PERMITTING EFFORTS THROUGH THE <br />RELATED PERMITTING AGENCY THE CONTRACTOR SHALL ACKNOWLEDGE THAT REVISIONS AND/OR DEVIATIONS MAY RESULT <br />IN ADDITIONAL PERMITTING REQUIREMENTS AND POSSIBLY AFFECT SCHEDULING OF WORK <br />2, UNLESS OTHERWISE NOTED ON PLANS, OR WITHIN THE PROJECT SPECIFICATIONS, ALL MATERIALS AND CONSTRUCTION ARE <br />TO BE IN ACCORDANCE WITH DESIGN AND CONSTRUCTION STANDARDS OF THE PERMITTING AGENCY HAVING JURISDICTION, <br />THE LOCALLY ADOPTED BUILDING CODE, AND ALL APPLICABLE LOCAL AND STATE CODES AND ORDINANCES <br />3 PERMITS MAY BE REQUIRED FOR ANY WORK IN THE PUBLIC RIGHT-OF-WAY THE CONTRACTOR IS TO ACKNOWLEDGE AND <br />SECURE ALL PERMITS AND INSPECTIONS REQUIRED FOR WORK WITHIN PUBLIC RIGHT-OF-WAY. <br />4 BOUNDARY & TOPOGRAPHIC INFORMATION SHOWN HEREIN ARE BASED UPON SURVEY PROVIDED BY A PROFESSIONAL LAND <br />SURVEYOR. <br />5 THIS PARCEL OF LAND MAY BE SUBJECT TO ANY AND ALL RECORDED (AND POSSIBLY UNRECORDED) EASEMENTS, <br />RESTRICTIONS AND COVENANTS. <br />6. PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES FOR VERIFICATION OF <br />UTILITIES WITHIN THE LIMITS OF CONSTRUCTION CALL AREA ONE CALL SYSTEM 48 HOURS PRIOR TO ANY EXCAVATION <br />7 THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF CONSTRUCTION ANY DISCREPANCIES SHALL BE <br />REPORTED TO THE ENGINEER IN A TIMELY MANNER <br />8. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO PROTECT EXISTING PERMANENT SURVEYING MONUMENTS <br />AND BENCHMARKS FROM DISTURBANCE SURVEY MONUMENTS DISTURBED BY CONSTRUCTION ARE TO BE REPLACED AND <br />ADJUSTED VIA A LAND SURVEYOR REGISTERED IN THE STATE FOR WHICH THE PROJECT IS LOCATED <br />9. THE CONTRACTOR SHALL COORDINATE WORK EFFORTS WITH THE OWNER TO MINIMIZE TRAFFIC INTERFERENCE AND <br />OPERATIONS OF THE FACILITIES. <br />10 NO BLASTING OR BURNING IS ALLOWED ON THE PROJECT, UNLESS OTHERWISE NOTED OR DIRECTED BY THE ENGINEER <br />11, IT IS NOT EXPECTED THAT HAZARDOUS MATERIALS WILL BE ENCOUNTERED HOWEVER, IF MATERIALS SUSPECTED OF <br />CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB, IMMEDIATELY NOTIFY ENGINEER AND OWNER <br />HAZARDOUS MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT <br />GEOTECHNICAL EXPLORATION: <br />1 GEOTECHNICAL EXPLORATION OF EXISTING CONDITIONS IN THE GENERAL AREA OF THE SITE HAS BEEN PERFORMED AND <br />REPORTS OF THE FINDINGS AND RECOMMENDATIONS ARE AVAILABLE UPON REQUEST FOR THE CONTRACTOR'S INFORMATION <br />ONLY. <br />2 IT IS EXPRESSLY UNDERvTOOD THAT THE OWNER, ARCHITECT/ENGINEER AND THE RESPECTIVE GEOTECHNICAL FIRM(S) WILL <br />NOT BE RESPONSIBLE FOR ANY INTERPRETATION OR CONCLUSION DRAWN THEREFROM. <br />a INVESTIGATIONS HAVE BEEN MADE FOR PURPOSES OF DESIGN ONLY AND NEITHER THE OWNER, ENGINEER, NOR THE <br />RESPECTIVE GEOTECHNICAL FIRM(S) GUARANTEE ADEQUACY OF DATA, OR THAT DATA ARE REPRESENTATIVE OF ALL <br />CONDITIONS TO BE ENCOUNTERED. <br />REGULATORY STANDARDS AND REQUIREMENTS: <br />C 1 COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE BEGINNING DEMOLITION <br />2 COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION <br />3. COMPLY WITH ANSI A10.6, "SAFETY REQUIREMENTS FOR CONSTRUCTION AND DEMOLITION." <br />4 COMPLY WITH NFPA 241, "SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS" <br />0 <br />0 <br />DEMOLITION AND CLEARING: <br />1 DEMOLITION AND CLEARING OPERATIONS SHALL CONFORM TO APPLICABLE REGULATIONS RELATING TO ENVIRONMENTAL <br />REQUIREMENTS, DISPOSAL OF DEBRIS, BURNING DEBRIS ON SITE, AND USE OF HERBICIDES. <br />2 DEMOLITION WASTE SHALL BE DISPOSED OF IN A LEGAL MANNER. REMOVE DEMOLITION WASTE MATERIALS FROM PROJECT <br />SITE AND DISPOSE OF WASTE IN AN EPA -APPROVED LANDFILL ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION DO NOT <br />BURY OR BURN DEMOLITION WASTE ON -SITE <br />3. HISTORIC ITEMS, RELICS, ANTIQUES, AND SIMILAR OBJECTS, INCLUDING, BUT NOT LIMITED TO CORNERSTONES AND THEIR <br />CONTENTS, COMMEMORATIVE PLAQUES AND TABLETS, AND OTHER ITEMS OF INTEREST OR VALUE TO OWNER THAT MAY BE <br />UNCOVERED DURING DEMOLITION REMAIN THE PROPERTY OF THE OWNER. <br />4 ARRANGE DEMOLITION SCHEDULE SO AS NOT TO INTERFERE WITH OWNER'S ON -SITE OPERATIONS OR OPERATIONS OF <br />ADJACENT OCCUPIED BUILDINGS PROVIDE NOT LESS THAN 72 HOURS NOTICE OF ACTIVITIES THAT WILL AFFECT <br />OPERATIONS OF ADJACENT OCCUPIED BUILDINGS <br />5 CONDUCT BUILDING DEMOLITION AND DEBRIS -REMOVAL OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, <br />STREETS, WALKWAYS, AND OTHER ADJACENT OCCUPIED AND USED FACILITIES. DO NOT CLOSE OR OBSTRUCT STREETS, <br />WALKS, WALKWAYS, OR OTHER ADJACENT OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM OWNER AND <br />AUTHORITIES HAVING JURISDICTION. <br />6. AUTHORITY FOR PERFORMING SITE CLEARING INDICATED ON PROPERTY ADJOINING OWNER'S PROPERTY MUST BE OBTAINED <br />BY OWNER PRIOR TO COMMENCEMENT OF CLEARING DO NOT PROCEED WITH WORK ON ADJOINING PROPERTY UNTIL <br />DIRECTED BY ENGINEER. <br />7, PRIOR TO COMMENCEMENT OF DEMOLITION OPERATIONS <br />a. VERIFY THAT HAZARDOUS MATERIALS, IF PRESENT, HAVE BEEN REMEDIATED <br />b. REVIEW PROJECT RECORD DRAWINGS OF EXISTING BUILDING AND EXISTING SITE IMPROVEMENTS. <br />c. INVENTORY AND RECORD THE CONDITION OF ITEMS TO BE REMOVED AND SALVAGED TAKE DIGITAL PHOTOGRAPHS OR <br />VIDEO OF PROJECT SITE AND SURROUNDING PROPERTIES, INCLUDING EXISTING ITEMS TO REMAIN DURING <br />CONSTRUCTION OPERATIONS. RECORD CONDITIONS THAT MIGHT BE MISCONSTRUED AS DAMAGE CAUSED BY <br />SALVAGE OPERATIONS <br />d. CLEAN, PACK, IDENTIFY, AND TRANSPORT SALVAGED ITEMS TO STORAGE AREA DESIGNATED BY OWNER <br />e. REMOVE REFRIGERANT FROM MECHANICAL EQUIPMENT ACCORDING TO 40 CFR 82 AND REGULATIONS OF AUTHORITIES <br />HAVING JURISDICTION. <br />If COORDINATE ANY ADDITIONAL REQUIREMENTS FOR DEMOLISHING OR RELOCATING SITE MECHANICAL AND ELECTRICAL <br />ITEMS WITH OWNER AND OTHER AUTHORITIES HAVING JURISDICTION. <br />g. ASSURE THAT ANY REQUIRED INITIAL EROSION AND SEDIMENT CONTROL MEASURES ARE INSTALLED AND IN WORKING <br />ORDER. <br />h. LOCATE, IDENTIFY, DISCONNECT, AND SEAL OR CAP -OFF EXISTING UTILITIES SERVING BUILDINGS AND STRUCTURES TO <br />BE DEMOLISHED CUT AND REMO\ E PIPE OR CONDUIT A MINIMUM OF 24 INCHES BELOW GRADE CAP, VALVE, OR PLUG <br />AND SEAL REMAINING PORTION OF PIPE OR CONDUIT <br />i. DO NOT START DEMOLITION WORK UNTIL UTILITY DISCONNECTION AND SEALING HAVE BEEN COMPLETED AND VERIFIED <br />IN WRITING <br />8 PRIOR TO COMMENCEMENT OF SITE CLEARING OPERATIONS, VERIFY THE FOLLOWING <br />a. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE AND IN WORKING ORDER <br />b UTILITY LOCATOR SERVICE HAS DETERMINED AND FLAGGED THE LOCATION OF UNDERGROUND UTILITIES <br />c. EXISTING SITE IMPROVEMENTS AND UTILITIES TO REMAIN HAVE BEEN PROTECTED <br />d BENCHMARKS AND SURVEY CONTROL POINTS HAVE BEEN PROTECTED FROM DISTURBANCE <br />e. TREES AND VEGETATION TO REMAIN (OR TO BE RELOCATED) HAVE BEEN LOCATED AND CLEARLY FLAGGED IN <br />ACCORDANCE WITH "TREE PROTECTION AND TRIMMING" REQUIREMENTS. <br />9. COORDINATE UTILITY DEMOLITION AND ABANDONMENT WITH UTILITY COMPANY OR AUTHORITY HAVING JURISDICTION. <br />10 IN THE EVENT BUILDINGS IMMEDIATELY ADJACENT TO THE DEMOLITION AREA WILL BE OCCUPIED CONDUCT SITE DEMOLITION <br />SO OPERATIONS OF OCCUPIED BUILDINGS WILL NOT BE DISRUPTED. MAINTAIN ACCESS TO AND FROM EXISTING WALKWAYS, <br />EXITS, AND OTHER FACILITIES USED BY OCCUPANTS OF ADJACENT BUILDINGS <br />11. PROTECT EXISTING FACILITIES AND ADJACENT WALKWAYS, LOADING DOCKS, BUILDING ENTRIES, AND OTHER BUILDING <br />FACILITIES DURING DEMOLITION OPERATIONS MAINTAIN EXITS FROM EXISTING BUILDINGS <br />12 ERECT TEMPORARY PROTECTION, SUCH AS WALKS, FENCES, RAILLINGS, CANOPIES, AND COVERED PASSAGEWAYS, AS <br />NECESSARY, AND AS REQUIRED BY AUTHORITIES HAVING JURISDICTION REMOVE TEMPORARY BARRIERS AND PROTECTIONS <br />WHERE HAZARDS NO LONGER EXIST. WHERE OPEN EXCAVATIONS OR OTHER HAZARDOUS CONDITIONS REMAIN, LEAVE <br />TEMPORARY BARRIERS AND PROTECTIONS IN PLACE <br />13 PROTECT EXISTING UTILITIES FROM DAMAGE DURING DEMOLITION OPERATIONS MAINTAIN OPERATION OF UTILITY SERVICES <br />TO REMAIN PROVIDE AT LEAST 72 HOURS NOTICE TO OCCUPANTS OF AFFECTED BUILDINGS IF SHUTDOWN OF SERVICE IS <br />REQUIRED. <br />B CIVIL PERMIT ISSUE <br />REV. REVISION DESCRIPTION <br />8 <br />JRH 02/15/2018 <br />DRN. I REV. DATE REV. <br />7 <br />14, IF REMOVAL, RELOCATION, OR ABANDONMENT OF UTILITY SERVICES WILL AFFECT ADJACENT OCCUPIED BUILDINGS, MAINTAIN <br />CONTINUITY OF SERVICE TO ADJACENT BUILDINGS BY PROVIDING TEMPORARY UTILITIES THAT BYPASS BUILDINGS AND <br />STRUCTURES TO BE DEMOLISHED. TEMPORARY BYPASS SERVICES SHALL BE PROVIDED IN ACCORDANCE WITH UTILITY <br />COMPANY OR AUTHORITIES HAVING JURISDICTION <br />15. UNLESS OTHERWISE INDICATED, DEMOLISH EXISTING FOUNDATION WALLS AND OTHER EXISTING BELOW -GRADE SITE <br />IMPROVEMENTS THAT ARE WITHIN THE FOOTPRINT INDICATED FOR NEW CONSTRUCTION AND EXTENDING 5 FEET OUTSIDE <br />THE FOOTPRINT INDICATED FOR NEW CONSTRUCTION ABANDON EXISTING FOUNDATION WALLS AND OTHER BELOW -GRADE <br />CONSTRUCTION LOCATED OUTSIDE OF THIS AREA. <br />16 UNLESS OTHERWISE INDICATED, DEMOLISH EXISTING UTILITIES AND BELOW -GRADE UTILITY STRUCTURES THAT ARE WITHIN 5 <br />FEET OUTSIDE THE FOOTPRINT INDICATED FOR NEW CONSTRUCTION. ABANDON EXISTING UTILITIES AND BELOW GRADE <br />UTILITY STRUCTURES LOCATED OUTSIDE OF THIS AREA. <br />17. TEMPORARY SHORING PROVIDE AND MAINTAIN INTERIOR AND EXTERIOR SHORING, BRACING, OR STRUCTURAL SUPPORT TO <br />PRESERVE STABILITY AND PREVENT UNEXPECTED MOVEMENT OR COLLAPSE OF EXISTING IMPROVEMENTS BEING <br />DEMOLISHED ALL SHORING OPERATIONS SHALL BE DESIGNED BY A LICENSED PROFESSIONAL AND INSTALLED PER O.S H A. <br />REQUIREMENTS. <br />18. DEMOLITION OF STRUCTURAL FRAMING MEMBERS SHALL PROCEED SYSTEMATICALLY, FROM HIGHER TO LOWER LEVEL. <br />COMPLETE BUILDING DEMOLITION OPERATIONS ABOVE EACH FLOOR OR TIER BEFORE DISTURBING SUPPORTING MEMBERS <br />ON THE NEXT LOWER LEVEL REMOVE DEBRIS FROM ELEVATED PORTIONS OF THE BUILDING BY CHUTE, HOIST, OR OTHER <br />DEVICE THAT WILL CONVEY DEBRIS TO GRADE LEVEL IN A CONTROLLED DESCENT. <br />19 CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS OF DUST, DIRT, AND DEBRIS CAUSED BY BUILDING DEMOLITION <br />OPERATIONS. RETURN ADJACENT AREAS TO CONDITION EXISTING BEFORE BUILDING DEMOLITION OPERATIONS BEGAN. <br />20. CLEARING AND GRUBBING. <br />a. REMOVE OBSTRUCTIONS, TREES, SHRUBS, GRASS, AND OTHER VEGETATION TO PERMIT INSTALLATION OF NEW <br />CONSTRUCTION. DO NOT REMOVE TREES, SHRUBS, AND OTHER VEGETATION INDICATED TO REMAIN OR TO BE <br />RELOCATED. <br />b- CUT MINOR ROOTS AND BRANCHES OF TREES INDICATED TO REMAIN IN A CLEAN AND CAREFUL MANNER AND ONLY <br />WHERE SUCH ROOTS AND BRANCHES OBSTRUCT INSTALLATION OF NEW CONSTRUCTION. <br />c, CLEAR UNDERGROWTH AND DEADWOOD WITHOUT DISTURBING SUBSOIL. <br />d GRIND STUMPS AND REMOVE ROOTS, OBSTRUCTIONS, AND DEBRIS EXTENDING TO A DEPTH BELOW EXPOSED <br />SUBGRADE AS FOLLOWS. <br />1. FOOTINGS, SLABS ON GRADE AND BOTTOM SLABS OF STRUCTURES. 36 INCHES <br />2. ROADS AND PAVEMENT AREAS: 18 INCHES. <br />3. AREAS TO BE GRASSED OR LANDSCAPED. 8 INCHES. <br />4. AREAS TO BE FILLED: 12 INCHES. <br />e. USE ONLY HAND METHODS FOR GRUBBING WITHIN TREE PROTECTION ZONES <br />If. CHIP REMOVED TREE BRANCHES AND DISPOSE OF OFF -SITE. <br />g- UNLESS FURTHER EXCAVATION OF EARTHWORK IS INDICATED, FILL DEPRESSIONS CAUSED BY CLEARING AND <br />GRUBBING OPERATIONS WITH SATISFACTORY SOIL MATERIAL. PLACE FILL MATERIAL IN HORIZONTAL LAYERS NOT <br />EXCEEDING A LOOSE DEPTH OF 8 INCHES, AND COMPACT EACH LAYER TO A DENSITY EQUAL TO ADJACENT ORIGINAL <br />GROUND. <br />22 TOPSOIL STRIPPING. <br />a. REMOVE SOD AND GRASS BEFORE STRIPPING TOPSOIL. <br />b. STRIP TOPSOIL TO WHATEVER DEPTHS ARE ENCOUNTERED IN A MANNER TO PREVENT INTERMINGLING WITH <br />UNDERLYING SUBSOIL OR OTHER WASTE MATERIALS REMOVE SUBSOIL AND NON -SOIL MATERIALS FROM TOPSOIL, <br />INCLUDING TRASH, DEBRIS, WEEDS, ROOTS, AND OTHER WASTE MATERIALS. <br />c. STOCKPILE TOPSOIL MATERIALS AWAY FROM EDGE OF EXCAVATIONS WITHOUT INTERMIXING WITH SUBSOIL GRADE <br />AND SHAPE STOCKPILES TO DRAIN SURFACE WATER. COVER TO PREVENT WINDBLOWN DUST, LIMIT HEIGHT OF <br />TOPSOIL STOCKPILES TO 72 INCHES DO NOT STOCKPILE TOPSOIL WITHIN TREE PROTECTION ZONES STOCKPILE <br />SURPLUS TOPSOIL TO ALLOW FOR RESPREADING DEEPER TOPSOIL. <br />23 SITE IMPROVEMENTS <br />a. REMOVE EXISTING ABOVE- AND BELOW -GRADE IMPROVEMENTS AS INDICATED AND AS NECESSARY TO FACILITATE NEW <br />CONSTRUCTION REMOVE SLABS, PAVING, CURBS, GUTTERS, AND AGGREGATE BASE AS INDICATED <br />b. UNLESS EXISTING FULL -DEPTH JOINTS COINCIDE WITH LINE OF DEMOLITION, NEATLY SAW -CUT LENGTH OF EXISTING <br />PAVEMENT TO REMAIN BEFORE REMOVING EXISTING PAVEMENT SAWCUT ALL FACES VERTICALLY. <br />c PAINT CUT ENDS OF STEEL REINFORCEMENT IN CONCRETE TO REMAIN TO PREVENT CORROSION <br />24. DISPOSAL <br />a- REMOVE SURPLUS SOIL MATERIAL, UNSUITABLE TOPSOIL, OBSTRUCTIONS, DEMOLISHED MATERIALS, AND WASTE <br />MATERIALS, INCLUDING TRASH AND DEBRIS, AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. <br />b. REMOVE AND TRANSPORT DEBRIS AND RUBBISH IN A MANNER THAT WILL PREVENT <br />SPILLAGE ON STREETS OR ADJACENT AREAS. CLEAN UP SPILLAGE FROM STREETS AND <br />ADJACENT AREAS. <br />c. COMPLY WITH FEDERAL, STATE AND LOCAL HAULING AND DISPOSAL REGULATIONS. <br />d. SEPARATE RECYCLABLE MATERIALS PRODUCED DURING SITE CLEARING FROM OTHER NON -RECYCLABLE <br />MATERIALS. STORE OR STOCKPILE WITHOUT INTERMIXING WITH <br />OTHER MATERIALS AND TRANSPORT THEM TO RECYCLING FACILITIES. <br />EROSION AND SEDIMENTATION CONTROL: <br />1 PRIOR TO COMMENCEMENT OF ANY CLEARING AND EXCAVATION WITHIN A WORK AREA, ALL EROSION AND SEDIMENT <br />CONTROL MEASURES SHALL BE INSTALLED AND IN WORKING ORDER. <br />2, THE CONTRACTOR SHALL REFERENCE THE "STORMWATER POLLUTION PREVENTION PLAN (SWPPP)," THE "EROSION AND <br />SEDIMENT CONTROL PLAN(S)," AND, RELATED "EROSION AND SEDIMENT CONTROL DETAIL(S)" CONTAINED WITHIN THIS PLAN <br />SET FOR DETAILED INFORMATION CONCERNING EROSION AND SEDIMENT CONTROL "BEST MANAGEMENT PRACTICES" TO BE <br />USED ON THIS PROJECT. <br />3, PERFORM WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE STATE AND FEDERAL NATIONAL POLLUTANT DISCHARGE <br />ELIMINATION SYSTEM (NPDES) PERMIT. <br />4. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING EROSION AND SEDIMENT CONTROL FEATURES TO PREVENT AND <br />CONTROL SEDIMENT -LADEN RUNOFF FROM LEAVING THE CONSTRUCTION AREAS AND ENTERING EXISTING STORMWATER <br />FACILITIES AND SURFACE WATERS. ADDITIONAL MEASURES BEYOND THOSE SHOWN WITHIN THESE PLANS MAY BE <br />NECESSARY DURING CONSTRUCTION, INCLUDING TEMPORARY VEGETATIVE MEASURES AND INSTALLATION OF OTHER SILT <br />TRAPPING MEASURES. <br />5 THE CONTRACTOR IS REQUIRED TO ADJUST THE EROSION AND SEDIMENT CONTROLS AS NECESSARY AND AS SHOWN ON THE <br />DRAWINGS, AND ADD ADDITIONAL CONTROL MEASURES AS REQUIRED TO INSURE THE SITE MEETS ALL FEDERAL, STATE AND <br />LOCAL EROSION AND SEDIMENT CONTROL REQUIREMENTS. <br />6, ALL BEST MANAGEMENT EROSION AND SEDIMENT CONTROL PRACTICES WILL BE INSPECTED BY THE SUPERINTENDENT, THE <br />PERSON RESPONSIBLE FOR THE DAY TO DAY OPERATIONS, OR SOMEONE APPOINTED BY THE SUPERINTENDENT, AT LEAST <br />EVERY OTHER WEEK AND FOLLOWING A STORM EVENT OF 0.5 INCHES OR GREATER <br />7, ALL BEST MANAGEMENT CONTROL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER, IF A REPAIR IS NECESSARY, IT <br />WILL BE INITIATED WITHIN 24 HOURS OF REPORT. <br />EARTHWORK: <br />1. IN THE EVENT OF ANY UNFORESEEN CONDITIONS THAT ARE ENCOUNTERED AND NOT COVERED BY THESE NOTES DURING <br />GRADING OPERATIONS, THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED FOR DIRECTION <br />2, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL NECESSARY CUTS AND FILLS WITHIN THE LIMITS OF THIS <br />PROJECT AND RELATED OFF -SITE WORK SO AS TO ESTABLISH THE DESIRED SUBGRADE, FINISH GRADES AND SLOPES <br />SPECIFIED WITHIN THE PLANS <br />3, ADEQUATE SHORING IS TO BE DESIGNED AND PROVIDED BY THE CONTRACTOR TO PREVENT UNDERMINING OF ANY <br />ADJACENT FEATURES OR FACILITIES AND/OR CAVING OF THE EXCAVATION AL SHORING AND ASSOCIATED TEMPORARY <br />C L <br />STRUCTURES SHALL BE DESIGNED BY A LICENSED PROFESSIONAL AND INSTALLED PURSUANT TO O S.H. REQUIREMENT _ SOIL MATERIALS. <br />1. UNSATISFACTORY SOILS CONSIST OF SOIL CLASSIFICATION GROUPS ML, OL, CH, MH, OH, AND PT, OR A COMBINATION OF <br />THESE GROUPS UNSATISFACTORY SOILS ALSO INCLUDE SATISFACTORY SOILS NOT MAINTAINED WITHIN 3 PERCENT OF <br />REVISION DESCRIPTION <br />DRN. I REV. DATE I REV. <br />OPTIMUM MOISTURE CONTENT AT TIME OF COMPACTION <br />2 SATISFACTORY SOILS: ASTM D 2487 SOIL CLASSIFICATION GROUPS AS IDENTIFIED ON THE DRAWINGS, OR A COMBINATION OF <br />THESE GROUPS. FREE OF ROCK OR GRAVEL LARGER THAN 3 INCHES IN ANY DIMENSION, DEBRIS WASTE, FROZEN MATERIALS, <br />VEGETATION, ANb OTHER DELETERIOUS MATERIAL. <br />SUBGRADE INSPECTION <br />1. PROOF -ROLL SUBGRADE BELOW THE BUILDING SLABS AND PAVEMENTS WITH HEAVY PNEUMATIC -TIRED EQUIPMENT TO <br />IDENTIFY SOFT POCKETS AND AREAS OF EXCESS YIELDING. DO NOT PROOF -ROLL WET OR SATURATED SUBGRADES. <br />a COMPLETELY PROOF -ROLL SUBGRADE IN TWO DIRECTIONS, REPEATING PROOF ROLLING IN DIRECTION <br />PERPENDICULAR TO FIRST DIRECTION LIMIT VEHICLE SPEED TO 3 MPH. <br />b. PROOF -ROLL WITH A LOADED 10-WHEEL, TANDEM -AXLE DUMP TRUCK WEIGHING NOT LESS THAN 15 TONS. <br />c EXCAVATE SOFT SPOTS, UNSATISFACTORY SOILS, AND AREAS OF EXCESSIVE PUMPING OR RUTTING, AS DETERMINED <br />BY ENGINEER, AND REPLACE WITH COMPACTED BACKFILL OR FILL AS DIRECTED. <br />2 RECONSTRUCT SUBGRADES DAMAGED BY FREEZING TEMPERATURES, FROST, RAIN, ACCUMULATED WATER, OR <br />CONSTRUCTION ACTIVITIES AS DIRECTED BY ENGINEER, WITHOUT ADDITIONAL COMPENSATION. <br />BACKFILL <br />1 THE CONTRACTOR SHALL PLACE AND COMPACT BACKFILL IN EXCAVATIONS PROMPTLY, BUT NOT BEFORE COMPLETING THE <br />FOLLOWING. <br />a CONSTRUCTION BELOW FINISH GRADE INCLUDING, WHERE APPLICABLE, SUBDRAINAGE, DAMPPROOFING, <br />WATERPRGFFING, AND PERIMETER INSULATION <br />b SURVEYING LOCATIONS OF UNDERGROUND UTILITIES FOR RECORD DRAWINGS. <br />c TESTING AND INSPECTING UNDERGROUND UTILITIES. <br />d REMOVING CONCRETE FORMWORK. <br />e REMOVING TRASH AND DEBRIS, <br />f REMOVING TEMPORARY SHORING AND BRACING, AND SHEETING. <br />g INSTALLING PERMANENT OR TEMPORARY HORIZONTAL BRACING ON HORIZONTALLY SUPPORTED WALLS. <br />COMPACTION OF SOIL EACKFILLS AND FILLS <br />1, CONTRACTOR SHALL PLACE BACKFILL AND FILL MATERIALS IN LAYERS NOT MORE THAN 8-INCHES IN LOOSE DEPTH FOR <br />MATERIAL COMPACTED BY HEAVY COMPACTION EQUIPMENT, AND NOT MORE THAN 4-INCHES IN LOOSE DEPTH FOR MATERIAL <br />COMPACTED BY HAND -OPERATED TAMPERS. <br />2- PLACE BACKFILL: AND FILL SOIL MATERIALS EVENLY ON ALL SIDES OF STRUCTURES TO REQUIRED ELEVATIONS, AND <br />UNIFORMLY ALONG THE FULL LENGTH OF EACH STRUCTURE <br />3. COMPACT SOIL MATERIALS TO NOT LESS THAN THE PLAN SPECIFIED PERCENTAGES OF MAXIMUM DRY UNIT WEIGHT <br />ACCORDING TO ASTM D 698 OR ASTM D 1557 (SEE CIVIL DETAILS FOR SUMMARY OF TRENCH BACKFILL AND BEDDING <br />MATERIALS AND OLACEMENT SPECIFICATIONS) <br />GRADING <br />1, GENERAL: UNIFORMLY GRADE AREAS TO A SMOOTH SURFACE, FREE OF IRREGULAR SURFACE CHANGES. COMPLY WITH <br />COMPACTION REQUIREMENTS AND GRADE TO DETAILED/INDICATED CROSS -SECTIONS, LINES, AND ELEVATIONS INDICATED IN <br />PLANS PROVIDE A SMOOTH TRANSITION BETWEEN ADJACENT EXISTING GRADES AND NEW GRADES CUT OUT SOFT SPOTS, <br />FILL LOW SPOTS, ,AND TRIM HIGH SPOTS TO COMPLY WITH REQUIRED SURFACE TOLERANCES <br />2 SITE GRADING SLOPE GRADES TO DIRECT WATER AWAY FROM BUILDINGS AND TO PREVENT PONDING FINISH SUBGRADES <br />TO REQUIRED ELEVATIONS WITHIN THE FOLLOWING TOLERANCES'. <br />a LAWN OR UNPAVED AREAS. PLUS OR MINUS ONE (1) INCH. <br />b WALKS PLUS OR MINUS ONE (1) INCH. <br />c PAVEMENTS PLUS OR MINUS ONE-HALF (1/2) INCH <br />d GRADING INSIDE BUILDING LINES: FINISH SUBGRADE TO A TOLERANCE OF ONE-HALF (112) INCH WHEN TESTED WITH A <br />10-FOOT STRAIGHTEDGE. <br />3- SUBBASE AND BASE COURSES. <br />a PLACE SUBBASE AND BASE COURSE ON SUBGRADES FREE OF MUD, FROST, SNOW, OR ICE <br />b PLACE SUBBASE AND BASE COURSE 6 INCHES OR LESS IN COMPACTED THICKNESS IN A SINGLE LAYER. <br />c PLACE SUBBASE AND BASE COURSE EXCEEDING 6 INCHES IN COMPACTED THICKNESS IN LAYERS OF EQUAL <br />THICKNESS, WITH NO COMPACTED LAYER MORE THAN 6 INCHES THICK OR LESS THAN 3 INCHES, <br />4 COMPACT SUBASE AND BASE COURSE AT OPTIMUM MOISTURE CONTENT TO REQUIRED GRADES, LINES, CROSS SECTIONS, <br />AND THICKNESS ACCORDING TO ASTM D 698 OR ASTM D 1557, AS INDICATED ON THE DRAWING DETAILS <br />FIELD QUALITY CONTROL <br />1, TESTING AGENCY: HASKELL OR THE OWNER WILL ENGAGE A QUALIFIED INDEPENDENT GEOTECHNICAL ENGINEERING <br />TESTING AGENCY TO PERFORM FIELD QUALITY CONTROL TESTING. <br />2. THE TESTING AGENCY WILL INSPECT AND TEST SUBGRADES AND EACH FILL OR BACKFILL LAYER. CONTRACTOR SHALL <br />PROCEED WITH SUBSEQUENT EARTHWORK ONLY AFTER TEST RESULTS FOR PREVIOUSLY COMPLETED WORK COMPLY WITH <br />REQUIREMENTS <br />3, FOOTING SUBGRADE: AT FOOTING SUBGRADES, AT LEAST ONE TEST OF EACH SOIL STRATUM WILL BE PERFORMED TO <br />VERIFY DESIGN EIEARING CAPACITIES SUBSEQUENT VERIFICATION AND APPROVAL OF OTHER FOOTING SUBGRADES MAY BE <br />BASED ON A VISUAL COMPARISON OF SUBGRADE WITH TESTED SUBGRADE WHEN APPROVED BY ENGINEER. <br />4 THE TESTING AGENCY WILL TEST COMPACTION OF SOILS IN PLACE ACCORDING TO ASTM D 1556, ASTM D 2167, ASTM D 2922, <br />AND ASTM D 2931, AS APPLICABLE TESTS WILL BE PERFORMED AT THE FOLLOWING LOCATIONS AND FREQUENCIES. <br />a. PAVED AN(O BUILDING SLAB AREAS. AT SUBGRADE AND AT EACH COMPACTED FILL AND BACKFILL LAYER, AT LEAST 1 <br />TEST FOR I<VERY 10,000 SQ. FT. OR LESS OF PAVED AREA OR BUILDING SLAB, BUT IN NO CASE FEWER THAN 3 TESTS <br />b FOUNDATION WALL BACKFILL AT EACH COMPACTED BACKFILL LAYER, AT LEAST 1 TEST FOR EACH 100 FEET OR LESS <br />OF WALL LENGTH, BUT NO FEWER THAN 2 TESTS. <br />c. TRENCH BACKFILL: AT EACH COMPACTED INITIAL AND FINAL BACKFILL LAYER, AT LEAST 1 TEST FOR EACH 150 FEET OR <br />LESS OF TRENCH LENGTH, BUT NO FIEWER THAN 2 TESTS. <br />5, IF THE TESTING AGENCY REPORTS THAT SUBGRADES, FILLS, OR BACKFILLS HAVE NOT ACHIEVED DEGREE OF COMPACTION <br />SPECIFIED, SCARIFY AND MOISTEN OR AERATE, OR REMOVE AND REPLACE SOIL TO DEPTH REQUIRED. RECOMPACT AND <br />RETEST UNTIL SPECIFIED COMPACTION IS OBTAINED <br />6- ALL FIELD QUALITY CONTROL TESTS THAT FAIL TO MEET THE SPECIFIED CONPACTION DENSITY SHALL BE REPORTED TO THE <br />ENGINEER <br />GENERAL UTILITY NOTES: <br />1, PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES FOR VERIFICATION OF <br />UTILITIES WITHIN THE LIMITS OF CONSTRUCTION. CALL THE AREA ONE CALL SYSTEM 48 HOURS PRIOR TO ANY EXCAVATION <br />2 THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF CONSTRUCTION ANY DISCREPANCIES SHALL BE <br />REPORTED TO THE ENGINEER. <br />3. THE CONTRACTOR SHALL COORDINATE WORK EFFORTS WITH THE OWNER TO MINIMIZE TRAFFIC INTERFERENCE AND <br />OPERATIONS OF THE FACILITIES. <br />4. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO PROTECT EXISTING PERMANENT SURVEYING MONUMENTS <br />AND BENCHMARKS FROM DISTURBANCE SURVEY MONUMENTS DISTURBED BY CONSTRUCTION ARE TO BE REPLACED AND <br />ADJUSTED VIA A LAND SURVEYOR REGISTERED IN THE STATE FOR WHICH THE PROJECT IS LOCATED. <br />5. EXISTING UTILITIES SHOWN HEREIN ARE BASED ON AVAILABLE RECORDS AND FIELD INVESTIGATIONS THE CONTRACTOR <br />SHALL VERIFY HORIZONTAL AND VERTICAL LOCATIONS OF UTILITIES PRIOR TO EXCAVATION WITHIN WORK AREAS THE <br />ENGINEER SHALL BE NOTIFIED UPON DISCOVERY OF ANY DISCREPANCIES THAT WILL AFFECT INSTALLATION OF WORK OR <br />DISCOVERY OF WNCHARTED UTILITIES WHICH MAY REQUIRE RELOCATION, NOTIFICATION SHALL BE DONE IN A TIMELY <br />MANNER + <br />6. WHERE APPLICABLE, THE CONTRACTOR SHALL MAINTAIN ALL FENCING, SIGNS, DETOURS, FLAGMEN, SIGNALS, ETC., FOR ANY <br />OPEN TRENCHES, HOLES OR PITS ALL TRENCHES, HOLES OR PITS SHALL BE CLOSED OR PROTECTED BY BARRICADES AT <br />THE END OF THE DAY. <br />7 PERMITS MAY BE REQUIRED FOR ANY WORK IN THE PUBLIC RIGHT-OF-WAY THE CONTRACTOR IS TO ACKNOWLEDGE AND <br />SECURE ALL PERMITS AND INSPECTIONS REQUIRED FOR WORK WITHIN PUBLIC RIGHT-OF-WAY. <br />8 THE CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS DURING CONSTRUCTION WHICH SHOW THE CONSTRUCTED <br />CONDITIONS OF ALL WORK INSTALLED. SEE "AS -BUILT" REQUIREMENTS FOR ADDITIONAL INFORMATION. <br />9, ALL VALVE BOXES, METER BOXES, VAULTS, CLEANOUTS, MANHOLE COVERS, FIRE HYDRANTS AND OTHER APPURTENANCES <br />THAT ARE TO REMAIN IN SERVICE WITHIN THE PROJECT AREA SHALL BE ADJUSTED TO CONFORM TO FINISHED GRADE <br />10. ALL SANITARY SEWER LINES SHALL BE TELEVISED AND THE VIDEO REPORTS SUBMITTED TO THE ENGINEER FOR REVIEW. <br />a. VIDEO REPORTS ARE TO BE SUBMITTED ON CD-ROM OR DVD COMPACT DISKS. <br />REVISION DESCRIPTION <br />5 <br />b. ALL LINES MUST BE FLUSHED AND CLEANED WITH POTABLE WATER PRIOR TO TELEVISING. <br />c. VIDEO REPORTS WILL BE USED TO VIEW THE CONDITION OF THE SANITARY SEWER PIPE PRIOR TO ACCEPTANCE. <br />WORKMANSHIP AND CLEANLINESS OF THE INSTALLATION WILL BE CHECKED. <br />11.AS-BUILT SURVEY: THE CONTRACTOR SHALL VERIFY WATER, SEWER, GAS, POWER AND TELECOM BY PROVIDING AN <br />"AS -BUILT" SURVEY OF CONSTRUCTED CONDITIONS FROM A LICENSED SURVEYOR REGISTERED IN THE STATE OF PROJECT <br />LOCATION. THE "AS -BUILT" SURVEY SHALL INCLUDE VERTICAL AND HORIZONTAL INFORMATION PERTAINING TO THE <br />INSTALLATION OF THE UTILITY SYSTEMS. DATUM ELEVATION AND BENCHMARK LOCATIONS SHALL BE INDICATED. <br />INFORMATION TO BE INCLUDED IS AS FOLLOWS: <br />a. PIPE TYPE, SIZE, VOLTAGE (WHERE APPLICABLE) AND INVERT ELEVATIONS. <br />b. LOCATION OF MANHOLE, PARSHALL FLUME, VALVE, POST INDICATOR, FIRE HYDRANT, JUNCTION BOX. <br />c. ELEVATIONS FOR MANHOLE AND PARSHALL FLUME. ELEVATIONS SHOULD INCLUDE RIM, BOTTOM, WEIR ELEVATION <br />AND PIPE INVERTS. <br />STORM DRAINAGE: <br />1. UNLESS OTHERWISE SHOWN ON PLANS, ALL PVC PIPE AND FITTINGS SHALL CONFORM TO THE FOLLOWING: <br />a. PVC SEWER PIPE AND FITTINGS, NPS 15-INCH AND SMALLER ASTM D 3034, SDR 35, WITH BELL -AND -SPIGOT ENDS FOR <br />GASKETED JOINTS USING ASTM F 477, ELASTOMERIC SEALS. <br />b. PVC SEWER PIPE AND FITTINGS, NPS 18-INCH AND LARGER ASTM F 679, T-1 WALL THICKNESS, WITH BELL -AND -SPIGOT <br />ENDS FOR GASKETED JOINTS USING ASTM F 477, ELASTOMERIC SEALS. <br />c. PIPE JOINTS SHALL BE WATER -TIGHT. <br />2 UNLESS OTHERWISE SHOWN ON THE PLANS, ALL REINFORCED CONCRETE PIPE AND FITTINGS SHALL CONFORM TO THE <br />FOLLOWING <br />a. ASTM C 76, WITH BELL -AND -SPIGOT OR GROOVE AND TONGUE ENDS AND GASKETED JOINTS WITH ASTM C 443 RUBBER <br />GASKETS. <br />b RCP PIPE SHALL BE CLASS III, WALL B. <br />c WHEN LOCATED IN TRAFFIC AREAS WITH LESS THAN 2 FEET OF COVER, RCP PIPE SHALL BE CLASS IV, WALL B <br />d. WHEN LOCATED UNDER AIRCRAFT RAMPS OR RAILROAD OPERATIONS, RCP PIPE SHALL BE CLASS V, WALL B WITH <br />O-RING JOINTS. <br />e. PIPE CLASS SHALL BE CLEARLY "STAMPED" ON EACH SEGMENT OF RCP PIPE DELIVERED TO THE PROJECT <br />f PIPE JOINTS SHALL BE WATER -TIGHT <br />3 CONTRACTOR SHALL HANDLE AND STORE PIPE, FITTINGS, GASKETS, AND RELATED APPURTENANCES IN ACCORDANCE WITH <br />MANUFACTURER'S WRITTEN RECOMMENDATIONS. <br />4 CONTRACTOR SHALL HANDLE MANHOLES, DROP INLETS, CURB INLETS, PIPE END COMPONENTS AND RELATED <br />APPURTENANCES ACCORDING TO MANUFACTURER'S WRITTEN RIGGING INSTRUCTIONS. <br />5 PVC PLASTIC PIPE AND FITTINGS SHALL NOT BE STORED IN DIRECT SUNLIGHT <br />6. ALL PIPE, FITTINGS, GASKETS, AND SEALS SHALL BE PROTECTED FROM DIRT AND DAMAGE. <br />7. ALL STORM SEWER LINES SHALL BE TELEVISED AND THE VIDEO REPORTS SUBMITTED TO THE ENGINEER FOR REVIEW. <br />a. VIDEO REPORTS ARE TO BE SUBMITTED ON CD-ROM OR DVD COMPACT DISKS. <br />b. ALL LINES MUST BE FLUSHED AND CLEANED WITH POTABLE WATER PRIOR TO TELEVISING. <br />c. FOR SUBMERGED SYSTEMS, POND WATER LEVELS SHALL BE LOWERED (PUMPED DOWN) BELOW THE LOWEST PIPE <br />ENTRANCE INVERT. <br />d. VIDEO REPORTS WILL BE USED TO VIEW THE CONDITION OF THE STORM SEWER PIPE PRIOR TO ACCEPTANCE. <br />WORKMANSHIP AND CLEANLINESS OF THE INSTALLATION WILL BE CHECKED. <br />8. AS -BUILT SURVEY: THE CONTRACTOR SHALL VERIFY STORM SEWER IMPROVEMENTS ALIGNMENT BY PROVIDING AN <br />"AS -BUILT" SURVEY OF CONSTRUCTED CONDITIONS FROM A LICENSED SURVEYOR REGISTERED IN THE STATE OF PROJECT <br />LOCATION. THE "AS -BUILT" SURVEY SHALL INCLUDE VERTICAL AND HORIZONTAL INFORMATION PERTAINING TO THE <br />INSTALLATION OF THE STORM SEWER SYSTEM PIPING AND STRUCTURES. DATUM ELEVATION AND BENCHMARK LOCATIONS <br />SHALL BE INDICATED. INFORMATION TO BE INCLUDED IS AS FOLLOWS: <br />a. PIPE TYPE, SIZE, AND INVERT ELEVATIONS. <br />b. MANHOLE, DROP INLET, CURB INLET, YARD DRAIN, AND POND CONTROL STRUCTURE LOCATIONS WITH ELEVATIONS OF <br />BOTTOM, RIM OR GRATE ELEVATION SHOWN. <br />c. POND CONTROL STRUCTURES: SHOW INFORMATION ON ALL FLOW CONTROL APPURTENANCES AND OUTLET PIPING. <br />ASPHALT PAVING: <br />1. THE CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF THE HASKELL COMPANY ASPHALT TESTING PROGRAM. <br />2. THE CONTRACTOR 15 TO PROVIDE BARRICADES, SIGNS, FLASHERS, AND FLAG PERSONELL AS NECESSARY TO INSURE THE SAFETY OF <br />WORKERS AND VISITORS. ALL CONSTRUCTION SIGNING, BARRICADING, AND TRAFFIC DELINEATION IS TO CONFORM TO THE "MANUAL <br />OF UNIFORM TRAFFIC CONTROL DEVICES," LATEST EDITION. <br />3. ALL ASPHALT PAVING MATERIALS, WORKMANSHIP, AND INSTALLATION REQUIREMENTS SHALL COMPLY WITH THE STANDARD <br />SPECIFICATIONS OF THE STATE DEPARTMENT OF TRANSPORTATION (D.O.T.) FOR THE STATE IN WHICH THE WORK OCCURS WITH SOME <br />EXCLUSIONS. THE DOT PAYMENT PROCEDURES AND SAFETY REQUIREMENTS SHALL GENERALLY NOT APPLY. <br />a. COARSE AGGREGATE, FINE AGGREGATE AND MINERAL FILLERS: IN ACCORDANCE WITH D.O.T. MATERIAL STANDARDS AND <br />ASSOCIATED CONSTRUCTION SPECIFICATIONS. <br />b. ASPHALT BINDER, ASPHALT CEMENT, PRIME COAT, AND TACK COAT: IN ACCORDANCE WITH D.O.T. MATERIAL STANDARDS AND <br />ASSOCIATED CONSTRUCTION SPECIFICATIONS. <br />c. JOINT SEALANT: ASTM D 6690 OR AASHTO M 324, TYPE II OR III, HOT APPLIED, SINGLE COMPONENT, POLYMER -MODIFIED <br />BITUMINOUS SEALANT. <br />d. PAVEMENT -MARKING PAINT: IN ACCORDANCE WITH D.O.T. MATERIAL STANDARDS AND ASSOCIATED CONSTRUCTION <br />SPECIFICATIONS. COLORS AS INDICATED. <br />3. DO NOT APPLY ASPHALT MATERIALS IF SUBGRADE IS FROZEN, WET, OR EXCESSIVELY DAMP; OR, IF RAIN IS IMMINENT OR EXPECTED <br />BEFORE TIME REQUIRED FOR ADEQUATE CURE. APPLY ONLY AT D.O.T. RECOMMENDED SURFACE TEMPERATURE. <br />4. INSTALLATION TOLERANCES: <br />a. PAVEMENT THICKNESS: THE AVERAGE OF THE MEASURED THICKNESSES OF THE PAVEMENT LAYERS SHALL MEET OR EXCEED THE <br />REQUIRED THICKNESS FOR THOSE LAYERS, AND THE MINIMUM THICKNESS IN ANY ONE AREA SHALL NOT BE LESS THAN 0.25 <br />INCHES BELOW THE REQUIRED THICKNESS. <br />b. PAVEMENT SURFACE SMOOTHNESS: COMPACT EACH COURSE TO PRODUCE A SURFACE SMOOTHNESS WITHIN THE FOLLOWING <br />TOLERANCES AS DETERMINED BY USING A 10-FOOT STRAIGHTEDGE APPLIED TRANSVERSELY OR LONGITUDINALLY TO PAVED <br />AREAS: <br />i BASE COURSE: 1/4- INCH <br />ii. SURFACE COURSE: 1/4 - INCH <br />c. CROWNED SURFACES: TEST WITH CROWNED TEMPLATE CENTERED AND AT RIGHT ANGLE TO CROWN. MAXIMUM ALLOWABLE <br />VARIENCE FROM TEMPLATE IS 1/4 - INCH. <br />5. PAVEMENT MARKINGS SHALL BE MADE WITH NON -THERMOPLASTIC ACRYLLIC MARKING PAINT MEETING THE DOT MATERIAL <br />REQUIREMENTS. ALLOW PAVING TO AGE FOR 30 DAYS BEFORE STARTING PAVEMENT MARKING. PROCEED WITH PAVEMENT MARKING <br />ONLY ON CLEAN, DRY SURFACES. SWEEP AND CLEAN SURFACE TO ELIMINATE LOOSE MATERIAL AND DUST. APPLY PAINT WITH <br />MECHANICAL EQUIPMENT TO PRODUCE PAVEMENT MARKINGS, OF DIMENSIONS AND COLORS INDICATED, WITH UNIFORM, STRAIGHT <br />EDGES. APPLY AT MANUFACTURER'S RECOMMENDED RATES TO PROVIDE A MINIMUM WET FILM THICKNESS OF 15 MILS AND ONLY AT <br />MANUFACTURER'S RECOMMENDED AMBIENT AND SURFACE TEMPERATURES. <br />6. WHEELSTOPS: PRECAST, AIR -ENTRAINED CONCRETE, 3500-PSI MINIMUM WITH DIMENSIONS AS INDICATED. INSTALL BY SECURELY <br />ATTACHING WHEELSTOP TO PAVEMENT WITH NOT LESS THAN (2) 18-INCH x 1/2-INCH DIAMETER GALVANIZED -STEEL DOWELS <br />EMBEDDED ATONE -QUARTER TO ONE-THIRD POINTS. SECURELY INSTALL DOWELS INTO PAVEMENT AND BOND TO WHEELSTOP. RECESS <br />HEAD OF DOWEL BENEATH TOP OF WHEEL STOP. <br />AS -BUILT SURVEY: <br />N N F WORK, THE SITEWORK SUB -CONTRACTOR SHALL RETAIN THE SERVICES OF A PROFESSIONAL LAND <br />UPON COMPLETION O THE E <br />SURVEYOR TO PERFORM AN "AS -BUILT" SURVEY_ THE "AS -BUILT" SURVEY SHALL INCLUDE LOCATION AND ELEVATION DATA FOR ALL <br />IMPROVEMENTS SPECIFI INFORMATION INCLUDED IN THE SURVEY SHALL BE AS FOLLOWS. <br />CONSTRUCTED C <br />1. ALL PAVEMENT SURFACES INCLUDING CURBS, WALKS, RAMPS, PADS, ETC. <br />2 ALL SANITARY SEWER <br />3 ALL STORM SEWER <br />4+HASKELL The Haskell Company <br />I I I Riverside Avenue <br />Jacksonville, Florida 32202 <br />Phone* (904)791-4500 <br />DRN. I REV. DATE I DRAM:INIM <br />DES, 3401007 <br />4 <br />NORTH AMERICA <br />CORPORATE ENGINEERING OFFICE <br />1322 CRESTSIDE DRIVE, SUITE 100 <br />COPPELL, TEXAS 75019 <br />4 ALL STORM DETENTION, RETENTION, AND WATER QUALITY POND GRADING <br />5, EMBANKMENT AND LAWN AREA GRADING <br />6 BUILDING FINISH FLOOR ELEVATION <br />7, BUILDING CORNER LOCATIONS <br />8 OUT BUILDINGS <br />9 WATER, GAS, BURIED ELECTRIC AND BURIED TELECOM LINES <br />10 LIGHT POLE LOCATIONS <br />11 STRIPING AND PAVEMENT MARKINGS <br />12 TREE LOCATIONS WITH SIZE AND SPECIES <br />PRELIMINARY <br />NOT FOR CONSTRUCTION <br />THIS DRAWING IS NOT IN FINAL FORM AND IS BEING TRANSMITTED SOLELY FOR REVIEW, <br />COMMENT AND INTERPRETATION BY THE PUBLIC AGENCY FURTHERMORE, THIS DOCUMENT <br />MAY SUBSEQUENTLY BE REVISED BY THE ENGINEER TO REFLECT RESOLUTION OF ISSUES WITH <br />THE PUBLIC AGENCY PRIOR TO FINAL ACTION BY THE AGENCY. CHANGES, REVISIONS AND <br />MODIFICATIONS MAY PROMPT ADDITIONAL DOCUMENT SUBMITTAL FOR AGENCY APPROVAL. <br />WAREHOUSE EXPANSION <br />ZEPHYRHILLS NATURAL SPRING WATER <br />ZEPHYRHILLS, FLORIDA <br />Mw Wwnw w g n I 'n - an Oft docuffm t N ** "* prop�rt�r of N1MIA <br />wW my not be oop W or dbd000d to olFlws wdm au�arls� by N IA <br />QATE: D.M.: Vw SCALE <br />2 <br />GENERAL NOTES <br />am D ISM <br />�C- 002 I� <br />In <br />C <br />0 <br />0 <br />1 <br />