Laserfiche WebLink
FTITIM qWKIIIIIIIIINIII M rr ��� w P_wwT-qwrwrMl , .1 1 up <br />FOUNDATION SCHEDULE <br />MARK SIZE DEPTH REINFORCING <br />V-6" x V-6" 11-01, (2) #5 E.W. BOT. <br />2'-0" x 2'-0" 11-0. (3) #5 E.W. BOT. <br />FF 275 7-6" x 2'-6" 11-0. (3) #5 E.W. BOT. <br />FF3.6] T-O" x T-O" (4) #5 E.W. BOT. <br />1� 3'-6" x T-6" l.-011 (4) #5 E.W. BOT. <br />FF4.-01 4'-0" x 4'-0- l.-011 (5) #5 E.W. BOT. <br />FF4.51 4'-6" x 4'-6" 1'.4" (5) #5 E.W. BOT. <br />FF57ol 5'-0" x T-O" l'-4" (6) #5 E.W. BOT. <br />[�� 6'-0" x 6'-0" V-15" (8) #5 E.W. BOT. <br />FOUNDATION DEPTH NOTE: <br />• INTERIOR PAD DEPTHS AS LISTED IN THE SCHEDULE ARE THE TOTAL DEPTH AND MEASURED <br />FROM THE TOP OF THE SLAB. <br />• EXTERIOR PAD DEPTHS AS LISTED IN THE SCHEDULE ARE TOTAL DEPTH WITH THE BOTTOM <br />OF THE FOOTING TO MATCH THE BOTTOM OF THE CONTINUOUS MONOLITHIC POUR WHICH <br />RUNS THROUGH IT. <br />GENERAL FOUNDATION NOTES: <br />1 . PROVIDE MIN. 6 MIL. APPROVED VAPOR BARRIER. ALL JOINTS TO BE <br />LAPPED MIN. 6" AND SEALED. <br />2. 4" 2500 PSI CONC. SLAB WITH Wl.4xWl.4 OVER 6 MIL VISQUEEN VAPOR <br />BARRIER& TREATED FOR TERMITES. <br />3. GC/ BUILDER, SEE ARCH PLANS FOR ROUGH OPENING LOCATIONS <br />AND ADDITIONAL INFORMATION REQ'D FOR DOORANINDOW <br />INSTALLATION ALONG w/ DIMENSIONS NOT SHOWN ON FOUNDATION <br />4. CONSULT W/ MANUFACTURER SPECIFICATIONS PRIOR TO POURING <br />OR RECESSING DOOR SILLS OR SLIDING GLASS DOOR SILLS. <br />5. NO WOOD STAKES PERMITTED IN FOUNDATION. <br />6. PENDING SITE CONDITIONS, FOUNDATION MAY HAVE TO BE STEPPED <br />DOWN. SEE FM18/Dl FOR ADDITIONAL INFORMATION. G.C. TO <br />DETERMINE STEP LOCATIONS, IF REQUIRED. <br />7. STEEL BENDS AND LAP SPLICE SEE FM18/Dl AND FMI91DI <br />8. ALL EQUIPMENTAND/OR APPLIANCES HAVING AN IGNITION SOURCE <br />SHALL BE ELEVATED A MIN OF 18". CONTRACTOR TO PROVIDE SUCH <br />PLATFORM w/ EITHER MASONRY OR WOOD CONSTRUCTION <br />9. ASSUMED ALLOWABLE SOIL BEARING PRESSURE AFTER <br />COMPACTION: 2000 PSF (SEE SOILS REPORT AND SPECIFICATIONS <br />FOR COMPACTION REQUIREMENTS). IF SOIL CONDITIONS ON THE <br />PROJECT DO NOT MEET OR EXCEED THE CAPACITY, THE GENERAL <br />CONTRACTOR SHALL CONTACT THE ENGINEER PRIOR TO <br />FOUNDATION POUR FOR VERIFICATION OF FOUNDATION DESIGN. SOIL <br />TO BE FREE OF ORGANIC MATERIAL AND COHESIVE SOILS, <br />COMPACTED IN 12" LIFTS TO AT LEAST 95% OF MAX. DRY DENSITY AS <br />DETERMINED BY ASTM D 1557 (MODIFIED PROCTOR). <br />10. R.403.1.4 MINIMUM DEPTH: EXTERIOR FOOTINGS SHALL BE PLACED <br />NOT LESS THAN 12 INCHES (305mm) BELOW THE FINISHED GRADE OF <br />GROUND SURFACE. <br />COLUMN SCHEDULE <br />FIRST FLOOR BASE <br />MARK <br />COLUMN SIZE <br />CONNECTIONS, SEE PLAN FOR <br />UPLIFT(lb) <br />SECOND FLOOR CONNECTIONS <br />FC17 <br />(3) 2x #2 SPF <br />(4)12d TOENAILS <br />NO <br />UPLIFT <br />FC72 <br />(3) 2x #2 SFIF <br />DTT2Z W/ Y2" ATR & (8) Y4"XlY2" <br />1800 <br />SDSSCREWS <br />FC 37 <br />(3) 2x #1 SYP <br />(4)12d TOENAILS <br />NO <br />UPLIFT <br />DTT2Z w/ Y2" ATIR & (8) Y4" x VVY' <br />1825 <br />(3) 2x #1 SYP <br />SDSSCREWS <br />Fc--5 <br />4x4 P.T.#2 SYP POST <br />ABU44 w/ %" ATR & (1 2)16d NAILS <br />G = 7570 <br />FIRST/SECOND FLOOR CONN. <br />U = 1900 <br />FC 6 <br />6x6 P.T. #2 SYP POST <br />ABU66 w/ 5/8" ATIR & (1 2)16d NAILS <br />G = 18205 <br />U = 2475 <br />FIRST/SECOND FLOOR CONN. <br />FC7 <br />8x8 P.T. #2 SYP POST <br />ABU88 w/(2)5/8" ATIR & (18)16d <br />G = 23140 <br />FIRST/SECOND FLOOR CONN. <br />U = 2570 <br />FC8 <br />3.5" x 3.5" P.L. 1.8E <br />Fb=2400 PSI <br />HDU5-SDS2.5 w/ %" ATR AND <br />5645 <br />(14) Y4"&/2" SDS WOOD SCREWS <br />(WOLMANIZED IF EXT.) <br />F6­91 <br />3.5" x 5.25" P. L. 1.8E <br />HDU5-SDS2.5 w/ %8" ATR AND <br />Fb=2400 PSI <br />(14) Y4"x2 Y2" SDS WOOD SCREWS <br />5645 <br />(WOLIVIANIZED IF EXT.) <br />Fc-10� <br />3.5" x 7" P.L. 1.8E <br />Fb=2400 PSI <br />HDU8-SDS2.5 w/ 7/8" ATR AND <br />7870 <br />(20) V'x2l/2" SDS WOOD SCREWS <br />(WOLMANIZED IF E)Cr.) <br />Fc-1 1-1 <br />5.25" x 5.25" P.L. 1.8E <br />Fb=2400 PSI <br />HDU8-SDS2.5 w/7/8"ATR AND <br />7870 <br />(20) Y4"x2 Y2" SDS WOOD SCREWS <br />(WOLMANIZED IF EXT.) <br />7" x 7" P.L. 1.8E <br />HDU8-SDS2.5 w/7/8"ATR AND <br />FC12] <br />Fb=2400 PSI <br />(20) Y4"x2 Y2" SIDS WOOD SCREWS <br />7870 <br />(WOLMANIZED IF EXT.) <br />Fc-1-31 <br />5.25" x 7" P.L. 1.8E <br />Fb=2400 PSI <br />HDU8-SDS2.5 w/7/8"ATR AND <br />7870 <br />(20) Y4"x2 Y2" SDS WOOD SCREWS <br />(WOLMANIZED IF EXT.) <br />GENERAL COLUMN NOTES: <br />1 . ALL STRUCTURAL LUMBER TO BE SYP#2 OR SPF#2 LINO ON PLAN. <br />2. MINIMUM BOLT EMBEDMENT: 5" EMBEDMENT FOR 1/2" ATR. 6" <br />EMBEDMENT FOR 5/8" ATR. 8" EMBEDMENT FOR 7/8" ATR. <br />3. P.L. COL. TO BRG DIRECTLY <br />ON FOUNDATION. CUT BASE PLATE AS <br />REQ'D. G.C. TO PROVIDE <br />MOISTURE BARRIER <br />4. IF COL. IS CALLED OUT ON 2ND FLOOR, THE BASE CONNECTION <br />IS NOT <br />REQ'D. SEE PLANS FOR BASE CONNECTION <br />5. VALUES HAVE BEEN REDUCED <br />FOR NARROW FACE APPLICATION. <br />CONNECTIONS SHALL BE <br />INSTALLED ON NARROW OR WIDE <br />FACE PER <br />SIMPSON TC-SCLCLM <br />2x TOP PLATE WITH 2-ROWS <br />OF 12d @ 3" O.C., TYPICAL <br />2x4 STUDS, <br />PER PLAN <br />TOP SPLICE <br />2x4 BEYOND AGAINST 2x8 STUD <br />AT ALL EXTERIOR CONDITIONS <br />ATTACH 2x STUDS TO TOP PLATE <br />w/ 4-16d NAILS (2 ON EA SIDE) <br />2x8 STUDS, PER PLAN (SIM w/2x6 STUDS) DOUBLE 2x8 <br />PROVIDE 2x4 ON TOP OF 2x8 TO BLOCK TOP PLATE <br />OUT TOP PLATE ATTACH w/ 2-ROWS OF 12d <br />@ 3- O.C. (SOLID BLOCK w/ 2x6) <br />TOP PLATE TRANSITION <br />2x TOP PLATE WITH 2-ROWS <br />OF 12d @ 3" O.C., TYPICAL <br />PIPE OR DUCT w/ PENETRATION <br />THRU TOP PLATE w/ MORE THAN TOP PLATE SPLICE <br />50% OF TOP PLATE WIDTH INSTALL <br />SIMPSON PSPN516Z w/12-16d NAILS <br />TOP AND BOTTOM <br />AT ALL EXTERIOR CONDITIONS <br />ATTACH 2X STUDS TO TOP PLATE W/ (4) <br />16d NAILS (2 ON EA. SIDE) TYP <br />NOTE: <br />B0170M SPLICE OVER STUD <br />TOP PLATE SPLICE_ <br />SCALE: 3/4" = V-0" <br />WOOD BEARING WALL SCHEDULE <br />HEADER SCHEDULE <br />SIMPSON - CONNECTOR SCHEDULE <br />MARK <br />STUD <br />CONNECTION & FASTENERS <br />LUMBER <br />UPLIFT <br />MARK <br />HEADER SIZE <br />HEADER NOTES <br />SPACING <br />TOP <br />BOTTOM <br />SPECIES <br />CAP. [plfl <br />(2) 2x6 #2 SYP 1 <br />. VERIFY W/ PLAN CORRECT LENGTH OF HEADER REQUIRED. <br />MARK <br />TYPE <br />CONNECTOR & FASTENERS <br />SPF <br />SYP <br />=BWl <br />16" <br />(2)16d <br />(3) 12d TOENAILS OR (2) <br />#2 SPF <br />NO <br />W/ 7/16" FLITCH PLATE 2. <br />IF HEADER IS ON THE 1ST FLOOR SEE PLAN FOR BEARING <br />FRAMETO <br />HETA16 w/ (9)10d x 1 1/2" OR <br />HETA20 1 Od 1 1/2" <br />1775 <br />1810 <br />TOENAILS <br />12d END OR BOX NAILS <br />UPLIFT <br /><@> <br />(2) 2x8 #2 SYP <br />WALL TYPE AND FOLLOW INSTRUCTIONS WITHIN BEARING <br />MASONRY <br />w/ (9) x <br />7BW27 <br />SP2 w/ <br />SP1 w/ (6) 10d NAILS & <br />#2 SPF <br />402 <br />w/ 7/16" FLITCH PLATE <br />WALL SCHEDULE FOR REQUIRED CORRECTIONS U.N.O. ON <br />FRAME TO <br />H2.5A W/ (1 O)8d NAILS <br />535 <br />56 <br />16" <br />(6)10d NAILS <br />ANCHOR BOLTS <br /><@> <br />(2) 2xl 0 #2 SYP <br />PLAN. <br />FRAME <br />(2) SP2 wl <br />(2) SP1 w/ (6) 1 Od NAILS & <br />w/ 7/16" FLITCH PLATE 3. <br />IF HEADER IS ON THE 2ND FLOOR SEE PLAN FOR <br />FRAME TO <br />A W/ x <br />1015 <br />1040 <br />FBW3 <br />16" <br />#2 SPF <br />804 <br />(2) 2xl2 #2 SYP <br />INDICATED HEADER CONNECTION FOR REQUIRED <br />FRAME <br />H 1 OA-2 w/(l 8)1 Od x 1 1/2" AT 2 PLY TRUSSES <br />930 <br />1080 <br />(6)1 Od NAI LS <br />ANCHOR BOLTS <br /><�> <br />wl 7/16" FLITCH PLATE <br />4. <br />CONNECTIONS. <br />ALL HEADER JACK AND KING STUDS SHALL BE FASTENED <br />FRAMETO <br />MTS12w/(14)10d x 1 1/2"(AT EXTERIOR <br />850 <br />990 <br />FBW4 <br />16" <br />(2)16d <br />(3) 12d TOENAILS OR (2) <br />#2 SYP <br />NO <br /><@> <br />(2) 1 3/4" x 11 1/4" LVL <br />TO EACH PER DETAIL WF37/SN. <br />FRAME <br />LOCATION INCLUDE (3) 12d TOENAILS) <br />TOENAILS <br />12d END OR BOX NAILS <br />UPLIFT <br />2.01E Fb=2600 5. <br />FASTEN ALL MULTI -PLY HEADERS TOGETHER w/ (2) ROWS <br />E <br />FRAME TO <br />MGT w/(22)10d NAILS AND 5/8" A.T.R. w/ 12" <br />3330 <br />3965 <br />FBW57 <br />16" <br />SP2 w/ <br />SP1 w/(6) 10d NAILS& <br />#2 SYP <br />439 <br /><@> <br />(2) 13/4" x 9 1/4" LVIL <br />2,OE Fb=2600 <br />12d COMMON NAILS AT 12" O.C. OR (3) ROWS IF 2xlO OR <br />MASONRY <br />EMBEDMENT W/ SIMPSON "SET" EPDXY <br />(6)10d NAILS <br />ANCHOR BOLTS <br />2xl 0 #2 SYP <br />LARGER TYP. EACH SIDE OR (2) ROWS 1/4" x 3 1/2" SDS <br />FRAME To <br />HTS20 w/(24)1 Od x 1 1/2" (AT EXTERIOR <br />1125 <br />1310 <br />FIBW6 <br />16" <br />(2) SP2 wl <br />(2) SP1 wl (6) 1 Od NAILS & <br />#2 SYP <br />878 <br /><@> <br />(3) <br />w/ 1" FLITCH PLATE <br />WOOD SCREWS @ 16" O.C. TYP. EACH SIDE. <br />FRAME <br />LOCATION INCLUDE (3)12d TOENAILS <br />(6)10d NAILS <br />ANCHOR BOLTS <br />6. <br />FASTEN ALL HEADERS TO KING STUDS w/ (3) 10d TOENAILS <br />FRAME TO <br />(2) HTS20 w/(48)10d x 1 1/2" (AT EXTERIOR <br />2250 <br />2620 <br />- <br />PER SIDE. <br />FRAME <br />LOCATION INCLUDE (6)12d TOENAILS <br />FBw7l <br />12" <br />(2)16d <br />TOENAILS <br />(3) 12d TOENAILS OR (2) <br />12d END OR BOX NAILS <br />#2 SPF <br />NO <br />UPLIFT <br />7. <br />IF HEADER IS NOT SPECIFIED CONTACT E.O.R. <br />HGT-2 w/ (16)10d NAILS AND (2) 5/8" A.T.R. <br />FRAME TO <br />w/ 12" EMBEDMENT w/ SIMPSON "SET" <br />6485 <br />10345 <br />FBW81 <br />12" <br />SP2 w/ <br />SP1 w/ (6) 10d NAILS& <br />#2 SPF <br />535 <br />HEADER SUPPORT - NUMBER OF JACKS & STUDS REQUIRED AT OPENINGS <br />MASONRY <br />EPDXY (HGT-3 FOR 3-PLY) <br />(6)10d NAILS <br />ANCHOR BOLTS <br />F-BW9 <br />12" <br />(2) SP2 w/ <br />(2) SP1 w/ (6) 1 Od NAILS & <br />#2 SPF <br />1070 <br />OPENING <br />2x4 WALL <br />2x6 OR 2x8 WALL <br />FRAMETO <br />MASONRY <br />FGTR w/ (18) 1/4" x 3" SDS WOOD SCREWS <br />AND (2) 1/2" x 5"TITEN HD ANCHOR BOLTS <br />3400 <br />4725 <br />(6)10d NAILS <br />ANCHOR BOLTS <br />SIZE <br />JACKS EA END <br />KINGS EA END <br />JACKS EA END <br />-4 <br />KINGS EA END <br />FRAME TO <br />(2) LGT2 W/ (32) 16d SINKERS & (14) <br />BW10 <br />F <br />12" <br />(2)16d <br />(3) 12d TOENAILS OR (2) <br />#2 SYP <br />NO <br />l'-O" - T-1 1 " <br />(1) <br />(2) <br />(1) <br />(2 <br />MASONRY/ <br />1/4" x 2 1/4" TITEN (2 PLY TRUSS) <br />3500-M <br />3240-F <br />4060-M <br />3770-F <br />TOENAILS <br />12d END OR BOX NAILS <br />UPLIFT <br />FRAME <br />OR (28) 16d SINKERS FOR FRAME (EA) <br />Bw <br />F <br />12" <br />SP2 w/ <br />SP1 w/ (6) 1 Old NAILS& <br /># 2SYP <br />585 <br />4'-0" - 8--1 1 " <br />1 (2) <br />(3) 1 <br />(2) <br />(2) <br />FRAME TO <br />(2) LGT3 w/ (24) 1/4" x 3" SIDS SCREWS <br />4730-M <br />6570-M <br />(6)10d NAILS <br />ANCHOR BOLTS <br />10'-0" - 16'-0" <br />(3) <br />(4) 1 <br />(3) <br />(4) <br />MASONRY/ <br />& (8) 3/8.1 x 5" TITEN (2 PLY TRUSS) <br />5010-F <br />6960-F <br />FBW12 <br />(2) SP2 w/ <br />(2) SP 1 w/ (6) 1 Od NAILS & <br />FRAME <br />OR (52) 16d SINKERS FOR FRAME (EA) <br />12- <br />(6)10d NAILS <br />ANCHOR BOLTS <br />#2 SYP <br />1170 <br />BEAM TO <br />HU410 OPT HUC410 w/ (18) 16d & (10) 10d <br />G#2680 <br />2x CRIPPLE STUDS @ 16" O.C. w/ (1) SIMPSON SP2 CONNECTOR @ TOP AND BOTTOM. <br />BEAM <br />NAILS <br />U#1 895 <br />CROSS REFERENCE CHART <br />-PROVIDE (3) 2x CRIPPLE STUDS BELOW ANY GIRDER TRUSS BEARING OVER HEADER. <br />BEAM TO <br />HU410 OPT HUC410 w/ (18) TITEN <br />G#4500 <br />SIMPSON SP1 / USP SPT22 SIMPSON SP2 USP SPT24 <br />CONNECT G.T. TO STUD W/ (2) SIMPSON HTS20 STRAPS AND CONNECT BOTTOM OF <br />MASONRY <br />1/4" x2 3/4" & (110) 1 Od NAILS <br />U#1800 <br />(2) 2x HEADER (U.N.O.) SEE FLOOR PLAN FOR MIN. SIZE. SEE <br />HD/SN FOR <br />STUD TO HEADER w/ (2) SIMPSON HTS20 STRAPS, U.N.O. (IF STUD IS LESS THAN 10" <br />BEAM To <br />HU46 OPT HUC46 w/ (6) 10d NAILS & <br />G#1785 <br />G#3000 <br />CONNECTION INFO. IF HEADER IS WITHIN A WALL w/ NO UPLIFT <br />AS INDICATED <br />TALL THEN USE SIMPSON CS18 INSTALLED FROM BOTTOM OF HEADER, UP STUD, <br />MASONRY/ <br />(12) 1/4" x 2 3/4" TITEN (TO MAS.) <br />U#1 135 <br />U#1 135 <br />IN THE WOOD BEARING WALL SCHEDULE, THE CONNECTORS INDICATED IN <br />OVER TOP PLATE & BACK DOWN OTHER SIDE OF WALL TO BOTTOM OF HEADER - <br />FRAME <br />OR (12) 16d & (6) 10d (FOR FRAME) <br />SYP-F <br />SYP-M <br />WF09 & HD CAN BE IGNORED <br />FASTEN STRAP w/ (2) 1 Od NAILS @ 3" O.C.) <br />-7 <br />T/ WALL <br />MASONRY WALL <br />(2) 2x TOP <br />7 <br />FRAME TO <br />(2) HETA16 OPT (2) HETA20 <br />1 -PLY w/ (10) 1 Od x 1 1/2" OR <br />2035 <br />1920 <br />SEE PLAN <br />(SEE PLAN) <br />PLATE <br />HEADER (SEE HEADER AND <br />MASONRY <br />2-PLY wl (12) 16d <br />2500 <br />2365 <br />.1 <br />BEAM SCHEDULE FOR <br />2x TOP PLATE SEE, <br />INT. BEARING WALL <br />SIMPSON <br />FASTENING REQUIREMENTS <br />HTSM 16 w/ (8)1 Od NAI LS AN D (4) 1/4"x2 1/4" <br />955 <br />1110 <br />WF17/SN FOR <br />ATTACHED TO EXT. <br />LSTA30 EA. END <br />UP- T <br />& SEE PLANS FOR SIZE) <br />FRAME TO <br />TAPCONS <br />ADDITIONAL INFO <br />BEARING WAL L, <br />OF HEADER <br />HEADER <br />(QPT.) <br />MASONRY <br />OR <br />SEE MS03/L2 FOR <br />(CENTER AT <br />HTSM20 w/ (10)10d NAILS AND (4) 1/4"x2 1/4" <br />2x M I D-SPAN BLOCKING w/ <br />CONNECTION INFO. <br />BOTTOM OF <br />i <br />DOWN -SET <br />TAPCONS <br />955 <br />1110 <br />(2) 12d TOENAIL @ EA. END <br />2x STUDS wl NO <br />HEADER)- <br />WRAP OVER <br />11 <br />EADER(OPl- <br />KING STUD(S) (SEE <br />FRAMETO <br />H10S w/ (8) 8d xl 1/2" NAILS AND (2) 3/8"x4" <br />780 <br />910 <br />ONLY FOR WALLS TALLER <br />THAN 8'-0" <br />UPLIFT, SEE CHART <br />TOP PLATE AS <br />CHART ABOVE FOR INFO) <br />MASONRY <br />TITEN HD <br />CONNECTOR TOP AND <br />ABOVE FOR O.C. <br />SPACING AND PLAN <br />REQ'D. <br />JACK STUD(S) (SEE <br />FRAME TO <br />DTT2Z w/ (8) 1/4" xl 1/2" SIDS WOOD <br />SCREWS AND (1) 1/2-0 A.T.R. EPDXIED w/ <br />1835 <br />2145 <br />BOTTOM PER WOOD <br />Im <br />FOR LOCATION AND <br />SIMPSON SP4 <br />WINDOW <br />DOOR <br />CHART ABOVE FOR INFO) <br />MASONRY <br />SIMPSON 'SET" (SEE NOTE #4) <br />BEARING WALL SCHEDULE <br />WALL SIZE. ATTACH <br />w/ (6) 1 Od NAILS <br />"(SEEARCH� <br />OPENINGI <br />'(SEEARCHI <br />, OPENING <br />0 <br />HTT5 wl (26) 1 Od x 1 1/2" NAILS AND (1) 518"0 <br />STUDS T&B w/ 2-GUN <br />@ 24" O.C. (SP6 <br />FRAME TO <br />A.T.R. EPDXIED W/ SIMPSON "SET" <br />3740 <br />4350 <br />ANCHOR BOLT(S): 1/2" A.B. <br />I <br />NAILS <br />FOR 2'�(6", SP8 <br />HTT4 w/ (118) 16d x 2 1/2" NAILS <br />MASONRY <br />(SEE NOTE #4 BELOW) <br />OR A.T.R.W/ SIMPSON SET FF <br />FOR 2"x8") <br />"CONNECT <br />SILL PLATE <br />& 5/8"0 A.T.R. EPDXIED W/ 6" <br />MIN. EMBEDMENT (MIN.) BASE <br />FRAME TO <br />HTT4 w/ (18) 16d x2 1/2" NAILS AND (1) 5/8"0 <br />@ 32" O.C. w/ EMBEDMENT! LLLL <br />OF7"MIN.OR1/2"TITEN L? <br />SEE FOUNDATION <br />GIRDER TRUSS <br />(SEE NOTE <br />CONNECTION AT EACH SIDE <br />MASONRY <br />A.T.R. EPDXIED w/ SIMPSON "SET" <br />3640 <br />4235 <br />w/ 4 1/2" MIN. EMBEDMENT �11` STE <br />FOR FOOTING <br />DIRECTLY TO <br />#1) <br />U.N.O. ON PLANS (IF AT STEP, <br />(SEE NOTE #4 BELOW) <br />1 <br />7" MIN PAST LOWER SLAB.) ONIL 'IF <br />TYPE&SIZE <br />HEADER w/ (2) <br />6" MIN. EMBEDMENT PAST <br />FRAME TO <br />H 10S w/ (24) 1 Od xl 1/2" NAILS <br />770 <br />910 <br />INDICATED WOOD BEARING <br />SIMPSON <br />LOWER SLAB) <br />FRAME <br />WALL OR SHEAR WALL, SEE <br />( <br />HTS2-0, VANA.,l. <br />FRAME TO <br />HM9KT w/ (4) 1/4"xl 1/2" SIDS WOOD <br />'x2 <br />760 <br />760 <br />PLAN FOR BEARING WALL/ <br />CROSS REFERENCE CHART <br />MASONRY <br />SCREWS & (5) 1/4 1/4" TAPCONS <br />SHEAR WALL LOCATION <br />NOTES: <br />SIMPSON LSTA30 / USP LSTA30 <br />VGT w/ (16) 1/4"x3" SIDS WOOD SCREWS & <br />GENERAL BEARING WALL NOTES: <br />1. OPENINGS GREATER THAN 4'-0" PROVIDE (2) 2x <br />SIMPSON SP4 / USP SPT4 <br />FRAME TO <br />MASONRY <br />(1) 5/8"0 A.T.R. EPDXIED w/ SIMPSON "SET" <br />3555 <br />4940 <br />1 . ALL STRUCTURAL LUMBER DESIGNATED AS SYP SHALL BE <br />SYP #2 AND ALL <br />SILL PLATE W/ A35 CLIPS EACH SIDE. <br />SIMPSON SP6 / USP SPT6 <br />w/ 12" MIN. EMBEDMENT <br />STRUCTURAL LUMBER DESIGNATED AS SPF SHALL BE SPF #2 U.N.O. <br />2. NO TOPTM SHALL OCCUR OVER <br />SIMPSON SP8 / USP SPT8 <br />(2) VGT w/ (32) 1/4"x3" SIDS WOOD SCREWS <br />2. SEE FLOOR PLAN FOR WALL SIZE, ASSUME 2x4 STUDS USED LINO. <br />,�CES <br />OR E HEADER. <br />SIMPSON HTS20 / USP HTW20 <br />FRAME TO <br />& (2) 5/8"0 A.T.R. EPDXIED w/ SIMPSON <br />5170 <br />7185 <br />3. CONNECTIONS TO BE INSTALLED TO EACH STUD AS INDICATED <br />3. HO TIONS NOT REQUIRED AT <br />SIMPSON SP2 / USP SPT24 <br />MASONRY <br />"SET" w/ 12" MIN. EMBEDMENT <br />4. CONTACT E.O.R. IF SP4's, SP6's OR SP8's CONNECTORS ARE SUBSTITUTED, TO <br />BEARINe0NVqECjqeR45LIFT. <br />SIMPSON A35 / USP MPAl <br />VERIFY THEY MEET THE STRUCTURAL REQUIREMENTS. <br />SIMPSON HTT4 / USP HTT45 <br />r(D <br />FRAME TO <br />VGT wl (116) 1/4"x3" SDS WOOD SCREWS & <br />5. IF "BW" IS INDICATED ON SECOND FLOOR BASE CONNECTION TO BE IGNORED. <br />AT <br />FRAME <br />HDU4-SDS2.5 w/ (10) 1/4"X2 1/2" SIDS WOOD <br />3285 <br />4565 <br />SEE WF06 AND FB06 OR INDICATED DETAIL FOR PROPER <br />CONNECTIONS FOR <br />06PEININGS <br />SCREWS & (1) 518"0 A.T.R. <br />i - <br />2ND FLOOR TO FIRST FLOOR CONNECTIONS. (NOTE: THIS IS FOR 2 STORY <br />HOD SCALE: NONE <br />FRAME TO <br />(2) HTT5 w/ (52) l6d"X2 1/2" NAILS & <br />8750 <br />10180 <br />PROJECTS ONLY) <br />FRAME <br />(2) 5/8"0 A.T.R. (SEE NOTE #4) <br />6. IF "SW" IS INDICATED ON PLAN THE WALL IS CONSIDERED A SHEAR WALL AND <br />REQUIRES MIN. 7/16" OSB / PLYWOOD W/8d NAILS @ 4" O.C. IN FIELD AND EDGE BEAM SCHEDULE <br />TO ONE SIDE OF WALL. U.N.O. ON PLANS. <br />7. ALL 2x EXTERIOR WALLS wl SHEATHING ATTACHED PER NAILING SCHEDULE MARK BEAM SIZE FASTENING SCHEDULE <br />TB13/SN ACTS AS SHEAR WALLS, SEE PLAN AND WALL SECTIONS FOR STUD //\ (2) 2x8 SYP #2 w/ <br />SPACING AND GRADE. I I DRAI '711r-11 n00 Cl 1-rrLJ <br />8. ALL TOP PLATES AND SILL PLATES SHALL BE THE SAME SPECIES AS THE WOOD <br />PLATE <br />z <br />:5 <br />z <br />GENERAL CONNECTOR NOTES: <br />STUDS. <br />z <br />00. <br />Z:5 <br />0 a. <br />1 . CONNECT ALL FLOOR TRUSSES TO INTERIOR BEARI NG WOOD WALLS / BEAMS w/ (2) 12d TOENAILS. <br />9. IF THE BEARING WALL IS INDICATED WITH THE BW1, BW4, BW7, BW10, THESE <br />(2) 2xl 0 SYP #2 w/ <br />(2) ROWS OF 12d @ 12" O.C. TYP. <br />cj 0 <br />(j <br />2. ALL TRUSS TO TRUSS CONNECTIONS ARE PROVIDED BY TRUSS MANUFACTURER, U.N.0 ON PLAN. <br />WALLS ARE ONLY SUPPORTING THE FLOOR LOAD AND DO NOT HAVE UPLIFT, <br />7/16" OSB FLITCH <br />EACH SIDE <br />3. G.C. MAY USE EITHER SIMPSON OR USP CONNECTIONS, SEE FRAMING PLAN FOR CONNECTOR CALL <br />THE STUDS ARE TOE NAILED TO THE PLATE AND THE 2X PLATE CAN BE <br />PLATE. <br />zi < <br />< <br />OUT. <br />ATTACHED WITH HARD CASED NAILS (GUN NAILS) AND WILL NOT REQUIRE THE <br />x <br />u- <br />X <br />u- <br />4. FOR SINGLE PLY TRUSSES, SCAB ON FULL HEIGHT SYP #1 2"x4" TO TRUSS VERTICAL WEB w/ (2) ROWS <br />ANCHOR BOLT ATTACHMENT INDICATED IN THE BEARING WALL SCHEDULE. <br />(2) 2xl 2 SYP #2 w/ <br />OF 10d NAILS @ 3" O.C. STAGGERED. <br />7/16" OSB FLITCH <br />5. MINIMUM A.T.R. EMBEDMENT: 5" EMBEDMENT FOR 1/2" A.T.R. 6" EMBEDMENT FOR 5/8" A.T.R. 8" <br />PLATE. <br />EMBEDMENT FOR 7/8" A.T.R. (IF AT STEP, DEPTH IS FROM LOWER SLAB). <br />0�> <br />(2) 1 3/4"xl 1 1/4" <br />2.OE Fb=2600 <br />04 <br />MINIMAL CONNECTOR LINO ON FRAMING PLAN <br />LVIL <br />04 <br />1 . CONNECTION FOR ALL ROOF / FLOOR TRUSSES TO MASONRY WALLS/ LINTELS/ ICF WALLS LINO ON <br />(2) 1 3/4"xl 17/8" <br />cr <br />0 <br />PLAN <br />2x4 SPF#2 wl 2-12d NAILS @ 24" O.C. @ <br />LVL 2.OE Fb=2600 <br />c') <br />0 u' <br />0 <br />0 z: <br />2. CONNECTION AT 24" OR 32" O.C. PENDING VERTICALS FOR ALL FLOOR TRUSSES PARALLEL TO <br />PARALLEL TRUSS CONDITION <br />(2) ROWS 1/4" x 3 1/2" SIDS WOOD <br />uj <br />zz <br />00 <br />I' <br />0 <br />00 - <br />MASONRY WALLS SEE DETAIL FB12/D3 FOR MORE INFORMATION <br />LIJ <br />z <br />z <br />3. CONNECTION FOR ALL HIP JACK (CORNER JACK) TO MASONRY WALLS/ICF WALLS/LINTELS <br />(2) 1 3/4"xl 6" LVL <br />SCREWS @ 16" O.C: TYP. EACH SIDE <br />0 <br />0 <br />U) <br />-j <br />Z <br />co <br />-j <br />4. CONNECTION FOR ALL CONTINUOUS RIM BOARD TO TOP OF MASONRY AT 32" O.0 MAX. w/ (2) AT <br />ROOF TRUSS <br />2.OE Fb=2600 <br />OR (2) ROWS OF 12d NAILS @ 12" <br />z <br />R <br />0 <br />R <br />EACH CORNER. G.C. TO VERIFY LOCATION DOES NOT CONFLICT w/TJI (IF APPLICABLE) LAYOUT <br />O.C. TYP. EACH SIDE <br />0 <br />(n <br />-j <br />0 <br />(3) 2xl 0 SYP #2 wl <br />a. <br />1:� <br />0 <br />2) 7/16" OSB <br />FLITCH PLATES <br />CO <br />02 <br />Q-0 <br />Z) <br />0 <br />a. <br />M <br />0 <br />MINIMAL CONNECTOR UNO ON FRAMING PLAN <br />)/4" MIN. SPACE <br />0 <br />0 <br />SIMPSON DTC w/4-8d NAILS TO <br />0 <br />0 <br />1. CONNECTION FOR JACK TRUSS TO WOOD WALL OR BEAM <br />TOP PLATE AND 2-8d NAILS @ <br />(3) 1 3/4"x9 1/4" <br />LVL 2.01E Fb=2600 <br />0 <br />0 <br />MINIMAL CONNECTOR LINO ON FRAMING PLAN <br />SLOT @ 4'-0" O.C. MAX <br />2x STUDS @ 24" O.C. MAX <br />1. CONNECTION FOR ALL TRUSSES TO INTERIOR/EXTERIOR BEARING WOOD <br />WALLS AND/OR BEAMS <br />2x PT BOTTOM PLATE 771 <br />GENERAL BEAM NOTES: <br />1 . VERIFY WITH PLAN CORRECT LENGTH OF BEAMS REQUIRED (MIN 4" BEARING EACH <br />END) <br />2. SEE PLAN FOR TOP OR BOTTOM OF BEAM INDICATIONS <br />WF18� NON-BRG INTERIOR WALL 3. BEAMS ARE NOT TO BE DRILLED OR NOTCHED IN ANY WAY WITHOUT WRITTEN <br />SCALE: 3/4"= V-0" APPROVAL FROM THE E.O.R. <br />-N -;Z� <br />04 <br />;0 <br />;0 <br />2-2x4 LAMINATIONS w/ 3-2x- LAMINATIONS w/ 2-ROWS OF <br />1-ROW OF STAGGERED 10d STAGGERED 16d COMMON WIRE NAILS <br />COMMON WIRE NAILS (ONE INTO EACH OUTSIDE FACE) <br />(D = 0.148", L= 3") OR EQUAL (D = 0. 162", L= 3-1/2") OR EQUAL <br />4-2x - LAMINATION PROVIDE Y4"0x5Y2" <br />LAG SCREWS AT SAME SPACING AS <br />ABOVE <br />NOTES: <br />1 . ADJACENT NAILS ARE DRIVEN FROM OPPOSITE SIDES OF THE <br />COLUMN. <br />2. ALL NAILS PENETRATE AT LEAST 3/4" OF THE THICKNESS OF <br />THE LAST LAMINATION <br />3. REFER TO NDS SECTION 15.3 FOR ADDITIONAL INFO. <br />MULTI -PLY FASTENING_ <br />SCALE: 3/4" = l'-9' <br />HEADER, SEE PLAN FOR SEE HD/SN FOR ADDITIONAL HEADER <br />w I--- LOCATION AND SIZE INFORMATION <br />346" <br />O.S.B. <br />EACH <br />SIDE <br />2x BLOCKIN <br />ILAFTO O.S.B. <br />IEN 2-8d EA. EN <br />EDGE VIEW <br />3-16d COMMON <br />NAILS, TYP <br />2x8 wl 2-16d TOE <br />NAILS EA. END <br />OPENING - <br />FRAMING, SEE <br />HD/SN FOR <br />ADDITIONAL <br />INFORMATION <br />wl wi - off -- <br />HEADER, SEE PLAN FOR LOCATION AND SIZE <br />2 1 <br />'/16" OSB w/6d NAILS @ 16" O.C. -7 A <br />TO SIDE AND TOP NAILER <br />AT <br />2x w/ 2-16d TOENAILS EA. END <br />2x4 SPF CONT. BLOCKING ATTACHED TO <br />�'16" OSB w/ 2-8d NAIL <br />7'-0" MAX OPENING 0 <br />02� WOOD FRAMED ARCH <br />SCALE: 3/4" = V-0" <br />UPLIFT CONNECTOR <br />TYPICAL SEE PLAN <br />GROUT TO BE - <br />FLUSH WITH <br />TOP OF WALL <br />PRECAST "U" LINTEL(S) FILLED <br />SOLID W/ 3000 PSI GROUT (SEE <br />LINTEL PLAN FOR MINIMUM <br />SIZE & REINFORCEMENT) <br />PROVIDE KNock--auall <br />BLOCK FOR FIRST <br />;COMPLETE CMU COURSE <br />BELOW SILL & FILL SOLID <br />W/ (1) #5 BAR FOR ALL <br />WINDOW OPENINGS 7' -8- <br />1 AND LARGER <br />15/32" OSB <br />EXPOSURE <br />SHEATHIN( <br />PROVIDE BLO( <br />AS REQUIRED <br />SECTION X-X 11 <br />FULL HEIGHT c <br />9x RIBBON OR <br />BETWEEN FLOOR SYSTEM <br />0 LO <br />Z <br />z(ou <br />(2)-2x TOP PLATE BEYOND //- 15132"OSB EXPOSURE 1 z <br />SHEATHING <br />2 <br />yl <br />SOLID 2x BLOCKING <br />@ ALL SHEATHING Lu a <br />Lu UJI <br />EDGES X: <br />U) <br />(SEE SECTION X-X) a <br />Zi U) <br />0 Z <br />U) <br />OPENING <br />11 <br />11 <br />I <br />W <br />LLI u- <br />FL 0 < <br />X <br />X <br />E <br />,-2x STUDS BEYOND. w w <br />SEE PLAN <br />go <br />co <br />0 K <br />U) <br />')-,A 0r DACC r3l Arr- DC\/f'%Klr% 0 <br />111=6=1 <br />VERTICAL HORIZONTAL <br />WALL ELEVATION DIAGRAR <br />..Q" = KIAII <br />PACING <br />3/4" <br />1/2" <br />SINGLE NAIL EDGE SPACING <br />/2" <br />U) Ln z <br />Q) C-10 <br />4-j Ljj <br />0 <br />u 04 <br />0 Lu <br />cl� U) <br />V) <br />v) <br />ul <br />04 <br />u (1) <br />Lu cl) <br />E <br />0 w 0 04 <br />q = E: 0 <br />M :S CO <br />:3 -,d co <br />U 0 c <br />(D <br />u- 0) <br />cl 0 <br />2 <br />< 0 M <br />Ill co 0) C14 2 6 <br />LL I,- M U) <br />X 0 Z) <br />< <br />fr I`- <br />0 0 <br />N c B D c <br />co A U <br />uj 0 <br />CN w 2 <br />M: 0 0-1 8 D. <br />w ILL <br />LL <br />THIS DOCUMENT AND/OR THE DESIGN <br />CONCEPTS EXPRESSED HEREIN ARE THE <br />PLAN <br />PROPERTY OF KEESEE ASSOCIATES AND <br />ALL RIGHTS OF OWNERSHIP, INCLUDING <br />COPYRIGHT OF INTELLECTUAL PROPERTY, <br />ARE RESERVED THE REPRODUCTIONS, <br />COPYING, OR USE OF THIS DOCUMENT <br />AND/OR THE DESIGN CONCEPT WITHOUT <br />AT ALL PANEL BLOCKING <br />THE WRITTEN CONSENT OF KEESEE <br />LOCATIONS SHALL BE MIN 2 X 4 <br />ASSOCIATES IS STRICTLY PROHIBITED D <br />#2 SPF TURNED VERTICAL W/ <br />PROTECTED BY UNITED STATES AND <br />7/16" FLITCH PLATE TO W/ (2) 12d <br />INTERNATIONAL LAW. <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL W/ (4) 8d <br />NAILS <br />04 J# <br />6 <br />-Z <br />N o 73750 IS <br />\--(2) 8d NAILS @ 3" O.C. <br />Go <br />STAGGERED FOR SHEATHING <br />fr- W <br />F uj co <br />T /j/ W Z <br />_j W <br />VERiICAL BLOCKING 4� r g <br />0 <br />DOUBLE NAIL EDGE SPACING SECTION X-X -,I otq co <br />.;iffmills <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM Y8" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />PENETRATE SURFACE MORE THAN Y8". <br />y NAIL AT BASE 2 ROWS @ 4" O.C. W/ 8d COMMON NAIL. <br />rD-l\ <br />\,Dj NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ 8d COMMON NAIL. <br />611\ <br />\,�- NAIL OPENING PERIMETER wl (2) ROWS @ 4" O.C. w/ 8d COMMON NAIL. <br />@ NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />W/ 8d COMMON NAIL. <br />0 PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER w/ 8d <br />COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />OU (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL MEMBER IF <br />GABLE END. <br />NOTE: 8d NAILS FOR WALL SHEATHING MUST BE MIN.131" X 2 1/2". <br />DO NOT OVERDRIVE NAILS: FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN Y8" I <br />T1313� WALL SHEATHING INSTALL & NAILING SCHEDULE <br />SCALE: N.T.S. <br />UPLIFT <br />CONNECTOR <br />PROVIDE SCREEN WHEN <br />TYPICAL <br />BLOCK BELOW IS NOT <br />(SEE PLAN) - <br />REQUIRED TO BE FILLED. <br />LO <br />04 <br />STANDARD 90 <br />z <br />E: Lo <br />w x <br />DEGREE HOOK (TYP.) <br />HOOK LINTEL <br />10" 2 <br />w 0 <br />REINFORCING <br />HOO <br />a--TYP. <br />BOND BEAM <br />INTO SIDE <br />TY <br />8"x 8"x 16"K.O. <br />VERTICALS ---- <br />LINTEL BLOCK <br />FILL w/ 3000 psi <br />CONC. W/ (1) #5 <br />REBAR BOTH SIDES <br />DIA. REBAR <br />OPENING U.N.O. <br />STD. 90 DEGREE <br />CORNER FILLED <br />PROVIDE STD. <br />wl 3000 psi <br />90'HOOKW/MIN. <br />GROUT W/ (1) #5 <br />25" LAP SPLIC <br />DIA. REBAR <br />ON EA. END--.,, <br />INDICATES <br />FILLED CELL <br />FROM FTG. TO <br />PROVIDE <br />BEAM W/ (1) #5 <br />KNOCK -OUT <br />IBLOCK FOR FIRST <br />BAR <br />COMPLETE CMU <br />COURSE BELOW <br />8" x 8"x 16" <br />SILL & FILL SOLID <br />CMU U.N.O. <br />W/(l)#5 BAR <br />TYP. DOWEL <br />j <br />25" MIN LAP <br />11' <br />(AC1530) <br />SEE FOUNDATION PLAN FOR <br />SEE FOUNDATION PLAN FOOTING REQUIREMENTS <br />FOR LOCATION <br />Sol� BLOCK WALL REINFORCEMENT_ <br />) REVISION 10-19-16 SCALE: 1/2"= T-0" <br />FILLED SOLID W/ 3000 PSI GROUT <br />(SEE LINTEL PLAN FOR MINIMUM <br />GROUT TO BE SIZE & REINFORCEMENT) <br />FLUSH WITH STANDARD 90 <br />TOP OF WALL--\ DEGREE HOOK <br />REV. FBC 7TH ED. 2020 <br />SPLICE BETWEEN WALL <br />REINF. & LINTEL TOP STEEL <br />AT EACH SIDE OF OPENING <br />- TYP. CONT. BOND BEAM <br />8" x 8" x 16" K.O. LINTEL <br />BLOCK FILL w/ 3000 PSI <br />GROUT W/ (1) #5 DIA. REBAR <br />7 <br />IL <br />ul <br />04 <br />a. <br />PROVIDE 3"x3" HOLE <br />IN BOTTOM OF <br />PRECAST LINTEL TO <br />EXTEND WALL REINF. <br />THROUGH AS REQ'D. <br />(DO NOT CUT STEEL) I <br />REBAR BOTH SIDES REBAR BOTH SIDES <br />OF OPENING U.N.O. OF OPENING U.N.O. <br />12" OR LESS <br />INDICATES <br />FILLED CELL <br />FROM FTG. TO <br />BEAM w/ (1) #5 <br />BAR <br />SEE FOUNDATION PLAN FOR' <br />FOOTING REQUIREMENTS <br />SHEAR FRAME <br />SCALE: 1/2" = T-O" <br />REVISION 10-19-16 <br />8" x 8"x 16" <br />CMU U.N.O. <br />TYP. DOWEL <br />25" MIN LAP <br />(AC1530) <br />SEE FOUNDATION PLAN <br />FOR LOCATION <br />SINGLE OR MULTIPLE WINDOWS <br />LJJ <br />Z <br />0 <br />cn <br />E <br />M <br />z <br />SHEET INFORMATION <br />DATE: 10/15/20211 <br />DRAWN BY: NJ <br />PROJECT NO: 21-6096 <br />REVIEWED BY: SL <br />wl Plan Revisions Date: <br />1 1 DOOR AT BACK LANAI <br />Sheet Name <br />NOTES & <br />SCHEDULES <br />Sheet No. SN <br />