I I
<br />I I i
<br />I I I
<br />I
<br />I I
<br />I I
<br />I
<br />1
<br />228.35'
<br />I
<br />I I
<br />I I
<br />I
<br />1
<br />228.35'
<br />- - - - - - - - - - - - - - - - - - - - - -
<br />/
<br />\
<br />\
<br />\ \
<br />IAREA
<br />OF INTERIOR
<br />1
<br />\
<br />REMODELING
<br />I
<br />existing
<br />/
<br />1
<br />N
<br />/
<br />building
<br />•cp.
<br />II I
<br />r
<br />I -
<br />I i
<br />W
<br />11-10*
<br />1
<br />-
<br />I 1
<br />GENERAL NOTES:
<br />1. ALL WORK SHALL CONFORM WITH THE LATEST EDITIONS OF THE
<br />FLORIDA BUILDING CODE 2006 WITH 2O07 SUPPLEMENTS, FLORIDA
<br />PLUMBING CODE 2004, FLORIDA MECHANICAL CODE 2005, THE
<br />NATIONAL ELECTRICAL CODE 2005/FLORIDA ACCESSIBILITY CODE
<br />2004 AND ALL OTHER APPLICABLE LOCAL, STATE AND FEDERAL
<br />CODES AND ORDINANCES AND ALL AUTHORITIES HAVING LOCAL
<br />JURISDICTION.
<br />2. THESE CONSTRUCTION DOCUMENTS HAVE BEEN PREPARED FROM
<br />THE MOST COMPLETE INFORMATION AVAILABLE TO THE ENGINEER.
<br />ALL DATA ON EXISTING CONSTRUCTION CONDITIONS ARE
<br />APPROXIMATE AND SHALL BE VERIFIED PRIOR TO COMMENCING
<br />ANY WORK.
<br />3. IT SHALL BE THE GC AND SUBCONTRACTOR'S RESPONSIBILITY TO
<br />PERSONALLY FIELD INSPECT THE JOB SITE PRIOR TO SUBMITTING
<br />HIS BID. THE INSPECTION IS REQUIRED SO THAT THE
<br />CONTRACTOR SHALL BE TOTALLY FAMILIAR WITH THE EXISTING
<br />CONDITIONS AND THEIR INTERFACE WITH THE NEW CONSTRUCTION
<br />AS DEFINED IN THESE CONSTRUCTION DOCUMENTS.
<br />4. ANY ADJUSTMENT TO THE CONSTRUCTION CONTRACT, ADDITIONS,
<br />DELETIONS OR CHANGE ORDERS, SHALL BE APPROVED BY THE
<br />OWNER, GENERAL CONTRACTOR AND ARCHITECT IN WRITING.
<br />5. ALL WORK (EQUIPMENT, MATERIALS AND LABOR) SHALL HAVE A
<br />MINIMUM WRITTEN GUARANTEE FOR A PERIOD OF ONE (1) YEAR,
<br />UNLESS SPECIFIED OTHERWISE, FROM THE DATE OF SUBSTANTIAL
<br />COMPLETION AGAINST ANY DEFECTS IN SAID WORK WITH
<br />APPROPRIATE REPAIR OR REPLACEMENT AT NO ADDITIONAL COST
<br />TO THE OWNER.
<br />6. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN A NEAT AND FIRST
<br />CLASS WORKMANLIKE MANNER. THE ARCHITECT RESERVES THE RIGHT TO DIRECT
<br />THE REMOVAL AND REPLACEMENT OF ANY ITEM, IN HIS OPINION, THAT DOES NOT
<br />PRESENT AN ORDERLY AND REASONABLY NEAT OR WORKMANLIKE APPEARANCE.
<br />THE REMOVAL AND REPLACEMENT SHALL BE DONE WHEN DIRECTED BY THE
<br />GENERAL CONTRACTOR AND PROJECT MANAGER AND/OR ARCHITECT/ENGINEER
<br />WITH OUT ADDITIONAL COST TO THE OWNER.
<br />7. THE CONTRACTOR SHALL COMPLY WITH THE MANUFACTURER'S INSTRUCTIONS AND
<br />RECOMMENDATIONS TO THE EXTENT PRINTED INFORMATION IS MORE DETAILED OR
<br />STRINGENT THAN REQUIREMENTS CONTAINED DIRECTLY IN THE PLANS.
<br />8. CONTRACTOR SHALL MAINTAIN ORDERLY HOUSEKEEPING DURING THE PROCESS OF
<br />CONSTRUCTION AND UPON COMPLETION SHALL THOROUGHLY CLEAN ALL AREAS.
<br />FINAL CLEAN UP SHALL INCLUDE THE FOLLOWING:
<br />A. SWEEPING FLOORING.
<br />B. DUSTING AND REMOVAL OF DIRT, PAINT DRIPPINGS, OIL,
<br />GREASE AND OTHER BLEMISHES FROM ALL SURFACES,
<br />INCLUDING PIPING AND EQUIPMENT.
<br />C. WINDOWS, GLASS, LIGHTS AND MIRRORS SHALL BE WASHED
<br />AND CLEANED.
<br />D. PAINT OVERRUNS AND PUTTY SMEARS SHALL BE REMOVED.
<br />E. HARDWARE SHALL BE CLEANED AND POLISHED WITH FLANNEL
<br />CLOTH.
<br />9. WORK TO BE DONE CONSISTS OF FURNISHING ALL MATERIALS, LABOR, EQUIPMENT,
<br />TOOLS AND ALL ITEMS AND SERVICES REQUIRED FOR CONSTRUCTION IN
<br />CONFORMITY WITH GENERAL NOTES AND PLANS.
<br />10. THE PLANS SHOW THE LOCATION OF ALL FIXTURES AND EQUIPMENT AND ARE
<br />INTENDED TO CONVEY THE GENERAL INTENT OF THE WORK IN SCOPE AND
<br />LAYOUT. THEY ARE NOT INTENDED TO SHOW IN MINUTE DETAIL EVERY AND ALL
<br />OF THE ACCESSORIES INTENDED FOR THE PURPOSE OF EXECUTION OF THE
<br />WORK, BUT IT IS UNDERSTOOD THAT SUCH DETAILS ARE PART OF THIS WORK.
<br />11. THE SUBCONTRACTORS SHALL REMOVE ALL CONSTRUCTION RUBBISH, SCAFFOLDING,
<br />EQUIPMENT, TEMPORARY PROTECTION, TEMPORARY FIELD STRUCTURES AND OTHER
<br />COMPONENTS WHICH WERE REQUIRED IN CONNECTION WITH THE CONSTRUCTION, BUT
<br />NOT A PERMANENT PART THEREOF.
<br />12. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND INSPECTIONS
<br />REQUIRED FOR THE WORK AND PAY ALL CHARGES INCIDENTAL THERETO.
<br />13. PROVIDE DOOR HARDWARE IN CONFORMANCE WITH ADA REQUIREMENTS.
<br />14. THE CONTRACTOR/GC SHALL PROVIDE ALL MISCELLANEOUS FACILITIES AS NEEDED,
<br />INCLUDING TEMPORARY STAIRS, TEMPORARY RAMPS, LADDERS, RUNWAYS, STAGING,
<br />SHORING, SCAFFOLDING, BRIDGES, RAILING, BRACING, BARRIERS, CLOSURES,
<br />PLATFORMS, TEMPORARY PARTITIONS, WASTE CHUTES AND SIMILAR ITEMS.
<br />15. THE CONTRACTOR SHALL PROTECT ALL CONSTRUCTION COMPONENTS DURING THE
<br />COURSE OF PAINTING AND SHALL PROMPTLY CLEAN ALL RESIDUE, SPLATTER OR
<br />OVER SPRAY UPON COMPLETION OF HIS WORK. THE CONTRACTOR SHALL USE DROP
<br />CLOTHES, MASKING AND OTHER SHIELDING DEVICES TO THE GREATEST EXTENT
<br />PRACTICAL TO PROTECT ALL ITEMS NOT TO BE PAINTED OR THOSE ITEMS WHICH
<br />HAVE ALREADY RECEIVED FINAL FINISH COATS. PROTECT THE STORE EQUIPMENT FROM
<br />DUST AT ALL TIMES.
<br />16. ALL PAINTING REQUIRED FOR THIS PROJECT SHALL BE PERFORMED IN ACCORDANCE
<br />WITH THE MANUFACTURER'S SPECS FOR PRODUCT HANDLING, SURFACE PREPARATION,
<br />PAINTING APPLICATION, CURING/DRYING TIME BETWEEN COATS, CLEANING AND
<br />PROTECTION OF PAINTED SURFACES UNTIL THE SOURCE OF CONSTRUCTION IS
<br />COMPLETE. PAINT COLORS TO BE SELECTED FOR THESE DOCUMENTS ARE AS
<br />MANUFACTURED BY GLIDDEN DIVISION OF SCM CORP. ALTERNATE ACCEPTABLE MFR.
<br />ARE AS FOLLOWS; BENJAMIN MOORE, D.P.I., RUSTOLEUM, PRATT LAMBERT, AND
<br />SHERWIN WILLIAMS.
<br />0' 20' 40'
<br />SCALE: 1 " = 20'
<br />LEGEND
<br />TYP
<br />R/W
<br />n
<br />TYPICAL
<br />RIGHT-OF-WAY
<br />PROPERTY LINE
<br />EXISTING SITE OUTLINE
<br />EXISTING BUILDING OUTLINE
<br />PROPOSED AREA OF REMODELING
<br />ADDRESS: 6042 GALL BLVD.
<br />ZEPHYHILLS, FLORIDA
<br />PARCEL ID: 03-26-21 -0010-11300-0000
<br />LEGAL DESCRIPTION:
<br />ZH COL SUB PB 1 PG 55 POR TR 113 LYING E OF US 301 DESC
<br />AS COM SE COR SEC TH NOODG 25MIN 50"W 497.30 FT TO PT ON
<br />WLY R/W LN FORT KING RD TH N25DG 39MIN 30"W 137.85 FT FOR
<br />POB TH W 177.53 FT TH S23DG 19MIN 56"E 135.82 FT TH S65DG
<br />25MIN 48"W 242.20 FT TO PT ON CV ON ELY R/W LN US 301 TH
<br />ALG CV CONCAVE TO ELY ON ARC OF 268. 29 FT RAD 1031.21 FT
<br />CHD 267. 53 FT BRG N07DG 11 MIN 58"W TH E 358.32 FT TO PT
<br />ON WILY R/W LN FORT KING RD TH S25DG 39MIN 30"E ALG R/W
<br />44.38 FT TO POB AKA MCDONALDS OR 796 PG 1777
<br />NOTES:
<br />1. THERE WILL BE NO SITE WORK IN THIS PROJECT.
<br />2. ALL WORK IS INTERIOR REMODELING, AS HATCHED ON
<br />THE BUILDING PORTION OF THE SITE PLAN.
<br />17. ALL DRYWALL PARTITIONS ARE DIMENSIONED FINISH TO FINISH
<br />UNLESS OTHERWISE NOTED. ALL MASONRY PARTITIONS ARE
<br />DIMENSIONED OUT TO OUT.
<br />18. ELECTRICAL PANELS, FIRE EXTINGUISHER CABINETS, ETC. LOCATED
<br />IN RATED PARTITIONS SHALL BE BACKED WITH DRYWALL AS
<br />REQUIRED TO MAINTAIN RATING. CONTRACTOR TO VERIFY WALL
<br />THICKNESS REQUIRED FOR ALL ELECTRICAL PANELS, FIRE
<br />EXTINGUISHER PANELS, ETC.
<br />19. PROVIDE DOUBLE STUDS AND BLOCKING WHERE REQUIRED TO
<br />SUPPORT MISCELLANEOUS ITEMS. EXAMPLE: TYPICAL CASEWORK
<br />CABINETS, GRAB BARS, ETC. CONTRACTOR SHALL FURNISH AND
<br />INSTALL ALL BACK-UP SUPPORTS.
<br />20. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE IN QUESTION, THE
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
<br />CLARIFICATION FROM THE OWNER'S REPRESENTATIVE BEFORE
<br />CONTINUING WITH CONSTRUCTION.
<br />21. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATE
<br />WITH ALL TRADES.
<br />22. CONTRACTOR SHALL VERIFY ALL EQUIPMENT LOCATIONS AND
<br />DIMENSIONS OF EQUIPMENT PRIOR TO INSTALLATION.
<br />23. REVIEW ALL ELECTRICAL LOCATIONS WITH OWNER BEFORE SIGN
<br />OFF FOR DRYWALL WORK.
<br />24. ALL THRESHOLDS AND FLOOR FINISH CHANGES TO BE PLACED
<br />UNDER CENTERLINE OF DOOR UNLESS -OTHERWISE NOTED.
<br />25. COORDINATE TELEPHONE AND SECURITY WITH OWNER BEFORE
<br />PROCEEDING.
<br />ALL WORK SHALL CONFORM WITH THE
<br />LATEST ADOPTED EDITIONS OF THE 2004
<br />FLORIDA BUILDING CODE INCLUDING
<br />ACCESSIBILITY, OTHER APPLICABLE
<br />CODES 2006 AND 2007 SUPPLEMENTS
<br />SUOISIA98
<br />cc
<br />a
<br />N
<br />a
<br />a
<br />W
<br />N
<br />O
<br />4)
<br />w
<br />Go
<br />a..
<br />aw
<br />Lan
<br />ti
<br />d'
<br />M
<br />ft .
<br />z
<br />Oct�O
<br />LL
<br />ca
<br />aJ
<br />�N�
<br />OIL
<br />-J(ON
<br />R
<br />Z
<br />O
<br />6
<br />Z
<br />U �
<br />CL CAI 0
<br />w
<br />:Dr
<br />z- M
<br />>LLI toort)
<br />Q� I oI,
<br />V) o I
<br />im OD O 6
<br />0
<br />F�. z
<br />O ` .' 00 w
<br />U-)�zX --I
<br />Om O QLL
<br />N Q 2 L�
<br />L� 0-
<br />U
<br />z
<br />w
<br />O
<br />0
<br />0
<br />Go
<br />a
<br />so..
<br />aA
<br />0
<br />Z
<br />a
<br />Z
<br />a
<br />J
<br />m
<br />W
<br />1"'
<br />a,
<br />JAMES M. WINTER, P.E.
<br />FL REG. 18313
<br />( ) NOV 0 3 -2008
<br />'� i
<br />THE DESIGN INDICATED IN THESE
<br />CONSTRUCTION DOCUMENTS DOES TO
<br />THE BEST OF MY KNOWLEDGE,
<br />(FORMATION, AND BELIEF COMPLY WIT
<br />THE APPLICABLE MINIMUM BUILDING
<br />CODES
<br />4�eet Nnmbe�