Laserfiche WebLink
1X4 1/2" DRYWALL <br />DOOR JAMB (REFER 1X4 /2" DRYWALL DOOR JAMB (REFER <br />11 XA4 F1/2" DRYWALL <br />UNACCEPTABLE INSTALLTION <br />DOOR JAMB (REFER P.T. F <br />TO SHT. SDW2-K1 TO SHT. SDW2-K1 <br />PROPER INSTALLATION MAX. 8" DO NOT DO THIS <br />2"x BOT. PLATE W/ (2) 10d @ 6" O.C.. <br />7�1 <br />TO SHT. SDW2-K1 <br />FOR CONN. DETAILSI)t <br />FOR CONN. DETAILS FOR CONN. DETAILS * <br />X 4 <br />X 4 <br />#5 REBAR (TYPj <br />3/4" PLYWOOD DECKING GLUED <br />ATTACHED WALL SHEATHING TO <br />X 4 <br />6 <br />3-1/4" LONG X 3/16"0 FURRING <br />3/16"0 X 3" LONG FURRING 3/16"0 X 3-1/2" LONG <br />TAPCONS <br />t <br />FURRING <br />#5 REBAR <br />(Typ') <br />AND NAILED W1 8d COMMON @ <br />6" O.C. EDGES AND 12" O.C. FIELD <br />2X BOTTOM PLATE W/ 8d @ 4" <br />O.C., 2 ROWS STAGGERED <br />TAPCON, INTO <br />STAGGERED @ 1611 TAPCONS STAGGERED <br />2X8 <br />BLOCK@ SPACING <br />1 "DETAIL <br />1X8 P.T. STAGGERED @ 16" O.C. <br />O.C. 2-ROWS INTO 2-ROWS INTO <br />—1X8 <br />2x BAND JOIST W1 FACE NAIL 10d <br />PER MANUFACTURE <br />MASONRYTHROUGH 1-1/211 DETAIL MASONRYTHROUGH 311 DETAIL <br />STD. 90A <br />D. 90- HOOK (TYP) <br />@ TOP & BTTM CHORD, AND (8) <br />1x4 P.T. & 1x8 P.T. 1x8 P.T. & 2x8 P.T. <br />FILL SOLID <br />BOTH CELL <br />HOOK (TYP.) <br />FACE NAILS 10d @ TRUSS VERT. <br />WEB <br />I <br />3/16" x 3 -1/2" <br />TAPCON @ 16r` <br />TAP <br />L :j/ <br />METAL SEAT PLATE <br />0 . C' <br />O.C. & 4" FROM <br />1 X4 P.T. -1/211 DOOR JAMB (REFER <br />3116" x 3 <br />1X 1/2" DRYWALL <br />X4 <br />1/1 El/&: <br />:—JLIIL <br />NOTE: <br />LAP SHEATHING TO <br />EACH END W/ MIN <br />DOOR JAMB (REFER C <br />DOOR JAMB (REFER TAPCON TO SHT. SDW2-K1 FOR <br />_\ K1 FOR <br />BOTTOM OF BAND <br />.. E <br />TO SHT. SDW2-K1 2" EDGE DIST. <br />TO SHT. SDW2-K1 CONN. DETAIL <br />JOIST TYPICAL <br />FOR CONN. DETAILS '42 <br />FOR CONN. DETAILS 1 Od @ 12" O.C. <br />2" 0 C. <br />1X4 <br />;000v <br />r/mmo <br />FURRING <br />11000 <br />3/16.,o X3- <br />2X8 P.T. WITH 3/16"0 X 3" <br />±21-1 <br />NONCS @ FIRST COURSE <br />NOTC @ FIRST COURSE <br />U& HGAM1 0 @ 12" O.C. w/4-SDS <br />LONG TAPCONS <br />1/4xl 1/2" SCREWS INTO BAND <br />L 2x P.T. AS REQ'D <br />2X8 P.T. <br />STAGGERED @ 16" O.C. <br />2X8 <br />L <br />JOIST & (4) 3116"x1-314" WEDGE <br />2x DETAIL <br />2 1/4" DETAIL 2-ROWS INTO MASONRY 3-1/411 <br />DETAIL <br />NOTCH WEB AT THE <br />FIRST 2 COURSES <br />BOLTS INTO K.O. BLOCK <br />±5A_ <br />BUILDOUT @ OVER SIZE DOOR -WINDOW ROUGH OPEN I NGSrcc_,�'� <br />LED CELL PER <br />FOUNDATION PLAN <br />�H <br />FILLED CELL INSTALLATION <br />� <br />RETROFIT FOR MISSING <br />EMBEDDED STRAP <br />SCALE: N.T.S. <br />� <br />�S <br />SCALE: N.T.S. � <br />�S <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. <br />INFO <br />SCALE: N.T.S. <br />2x8 P.T. BUCK -CONNECT TO BLOCK <br />SECTION <br />UPLIFT CAPACITY = 945 # FOR 1 STRAP <br />W/ 1/4" x 3 1/4" TAPCON ( 1 1/4" MIN, <br />A -A <br />= 1890 # FOR 2 STRAPS <br />/--FILL 1st4 COURSES <br />EMBEDMENT INTO BLK.) 1/4" MAX <br />2' <br />81' <br />1 -PLY PRE-ENGINEERED TRUSS <br />SOLID W/GROUT <br />it <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN. <br />1/4" x 3 1/4" TAPCONS <br />USP RT1 6M W1 (8) NA1 1 NAILS & (6) 1" x 2-1" <br />BLOCK HEADER ARCH BLKG. & BUCK <br />4 4 <br />TAPCONS <br />1/2" DRYWALL <br />S x 11" NAILS AND <br />10d NAIL 2 <br />8d NAILS AT 8" O.C. AT BUCK <br />A CUT OUT IN O.S.B. ON THE <br />1., X 1 3,, <br />(4) WEDGE BOLTS (1) STRAP 1225 <br />2 x 8 45' DIAGONAL (4) 10d NAILS INTO <br />--.,--LEAVE <br />INSIDE TO ALLOW FOR INSULATION <br />(2) STRAPS 2450#1) <br />BRACE(S) 2 x 8 BRACE/ BLKG. <br />7/16" OSB <br />TO BE INSTALLED <br />BOND BEAM OR CAST <br />FOR OVERHANGS BE /2" <br />TWEEN OVER 11 <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B.. FOR <br />POLY -CELL IN THIS AREA <br />---2 x 8 45 DIAGONAL BRACE AT EA. <br />IN PLACE BEAM <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. <br />SCRIBE (NOTCH) <br />FACE OF ARCH W/ (3) 1 Od NAILS <br />OVERHAN <br />BACKSIDE TO FIT ARCH (4) 1 Od NAILS INTO 2 x 8 <br />AT EA. END <br />RETROFIT TRUSS DETAIL <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />\\_2 <br />\—PROVIDE <br />N.T.S. <br />INSTALL WDW. SCREW ANCHOR— x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTW`N- OSB <br />ARCH FACES W (4) 10d NAILS THRU OSB INTO 2 x 8 TAPCON WITHIN <br />RETROFIT WALL OVERHANG DETAIL <br />(NTS) <br />INTO ARCH BLKG. PER <br />4" MIN. OF BRACE <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />INSTALLATION DETAILS A -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR <br />THRU __\ \ <br />TRUSS AS SHOWN FOR O.H. UP TO 7-15" <br />FOR OVERHANGS BETWEEN 3/4" TO 11/2" <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />START OF ARC <br />IF TRUSSES USED W/ (3) #6 X 4Y." WOOD <br />) <br />NOTE: FOR OVERHANGS LESS THAN 3/4"- NO REPAIR REQ-D. <br />I 4'MAX. RAD. <br />SCREWS �w 16 O.C. MAX. OR IF MASONRY <br />0 (2) 10d NAILS @ 8" O.C. <br />TO TRUSS TOP CHORD <br />ARCH DETAIL <br />WALL USE (3) 1/4" X 3 1/2" TAPCONS AT 16" <br />SCALE: N.T.S. <br />SS <br />O.C. 12 <br />+ <br />+ + PLYWOOD SHEATHING <br />11-011 51-011 <br />JACK TRUSS PROVIDED BY SEE <br />+ + <br />TRUSS COMPANY OR PLAN <br />2x6 #2 SYP @ 24" O.C. <br />+ + <br />+ <br />[NISH FLO R <br />2 <br />x 8 BUCK - CONNECT TO BLOCK <br />SECTION <br />+ + BLOCKING AS <br />1-1w <br />WITH <br />1/4" x 3 1/4" TAPCON (1 1/4" MIN <br />B-B <br />ROOF SHEATHING ATTACHED <br />+ REQUIRED <br />-0 77.77 <br />/4" MAX EMBEDME'NT INTO <br />2'41 811 <br />PER NAILING SCHEDULE <br />LL <br />TRUSS + TO SUPPORT <br />SOFFIT <br />. <br />A <br />BAR <br />+ <br />_F31 + <br />CENTERED W/ <br />,BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />(5) -12d NAILS <br />+ I <br />- 9T <br />IN TOP <br />BLKG. & BUCK <br />2X6 TO 2X4 USP RT3A <br />2X4 S YP <br />A <br />9 <br />1 X 4 FURRING <br />EACH TRUSS <br />­1-7-7-7-7 7 7 1 ly I., I <br />KNOCKOUT/ ZN <br />AIR BIL K <br />8d NAILS @ 8" O.C. AT BUCK <br />BRACE B <br />2 x 8 VERT. W/ (2) 1 Od <br />NAILS AT EA. END <br />PROVIDE (2) MIN. <br />PROVIDE 2x <br />CONT. W/ <br />CONNECTOR <br />MONOFO, IN <br />+. % <br />PROVIDE 2 x 8 DIAG. <br />VERT. BRACES WHEN HGT. OrN'IN <br />TAPCON AT EA. SIDE <br />(3)_ <br />12d NAILS <br />SEE LINTEL <br />SIZE AND REINF. PER PIL <br />AND SECTION DETAILS <br />BUCK - (1) WITHIN 4" <br />BRACE EXCEEDS 24" <br />JACK TRUSS PROVIDED BY--J <br />SCHED. <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />CLEAN FILL <br />2 x 8 VERT, BRACE(S) <br />INSIDE TO ALLOW FOR INSULATION <br />ARCH <br />#2 SYP @ 24" O.C. <br />ENTER SO01T <br />DIRT <br />TO BE INSTALLED <br />BUILT UP PLWD. BUCK - <br />PRECAST LINTEL % % <br />STANDARD <br />4'-0" MAX SEE PLAN <br />SCRIBE (NOTCH) BACKSIDE <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />v <br />ELEVATION <br />90' <br />#5 BAR IN <br />HOOK <br />TO FIT ARCH CONNECT W/ <br />IF TRUSSES USED) W/ (2) #6 X 4%." WOOD <br />,SEE <br />FOR OVER HANG <br />FILLED CELL, L <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />START OF ARC <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />(MAX. 4'-0") <br />IV, <br />BTWN. OSB ARCH FACES W/ (4) 1 Od NAILS I <br />EQUAL EQU L <br />4'MAX. RAD. <br />WALL USE (2) 1/4" X 3 1/2" TAPCONS AT 16" <br />7- 1. <br />INSTALL WDW, SCREW <br />THRU OSB INTO 2 x 8 <br />O.C. <br />sk <br />ANCHOR INTO ARCH BLKG. <br />rK <br />STEMWALL FOOTING SIZE AND <br />PER INSTALLATION DETAILS <br />13-13 <br />ARCH DETAIL <br />SECTION @ ENTRY <br />SECTION @ ROOF EXTENSION <br />REINF. PERLAN AND STEMWALL <br />MONO TO STEMWALL FOOTING <br />SCALE: N.T.S. <br />� <br />�S <br />SCALE: 3/4" V-0" <br />�S <br />SCALE: 3/4" V-0" <br />� �S <br />SECTION DETAILS <br />SCALE: 3/4" V-0" <br />GLASS BLOCK INSTALLATION NOTES <br />NOTE: <br />IF RETROFIT FILLED CELL CONDITIONS <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />EXCEED <br />(3) PER PROJECT, CONTACT ENGINEER OF RECORD <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />FOR ADDITIONAL <br />INSTRUCTION. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />EXTENDS TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />EXISTING BOND BEAM. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />REINFORCING. PROVIDE LOWER <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />HOOKED DOWEL <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />SEE SHEET D2 AND <br />DRILL 3/4"X6" MIN. HOLE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />EXPANSION STRIP <br />FLOOR PLAN FOR <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />20 ga. PANEL <br />MORE INFO <br />SET BAR IN EPDXY <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCKAFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />ANCHOR <br />HTT16W/(18)-16d NAILSTO <br />CAP TO PREVENT LEAKAGE <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />"SQUEEZED" <br />W.W.M. AT PERIMETER <br />STUDS & (1) - 5/8" DIA. ALL <br />COURSES TO PREVENT THE MORTAR FROM BEING OUT. <br />1/4"EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />#5X6'EMBEDDED INTO <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />9 ga. PANEL 5���PER ANCHOR) <br />(1) #5 BARS CONT. OCCURS <br />TOP WITH MIN. 3" <br />THREAD ROD EPDXIED W/ <br />SIMPSON "SET'EPDXY MIN. <br />z <br />EXISTING BOND BEAM <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS, (THE SAME SPACING <br />REINFORCING <br />COVER 6 <br />5" EMBEDMENT & 3" MIN. <br />0 <br />co <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />(EVERY OTHER <br />,—F.F. <br />EDGE DISTANCE <br />< <br />FILL CELL FULL HEIGHT W/ <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />COURSE) EXPANSION STRIP <br />U_ LU <br />NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />0 <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />t> <br />LU <br />A <br />REINFORCING AS FOLLOWS: <br />SEALANT <br />PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />PRESS PANEL REINFORCING INTO PLACE. <br />6" MIN. LAP SPLICE W/ <br />J, I I <br />5X6'EMBEDDED INTO <br />FOOTING <br />2-#5X6' IN C ONC. <br />COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL <br />REINFORCING PANEL <br />M <br />LO <br />"'��EXISTING <br />FILLED CELL <br />SMOOTH. DO NO FURROW. <br />lEil <br />DRILL 3/4"X6" MIN, HOLE <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />GRADE <br />SET BAR IN EPDXY <br />FURROW, MAINTAIN UNIFORM JOINT WIDTH. <br />3" MIN. LAP <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />SPLICE <br />N 7 <br />REMAIN FREE OF MORTAR. <br />NOTE: <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS <br />SEE GLASS BLOCK INSTALLATION NOTES. <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SEALANT <br />�_�(2) <br />SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />GLASS BLOCK DETAIL <br />#5 REBAR. MIN. 3" <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) GLASS <br />BLOCK SHALL BE INSTALLED PER THE FLORIDA BUILDING CODE RESIDENTIAL SECTION R160 <br />16" MIN. COVER EA. WAY <br />SECTION <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />SCALE: N.T,S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />rDF"'�SECTION AT DEEP MONO FOUNDATION <br />RETROFIT FOR MISSING MSTAM STRAP <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT <br />FILLED CELL DETAIL <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />SCALE: 314" = V-0" <br />SCALE: 3/4" = V-0" <br />FOR WIND SPEEDS UP TO 110 MPH, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />ID <br />z <br />Q) <br />C-/) <br />LU <br />U <br />0 LU <br />F E <br />C!f <br />V) <br />V ZD <br />) <br />0 <br />W <br />Cn CO <br />00 <br />C14 <br />4) M <br />LU <br />2 <br />0 <br />0) co <br />C 0 Cl) <br />em - <br />1 C14 <br />0 <br />0 20 <br />r- LL 00 <br />C <br />af <br />U) CL 0 <br />< 0 <br />LO 0 :S <br />.A — <br />BD. <br />N-C�B D C <br />vUl) <br />M <br />W <br />0- <br />0" it4 <br />—S M ­4 <br />tA <br />Lo r-- <br />0 0 <br />�&, <br />z Lou '5- — <br />MF 4W rX 1�- (a co�'_ <br />ILL <br />I I <br />CN a <br />j-,MW �,­ - - I - <br />LU > 1i - ­. (� � <br />U-1 <br />_� <br />LU LL, k� 2 <br />Z1. <br />43 a <br />FU R. z5_ <br />LL <br />FL <br />k. <br />To the best of the Eng, �nkFeQS&InAtlion <br />belief, the structural plan;4141' <br />ra <br />within these drawings comply, ing <br />Code 5th Edition (2014) Residential. Engineer's signature <br />and seal is only for the structural engineering portions of <br />the drawing pages bearing Engineer's signature and seal. <br />C) <br />Z (�4 <br />0 2 N <br />1__q C) <br />V) ­ <br />:3 t.0 <br />C) <br />> <br />C:) <br />V) M Ln <br />V, :2 Nr <br />En 6N <br />0) — Ln <br />" LL <br />z <br />Ce U>% <br />00 <br />< <br />z E <br />z <br />LU <br />W <br />z <br />0 <br />ED LL <br />L, Z F_ v) a: <br />uj ED Z z SIX <br />Uj <br />w a 0 <br />0 <br />0 z z < <br />Z 0 a. W <br />Z >- < U 2: < <br />7,- � LzLi ;-1 zz <br />z a a: LLJ <br />Lu R _1 <br />00 <br />U, U.) <br />U LU C11 <br />C:) <br />02 <br />a. 0 z <br />z <br />M <br />LU X: <br />02 Lq <br />C:) <br />Ln <br />fI14 <br />(**4 <br />ul <br />_j <br />j L<u < <br />< <br />Ui ag <br />0 <br />Lo <br />Lj <br />U 0 <br />z LL <br />9 <br />-0 <br />Z <br />Z <br />s t �Z- <br />Uj CY �) 2!� =, cz) <br />z< <br />Uj <br />(LDLJ _j 8 p <br />9 � U, Q 6 <br />2! <br />_3 <br />0 LU X �- n <br />2 > 9 0 -, <br />0 LL Z < <br />x 0 <br />0o <br />M 0 <br />0 e <br />Cy 2: LL <br />U) z <br />XR <br />0 <br />z < <br />LU <br />0 <br />I_- <br />c) <br />r.4 <br />F- <br />LL <br />z <br />LU <br />> <br />0 <br />Z <br />z <br />SCALE AS NOTED <br />PLOT DATE 12/7/2012 <br />TECH: FLORES <br />VERSION NO. <br />106 <br />JOB NO: 16-6650 <br />SHEET NO. <br />SS <br />E <br />