Laserfiche WebLink
Digitally signed by <br />taICS® Thomas V Platania <br />® cncta"2s4 ProCalcs, LLc Date: 2020.11.18 <br />14:58:37-05'00' <br />Signature can only be verified and <br />validated with electronic copy of <br />documents. <br />HVAC DESIGN FOR <br />POINT WEST ENGINEERING <br />PEREYRA RESIDENCE <br />General Notes <br />Please note not all notes may apply. <br />1. CONTRACTOR SHALL PROVIDE A COMPLETE AND OPERABLE MECHANICAL SYSTEM. <br />2. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE. CAREFUL ATTENTION SHALL BE PAID TO PRECISE LOCATION AND <br />COORDINATION OF DIFFUSERS, REGISTERS, AND GRILLES WITH STRUCTURAL FRAMING AND ELECTRICAL FIXTURES AT <br />CEILING LOCATIONS. ELECTRICAL FIXTURES AT CEILING TAKE PRIORITY OVER DUCT LAYOUT. ELECTRICAL FIXTURES AT <br />CEILING ARE NOT TO BE MOVED FROM THEIR PROPOSED LOCATIONS. SEE THE REFLECTED CEILING PLANS, WHERE <br />AVAILABLE, FOR EXACT LOCATIONS OF CEILING FIXTURES. NO STRUCTURAL MEMBER SHALL BE CUT WITHOUT PERMISSION <br />FROM STRUCTURAL ENGINEER. <br />3. THE CONTRACTOR SHALL OBTAIN, AT HIS EXPENSE, ALL NECESSARY FEES, PERMITS, AND TESTS. <br />4. ALL WORK SHALL COMPLY WITH APPLICABLE CODES, REGULATIONS, ORDINANCES AND REQUIREMENTS OF AUTHORITIES <br />HAVING JURISDICTION. NO CONTRACTOR SHALL BID UNLESS FAMILIAR WITH THESE CODES. ALL WORK SHALL BE <br />EXECUTED IN A WORKMANLIKE MANNER AND SHALL PRESENT A NEAT, PROFESSIONAL APPEARANCE WHEN COMPLETED. <br />ALL MATERIALS AND EQUIPMENT SHALL BE NEW. STORE AND INSTALL MATERIALS AND EQUIPMENT IN ACCORDANCE WITH <br />THE MANUFACTURER'S INSTRUCTIONS. <br />5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE HVAC SYSTEM(S) TO BE INSTALLED (REFRIGERANT LINES, EQUIPMENT, <br />DUCTWORK, GRILLES, ETC.). ADDITIONAL OFFSETS, TRANSITIONS, ETC. MAY BE REQUIRED TO PROVIDE A COMPLETE <br />SYSTEM. NO ABRUPT TRANSITIONS SHALL BE PERMITTED. THE MECHANICAL WORK HEREIN INCLUDES COMPLETE <br />SYSTEMS OF HEATING, AIR CONDITIONING (TEMPERATURE AND HUMIDITY CONTROL), VENTILATION, BATHROOM EXHAUST, <br />KITCHEN EXHAUST, AND ALL DUCTWORK. THE CONTRACTOR SHALL PROVIDE EACH ELEMENT THEREOF, AS INDICATED <br />HEREIN, OR REASONABLY INFERRED (WHETHER OR NOT SPECIFICALLY CALLED FOR BY ITEM), REASONABLY NECESSARY TO <br />FACILITATE EACH SYSTEM'S FUNCTIONING AS INDICATED BY THE DESIGN AND EQUIPMENT SPECIFIED. CONTRACTOR SHALL <br />VERIFY SPACE CONDITIONS PRIOR TO THE FABRICATION OR INSTALLATION OF ANY WORK. <br />6. THE CONDENSING UNIT AND AIR HANDLING UNIT EQUIPMENT SHALL BE AS SPECIFIED OR ARCHITECT APPROVED <br />SUBSTITUTE. <br />7. PRIOR TO START OF THE HVAC WORK, THE CONTRACTOR SHALL SUBMIT, TO THE ARCHITECT, AN UPDATED MANUAL J LOAD <br />ANALYSIS, BASED ON THE FINAL CONTRACTOR DOCUMENTS AND ACTUAL MATERIALS AND PRODUCTS SELECTED (ie: <br />BUILDING ENVELOPE INSULATION, EXTERIOR DOOR GLAZING, AND ANY OTHER APPLICABLE FACTORS THAT WOULD AFFECT <br />THE UPDATED MANUAL J LOAD ANALYSIS). THE SIZING OF THE ACTUAL HVAC SYSTEMS TO BE UTILIZED (REFRIGERANT <br />LINES, EQUIPMENT, DUCTWORK, GRILLES, ETC.) SHALL BE BASED ON THE UPDATED MANUAL J LOAD ANALYSIS, THE <br />CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR PROPERLY SIZING THE HVAC SYSTEM. <br />8. THE CONTRACTOR SHALL COORDINATE A "MECHANICAL WALK-THROUGH" MEETING, WHICH IS TO OCCUR PRIOR TO THE <br />START OF THE MECHANICAL ROUGH -IN. THE PURPOSE FOR THIS MEETING IS TO ALLOW THE OWNER, ARCHITECT, AND <br />CONTRACTOR TO REVIEW AND COORDINATE FINAL DUCT AND AIR DEVICE LOCATIONS. THE MECHANICAL <br />SUBCONTRACTOR'S FOREMAN IS TO ATTEND THIS MEETING AS WELL. <br />9. NO CHANGES TO THE HVAC PLANS OR NOTES SHALL BE PERMITTED WITHOUT PROCALCS, LLC. PRIOR APPROVAL. <br />10. REFRIGERANT PIPING SHALL BE TYPE "L" SOFT DRAWN COPPER, ASTM B280, AND SHALL BE MILL CLEANED, DRIED AND <br />CAPPED. INSULATE REFRIGERANT SUCTION LINE WITH " WALL FOAMED PLASTIC INSULATION SLIPPED OVER TUBING AND <br />ALL JOINTS THOROUGHLY SEALED. PAINT REFRIGERANT PIPING INSULATION WITH TWO (2) COATS OF ACRYLIC PROTECTIVE <br />PAINT WHERE INSULATION IS EXPOSED TO WEATHER. <br />11. ALL FIBERGLASS DUCTWORK SHALL BE 1-1/2" FIBROUS GLASS ANTI -MICROBIAL DUCTBOARD INSTALLED IN ACCORDANCE <br />WITH THE LATEST EDITION OF S.M.A.C.N.A. FIBROUS GLASS DUCT CONSTRUCTION STANDARDS. 1" FIBROUS GLASS <br />ANTI -MICROBIAL DUCTBOARD MAY BE USED IN THOSE LOCATIONS WHERE ALLOWED BY CODE. NO ABRUPT TRANSITIONS <br />SHALL BE PERMITTED. PROVIDE AIR TURNING VEINS IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS. <br />12. FLEXIBLE DUCTWORK SHALL BE THERMAFLEX M-KA TYPE WITH 1-1/2" ONE -POUND DENSITY INSULATION AND VINYL VAPOR <br />BARRIER OR ARCHITECT APPROVED SUBSTITUTE. NO ABRUPT TRANSITIONS SHALL BE PERMITTED. <br />13. DUCT SIZES SHOWN ARE INSIDE NET DIMENSIONS. <br />14. ALL AIR DEVICES SHALL BE MANUFACTURED BY TITUS, 250 SERIES, OR APPROVED SUBSTITUTE. COLOR TO BE APPROVED <br />BY THE PROFESSIONAL OF RECORD PRIOR TO PAINTING GRILLES BUT ASSUMED TO BE WHITE FOR BID/BUDGET PURPOSES. <br />SUPPLY AIR REGISTERS SHALL BE DOUBLE DEFLECTION TYPE WITH OPPOSED BLADE DAMPERS. ALL SIZES AND PATTERNS <br />ARE NOTED ON THE MECHANICAL PLANS. <br />15. FOR EACH RETURN AIR GRILLE, PROVIDE 3M FILTRETE 1000 MICRO ALLERGEN PLEATED AIR FILTERS (3M, 800-49403552, <br />www.filtrete.com, MERV RATING: 11, PRESSURE DROP: .2 @ 300 FPM, OR APPROVED SUBSTITUTE). PRIOR TO INSTALLATION, <br />THE CONTRACTOR SHALL VERIFY THAT THE AIR VELOCITY NOICE ACROSS EACH RETURN AIR FILTER WILL BE LOW, BASED <br />ON THE PRESSURE DROP FOR PROPOSED FILTER TYPE AND THE PROPOSED RETURN AIR GRILLE SIZE(S). ANY RETURN AIR <br />FILTER GRILLES THAT ARE REQUIRED TO BE RESIZED BY THE CONTRACTOR, ARE TO BE SIZED FOR FILTER SIZES THAT ARE <br />READILY AVAILABLE AT HOME SUPPLY STORES. CUSTOM SIZES ARE NOT PERMITTED. <br />16. ALL BATH, KITCHEN, AND DRYER EXHAUST(S) SHALL BE VENTED TO THE EXTERIOR. <br />17. ALL BATH EXHAUST FANS SHALL BE DUCTED WITH 4" R-FIN. SLOPE AND FULLY SUPPORT ALL BATHROOM EXHAUST DUCTS <br />TO AVOID ANY SNAGS IN THE DUCT AND TO ALLOW FOR PROPER DRAINAGE. TERMINATE AT SOFFIT WITH SCREENED <br />GRILLE, UNLESS OTHERWISE NOTED. <br />18. PROVIDE BACKDRAFT DAMPERS FOR ALL EXHAUST FANS. <br />19. ALL EXHAUST AIR DUCTS SHALL BE GALVANIZED SHEET METAL CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH <br />ASHRAE AND SMACNA STANDARDS.D <br />20. TESTING, ADJUSTING, AND BALANCING: THE CONTRACTOR SHALL BALANCE THE AIRFLOW DISTRIBUTION SYSTEMS, <br />INCLUDING SUB MAINS, BRANCHES, AND TERMINALS TO QUANTITIES INDICATED ON THE UPDATED MANUAL J LOAD <br />ANALYSIS (FOR RESIDENTIAL PROPERTIES) AND MANUAL J (COMMERCIAL PROPERTIES). <br />21. PROVIDE DRAW -THROUGH CONDENSATE TRAP AT EACH UNIT CONDENSATE DRAIN. DEPTH SHALL BEAT LEAST 1-1/2 TIMES <br />THE TOTAL S.P DROP OF THE UNIT. <br />22. PROVIDE PROGRAMMABLE SERIES 7-DAY THERMOSTAT. PRIOR TO ORDERING THE THERMOSTAT, THE CONTRACTOR SHALL <br />VERIFY THAT THE SPECIFIED THERMOSTAT WILL OPERATE PROPERLY WITH THE PROPOSED AIR CONDITIONING EQUIPMENT. <br />IF A SUBSTITUTE IS REQUIRED, CONTRACTOR MUST SUBMIT PRODUCT INFORMATION TO ARCHITECT FOR PRODUCT <br />APPROVAL. COORDINATE THERMOSTAT LOCATION WITH FURNITURE/EQUIPMENT LAYOUTS, WINDOWS AND DOOR SWINGS. <br />THERMOSTAT MUST BE LOCATED AT 54" A.F.F. AND NOT LOCATED ON AN OUTSIDE WALL. <br />23. SUPPLY AND RETURN AIR GRILLES SHALL MAINTAIN A MINIMUM DISTANCE OF 3'-0" FROM CEILINGS FANS. <br />24. ALL DUCT BRANCHES, PER ACCA MANUAL D, SHOULD INCLUDE DAMPERS FOR PROPER AIR FLOW AND BALANCING, <br />25. NO EQUIPMENT SHALL BE PURCHASED UNTIL REVIEW BY THE PROFESSIONAL OF RECORD, EVEN IF EQUIPMENT HAS BEEN <br />SPECIFIED. <br />26. ANY VARIATION FROM THE DESIGN PRESENTED COULD AFFECT SYSTEM PERFORMANCE. <br />27. EQUIPMENT SHALL BEAR A U.L. OR OTHER RECOGNIZED LABEL, NAMEPLATES, WIRING DIAGRAMS, AND ENERGY RATINGS, <br />AS APPLICABLE. <br />28. CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND ACCESSORIES SO THAT IT IS READILY ACCESSIBLE FOR SERVICING, <br />TESTING, BALANCING AND REPLACEMENT. <br />29. CONTRACTOR SHALL PROVIDE A WRITTEN GUARANTEE AGAINST DEFECTS WALL MATERIALS AND WORKMANSHIP FOR ONE <br />(1) YEAR FROM ACCEPTANCE WITH FOUR ADDITIONAL YEARS OF WARRANTY ON COMPRESSORS. <br />30. PRIOR TO ACCEPTANCE BY THE OWNER, THE SYSTEMS SHALL BE TESTED AND BALANCED BY A AABC OR NEBB CERTIFIED <br />T&B CONTRACTOR EXPERIENCED WITH THIS SYSTEM. THE CONTRACTOR SHALL CERTIFY THE TESTING AND BALANCING <br />WITHIN +/- 10 % OF DESIGN CFMS AND PROVIDE BALANCE TEST SHEETS. <br />31. AIR BALANCE TO BE PERFORMED BY THE AIR CONDITIONING CONTRACTOR TO THE OWNER'S COMFORT. ALL SUPPLY AND <br />RETURN DUCTWORK SHALL BE INSTALLED IN ACCORDANCE T MA NA WITH <br />I S C STANDARDS AND LOCAL BUILDING CODES. <br />32. PROVIDE ALL CONTROLS, STARTERS, CONTROL WIRING, DISCONNECTS, AND OTHER ELECTRICAL EQUIPMENT AS REQUIRED <br />FOR A COMPLETE AND OPERATIONAL SYSTEM. MECHANICAL CONTRACTOR IS TO COORDINATE WITH OTHER <br />CONTRACTORS TO ENSURE THAT ALL ITEMS REQUIRED ARE INCLUDED IN <br />33. COORDINATE ALL POWER AND CONTROL WIRING WITH ELECTRICIAN. <br />- 'We are the missing place' <br />PO Box 882032 <br />Port Saint Lucie, FL 34988 <br />Phone:772-882-5700 <br />www,ProCalcs.Net <br />tom@procalcs.net <br />License CAC1815254 <br />No. Revision/Issue Date <br />1 Issue 11118/202 <br />For: <br />Point West Engineering <br />PO Box 360035 <br />Tampa, FL,33673 <br />Drawn By: Sheet <br />AAG <br />Checked By: <br />TP M_ 1 <br />Date: <br />11/18/2020. <br />Scale: <br />As Shown <br />