SECTION 0100 - GENERAL REQUIREMENTS
<br />prepared and executed prior to the installation of any work.
<br />certificates are to be submitted to owner, with t-e original
<br />G.
<br />The Architect retains the right to adjust finish grades 6"
<br />posted at the job site as required by law.
<br />1.00
<br />CONSTRUCTION DOCUMENT NOTES:
<br />(+ or -) to conform to adjacent grades or to facilitate
<br />-
<br />drainage. The contractor may adjust grodes to balance cut
<br />H. Where items have been removed or left a depression the
<br />A.
<br />Drawings will not be scaled. Dimensional data is to be
<br />and fill provided the Architect agrees to adjustment prior
<br />contractor shall fill some back to surrounding natural grade.
<br />obtained through written information only. Verify all
<br />to beginning work.
<br />The fill material shall be placed in accordance with the
<br />existing conditions, elevations, and dimensions.
<br />H.
<br />The contractor will take whatever steps necessary to prevent
<br />requirements for fill contained in the soils report and/or
<br />B.
<br />Make no changes to the contract documents without first
<br />erosion resulting from increased runoff during site work
<br />section 0202 Eorthwork which ever is more stringent.
<br />receiving written permission from the Architect.
<br />construction, in accordance with all local codes.
<br />C.
<br />Where detailed information is locking, or if discrepancies
<br />I.
<br />The contractor will maintain positive drainage to prevent
<br />SECTION 0202 EARTHWORK
<br />should appear within the contract documents, request
<br />ponding on the sub -grade and surface grade.
<br />interpretation from the Architect before proceeding with
<br />J.
<br />The contractor is to verify and coordinate all underground
<br />1.00 GENERAL:
<br />that portion of the work.
<br />service to the building, as well as any landscape sleeving
<br />D.
<br />All work, as outlined in these documents,.sholl strictly
<br />prior to paving.
<br />A. All work performed under this section shall be done in
<br />conform to all applicable codes and ordinances. The most
<br />K.
<br />The contractor shall remove trash, debris, and weeds from
<br />strict conformance with the requirements of this section or the
<br />stringent sholl govern.
<br />site. Cut grass, rake yard, as well as landscape along the
<br />Soils Reports which ever is the more stringent.
<br />E.
<br />When a material system is called out, oil parts and
<br />R.O.W. to the property line.
<br />materials required to complete the system will be furnished
<br />L.
<br />Any areas whether on -site or off -site disturbed during the
<br />Soils report prepared by:
<br />and installed as port of the contract.
<br />construction process shall be returned to their natural
<br />F.
<br />Unless otherwise noted, electrical conduits, plumbing lines,
<br />state by the contractor prior to final acceptance of the
<br />ADVANCED TESTING LABORATORIES OF FLORIDA 10/12/95
<br />DATED:
<br />etc., are to be concealed, and froming shall be of adequate
<br />project by the owner.
<br />size to accomplish this result without changes in the wall
<br />B. The required eorthwork to be accomplished is to provide a
<br />pion.
<br />SECTION
<br />0201 DEMOLITION
<br />minimum of 2000 psi. bearing pressure.
<br />G.
<br />It is the intent of these contract documents to define a
<br />complete finished facility. Any discrepancy or omissions
<br />1.00
<br />CONDITION OF EXISTING PREMISES:
<br />2.00 MATERIAL:
<br />which normally would be required ore to be provided and
<br />finished as if specifically noted.
<br />A.
<br />Owner assumes no responsibility for the condition of any
<br />A. AS REQUIRED BY THE SOILS REPORT
<br />H.
<br />All property lines, angles, contours, elevations, curb cuts,
<br />building(s) on site, nor any construction existing at the
<br />and utilities ore taken from the survey prepared by
<br />time construction commences.
<br />3.00 EXCAVATING:
<br />MCKEAN AND ASSOCIATES SURVEYORS 10/19/95
<br />B.
<br />Contractor sholl accept premises as found; clear building
<br />Dated:
<br />site as'specified. Assume risk regarding damage or loss
<br />A. Excavate to elevations and dimensions indicated on the
<br />CODE
<br />INFORMATION TYPE OCCUPANCY: MERCANTILE
<br />whether by reason of fire, theft, or other casualty or
<br />Drawings and as required to accommodate the insto!lotion and
<br />BUILDING: SBC '85 TYPE CONSTRUCTION: IV
<br />happening, to specified building(s) from and after date of
<br />remain within the Code Limitations.
<br />ELECTRICAL: NEC '84 FLOOR AREA: 6,889 (GROSS) SO. FT.
<br />beginning construction; no such damage or loss shall relieve
<br />B. Where removal of surface and subsurface obstructions have
<br />PLUMBING: SPC '82 6,471 (NET) SQ. FT.
<br />contractor of contractual obligation to complete work.
<br />created depressions, open the depressions to equipment
<br />r MECHANICAL: SMC 82 N0. OF STORIES: ONE
<br />working width and remove debris and unsuitable material.
<br />2.00
<br />EXECUTION:
<br />C. Provide berms or channels to prevent flooding to s::bgrode;
<br />ACTUAL MAX. HEIGHT: 18 FEET
<br />promptly remove all water collecting in depressions and
<br />A.
<br />All work is to be accomplished in strict accordance with all
<br />excavations.
<br />1.01
<br />GENERAL CONSTRUCTION NOTES:
<br />ordinances and requirements of the governing local, state
<br />D. Remove soil that has been softened by flooding or placement
<br />and/or federal agency applicable to this project.
<br />during unfavorable weather and recompoct as specified.
<br />A.
<br />Contractor sholl be responsible for and furnish all materials
<br />B.
<br />Within the subject property the intent is to have a clean,
<br />E. The bottom of oil footings sholI be founded 36" below floor,
<br />and labor necessary to complete the project unless a specific
<br />clear site free of all existing items noted to be removed in
<br />6" below frostline, or 24" below finish grade, whichever is
<br />item is called out to be furnish and/or installed by others.
<br />order to permit the construction of the new project.
<br />greater.
<br />B.
<br />Contractor shall secure and pay for all necessary permits,
<br />C.
<br />Remove all utilities to existing structures whether shown or
<br />F. Site will be cleared of all topsoil, fill, rubble, etc,
<br />utility tops, etc. required. The Owner shall reimburse
<br />not. Cut and cap all underground lines at the property line.
<br />Required fill shall be placed in lifts to obtain c minimum
<br />the Contractor the cost of some upon the furnishing of proper
<br />D.
<br />For all items noted to be removed, remove not only above
<br />compaction of 95% standard Proctor at or slightly above
<br />receipts and documentation.
<br />ground elements but all underground elements as well,
<br />optimum moisture, or as may be required by the Soils Report.
<br />C.
<br />Contractor to coordinate oil utility lines and meter locations
<br />including but not necessarily limited to foundations,
<br />G. All paved areas are to be fine graded to within 1/10th of a
<br />with the appropriate utilities and other trades to ovoid
<br />grovel fills, tree roots, etc.
<br />foot of finished grade required to receive paving system.
<br />conflicts and problems.
<br />E.
<br />Protect all items noted to remain.
<br />Remove all clods, debris, refuse and deleterious materials.
<br />D.
<br />Any unresolved conflicts or discrepancies with the contract
<br />F.
<br />If this work is being performed under a separate contract,
<br />H. All landscaped areas shall be fine graded to within 1/10th
<br />documents are to be brought to the attention of the project
<br />notify the project manager immediately upon completion of
<br />of a foot of finished grade required to receive Iandscape
<br />architect for resolution prior to the work installed.
<br />work in order to allow new construction to commence at the
<br />material. Remove all clods, debris, refuse and de eterious
<br />This project may include off -site (beyond the actual property
<br />earliest possible date.
<br />materials.
<br />lines) work as part of the contract. Contractor to complete
<br />G.
<br />The contractor shall obtain any required permits and/or
<br />some and furnish some warranties as required for on -site work.
<br />notices authorizing building demolition and disposal of
<br />F.
<br />Any additional work whether on -site or off -site requested or
<br />debris. The contractor shall obtain all required
<br />required by a governing regulatory agency as being required for
<br />certificates of severance of utility services as may be
<br />-
<br />completion or occupancy permit shall first be discussed with
<br />required by local utility companies. Copies of permits an
<br />the project architect so as to clearly define the required
<br />f�
<br />scope of work. Then cost estimates and change order shall be
<br />114
<br />�n o
<br />r` rn
<br />I I
<br />LO LO
<br />rn M
<br />®
<br />0 0
<br />rn rn
<br />x
<br />®
<br />M
<br />Cl
<br />Z
<br />o0
<br />W "'
<br />z
<br />(L vi
<br />®
<br />O=
<br />J w
<br />W�
<br />W
<br />a
<br />W z
<br />� o
<br />0
<br />o
<br />U)
<br />Z
<br />0
<br />F-
<br />WLn Ln
<br />U_
<br />} ci1
<br />LL
<br />W
<br />U
<br />J J
<br />W
<br />�J
<br />J
<br />--I
<br />Q
<br />_J
<br />Q=
<br />�
<br />�L�
<br />W
<br />N M W
<br />F-
<br />s d) N
<br />=
<br />U
<br />C
<br />a
<br />Q
<br />REVISION
<br />W
<br />Z
<br />2.
<br />O
<br />Z
<br />N
<br />3.
<br />4.
<br />ARCHITECT:
<br />DRAFTSMAN:
<br />CHECKED.
<br />10/16/95
<br />SPECS
<br />i
<br />AS
<br />
|