Laserfiche WebLink
BAFFLE <br />INSULATION PER — <br />CHART ON FLOOR <br />PLAN <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />BOARD PER CODE W/ 1318" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8" O/C WALLS <br />1/2" GYP WB <br />DOUBLE 2x S.P.F. TOP PLATE <br />(2) LAYERS ASTN TYPE 11 OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH > 4:12 AND ATTACHED PER <br />TABLE R905.1.1.1 OF THE FBC 7TH EDITION (2020)-RESIDENTIAL <br />(2) LAYERS ASTNI TYPE II OR ASTM D4869 TYPE III OR TYPE IV <br />UNDERLAYMENT FOR ROOF PITCH 4:12 OR LESS AND ATTACHED <br />PER SECTION R905.1.1.1, ITEM 4 OF THE FBC 7TH EDITION <br />(2020)-RESIDENTIAL <br />PRE ENGINEERED HURRICANE ANCHOR @ EACH TRUSS <br />WOOD TRUSS @ 24" <br />O.C. MAX. SHINGLE ROOF <br />—SHINGLE ROOF <br />15/32" CDX PLYWOOD OR 7116" <br />O.S.B. (SEE ROOF NAILING <br />SCHEDULE ON SHT SN1) <br />ALUMINUM DRIP EDGE <br />I <br />ALUMINUM FASCIA <br />2x SUB FASCIA <br />SEE SOFFIT SHEET <br />ATTACHED WALL SHEATHING TO <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />1x2 NAILER <br />PLYWOOD SHEATHING <br />J <br />2X BLOCKING @ EA. WALL <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />SHEATHING JOINT <br />(n <br />FOR MORE INFO <br />w <br />16" O.C. 2X S.P.F. STUDS <br />0 M <br />W/ (4) 16d TOENAILS TO TOP PLATE <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />2x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />_j w <br />LAYER 1/8" THICK. <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />� = <br />INSULATION PER <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />CHART ON FLOOR PLAN <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA 51000 <br />g R <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W/ <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEALE <br />S6 S6 <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />ETAL SEAT <br />LNP\ER PLAN 0 <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />o:A <br />BARRIER <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" <br />GYP. TYPE " X" @ GARAGE ONLY) W/ 13/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN —� <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />v <br />c <br />N <br />6x6 W1.4xW1.4 <br />WWF OR FIBEI <br />1x WD FURRING @ 24" O.C. <br />BASEBOARD <br />MIN. 2500 PSI CONC. SLAB <br />MIN. PSI MAY VARY PER <br />MUNICIPALITY <br />..'d � " ' .a <br />.• A' G v <br />• .. Aa <br />—III— I J,J I a <br />STD. 90 HOOK (SEE DETAIL) <br />8"x8"X16" CONC. KNOCKOUT <br />BLK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />M <br />Lu <br />v <br />4"x4" INSPECTION PORT AT <br />a- <br />EACH FILL CELL TYPICAL <br />Lu <br />w <br />AT GARAGE CONTRACTOR <br />M <br />TO CUT BLOCK OR POUR <br />CURB DUE TO SLOPE <br />NOTE: EXTEND DECO FINISH <br />/,--4"to <br />6" BELOW GRADE <br />=1NISH GRADE o0 <br />"' '' ''� —STD. 90'HOOK <br />(3) # 5 REBAR ON 3" CHAIRr-'� (SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" 1'4" <br />TYP 2-STORY WALL SECTION ri <br />SCALE: 3/4 -1-0 S6 <br />00 <br />T <br />o z <br />SIMPSON LSTA24 STRAP w/ (8)10d x 1 1/2" NAILS TO <br />STUD F <br />2nd FLOOR W, <br />BEAM/GIRDER <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 1 Od x 1 1/2" <br />NAILS TO STUD & (8)10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL------ <br />*SIMPSON LTP4 w/ <br />(12) 8d xl 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL— <br />SIMPSON LSTA24 STRAP w/ (8)1Od x 1 1/2" <br />NAILS TO STUD & (8) 1Od x 1 1/2" TO BAND — <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />�iZeT3lrie��? <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />"END SHEATHING TO <br />)F BEAM OR GIRDER <br />XE W/ <br />O.C. <br />)OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2) 1 Od @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL'IT" AND CORNER <br />DETAILS rN <br />SCALE: N.T.S. S6 <br />E <br />S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />SEE FRAMING WEEP SCREED <br />PLAN INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8)1Odx1 1/2" <br />0/C FOR THE 1ST 2'-0" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)10dx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1 <br />2"x BOT. PLATE <br />(2)1 Od @ 6" OX <br />PRE-ENGINEE <br />FLOOR TRUS: <br />FLOOR CONNECTION <br />@ MASONRY 1ST FLR. SEE J/S6 <br />FOR ADDITIONAL INFORMATION. <br />PROVIDE CONTINUOUS <br />BLOCKING FROM B.U.C. <br />TO MASONRY BELOW <br />(6)1/4" x 21/4" TITEN <br />SCREWS TO MANSONRY f� <br />WALL PER STRAP \ <br />WOOD TO MASONRY <br />CONNECTION W/ MSTAM36 <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8) 1Odxl 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />B <br />SCALE:3/4"=1'-O" S6 <br />B.U.C. <br />(8) 1 Od NAILS TO <br />STUD PER STRAP <br />SIMPSON MSTAM36 <br />MASONRY WALL <br />SCALE: N.T.S. <br />RIBBONS <br />DETAIL FLOOR TRUSS 0 <br />SCALE: 1 1/2"=V-0" "6,) <br />NOTE: SEE TYPICAL WALL <br />SEE SHEATHING <br />SECTION C/S3 FOR <br />SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />GYP. W.B. MIN. @ <br />(1) ROW OF 2x BLOCKING @ MID <br />GARAGE SIDE IF APPLICABLE <br />HGT. FOR WALL HGT.:5 8'-6". (2) <br />ROWS OF 2x BLOCKING @ 3rd <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />PTS FOR WALL HGT. > 8'-6" <br />EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 w/ (10)10d <br />2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD <br />(MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. <br />TYPICAL TENSION 2600#.) <br />2X P.T. PLATE <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />d aTill <br />. d <br />T � Am <br />'�77�� 7I' 7�,�IA I P <br />—III,=��I�III�IJ iIIRIJII�Jjj, #5CONT. ON3" <br />C <br />8,� 11 1,_8„ jl 8�� CHAIR W/ 3" MIN. <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION S <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=1'-O" S6 <br />ADDITIONAL SLAB INFORMATION. <br />w <br />w <br />0 <br />Lo <br />15/32" OSB <br />EXPOSUREI41, <br />SHEATHING <br />F <br />x <br />x <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />D <br />0 SECTION X-X IF <br />W� NOT FULL <br />HEIGHT SHEET-C <br />Z <br />G <br />FLOOR SYST <br />M <br />(2)- 2x TOP PLATE <br />BEYOND I <br />15/32" OSB <br />EXPOSUREI f <br />F <br />SHEATHING w <br />SOLID 2x <br />C <br />BLOCKING @ ALL <br />C <br />SHEATHING <br />EDGES (SEE <br />OPENING <br />SECTI N X-X <br />a0 <br />C <br />x <br />rxw <br />x <br />E <br />2x STUDS w <br />BEYOND. <br />SEE PLAN o <br />O <br />In <br />\-2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM lAlAI I rI r-%IA-rl^►I f1IA^r%AAI <br />4t" <br />` "S" = NAIL <br />ACING <br />/4" <br />vr' <br />SINGLE NAIL EDGE SPACING DOUBLE <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO w/ (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3- O.C. <br />STAGGERED FOR SHEATHING <br />VERMAL a OMNG. <br />SECTION X-X <br />SF p�Npo� <br />�N <br />2x CRIPPLES @ - <br />16" O.C. W/ (2)12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP, <br />DOUBLE 2x — <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />S <br />/-1/2" <br />S 1/2" <br />EDGE SPACING <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM �" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />w <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THAN Ye"• <br />2 <br />OA NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />(7 <br />© NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />LL 2 <br />© NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMMON NAIL. <br />0 <br />QD NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />co <br />O STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />J <br />w/ 8d COMMON NAIL <br />o w <br />w w r 0 c <br />O PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />F <br />y 0 in <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />F_ ¢rQ�Ocn <br />U) L <br />z <br />@(2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />N W 0 0~ <br />MEMBER IF GABLE END <br />N LL <br />NOTE: <br />• 8d NAILS FOR WALL SHEATHING MUST BE MIN .131" X 21/2" <br />• DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 118". <br />C WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />'• INTERIOR HEADER: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE wl SIMPSON <br />LS30 w/ (6)1Od x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />Op FiQj �BL OR TRUSS I <br />FNu,_OR <br />( 1 <br />S4 <br />BOX HEADER <br />ONLY <br />SEE PLAN FOR REQUIRED-' <br />CONNECTIONS <br />SECOND FLOOR LOAD BEARING/EXTERIOR <br />FRAME WALL HEADER DETAIL M <br />(2) ROWS OF 2x BLOCKING <br />AT THIRD POINTS <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W1.4xW1.4 <br />WWF OR FIBERMESH <br />C <br />I '' A. :'Q A A ,. <br />4 A , <br />A <br />M-III—I <br />I I_I I I_ I I <br />A' a <br />4... <br />I <br />I —III <br />—III <br />I I <br />'.. °... <br />• A <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />SIZE <br />EA END <br />EA END <br />EA END <br />EA END <br />1'4' <br />(1) <br />2) <br />(1) <br />2 <br />(1) LSTA30 <br />4'4 <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />(3) <br />3) <br />(2) <br />(3) <br />(2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 wl (10) 1Od NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />FINISH GRADE <br />00 <br />CD z <br />(3) # 5 REBAR ON 3" CHAIR 4" l'-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOurING ry <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=V-0" S6 <br />ADDITIONAL INFORMATION. <br />Plal <br />for colt <br />M <br />04 <br />0 <br />04 <br />LO <br />LO <br />M0y� <br />W <br />_ t <br />0 <br />f <br />R <br />J. + <br />Z <br />UU <br />6 p <br />is-o 4 gJ <br />0 <br />J� <br />W <br />0 <br />z <br />Q <br />nN) NON' E <br />0 <br />0 <br />W `■ o <br />_ <br />\ n pM^.cq m <br />/_ M m <br />V Q a0 y cPM <br />E mu <br />`0 <br />p LO 8 Q <br />.�s Wap�^ <br />SLN C <br />M <br />a) 16m c 00 <br />�o ^�a4) <br />/� <br />V LLI <br />w <br />w L_ w J w 2- 0 <br />�0— <br />Q Q V <br />~ <br />JN03a'U)LLc•)Ou-JO <br />jO0 <br />�ZLLu,0_zm0O�F-�0�wL��- <br />Z<Lu <br />V5W�wold0Z�pEL <br />wZ <br />CL <br />U- <br />Ow R �wo� <br />0it o oQ <br />U-< 0 <br />i <br />(V <br />Z <br />Lu <br />0 <br />> 0 <br />O <br />�M <br />LO <br />2u)U <br />Ltd <br />F— 42 _M <br />00 <br />ZUF¢— <br />W <br />W <br />�0 <br />O <br />qt <br />7 <br />pp <br />Virtual Review <br />Review com <br />sis <br />`n <br />fiance with the ? <br />�p n <br />rov <br />dl <br />Y Debra Anne Kla <br />C <br />h E <br />itio <br />r P <br />230 <br />N <br />N <br />o000 <br />L0) <br />O <br />O <br />O <br />N <br />O <br />00 <br />O <br />O <br />I <br />I <br />z <br />0 <br />N <br />(0 <br />ULI <br />I <br />I <br />i <br />N <br />Ih <br />v <br />' r <br />00 c ♦ <br />} <br />Z <br />Z <br />Lu <br />_ <br />O ♦J <br />Ll.11 <br />Z � <br />0 0 <br />0 <br />V <br />w <br />0 <br />zj <br />LO0 <br />Or< <br />Q((^^ <br />Z <br />aaira <br />UJ <br />1--� <br />LD <br />LU <br />co r- Lu <br />N <br />�� <br />tV <br />Z = _ <br />w <br />a=U) <br />0 <br />ZOO <br />0 <br />z <br />V <br />a.Z� <br />L` <br />a <br />U)z <br />U <br />4 <br />0 <br />_p <br />W <br />Z <br />S6 <br />Z <br />Z <br />w <br />ui <br />J <br />rl- <br />N <br />N <br />N <br />LAST PLOT DATE <br />■ ■ <br />Z 0 <br />STRUCTURAL <br />DETAILS - MONO <br />