SECTION 0100 - GENERAL REQUIREMENTS <br />prepared and executed prior to the installation of any work. <br />certificates are to be submitted to owner, with t-e original <br />G. <br />The Architect retains the right to adjust finish grades 6" <br />posted at the job site as required by law. <br />1.00 <br />CONSTRUCTION DOCUMENT NOTES: <br />(+ or -) to conform to adjacent grades or to facilitate <br />- <br />drainage. The contractor may adjust grodes to balance cut <br />H. Where items have been removed or left a depression the <br />A. <br />Drawings will not be scaled. Dimensional data is to be <br />and fill provided the Architect agrees to adjustment prior <br />contractor shall fill some back to surrounding natural grade. <br />obtained through written information only. Verify all <br />to beginning work. <br />The fill material shall be placed in accordance with the <br />existing conditions, elevations, and dimensions. <br />H. <br />The contractor will take whatever steps necessary to prevent <br />requirements for fill contained in the soils report and/or <br />B. <br />Make no changes to the contract documents without first <br />erosion resulting from increased runoff during site work <br />section 0202 Eorthwork which ever is more stringent. <br />receiving written permission from the Architect. <br />construction, in accordance with all local codes. <br />C. <br />Where detailed information is locking, or if discrepancies <br />I. <br />The contractor will maintain positive drainage to prevent <br />SECTION 0202 EARTHWORK <br />should appear within the contract documents, request <br />ponding on the sub -grade and surface grade. <br />interpretation from the Architect before proceeding with <br />J. <br />The contractor is to verify and coordinate all underground <br />1.00 GENERAL: <br />that portion of the work. <br />service to the building, as well as any landscape sleeving <br />D. <br />All work, as outlined in these documents,.sholl strictly <br />prior to paving. <br />A. All work performed under this section shall be done in <br />conform to all applicable codes and ordinances. The most <br />K. <br />The contractor shall remove trash, debris, and weeds from <br />strict conformance with the requirements of this section or the <br />stringent sholl govern. <br />site. Cut grass, rake yard, as well as landscape along the <br />Soils Reports which ever is the more stringent. <br />E. <br />When a material system is called out, oil parts and <br />R.O.W. to the property line. <br />materials required to complete the system will be furnished <br />L. <br />Any areas whether on -site or off -site disturbed during the <br />Soils report prepared by: <br />and installed as port of the contract. <br />construction process shall be returned to their natural <br />F. <br />Unless otherwise noted, electrical conduits, plumbing lines, <br />state by the contractor prior to final acceptance of the <br />ADVANCED TESTING LABORATORIES OF FLORIDA 10/12/95 <br />DATED: <br />etc., are to be concealed, and froming shall be of adequate <br />project by the owner. <br />size to accomplish this result without changes in the wall <br />B. The required eorthwork to be accomplished is to provide a <br />pion. <br />SECTION <br />0201 DEMOLITION <br />minimum of 2000 psi. bearing pressure. <br />G. <br />It is the intent of these contract documents to define a <br />complete finished facility. Any discrepancy or omissions <br />1.00 <br />CONDITION OF EXISTING PREMISES: <br />2.00 MATERIAL: <br />which normally would be required ore to be provided and <br />finished as if specifically noted. <br />A. <br />Owner assumes no responsibility for the condition of any <br />A. AS REQUIRED BY THE SOILS REPORT <br />H. <br />All property lines, angles, contours, elevations, curb cuts, <br />building(s) on site, nor any construction existing at the <br />and utilities ore taken from the survey prepared by <br />time construction commences. <br />3.00 EXCAVATING: <br />MCKEAN AND ASSOCIATES SURVEYORS 10/19/95 <br />B. <br />Contractor sholl accept premises as found; clear building <br />Dated: <br />site as'specified. Assume risk regarding damage or loss <br />A. Excavate to elevations and dimensions indicated on the <br />CODE <br />INFORMATION TYPE OCCUPANCY: MERCANTILE <br />whether by reason of fire, theft, or other casualty or <br />Drawings and as required to accommodate the insto!lotion and <br />BUILDING: SBC '85 TYPE CONSTRUCTION: IV <br />happening, to specified building(s) from and after date of <br />remain within the Code Limitations. <br />ELECTRICAL: NEC '84 FLOOR AREA: 6,889 (GROSS) SO. FT. <br />beginning construction; no such damage or loss shall relieve <br />B. Where removal of surface and subsurface obstructions have <br />PLUMBING: SPC '82 6,471 (NET) SQ. FT. <br />contractor of contractual obligation to complete work. <br />created depressions, open the depressions to equipment <br />r MECHANICAL: SMC 82 N0. OF STORIES: ONE <br />working width and remove debris and unsuitable material. <br />2.00 <br />EXECUTION: <br />C. Provide berms or channels to prevent flooding to s::bgrode; <br />ACTUAL MAX. HEIGHT: 18 FEET <br />promptly remove all water collecting in depressions and <br />A. <br />All work is to be accomplished in strict accordance with all <br />excavations. <br />1.01 <br />GENERAL CONSTRUCTION NOTES: <br />ordinances and requirements of the governing local, state <br />D. Remove soil that has been softened by flooding or placement <br />and/or federal agency applicable to this project. <br />during unfavorable weather and recompoct as specified. <br />A. <br />Contractor sholl be responsible for and furnish all materials <br />B. <br />Within the subject property the intent is to have a clean, <br />E. The bottom of oil footings sholI be founded 36" below floor, <br />and labor necessary to complete the project unless a specific <br />clear site free of all existing items noted to be removed in <br />6" below frostline, or 24" below finish grade, whichever is <br />item is called out to be furnish and/or installed by others. <br />order to permit the construction of the new project. <br />greater. <br />B. <br />Contractor shall secure and pay for all necessary permits, <br />C. <br />Remove all utilities to existing structures whether shown or <br />F. Site will be cleared of all topsoil, fill, rubble, etc, <br />utility tops, etc. required. The Owner shall reimburse <br />not. Cut and cap all underground lines at the property line. <br />Required fill shall be placed in lifts to obtain c minimum <br />the Contractor the cost of some upon the furnishing of proper <br />D. <br />For all items noted to be removed, remove not only above <br />compaction of 95% standard Proctor at or slightly above <br />receipts and documentation. <br />ground elements but all underground elements as well, <br />optimum moisture, or as may be required by the Soils Report. <br />C. <br />Contractor to coordinate oil utility lines and meter locations <br />including but not necessarily limited to foundations, <br />G. All paved areas are to be fine graded to within 1/10th of a <br />with the appropriate utilities and other trades to ovoid <br />grovel fills, tree roots, etc. <br />foot of finished grade required to receive paving system. <br />conflicts and problems. <br />E. <br />Protect all items noted to remain. <br />Remove all clods, debris, refuse and deleterious materials. <br />D. <br />Any unresolved conflicts or discrepancies with the contract <br />F. <br />If this work is being performed under a separate contract, <br />H. All landscaped areas shall be fine graded to within 1/10th <br />documents are to be brought to the attention of the project <br />notify the project manager immediately upon completion of <br />of a foot of finished grade required to receive Iandscape <br />architect for resolution prior to the work installed. <br />work in order to allow new construction to commence at the <br />material. Remove all clods, debris, refuse and de eterious <br />This project may include off -site (beyond the actual property <br />earliest possible date. <br />materials. <br />lines) work as part of the contract. Contractor to complete <br />G. <br />The contractor shall obtain any required permits and/or <br />some and furnish some warranties as required for on -site work. <br />notices authorizing building demolition and disposal of <br />F. <br />Any additional work whether on -site or off -site requested or <br />debris. The contractor shall obtain all required <br />required by a governing regulatory agency as being required for <br />certificates of severance of utility services as may be <br />- <br />completion or occupancy permit shall first be discussed with <br />required by local utility companies. Copies of permits an <br />the project architect so as to clearly define the required <br />f� <br />scope of work. Then cost estimates and change order shall be <br />114 <br />�n o <br />r` rn <br />I I <br />LO LO <br />rn M <br />® <br />0 0 <br />rn rn <br />x <br />® <br />M <br />Cl <br />Z <br />o0 <br />W "' <br />z <br />(L vi <br />® <br />O= <br />J w <br />W� <br />W <br />a <br />W z <br />� o <br />0 <br />o <br />U) <br />Z <br />0 <br />F- <br />WLn Ln <br />U_ <br />} ci1 <br />LL <br />W <br />U <br />J J <br />W <br />�J <br />J <br />--I <br />Q <br />_J <br />Q= <br />� <br />�L� <br />W <br />N M W <br />F- <br />s d) N <br />= <br />U <br />C <br />a <br />Q <br />REVISION <br />W <br />Z <br />2. <br />O <br />Z <br />N <br />3. <br />4. <br />ARCHITECT: <br />DRAFTSMAN: <br />CHECKED. <br />10/16/95 <br />SPECS <br />i <br />AS <br />