Laserfiche WebLink
LO <br />rl- <br />LO <br />C14 <br />LO <br />LO <br />-0 <br />0 <br />=3 <br />lzr <br />Cn <br />*1 <br />19 <br />:;2 <br />ZS <br />Lo <br />C> <br />- <br />9 <br />CD <br />I <br />1 <br />5�_ <br />LO <br />Ln <br />C14 <br />LO <br />LO <br />Cr <br />Ln <br />C14 <br />1�0 <br />CD <br />Cl! <br />if) <br />C� <br />C:l <br />Lo <br />LID <br />E <br />F!R <br />co <br />E <br />0 <br />(D <br />tz <br />1`3 <br />t2 <br />_146 <br />- <br />18- <br />- <br />0 <br />0- <br />1�0 <br />LO <br />LA <br />ROOF FLASHING AND ROOF FLASHING <br />COMPONENTS TO BE IN ACCORDANCE <br />W/ R903.2, FLORIDA BUILDING CODE <br />7TH EDITION (2020) RESIDENTIAL <br />12 <br />INSULATION — <br />BAFFLE <br />INSULATION PER - <br />CHART ON FLOOR <br />PLAN <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />BOARD PER CODE W/ 13/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8" O/C WALLS <br />1/2" GYP WEI <br />------------- / <br />DOUBLE 2x S.P.F, TOP PLATE - ATTACH 2x STUDS :� <br />TO TOP PLATE W1 (1) SIMPSON SP2 TYP. @ <br />CORNERS, SP2 MAY BE SUBSTITUTED W/ (1) H2.5A <br />2X BLOCKING @ EA. WALL <br />SHEATHING JOINT <br />16" O.C. 2X S,P.F. STUDS <br />2X BOT. PLATE W/ (2) 10d @ 6" O.C. <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W OSB <br />(DRAFTSTOPPING) TO BE NAILED W/8d COMMON @ 6" O/C <br />TO ONE SIDE OF THE FLOOR TRUSS FOR AN AREA !9 1000 <br />SQ. FT. OF FLOOR AREA & SEALED PENATRATION AREA W1 <br />FOAM. DRAFTSTOPPING SHALL DIVIDE THE CONCEA�I�iiiiii <br />SPACE INTO APPROX. EQUAL AREAS. <br />FLOOR SYSTEM <br />\PER PLAN <br />GYP WB (OR 5/8" <br />1/2" HIGH STRENGTH OR 5/8 <br />GYP. TYPE " X- @ GARAGE ONLY) W/ 13/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8'O/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />1x WD FURRING @ 24" OJ <br />BASEBOARD <br />MIN. 2500 PSI CONIC. SLAE <br />MIN. PSI MAY VARY PER <br />MUNICIPALITY <br />4 <br />19 <br />CN <br />Cl) <br />1�— zmm 11-1 <br />6x6 . 1 <br />Tif <br />S-, I=U11 7=1 151 <br />WWFORFIBERME <br />'W1 4xW1 4 <br />A <br />FOR UNDERLAYMENT <br />REQUIREMENTS SEE R905.1.1 <br />PRE ENGINEERED WOOD TRUSS @ 24" O.C. MAX. <br />HURRICANE ANCHOR @ EACH TRUSS <br />SHINGLE ROOF, SHINGLES TO BE IN <br />ACCORDANCE w/ ASTM D7158-CLASS G or <br />H, or ASTM D3161 -CLASS F, IN <br />ACCORDANCE w/ TABLE R905.2.6. 1, <br />FLORIDA BUILDING CODE 7TH EDITION <br />(2020) RESIDENTIAL <br />ROOF SHEATHING - SEE <br />FRAMING SHEET FOR <br />SCHEDULE - [RSH] - ON <br />SHEATHING AND FASTENERS <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />2x SUB FASCIA <br />SEE STRUCTURAL SOFFIT SHEET SS <br />ATTACHED WALLSHEATHING TO <br />(2) TOP PLATE W1 8d @ 4" <br />O.C., 2 ROWS <br />1x2 NAILER <br />_j LU PLYWOOD SHEATHING <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />CO FOR MORE INFO <br />Uj <br />jj <br />7/8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />LAYER 1/8" THICK. <br />'ru <br />INSULATION PER <br />CHART ON FLOOR PLAN <br />(" B �R <br />S6 S6 <br />ETAL SEAT <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />BARRIER <br />STD. 90 TIOOK (SEE DETAIL) <br />8"&'X16" CONIC. KNOCKOUT <br />BILK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />-ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />(71) <br />U-1 <br />4"X4" INSPECTION PORT AT <br />J_ <br />EACH FILL CELL TYPICAL <br />UJ <br />Cn <br />0- <br />AT GARAGE CONTRACTOR <br />C14 <br />TO CUT BLOCK OR POUR <br />CURB DUE TO SLOPE <br />NOTE: EXTEND DECO FINISH <br />411to 6" BELOW GRADE <br />/FINISH GRADE <br />A <br />A <br />A' <br />A <br />\-STD. 90'HOOK <br />(3) # 5 REBAR ON 3" CHAIR <br />(SEE DETAIL) <br />Tr <br />W/3" MIN. CLEARANCE 4" <br />TYP 2-STORY WALL SECTION <br />REV. 03.16.21 <br />SCALE: 3/4"=1 0" <br />SI M PSON LSTA24 STRAP w/ (8) 1 Od x 11/2" NAI LS TO <br />ST­ <br />2nd FLOO <br />BEAM/GIR <br />2ND FLOOR FRAME CONNECTION <br />SEE JIS-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8) 10d x 1 1/2" <br />NAILS TO STUD & (8) 1 Od x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2nd FLOOR WALL----. <br />BAND JOIST <br />*SIMPSON LTP4 W/ <br />(12) 8d x1 1/2" NAIL <br />@ 24" O.C. <br />/\ \ <br />1st FLOOR WALL <br />S I M PSON LSTA24 STRAP W/ (8) 1 Od x 1 1/2" <br />NAILS TO STUD & (8) 10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />'END SHEATHING TO <br />)F BEAM OR GIRDER <br />TE W1 <br />O.C. <br />IOR TRUSS/JOIST <br />2"x BOT, PLATE W/ <br />(2) 1 Od @ 6" O.C. <br />NOTES: * USE <br />LTP4 & EXTEND <br />SHEATHINGTO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />"T" CORNER <br />TYPICAL 'IT" AND CORNER <br />DETAILS <br />SCALE: N.T.S. <br />'\, �6 <br />E <br />S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING --\ <br />ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" O/C, 2 ROWS STAGGERED <br />FLOOR TRUSS SEE FRAMING PLAN <br />FLOOR TRUSS <br />qSIMPSON <br />00 <br />SEE FRAMING WEEP SCREED <br />C) <br />PLAN - " <br />INSTALLED PER MANUF. <br />CE @ 48- HETA20 W/ (8) 1 Odxl 1/2" <br />2"X4" CROSS BRACE @ 48" T <br />O/C FOR THE 1 ST Z-10" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W1 (2)10dx3" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"X4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" `l`l �6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS@ 1 - - - <br />2"x BOT. PLATE <br />(2) 10d @ 6-1 0.( <br />PRE-ENGINEE <br />FLOOR TRUSEE <br />FLOOR CONNECTION <br />@ MASONRY 1ST FLR. SEE J/S6 <br />FOR ADDITIONAL INFORMATION. <br />PROVIDE CONTINUOUS <br />BLOCKING FROM B.U.C. <br />TO MASONRY BELOW <br />(6) 1/4" x 2 1/4" TITEN <br />SCREWS TO MANSONRY <br />WALL PER STRAP <br />WOOD TO MASONRY <br />CONNECTION W/ MSTAM36 <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W1 8d @ 4'1 O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />I- <br />WEEP SCREED <br />U <br />u <br />:1 <br />INSTALLED PER. MANUF. <br />U <br />SIMPSON HETA20 W/ (8) 10dX1 1/2" <br />NAILS AT EA. TRUSS W/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />B <br />SCALE: 3/4"=V-0" <br />S6 <br />B.U.C. <br />(8) 1 Od NAILS TO <br />STUD PER STRAP <br />FLOOR SYSTEM <br />SIMPSON MSTAM36 <br />MASONRYWALL <br />SCALE: N.T.S. <br />RIBBONS <br />DETAIL (FLOOR TRUSS) <br />0� <br />SCALE: 1 1/2"=V-10" <br />"6�,) <br />NOTE: SEE TYPICAL WALL <br />',,,--SEE SHEATHING <br />SECTION C/S3 FOR <br />SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />1/2" GYP W.B. MIN.@ <br />GARAGE SIDE IF APPLICABLE <br />2x BLOCKING HORIZONTALLY— - <br />@ INTERVALS NOT <br />5/8"DIA. x 10" "J" BOLT W1 8" <br />EXCEEDING 10'-0" (R302.1 1) <br />EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 w/ (10) 10d <br />2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD <br />(MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. <br />TYPICAL TENSION 2600#.) <br />2X P.T. PLATE <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />, . <br />—A . : , , , , , . - .: <br />4,. <br />1 —11 P- <br />'d 4 <br />-t(3) #5 CONT. ON 3" <br />CHAIR W/ 3" MIN. <br />8' 11-81' 81, <br />CLEARANCE <br />INTERIOR 2-STORY FRAME SECTION �'S <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" S6 <br />ADDITIONAL SLAB INFORMATION. <br />15/32" OSB <br />A/ <br />EXPOSURE1 <br />SHEATHING <br />x <br />PROVIDE <br />BLOCKING AS <br />REQUIRED PER <br />ci SECTION X-X IF <br />U�' NOT FULL <br />_j HEIGHT SHEET- <br />U) <br />z <br />L <br />FLOOR SYST <br />�/ <br />(2)- 2x TOP PLATE <br />BEYOND <br />I <br />— <br />- <br />�-115/32"OSB <br />EXPOSURE1 F- <br />SHEATHING w <br />Lu <br />:r <br />OLID2x 0 <br />I <br />BLOCKING @ ALL 2� <br />Y11 <br />SHEATHING 0 <br />W <br />EDGES (SEE <br />OPENING <br />I <br />SECTION X-X) <br />__1 <br />W <br />CL 3 <br />_x <br />�g <br />c� <br />_x <br />_2x STUDS Lu <br />BEYOND. = <br />SEE PLAN <br />zi <br />0 <br />Cn <br />\-2x'4 P.T. BASE <br />\_�HORIZONTAL PLATEBEYOND <br />2x!RIBBONOR <br />VERTICAL SEE PLAN <br />BLOCKING <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM IAIAI I rl rAIA-rl^kl r%IA^f-%A%A <br />3/8" "S" = NAIL <br />SPACING <br />3/4"112, 112" <br />S <br />S <br />_?VL <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />S. <br />SPF TURNED VERTICAL w/ 7116" <br />FILITCH PLATE TCw/ (2) 12d <br />TOENAILS EA, END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ Y O.C. <br />STAGGERED FOR SHEATHING <br />SECTION X-X <br />19 t4bb <br />2x CRIPPLES @ <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />�0, <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />0 <br />Lu <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />..., <br />PENETRATE SURFACE MORE THAN Y8". <br />u) <br />z <br />(Z) NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />LL 7 <br />@ NAIL OPENING PERIMETER wl (2) ROWS @ 4" O.C. wl 8d COMMON NAIL. <br />0 � <br />@ NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />ui <br />U) <br />STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />0 <br />W/ 8d COMMON NAIL <br />Lu 2 <br />uj 0 <br />I.- <br />YW <br />PL OOD SPLICES@ HEADER -NAIL SHEATHING TO HEADER <br />_j >- < 1-- 0 u) <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />Q� �- 0 0 cn <br />0 co M D <br />co - <br />1. <br />G (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />U) Lu 0 L� F.- <br />ci LU 0 <br />MEMBER IF GABLE END <br />M <br />Co <br />NOTE: <br />. 8d NAILS FOR WALL SHEATHING MUST BE MIN.131"X 2 1/2" <br />. DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />WALL SHEATHING INSTALL. <br />rc <br />& NAILING SCHED. <br />REVISION 12-7-2020 <br />BOX HEADER <br />ONLY <br />SEE PLAN FOR REQUIRED --- <br />CONNECTIONS <br />LOAD BEARING/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />2 ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED@ 12" O/C FOR <br />2"xl 0" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />INTERIOR HEADER: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6) 1 Od x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />FLOOR TRUSS <br />BEAM <br />2x BLOCKING HORIZON <br />@ INTERVALS NOT <br />TAtp(_� <br />�.11) <br />EXCEEDING 10'-0" (R302 <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W1 6x6 W <br />WWF OR FIBERMESH <br />1AxW1.4 <br />. - . ? I : I . 4 <br />E <br />— . <br />A <br />171) <br />=1 4 <br />5E1 I I <br />A <br />-1 <br />D <br />I(3) # 5 REBAR ON 3" CHAIR 4" V-8" <br />W/3" MIN. CLEARANCE <br />ALTERNATE FOOTING <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ, AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />SIZE <br />EA END <br />EA END <br />EA END <br />EA END <br />1-4 <br />(1) <br />(2) <br />(1) <br />(2) <br />(1) LSTA30 <br />T-9' <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />(3) <br />(3) <br />(2) <br />(3) <br />1 (2)LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />O/C <br />_2X STUDS @ 16 <br />7/8" STUCCO FINISH PER ASTIM C. 926 <br />/- APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 W/ (10) 10d NAILS <br />AT EA. STUD <br />WEEP SCREED INSTALLED PER. MANUF. <br />2X P.T. PLATE <br />00 <br />FINISH GRADE <br />0? <br />I I <br />C? <br />@ WOOD IIST FLR. SEE J/S6 FOR SCALE: 3/4"=V-0" <br />ADDITIONAL INFORMATION. <br />C2 LLJ <br />C= <br />Cj C3. L'- C= <br />Cc C,, <br />LL. <br />cc = <br />in, -= CN <br />Ca co <br />"M - <br />'IC <br />CU - <br />CL. W <br />cu� <br />ij <br />W Cu <br />*� Cj CU <br />E <br />0 <br />I ir `1141, <br />f <br />C) <br />471�1 <br />S <br />Q <br />0� <br />J�j <br />0. <br />I - . (11 <br />4 <br />F L <br />? unlum"%\ <br />To the best of the Engineer's knowledge, information and belief, <br />the structural <br />plans and specifications contained within these <br />dra ings comply with the 2020 Florida Building Code - <br />Reswidential <br />7th Edition. Engineers signature and seal is only for <br />the structural <br />engineering portions of the drawing pages bearing <br />Engineers <br />signature and seal, <br />W 'q E <br />0 <br />q 8 <br />0 00 <br />�; �? <br />:3 <br />0 0 1­ r-, �2 Z <br />0 <br />.4 26 7� <br />M LL u_ ui <br />0 uj <br />Z -a [L <br />co C <br />9 0 <br />W 0 <br />0 2 <br />W Ch <br />- Z� 0 <br />LO CY) Z <br />LL <br />(N < l5f 0 <br />d C) 6 0 <br />z Cn <br />W <br />0 <br />< <br />10 <br />Q) <br />4-1 <br />M <br />Q) <br />0 <br />VLn <br />(a f­ U) <br />C) 6 <br />E <br />low <br />co <br /><c W 0 <br />CE, <br />ci <br />Cl> <br />Cn <br />i <br />0, <br />z <br />< <br />LL_ <br />ce E <br />2. <br />q.: <br />0 <br />00 <br />z <br />CL <br />Co E <br />0 <br />�z <br />�z <br />M <br />-C3 C: <br />O� <br />M0 <br />0� <br />Z, <br />z <br />E <br />.. <br />�z <br />,I <br />0M <br />zz <br />W <br />co 3: <br />�0 <br />-, z <br />WW <br />8 <br />0 <br />C) <br />a) <br />> r--. <br />LO <br />L0 <br />T <br />0- <br />L_ <br />11-1 <br />C) <br />LO <br />LO <br />1,ef <br />0 <br />CT 0 <br />0 <br />_j <br />L0 <br />0 <br />U_ <br />C) <br />LO <br />r1__ <br />co <br />CN <br />LO <br />C) <br />N <br />L0 <br />CN <br />< (0 <br />LO LO <br />a) <br />E <br />M <br />0 <br />z <br />E 12D <br />Ca <br />C: <br />M <br />E 'a <br />0 0 _0 ca <br />_j < 0 <br />a) <br />_j <br />OB <br />NO 23-06126 <br />SCALE AS NOTED <br />SHEET NO. <br />S6 <br />(MONO) <br />�zw <br />