Laserfiche WebLink
I� <br />ABBREVIATIONS GENERAL NOTES VERSION CHANGES INDEX OF DRAWINGS <br />ABV -ABOVE MLDG -MOULDING VERSION DESCRIPTION OF CHANGES SHT NO: TITLE <br />AFF -ABOVE FINISH FLOOR MNT - MOUNT OR MOUNTING THE FOLLOWING TECHNICAL CODES SHALL APPLY: 1.0 PLAN REVISIONS CS COVER SHEET `o <br />N <br />AHU -AIR HANDLER. UNIT MO - MASONRY OPENING Al FOUNDATION PLAN 0 <br />A/C -AIR CONDITIONING MUNT - MUNTINS 2020 FLORIDA BUILDING CODE RESIDENTIAL, PLUMBING, MECHANICAL, FUEL GAS, 2.0 TYPICAL TRUSS CONNECTOR REVISION A2 1ST FLOOR PLAN M <br />ALUM - ALUMINUM # -NUMBER ENERGY EFFICIENCY, ACCESSIBILITY, AND NFPA 70 NATIONAL ELECTRICAL CODES 2017 <br />AT -ALUMINUM THRESHOLD OC - ON CENTER • ' - <br />3.0 ELEVATION A ENTRY PORCH ROOF UPDATE A3 2ND FLOOR PLAN M <br />_ J <br />AB -ANCHOR BOLT 4.0 FLORIDA BUILDING CODE 7TH EDITION 2020 UPDATE A4 ROOF PLAN 0y'c 00 <br />OGD -OVERHEAD GARAGE DOOR 2020 FBC PLUMBING RESIDENTIAL SECTION 604 � � a � <br />AVG -AVERAGE OPNG -OPENING 1. TANK TYPE WATER CLOSET VOLUME ( ) A4.1 2ND FLOOR FRAMING &ROOF PLAN <br />BFE -BASE FLOOD ELEVATION LO <br />OPP - OPPOSITE 1.6 GALLONS 5.0 ADDING K, L, M ELEVATIONS A5 EXTERIOR ELEVATIONS <br />BM -BEAM OPT - OPTIONAL A ° <br />A6 1ST FLOOR ELECTRICAL PLAN <br />BLK -BLOCK OH - OVER HANG 6.0 ADDED SHEETS WP2.0 AND WP2.1 TO SHEET INDEX A6.1 2ND FLOOR ELECTRICAL PLAN • Q <br />BLDG - BUILDING 2. WATER - FLOW RATE. • P . <br />OH CABS- OVERHEAD CABS SNO STRUCTURAL NOTES �y • z <br />BRD -BOARD PNT - PAINT FINISH PUBLIC FACILITIES LAV 0.5 G.P.M. SN1 STRUCTURAL NOTES i <br />BRG - BEARING PTD -PAINTED PRIVATE FACILITIES LAV 2.2 G.P.M. S3M FOUNDATION DETAILS �: <br />BTM -BOTTOM PED -PEDESTAL SHOWER HEADS 2.5 G.P.M. o <br />S4 FRAME WALL DETAILS <br />BUC - BUILT UP COLUMN PERF -PERFORATED S5 ROOF FRAMING DETAILS -� C' <br />CAB - CABINET PLT -PLATE 3. ALL PLUMBING WATER LINES S6 WALL SECTION DETAILS l� <br />CD - CONSTRUCTION DOCUMENTS PLYWD - PLYWOOD TO BE CPVC (� `U w <br />CLG - CEILING PKT -POCKET <br />SS RETRO FIT DETAILS <br />CLG HT - CEILING HEIGHT LB -POUND VTR LOCATIONS ARE APPROXIMATE AND MAY CHANGE DUE TO ST STAIR DETAILS o <br />CEMT - CEMENTITIOUS PSF - POUNDS PER SQUARE FOOT JOBSITE CONDITIONS S11 PRECAST DETAILS >J Q <br />CL - CENTERLINE PSI - POUNDS PER SQUARE S12 PRECAST DETAILS <br />COL -COLUMN PT - PRESSURE TREATED THE FOLLOWING SHALL COMPLY WITH THE 2020 FBC RESIDENTIAL PA1.0 PRODUCT APPROVAL <br />CONC - CONCRETE PB - PUSH BUTTON CODE PA1.1 PRODUCT APPROVAL <br />CMU - CONCRETE MASONRY UNIT REF - REFRIGERATOR PA1.2 PRODUCT APPROVAL N Q) LO ry o <br />CONST - CONSTRUCT OR CONSTRUCTION RECP -RECEPTACLE Q PORCHES AND BALCONIES L PA1.3 PRODUCT APPROVAL L ,o ,o U <br />CONT -CONTINUOUS OR CONTINUES REINF -REINFORCING CHAP. 3 <br />p coco ` <br />CTR -CENTER READ -REQUIRED PA1.4 PRODUCT APPROVAL PA1.5 PRODUCT APPROVAL N V Q n v <br />CJ -CONTROL JOINT R/A - RETURN AIR Q HANDRAILS - CHAP. 3 <br />DTL - DETAIOR DEPTH R� -ROUGH SAWNOPENING w `� a <br />DP - DEEP - ROUGH SH 1.0 HURRICANE SHUTTERS o <br />DIA - DIAMETER SC - SOLID CORE _ U _ , < <br />Q GUARDRAILS - CHAP. 3 .� 0 <br />SH 1.1 HURRICANE SHUTTERS � <br />SH 1.2 HURRICANE SHUTTERS � � �� � Q <br />Q1� <br />DIM -DIMENSION SCP -SCUPPER SH 1.3 HURRICANE SHUTTERS <br />DISCON - DISCONNECT SCRN -SCREEN Q STAIRS - CHAP. 3 SH 1.4 HURRICANE SHUTTERS Q� L o ��' <br />DW - DISHWASHER SIM - SIMILAR SH 1.5 HURRICANE SHUTTERS a <br />DR -DOOR SHLVS -SHELVES Q CHIMNEY & FIREPLACE <br />CHAP. 10 WP1.0 WATERPROOFING DETAILS <br />DBL - DOUBLE S/R - SHELF & ROD WP2.0 WATERPROOFING DETAILS <br />DWG - DRAWING SH - SINGLE HUNG WINDOW WP2.1 WATERPROOFING DETAILS <br />EA -EACH SGD - SLIDING GLASS DOOR Q EGRESS WINDOWS 4 <br />ELEC - ELECTRICAL SPECS - SPECIFICATIONS CHAP. 3 <br />ELEV - ELEVATOR SQ FT - SQUARE FEET <br />EQ -EQUAL SQ IN - SQUARE INCH 5. ALL OPENINGS SHALL COMPLY WITH 2O20 FBC RESIDENTIAL WIND LOADS AS <br />EQUP - EQUIPMENT STD -STANDARD STATED BELOW. ATTACHMENTS OF WINDOWS, DOORS, SLIDING GLASS DOORS <br />EXP JT - EXPANSION JOINT STL -STEEL AND O.H. GARAGE DOORS ARE TO DELEGATED THE MANUFACTURER OF THESE <br />EXT - EXTERIOR STRUCT -STRUCTURAL ITEMS. THE MANUFACTURER OF THESE ITEMS SHALL SUBMIT ATTACHMENTS FOR <br />FIN FLR - FINISHED FLOOR TEMP -TEMPERED SITE INSTALLATION. <br />FIN - FIN THK - THICK OR THICKNESS <br />EW - EACH WAY TB - TOWEL BAR SEE ATTACHED SPECIFICATION SHEETS FOR MANUFACTURERS DESIGN CRITERIA <br />FG - FIXED GLASS TOM - TOP OF CONCRETE AND INSTALLATION METHODS FOR WINDOWS, DOORS, SLIDING GLASS DOORS, <br />FD - FLOOR DRAIN TOM - TOP OF MASONRY FE -FIRE EXTINGUISHER TOP -TOP OF PLATE OVERHEAD GARAGE DOORS, AND ROOFING. <br />FLR - FLOOR TP - TOILET PAPER HOLDER <br />FLOUR - FLUORESCENT TYP - TYPICAL 6. ALL DOORS INTERIOR & EXTERIOR ARE 6'-8" UNLESS OTHERWISE NOTED ALL w w o <br />FTG - FOOTING UNO - UNLESS NOTED OTHERWISE SHOWER ENCLOSURES TO BE TEMPERED GLASS W � < W af a z � <br />FR DR - FRENCH DOOR VAC - VACUUM U L�J � zo) < 8 3 � < Q � 0 0 J o <br />GALV - GALVANIZED VAL -VALANCE 7. ALL WINDOWS WITHIN 24" OF DOORS INTERIOR & EXTERIOR AND WITHIN 18" OF Q Q U D 0 o Z LL w o Z 2 0 0 r <br />( ) 90 0E00m0Z U <br />GA -GAUGE VERT - VERTICAL Z) F" o w w - Z w - Z � <br />FLR TO BE TEMPERED GLASS. (SECTION R308) <br />GB -GRAB BAR VIF -VERIFY IN FIELD �a¢owYozwzowCoa <br />GFI / GFCI- GROUND FAULT CIRCUIT INTERRUPTOR VTR -VENT THROUGH ROOF DIMENSIONING: z ¢ o w 2 Y z 2 GLS - GLASS V - VOLT o¢ o Q w <br />GWB - GYPSUM WALL BOARD WC - WATER CLOSET A. DIMENSIONS INDICATED ARE TO: <br />GYPBRD -GYPSUM BOARD WH -WATER HEATER HD - HEAD WL - WIND LOAD A.1. CMU WALL: OUTSIDE FACE OF WALL � <br />HVAC - HEATING, VENTILATING, AIR CONDITIONING WP - WEATHERPROOF A.2. INTERIOR FRAMED WALLS: PLAN WEST (OR PLAN NORTH) FROM FACE OF <br />HT - HEIGHT WWM - WELDED WIRE MESH CORE -STUD O <br />HB - HOSE BIB W - WIDE OR WIDTH A.2.1. DIMENSIONS ARE NOT FROM ELEMENTS ATTACHED TO CORE STUD - I.E. O <br />HC -HANDICAP WDW -WINDOW FURRING\ <br />Z cV <br />INSUL - INSULATION W/ - WITH LU <br />INT -INTERIOR WD -WOOD A.3. EXTERIOR FRAMED WALLS: TO OUTSIDE FACE OF STRUCTURAL CORE -STUD � � <br />LVL - LAMINATED VENEER LUMBER A.4. WINDOW OPENINGS: <br />LT - LAUNDRY TUB A.4.1. CMU WALLS: TO LEFT SIDE OF ROUGH OPENING <br />LGT - LIGHT A.4.2. EXTERIOR FRAMED WALLS: TO CENTER OF OPENING <br />MAX - MAXIMUM A.5. DOOR OPENINGS: Q co O <br />MATL - MATERIAL A.5.1. CMU WALLS: TO LEFT SIDE OF ROUGH OPENING (n M � <br />MFR -MANUFACTURER A.5.2. EXTERIOR FRAMED WALLS: TO CENTER OF OPENING < J <br />MECH - MECHANICAL A.5.3. INTERIOR FRAMED WALLS: ADJACENT TO SIDE WALL: 5" RETURN MEASURED IL � <br />MTL - METALLJ L FROM THE FINISH FACE OF ADJACENT WALL TO INTERIOR FACE OF DOOR <br />MC - MEDICINE CABINET FRAME I�- W < U? <br />MIN -MINIMUM A.5.4. INTERIOR FRAMED WALLS: AWAY FROM SIDE WALLS: DIMENSIONED TO CENTER T- <br />OF DOOR 00 <br />A.6. SPECIAL AND CODE REQUIRED CLEARANCES - AS INDICATED ON PLANS OR FINISH z 0 <br />SURFACE TO FINISH SURFACE <br />SYMBOL LEGEND . A.6.1. EXAMPLE: T-0" CLEAR INSIDE FINISH FOR ADA TRANSFER SHOWER z <br />B. ALIGNMENT OF WALLS AND FINISHES AS SCHEDULED SHALL BE STRAIGHT, TRUE AND J <br />= STAIR CALL OUT HEIGHT OF SHEET NUMBER PLUMB. (0- � STEP DOWN C. THE PRIORITY FOR PROJECT DIMENSIONS SHALL BE IN THE FOLLOWING ORDER: � � <br />\\ 1 INT ELEV NUMBER C.1. CODE MINIMUM -MAXIMUM DIMENSIONS AND CLEARANCES <br />FOOTING CALL OUTC.2. LOAD BEARING CONCRETE MASONRY UNIT WALLS <br />O = SEE FOOTING STEP DOWN ARROW SHOWS <br />SCHEDULE CALLOUT DIRECTION OF VIEW C.3. FRAMED WALLS EXTERIOR <br />ARROW SHOWS INTERIOR ELEVATION CA. FRAMED WALLS INTERIOR <br />= KEYNOTE CALL OUT DIRECTION OF VIEW MARKER C.5. DOORS AND WINDOWS <br />4z::::SHEET <br />D. FLOOR ELEVATIONS ARE INDICATED TO THE FACE OF THE STRUCTURAL SLAB - <br />ELEV NUMBER UNLESS OTHERWISE NOTEDARROW SHOWS <br />PRE -CAST LINTEL CALL NUMBER DIRECTION OF CUT E. VERTICAL DIMENSIONS ARE INDICATED FROM THE FLOOR ELEVATION TO THE FACE <br />�q = OUT - SEE LENTEL EXTERIOR 1 OF MATERIAL AT THE DIMENSION .POINT - UNLESS OTHERWISE NOTED <br />SCHEDULE ELEVATION MARKER All SECTION NUMBER F. CEILING HEIGHTS ARE INDICATED FROM THE FLOOR ELEVATION TO FACE OF THE ' <br />1<---ELEV NUMBER SHEET NUMBER STRUCTURAL MATERIAL ABOVE AS SCHEDULED <br />LEDGER CALL OUT - SEE G. DIMENSIONS SHOWN ON THE DRAWINGS SHALL INDICATE THE REQUIRED SIZE, <br />LEDGER SCHEDULE 4 A15 2 SHEET NUMBER CLEARANCE AND DIMENSIONAL RELATIONSHIP BETWEEN PROJECT SYSTEMS AND I� <br />LOCATION OF CUT COMPONENTS - DIMENSIONS SHALL NOT BE DETERMINED BY SCALING THE <br />3 E--ARROW SHOWS DRAWINGS. O <br />DIRECTION OF VIEW <br />MULTI VIEW INTERIOR SECTION N o 0 0 N CO <br />ELEVATION MARKER MARKER <br />o 0 0 0 0 0 <br />xm R��� to p O�r000 i <br />z <br />0 <br />MAY 18 2023 NL0 <br />w o d o 0 0 0 <br />Li > r N ri qr Lri co i <br />��► Cr <br />�.��;l MAT 2 2023 � CD z <br />}� Q W <br />O }� Z <br />0 Woo <br />W <br />_ U <br />VRA.� �Zj <br />O °w� <br />F= N NA Flow Virtual Review Assist, Inc. Z a�a <br />Plans Review completed and approved Q <br />for compliance with the 2020 FBC 7th Edi on to ~ w Q <br />L E N N A R TA M PA DIVISION by Debra Anne Klanr Px2s°° r.4 = m W <br />N Zo= <br />4600 W CYPRESS ST, SUITE 200 w <br />NOTICE TO BUILDER & ALL SUBCONTRACTORS 0O ZWO <br />TAMPA; FL 33607 z az" <br />IT IS THE INTENT OF DESIGN PROFESSIONAL LISTED IN THE TITLE <br />813.574.5700 BLOCK THAT THESE DOCUMENTS ARE ACCURATE, PROVIDING z <br />LICENSED PROFESSIONALS CLEAR INFORMATION. EVERY ATTEMPT U J <br />HAS BEEN MADE TO PREVENT ERRORS: THE BUILDER AND ALL O 0 <br />SUBCONTRACTORS ARE REQUIRED TO REVIEW ALL THE <br />INFORMATION -CONTAINED IN THESE DOCUMENTS, PRIOR TO THE MM <br />COMMENCEMENT OF ANY WORK. THE DESIGN PROFESSIONAL ARE C <br />NOT RESPONSIBLE FOR ANY PLAN ERRORS, OMISSIONS,OR Q <br />MISINTERPRETATIONS UNDETECTED AND NOT REPORTED TO THE z z <br />DESIGN PROFESSIONAL PRIOR TO CONSTRUCTION. ALL SW <br />CONSTRUCTION MUST BE IN ACCORDANCE TO THE INFORMATION LIJ <br />O <br />FOUND IN THESE DOCUMENTS. ANY QUESTIONS REGARDING THE N <br />2216 INFORMATION FOUND IN THESE PLANS SHOULD BE DIRECTED TO THE N LAST PLOT DATE <br />DESIGN PROFESSIONAL LISTED IN THIS TITLE PAGE. NO BACK > March 23, 2023 <br />CHARGES WILL BE CONSIDERED FOR REIMBURSEMENT BY THE z O <br />DESIGN PROFESSIONAL WITHOUT ADVANCED NOTIFICATION AND <br />APPROVAL BY THE DESIGN PROFESSIONAL. J COVER SHEET <br />