Laserfiche WebLink
GENERAL NOTES <br />1 . ALL INSTALLATIONS AND EQUIPMENT SHALL BE IN STRICT ACCORDANCE WITF <br />ALL APPLICABLE STATUTES, CODES AND REGULATIONS OF THE GOVERNMENTAL <br />BODIES HAVING JURISDICTION. THIS SET OF PLANS IS DESIGNED TO BE IN <br />ACCORDANCE WITH FLORIDA PLUMBING CODE. <br />2. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF PLUMBING FIXTURE <br />MOUNTING HEIGHTS, AND DIMENSIONS. <br />3. REFER TO ARCHITECTURAL PLANS FOR FIRE RATED FLOOR AND WALL <br />PENETRATION DETAILS. <br />4. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER TRADES. <br />5. VALVES AND FITTINGS SHALL BE OF SAME SIZE OF LINE ON WHICH THEY ARE <br />LOCATED, UNLESS OTHERWISE INDICATED ON DRAWINGS. <br />6. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING FIRE RATING AND <br />WEATHERPROOFING INTEGRITY OF ALL PIPING AND PENETRATIONS. ALL <br />PENETRATION FOR ALL PIPING THRU FLOOR SLAB SHALL BE WATERPROOFED. <br />7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY <br />SUPPORTING DEVICES FOR ALL FIXTURES INCLUDED IN CONTRACT OR HEREIN <br />SPECIFIED OR OTHERWISE. <br />8. ROUTE ALL PIPING CONCEALED ABOVE CEILINGS, WITHIN WALLS, OR IN <br />CHASES. PIPING EXPOSED SHALL BE SLOPED AND PAINTED TO MATCH <br />ARCHITECTURAL FINISHES. PIPING IN MECHANICAL ROOMS MAY BE EXPOSED. <br />9. CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT CONNECTIONS OF <br />DISSIMILAR METALS. <br />10. CONTRACTOR SHALL ROUGH -IN ALL WASTES AND SUPPLIES TO SPECIAL <br />EQUIPMENT ACCORDING TO MANUFACTURER'S SHOP DRAWINGS AND MAKE <br />FINAL CONNECTIONS. ALL SUPPLIES SHALL BE VALVED. INSTALL VACUUM <br />BREAKERS WHERE REQUIRED BY CODE. <br />11. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS (INCLUDING PIPE ROUTING AND <br />EQUIPMENT LOCATIONS) TO ARCHITECT/ENGINEER FOR REVIEW AND APPROVAL <br />PRIOR TO THE INSTALLATION OR PURCHASING OF ANY PIPING AND/OR <br />EQUIPMENT. <br />12. CONTRACTOR SHALL FIELD VERIFY ALL GIVEN MEASUREMENTS PRIOR TO LAYING <br />AND CONNECTING ALL SANITARY AND WASTE PIPING AND NOTIFY ARCHITECT OF <br />ANY DISCREPANCIES. <br />13. ALL SANITARY PIPING OVER 2" IN DIAMETER SHALL HAVE A 1/8" PER FOOT <br />AND ALL SANITARY PIPING 2" OR LESS IN DIAMETER SHALL HAVE A 1/4- PER <br />FOOT SLOPE UNLESS OTHERWISE NOTED. <br />14. ALL DRAINAGE PIPING SHALL BE MARKED WITH THE SEAL OF APPROVAL OF <br />THE NATIONAL SANITATION FOUNDATION. <br />15. ALL FLOOR DRAINS SHALL BE PROVIDED WITH TRAP PRIMER VALVE AND <br />FITTINGS UNLESS NOTED OTHERWISE. <br />16. CONTRACTOR SHALL VERIFY INVERT ELEVATIONS OF SEWERS TO WHICH NEW <br />SEWER LINES ARE TO BE CONNECTED BEFORE INSTALLATION OF NEW SEWER <br />LINE. <br />17. INSTALL WATER HAMMER SHOCK ARRESTORS AT EACH FIXTURE AND BATTERY <br />OF FIXTURES. ARRESTORS SHALL BE FACTORY -FABRICATED. INSTALL <br />ARRESTORS AND SIZE PER PLUMBING AND DRAINAGE INSTITUTE STANDARD <br />P.D.I. WH-2011. ACCEPTABLE MANUFACTURERS - SIOUX CHIEF, PRECISION <br />PLUMBING PRODUCTS INC., FOR 1-11 F.U.'S PROVIDE PDI-A, 12-32 F.U.'S <br />PDI-B, 33-60 F.U.'S PDI-C, 61-113 PDI-D. <br />18. AIR CHAMBERS SHALL NOT BE CONSIDERED AN EQUAL TO WATER ARRESTORS <br />AS SPECIFIED. <br />19. PROVIDE ACCESS PANELS TO ALL VALVES WITHIN CHASES OR ABOVE <br />NON -ACCESSIBLE CEILINGS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING <br />TYPES. <br />20. PROVIDE REDUCED PRESSURE BACKIFLOW PREVENTERS FOR DOMESTIC WArER <br />SUPPLIES AS REQUIRED BY LOCAL WATER PURVEYORS. <br />21. PRESSURE REDUCING VALVES SHALL BE INSTALLED ON BRANCH LINES <br />AND/OR MAINS SERVING FIXTURES AND/OR EQUIPMENT, WHEN THE PRESSURE <br />IN THE LINE EXCEEDS 80 P.S.I. IT IS RECOMMENDED THAT A VELOCITY <br />BETWEEN 5 AND 8 PER SECOND BE MAINTAINED. <br />22. PROVIDE CLEAN OUTS AS REQUIRED BY CODE AND AHJ. <br />ABBREVIATIONS <br />AD <br />ACCESS DOOR <br />HD <br />HEAD <br />AFF <br />ABOVE FINISHED FLOOR <br />HW <br />HOT WATER <br />APPROX <br />APPROXIMATELY <br />HR <br />HOUR <br />ARCH <br />ARCHITECTURAL <br />INV <br />INVERT ELEVATION <br />AUTO <br />AUTOMATIC <br />LBS <br />POUNDS <br />BLDG <br />BUILDING <br />MIN <br />MINIMUM <br />CD <br />CONDENSATE DRAIN <br />NC <br />NORMALLY CLOSED <br />CLG <br />CEILING <br />NIC <br />NOT IN CONTRACT <br />CO <br />CLEAN -OUT <br />NO <br />NORMALLY OPEN <br />COND <br />CONDENSATE <br />NTS <br />NOT TO SCALE <br />CONT <br />CONTINUATION <br />PSI <br />POUNDS PER SQUARE INCH <br />CMU <br />CONCRETE MASONRY UNIT <br />PVC <br />POLYVINYL CHLORIDE <br />CW <br />COLD WATER (CITY) <br />R <br />RISE <br />EL <br />ELEVATION <br />REQ'D <br />REQUIRED <br />ELEC <br />ELECTRIC <br />RM <br />ROOM <br />-F <br />DEGREES FAHRENHEIT <br />SAN <br />SANITARY <br />ECO <br />EXTERIOR CLEANOUT <br />SPEC <br />SPECIFICATION <br />FCO <br />FLOOR CLEANOUT <br />TEMP <br />TEMPERATURE <br />FD <br />FLOOR DRAIN <br />TYP <br />TYPICAL <br />GAL <br />GALLONS <br />V <br />VENT LINE <br />GPH <br />GALLONS PER HOUR <br />VTR <br />VENT THRU ROOF <br />GPM <br />GALLONS PER MINUTE <br />W/ <br />WITH <br />HB <br />HOSE BIBB <br />WCO <br />WALL CLEANOUT <br />PLUMBING LEGEND <br />COLD WATER SUPPLY <br />EQUIPMENT <br />HOT WATER SUPPLY <br />HOT WATER RETURN <br />SAN- SANITARY <br />PLUMBING SPECIFICATIONS <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />A. GENERAL PROVISIONS SPECIFICALLY APPLICABLE TO DIVISION 15 SECTIONS, <br />IN ADDITION TO DIVISION 1 - GENERAL REQUIREMENTS. <br />1.2 SCOPE <br />A. THE WORK SHALL INCLUDE THE PROVISIONS OF SYSTEMS, <br />EQUIPMENT AND MATERIALS SPECIFIED IN THIS DIVISION AND AS <br />CALLED FOR ON THE DRAWINGS. WORK SHALL ALSO INCLUDE <br />SUPERVISION, OPERATION, METHODS AND LABOR FOR THE <br />FABRICATION, START-UP AND TESTS FOR A COMPLETE OPERATIONAL <br />PLUMBING INSTALLATION. <br />B. DRAWINGS FOR THE WORK ARE DIAGRAMMATIC IN NATURE AND ARE <br />INTENDED TO CONVEY THE SCOPE OF THE INSTALLATION AND TO INDICATE <br />THE GENERAL ARRANGEMENT AND LOCATIONS OF THE WORK. BECAUSE OF <br />THE SCALE OF THE DRAWINGS, CERTAIN BASIC ITEMS SUCH AS PIPE <br />FITTINGS, ACCESS PANELS, AND SLEEVES MAY NOT BE SHOWN. THIS <br />CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTING THE EQUIPMENT TO <br />FIT THE SPACE PROVIDED. THE LOCATION AND SIZES FOR PIPE FITTINGS, <br />SLEEVES, INSERTS, FIRE AND/OR SMOKE DAMPERS, AND OTHER BASIC <br />ITEMS REQUIRED BY CODE AND OTHER SECTIONS SHALL BE COORDINATED <br />AND INCLUDED FOR THE PROPER INSTALLAMON OF THE WORK. <br />C. EQUIPMENT SPECIFICATIONS MAY NOT DEAL INDIVIDUALLY WITH MINUTE <br />ITEMS REQUIRED SUCH AS COMPONENTS, PARTS, CONTROLS AND DEVICES <br />WHICH MAY BE REQUIRED TO PRODUCE THE EQUIPMENT PERFORMANCE <br />SPECIFIED OR AS REQUIRED TO MEET THE EQUIPMENT WARRANTIES. WHERE <br />SUCH ITEMS ARE REQUIRED, THEY SHALL BE INCLUDED BY THE INSTALLER <br />OF THE EQUIPMENT, WHETHER OR NOT SPECIFICALLY INDICATED IN THE <br />CONTRACT DOCUMENTS WITH NO ADDITIONAL COST INCURRED. <br />D. WHERE NOTED ON THE DRAWINGS OR INDICATED IN OTHER SECTIONS OF <br />THE SPECIFICATION, THE CONTRACTOR FOR THIS DIVISION SHALL INSTALL <br />PLUMBING EQUIPMENT FURNISHED BY OTHERS, AND SHALL MAKE ALL <br />FINAL CONNECTIONS. CONTRACTOR SHALL INSTALL EQUIPMENT AND <br />SYSTEMS IN STRICT ACCORDANCE WITH MANUFACTURERS <br />RECOMMENDATIONS. <br />E. COORDINATE WITH ALL TRADES IN SUBMITTAL OF SHOP DRAWINGS. TIGHT <br />SPACE CONDITIONS SHALL BE DETAILED TO THE SATISFACTION OF ALL <br />TRADES, SUBJECT TO THE REVIEW AND FINAL ACCEPTANCE OF THE <br />ARCHITECT/ENGI NEER. IN THE EVENT THAT THE CONTRACTOR INSTALLS HIS <br />WORK BEFORE COORDINATING WITH OTHER TRADES OR SO AS TO CAUSE <br />ANY INTERFERENCE WITH THE WORK OF THE OTHER TRADES THIS <br />CONTRACTOR SHALL MAKE ALL REQUIRED CHANGES TO CORRECT THE <br />CONDITION AT NO ADDITIONAL COST TO THE PROJECT. <br />F. CONTRACTOR SHALL VERIFY ALL EQUIPMENT CONNECTION SIZES PRIOR TO <br />INSTALLATION OF ANY SYSTEMS. THIS CONTRACTOR SHALL ADJUST PIPING <br />SYSTEM SIZES AS REQUIRED TO MATCH EQUIPMENT CONNECTIONS. UTILIZE <br />REDUCERS WHERE EQUIPMENT CONNEC11ONS ARE SMALLER THAN PIPE <br />SIZES INDICATED ON PLANS, NO PIPING SHALL BE DECREASED IN SIZE (IN <br />THE DIRECTION OF FLOW). <br />G. EXAMINATION OF BIDDING DOCUMENTS: <br />1. EACH BIDDER SHALL EXAMINE THE BIDDING DOCUMENTS CAREFULLY <br />AND NOT LATER THAN TEN (110) DAYS PRIOR TO THE DATE FOR <br />RECEIPT OF BIDS, SHALL MAKE WRITTEN REQUEST TO THE ENGINEER <br />FOR INTERPRETAT10N OR CORRECTION OF ANY AMBIGUITY, <br />INCONSISTENCY OR ERROR THEREIN. ANY INTERPRETATION OR <br />CORRECTION WILL BE ISSUED AS AN ADDENDUM BY THE ENGINEER. <br />ONLY A WRITTEN INTERPRETATION OR CORRECTION TO BID <br />DOCUMENTS BY ADDENDUM SHALL BE BINDING. NO BIDDER SHALL <br />RELY UPON ANY INTERPRETATION OR CORRECTION GIVEN BY ANY <br />OTHER METHOD. <br />H. SUBSTITUTIONS: <br />1. EXCEPT AS PROVIDED BELOW, EACH BIDDER REPRESENTS THAT HIS <br />BID IS BASED UPON THE MATERIALS AND EQUIPMENT DESCRIBED IN <br />THE BIDDING DOCUMENTS. <br />2. NO SUBSTITUTIONS FOR OTHER MATERIALS AND EQUIPMENT WILL BE <br />CONSIDERED UNLESS WRITTEN REQUEST HAS BEEN SUBMITTED TO <br />THE ENGINEER FOR APPROVAL AT LEAST TEN (10) DAYS PRIOR TO <br />THE DATE FOR RECEIPT OF BIDS. EACH SUCH REQUEST SHALL <br />INCLUDE A COMPLETE DESCRIPTION OF THE PROPOSED SUBSTITUTE, <br />THE NAME OF THE MATERIAL OR EQUIPMENT FOR WHICH IT IS TO <br />BE SUBSTITUTED, DRAWINGS, CUTS, PERFORMANCE AND TEST DATA <br />OR INFORMATION NECESSARY FOR A COMPLETE EVALUATION. <br />3. IF THE ENGINEER APPROVES ANY PROPOSED SUBSTITUTION, SUCH <br />APPROVAL WILL BE ISSUED AS AN ADDENDUM FORWARDED TO ALL <br />PARTICIPATING BIDDERS. <br />4. IF ANY BIDDER IS UNABLE TO PROCURE WRITTEN APPROVAL OF ANY <br />SUBSTITUTION FROM THE ENGINEER PRIOR TO THE OPENING OF <br />BIDS, THEN HE SHALL BASE HIS BID ON ITEMS AND SYSTEMS AS <br />SPECIFIED IN BID DOCUMENTS. <br />5. SUBSTITUTIONS REQUESTED ON THE BID PROPOSAL FORM WHICH <br />ARE PRIOR APPROVED BY THE ENGINEER WILL BE INCORPORATED <br />INTO THE CONTRACT WITH THE SUCCESSFUL BIDDER. <br />6. REQUESTS FOR ANY SUBSTITUTIONS NOT SUBMITTED AND APPROVED <br />IN ACCORDANCE WITH THE ABOVE INSTRUCTIONS WILL BE DENIED BY <br />THE ENGINEER. <br />1.3 REGULATORY REQUIREMENTS <br />A. ALL INSTALLATIONS AND EQUIPMENT SHALL BE IN STRICT ACCORDANCE <br />WITH ALL APPLICABLE STATUTES, CODES AND REGULATIONS OF THE <br />GOVERNMENTAL BODIES HAVING JURISDICTION. <br />1.4 CUTTING AND PATCHING <br />A. SUBMIT WRITTEN REQUEST IN ADVANCE OF CUTTING OR ALTERING <br />ELEMENTS. <br />A BALL VALVE <br />-fZ4- CHECK VALVE, HORIZONTAL SWING <br />CAPPED LINE <br />HOSE BIBB <br />- - - SAN- - - SANITARY UNDERGROUND <br />------------ VENT <br />DIRECTION OF FLOW IN PIPE <br />0 PIPE UP <br />PIPE DOWN <br />B. EMPLOY SKILLED AND EXPERIENCED INSTALLER TO PERFORM CUTTING <br />AND PATCHING WHICH EFFECT: <br />1. INTEGRITY OF WEATHER PROOFING MATERIALS. <br />2. EFFICIENCY, MAINTENANCE, OR SAFETY OF ELEMENT. <br />3. VISUAL QUALITIES OF SIGHT. <br />4. WORK OF OWNER OR SEPERATE CONTRACTOR. <br />C. NO STRUCTURAL ELEMENTS TO BE CUT WITHOUT PRIOR APPROVAL OF THE <br />ARCHITECT. <br />PART 2 PRODUCTS <br />2.1 PIPE HANGERS AND SUPPORTS <br />A. MANUFACTURERS: <br />1. B-LINE <br />2. OTHER ACCEPTABLE MANUFACTURERS OFFERING EQUIVALENT <br />PRODUCTS. <br />A) MICHIGAN HANGER. <br />B) PHD. <br />2.2 HOT WATER WATER PIPING INSULATION <br />A. MANUFACTURERS: <br />1. ARMACELL <br />2. AEROCEL <br />B. FLEXIBLE CLOSED CELL ELASTOMERIC THERMAL INSULATION TUBULAR FORM. <br />ASTM C 534 TYPE 1 GRADE 1. 25/50 FLAME SPREAD & SMOKE INDEX. <br />C. INSULATION THICKNESS 3/4-. <br />2.3 SANITARY & STORM SEWER PIPING, ABOVE AND BELOW GRADE: <br />A. PVC: ASTM D2665 SCHEDULE 40 PVC PIPING. <br />1. FITTINGS: ASTM D2665 SCHEDULE 40 PVC DWV FITTINGS. <br />2. JOINTS: ASTM D2564 SOLVENT CEMENT. JOINTS SHALL BE <br />INSTALLED IN ACCORDANCE WITH ASTM D2855. <br />2.4 WATER PIPING, ABOVE GRADE <br />A. CPVC PIPING & FITTINGS: ASTM D1784 PIPE COMPOUND CELL CLASS <br />24448. <br />1. JOINTS: ASTM F493 SOCKET TYPE WITH SOLVENT CEMENT ASTM F402 <br />NSF INTERNATIONAL APPROVED MFG. COMPATIBLE. <br />2. FLOWGUARD GOLD CPVC PIPE AS MFG. BY NOVEON INC. <br />PART 3 INSTALLATION <br />A. INSTALL IN STRICT ACCORDANCE WITH MANUFACTURER'S <br />INSTRUCTIONS. <br />B. PROVIDE NON -CONDUCTING DIELECTRIC CONNECTIONS WHEREVER <br />JOINTING DISSIMILAR METALS. <br />C. ROUTE PIPING IN ORDERLY MANNER AND MAINTAIN GRADIENT. <br />D. INSTALL PIPING TO CONSERVE BUILDING SPACE AND NOT <br />INTERFERE WITH USE OF SPACE. <br />E. GROUP PIPING WHENEVER PRACTICAL AT COMMON ELEVATIONS. <br />F. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION <br />WITHOUT STRESSING PIPE, JOINTS, OR CONNECTED EQUIPMENT. <br />G. PROVIDE CLEARANCE FOR INSTALLATION OF INSULATION AND ACCESS TO <br />VALVES AND FITTINGS. <br />H. PROVIDE ACCESS WHERE VALVES AND FITTINGS ARE NOT EXPOSED. <br />COORDINATE SIZE AND LOCATION OF ACCESS DOORS WITH APPROPRIATE <br />ARCHITECTURAL SECTION. <br />1. ESTABLISH ELEVATIONS OF BURIED PIPING OUTSIDE THE BUILDING TO <br />ENSURE PROPER SLOPE AND COVER. <br />J. ESTABLISH ELEVATIONS OF EXISTING BURIED PIPING FOR CONNECTION TO <br />NEW WORK TO ENSURE PROPER SLOPE AND COVER. <br />K. WHERE PIPE SUPPORT MEMBERS ARE WELDED TO STRUCTURAL BUILDING <br />FRAMING, SCRAPE, BRUSH CLEAN, AND APPLY ONE COAT OF ZINC RICH <br />PRIMER TO WELDING. <br />L. EXTEND CLEANOUTS TO FINISHED FLOOR OR WALL SURFACE. LUBRICATE <br />THREADED CLEANOUT PLUGS WITH MIXTURE OF GRAPHITE AND LINSEED <br />OIL ENSURE CLEARANCE AT CLEANOUT FOR RODDING OF DRAINAGE <br />SYSTEM. <br />M. INSTALL WATER HAMMER SHOCK ARRESTORS AT EACH FIXTURE OR BATTERY <br />OF FIXTURES WHERE REQUIRED. ARRESTORS SHALL BE FACTORY <br />FABRICATED. INSTALL ARRESTORS AND SIZE PER PLUMBING AND DRAINAGE <br />INSTITUTE STANDARD P.D.I. WH-201. ACCEPTABLE MANUFACTURERS ZURN, <br />JOSAM, SIOUX CHIEF. PPP INC. FOR 1-11 FU'S PROVIDE PDI-A, FOR <br />12-32 FU'S PDI-B, 33-60 FU'S PDI-C, 61-113 FU'S PDI-D. <br />0- FLOOR CLEANOUT <br />0 2-WAY EXTERIOR CLEANOUT <br />--i I WALL CLEANOUT <br />SHOCK ABSORBER <br />PLUMBING SPECIALTIES SCHEDULE <br />FIXTURE <br />FIXTURE TYPE <br />WASTE <br />TRAP <br />VENT <br />C.W. <br />H.W. <br />MANUFACTURER <br />DESCRIPTION <br />NO. <br />CONN. <br />CONN. <br />CONN. <br />CONN. <br />/ MODEL # <br />WC-11 <br />WATER CLOSET <br />3w <br />INTEG. <br />2" <br />in <br />- <br />AMERICAN STANDARD <br />MADERA 15- RIM HEIGHT, 1.6 GPF, TOP SPUD FLOOR MOUNT VITREOUS CHINA, SIPHON <br />2234001.020 <br />JET, 6047161.002 MANUAL FLUSH VALVE, BEMIS 1955SSC STATITE SEAT <br />WC-2 <br />WATER CLOSET <br />3" <br />INTEG. <br />2" <br />1" <br />- <br />AMERICAN STANDARD <br />MADERA 16 1/2" RIM HEIGHT, 1.6 GPF, TOP SPUD, FLOOR MOUNT VITREOUS CHINA, <br />ADA <br />3043001.020 <br />SIPHON JET, AMERICAN STANDARD 6047161.002 MANUAL FLUSH VALVE, BEMIS 1955SSC <br />STA-TITE SEAT <br />UR-1 <br />URINAL <br />2" <br />2" <br />1-1/2- <br />3/4- <br />- <br />AMERICAN STANDARD <br />LIP 17* AFF. VITREOUS CHINA, WHITE, WALL HUNG WASHOUT FLUSH URINAL COMPLETE <br />ADA <br />6561.017 <br />WITH 3/4- TOP SPUD AND WALL HANGERS. 'SLOAN' ROYAL FLUSH VALVE #186-0.5 <br />(0.5 GALLON PER FLUSH). 'ZURN' Z1221 CAST IRON, FLOOR MOUNTED CARRIER. <br />L-1 <br />LAVATORY <br />1-1/2- <br />1-1/4- <br />1-1/2- <br />1/2- <br />1/2- <br />AMERICAN STANDARD <br />COUNTERTOP TYPE, OVAL, SELF -RIMMING, VITREOUS CHINA LAVATORY WITH CONCEALED <br />2 HANDLE FAUCET <br />0419.444 <br />FRONT OVERFLOW. FAUCET: 'BANNER' #311-1.5, 4" CENTERS, METAL TWO -LEVER <br />HANDLES. POP UP STRAINER WITH TAILPIECE, C.P. BRASS P-TRAP WITH WALL ARM & <br />ESCUTCHEONS. 'BRASSCRAFT' ANGLE VALVE SUPPLY RISERS W/LOOSE KEY STOPS. <br />INSULATE P-TRAP AND SUPPLIES WITH 'TRUEBRO' INSULATION KIT. PROVIDE LAWLER <br />1070 POINT OF USE MIXING VALVE. <br />L-2 <br />LAVATORY <br />1-1/2- <br />1-1/4- <br />1-1/2- <br />1/2- <br />1/2- <br />AMERICAN STANDARD <br />LUCERNE 20" x 18" WALL HUNG, VITREOUS CHINA WITH INTEGRAL BACKSPLASH. <br />ADA <br />0355.012 <br />'BANNER' #501, 4" CENTERS, C.P. METAL, SINGLE -LEVER HANDLE FAUCET. POP-UP <br />SINGLE LEVER FAUCET <br />STRAINER WITH TAILPIECE, C.P. BRASS P-TRAP WITH WALL ARM & ESCUTCHEONS. <br />'BRASSCRAFT` ANGLE VALVE SUPPLY RISERS W/LOOSE KEY STOPS. INSULATE P-TRAP <br />AND SUPPLIES WITH 'TRUEBRO' INSULATION KIT. 'ZURN' 1231 CAST IRON FLOOR <br />MOUNTED CARRIER FITTING WITH CONCEALED ARMS. PROVIDE LAWLER 1070 POINT OF <br />USE MIXING VALVE. <br />SH-1 <br />SHOWER <br />2* <br />2" <br />1-1/2- <br />1/2- <br />1/2- <br />SYMMONS <br />SHOWER ENCLOSURE SPECIFIED ON ARCHITECTURAL DRAWINGS. TEMPTROL PRESSURE <br />C-96-300-X <br />BALANCING VALVE WITH SINGLE BLADE LEVER HANDLE, INTEGRAL VOLUME CONTROL, AND <br />ZURN FD2210 <br />ADJUSTABLE STOP SCREW TO LIMIT HAND TURN. ADJUSTABLE SHOWER HEAD, ARM AND <br />FLANGE. ADJUSTABLE PVC FLOOR DRAIN WITH NICKEL CHROME PLATED STRAINER. <br />SH-2 <br />SHOWER <br />2* <br />2" <br />1-1/2- <br />1/2- <br />1/2- <br />SYMMONS <br />SHOWEROFF SHOWER LIMITER VALVE WITH INTEGRAL STOP, 1/2- IPS BACK CONNECTION <br />OUTDOOR INSTALLA11ON <br />3-310-R <br />AND ESCUTCHEON WITH REAR MOUNTING. FRE-FLO INSTITUTIONAL SHOWER HEAD WITH <br />ADJUSTABLE SPRAY. BACK PLATE AND THRU BOLTS FOR EXTRA THICK WALL. ALL <br />MOUNTING FASTENERS FOR VALVE AND HEAD ARE VANDAL RESISTANT HEX SOCKET TYPE. <br />PROVIDE 1.5 GPM FLOW RESTRICTOR. <br />EWC-1 <br />ELECTRIC WATER COOLER <br />2" <br />1-1/2- <br />1-1/2- <br />1/2- <br />ELKAY <br />LOWER BUBBLER 36"AFF; UPPER 417AFF. WALL/FLUSH MOUNTED CAPACITY TO DELIVER <br />DUAL LEVEL <br />EZSTL8C <br />8 GPH OF 50*F. WATER WITH INLET TEMP. OF 80*F AND ROOM TEMP. OF 90*F., <br />STAINLESS STEEL BASIN & PEWTER VINYL W/ 1/5 HP.,120V, 60 CYCLE, 1 PH. W/ <br />OVERLOAD PROTECTION 1 1/2- P-TRAP STOP VALVE, CORD & PLUG. ZURN #Z1225-BL <br />CAST IRON FLOOR MOUNTED CARRIER FITTING WITH BEARING PLATE. <br />MS_ 1 <br />MOP SINK <br />SO <br />3" <br />1-1/2- <br />3/4- <br />3/4' <br />FIAT <br />24"x24"xlO* HIGH MOLDED STONE RECEPTOR, W/ FIAT #830-AA FAUCET MOUNTED IN <br />MSB 2424 <br />WALL ABOVE FIXTURE. COMPLETE WITH VACUUM BREAKER, HOSE THREAD OUTLET & <br />BUCKET HOOK, INTEGRAL STOPS AND MOUNTING BRACKET. PROVIDE COMBINATION <br />STAINLESS STEEL DOME STRAINER AND LINT BASKET, 3-CAULKED OUTLET, CAULK WITH <br />SILICONE SEALANT AS REQUIRED. <br />HB-1 <br />HOSE BIBB <br />3/4" <br />- <br />WOODFORD <br />HOSE CONNECTION FOR NON-FREEZING AREAS WITH VACUUM BREAKER ENCLOSED IN A <br />B24 <br />FLUSH MOUNTED WALL BOX. <br />HB-2 <br />HOSE BIBB <br />3/4- <br />- <br />WOODFORD <br />HOSE CONNECTION FOR NON-FREEZING AREAS WITH VACUUM BREAKER. <br />ANTI -SIPHON <br />24 <br />SA <br />SHOCK ARRESTOR <br />- <br />- <br />SIOUX CHIEF <br />SIZE PER MANUFACTURER'S RECOMMENDATIONS. PD1 CERTIFIED. <br />650 SERIES <br />TPV_i <br />TRAP PRIMER VALVE <br />1/2- <br />- <br />PRECISION PLUMBING <br />CORROSION RESISTAN BRASS TRAP PRIMER, 1/2" COLD WATER INLET AUTOMATICALLY <br />PRODUCTS <br />OPERATED BY PRESSURE DROP OF 10 PSIG. <br />PR-500 <br />AAV- 1 <br />AIR ADMITTANCE VALVE <br />1-1/2- <br />- <br />- <br />STUDOR <br />AUTOMATIC AIR ADMITTANCE VALVE WITH VENTED ACCESS PANEL. LOCATE FULLY <br />TEC-VENT <br />ACCESSIBLE. <br />FD-11 <br />FLOOR DRAIN <br />SEE PLAN <br />1/2 <br />- <br />ZURN <br />DURA-COATED CAST IRON BODY WITH BOTTOM OUTLET, COMBINATION INVERTIBLE <br />STANDARD ROUND <br />ZN411513-CP <br />MEMBRANE CLAMP AND ADJUSTABLE COLLAR WITH SEEPAGE SLOTS AND TYPE 'B' <br />POLISHED NICKEL BRONZE STRAINER. PROVIDE 1/2" COLD WATER TRAP PRIMER <br />CONNECTION AND CHROME PLATED BRONZE TOP. <br />FCO <br />FINISHED FLOOR CLEANOUT <br />SEE PLAN <br />- <br />- <br />ZURN <br />"LEVEL-TROL" ADJUSTABLE FINISHED FLOOR CLEANOUT, DURA-COATED CAST IRON BODY <br />Z1400 <br />WITH GAS AND WATERTIGHT ABS TAPERED THREADED PLUG, AND ROUND SCORIATED <br />SECURED TOP. ADJUST TO FINISHED FLOOR (COORDINATE TOP FINISH WITH ARCHITECT). <br />WCO <br />WALL CLEAN -OUT <br />SEE PLAN <br />- <br />- <br />ZURN <br />CAST IRON CLEAN -OUT TEE, DURA COATED BODY, GAS AND WATERTIGHT ARS TAPERED <br />Z1446 <br />THREAD PLUG AND ROUND, SMOOTH STAINLESS STEEL WALL ACCESS COVER WITH <br />SECURING SCREW. <br />ECO <br />EXTERIOR CLEANOUT <br />SEE PLAN <br />- <br />- <br />- <br />ZURN <br />HEAVY TRAFFIC AREA EXTERIOR CLEANOUT WITH ACCESS COVER AND TWO-WAY FITTING. <br />Z-1400-HD <br />SEE PLANS FOR PIPE SIZE CONNECTION. <br />IMB- 1 <br />ICE MAKER BOX <br />1/2" <br />- <br />OATEY <br />VALVE 24"AFF. HIGH IMPACT PLASTIC BOX W/ DIMENSION OF 9" HIGH x 10 3/4" WIDE. <br />#38811 <br />PROVIDE 1/2" FIP INLET x 1/4* OD OUTLET COMPRESSION ANGLE VALVE. SUPPLY <br />CONNECTION SIZE SHALL BE 1/2- OD. COORDINATE ALL VALVE BOX LOCATIONS WITH <br />ARCHITECT PROIR TO INSTALLATION. <br />S-2 <br />SINK <br />2n <br />1-1/2- <br />1-1/2- <br />1/2- <br />1/2- <br />ELKAY <br />LUSTERTONE ADA COMPLIANT 33x22 DOUBLE COMPARTMENT SINK, 6" DEEP, 18 GAUGE, <br />2 COMPARTMENT <br />LRAD33226 <br />3HOLE, TYPE 304 SS, SELF RIMMING, T&S B2731 SINGLE CONTROL LEVER HANDLE, <br />DAYTON D1125 BASKET STRAINER, TAILPIECE, P-TRAP & CONTINUOUS DRAIN FITTING. <br />PROVIDE ANGLE STOPS, SUPPLIES & ESCUTCHEONS. GARBAGE DISPOSAL: ISE BADGER <br />5XP 3/4 H.P. QUIET DURA-DRIVE INDUCTION MOTOR. <br />HD- 1 <br />HUB DRAIN <br />SEE PLAN <br />- <br />WATTS <br />EPDXY -COATED CAST IRON BODY WITH BOTTOM OUTLET, COMBINATION INVERTIBLE <br />BACKWATER VALVE <br />FD100-A7-Gl-8 <br />MEMBRANE CLAMP AND ADUSTABLE COLLAR WITH SEEPAGE SLOTS AND 7" TYPE "A" <br />NICKEL BRONZE STRAINER, OVAL FUNNEL, BACKWATER VALVE <br />DW <br />DISHWASHER <br />1/2* <br />1/2- <br />BY OTHERS <br />REFER TO ARCHITECTURAL DRAWINGS FOR DETAILS. <br />BFP- 1 <br />BACKIFLOW PREVETER <br />- <br />1-1/4- <br />- <br />WATTS #LFOO7 <br />3/4- REDUCED PRESSURE ZONE ASSEMBLY W/ (2) ISOLATION VALVES AND (2) BRONZE <br />BODY TEST COCKS. CAST IRON BODY WITH BRONZE SEATS. <br />NOTE: ALL PLUMBING FIXTURES SHALL BE SUPPLIED WITH WATTS "FLOODSAFE" AUTO -SHUT OFF CONNECTOR TYPE SUPPLY RISERS WITH BRAIDED STAINLESS STEEL CONNECTORS. THIS SHALL <br />INCLUDE ALL FAUCETS, TOILETS, WASHING MACHINES, DISHWASHERS & ICE MAKERS. PROVIDE FULLY ACCESSIBLE SHOCK ARRESTORS ON SUPPLIES TO WASHING MACHINES, ICE MAKERS AND <br />DISHWASHERS. <br />RECIRCULATING PUMP SCHEDULE <br />UNIT # <br />TYPE <br />GPM <br />HEA?0FT. <br />H <br />CONN. SIZE <br />MOTOR DATA <br />SELECTION BASED ON: <br />REMARKS <br />INLET <br />OUTLET <br />WATTS <br />RPM <br />VOLT <br />PH. <br />MANUFACTURER <br />MODEL <br />HWRP-1 <br />IN -LINE <br />5 <br />15 <br />3/4- <br />3/4- <br />92 <br />2940 <br />120 <br />1PH <br />BELL & GOSSETT <br />NBF-18S <br />PROVIDE AQUASTAT <br />ELECTRIC WATER HEATER SCHEDULE <br />FIRST HOUR <br />VOLTAGE/ <br />APPROX. <br />MANUFACTURER <br />UNIT # <br />LOCATION <br />GALLONS <br />KW <br />RATE <br />PHASE <br />DIMENSIONS <br />SHIP WT. <br />NOTES <br />(LBS) <br />MFG <br />MODEL # <br />EWH- 1 <br />JAN 108 <br />30 <br />4.5 <br />48 <br />208V - 10 <br />47-1/2" H x 119-1/4"0 <br />92 <br />RHEEM <br />PROE30 T2 RH95 <br />SEE BELOW <br />NOTES: <br />1. PROVIDE EACH WATER HEATER WITH PROPERLY SIZED WATTS PLT-5 THRU 20 EXPANSION TANK OR WATTS <br />SERIES 530C CALIBRATED PRESSURE RELIEF VALVE, AND <br />ALL GAUGES, HEAT TRAPS, THERMOSTATS, THERMO EXPANSION VALVE, TEMPERATURE AND PRESSURE RELIEF VALVE AND SHUT-OFF VALVES AS REQUIRED BY LOCAL <br />CODES AND MFG'S RECOMMENDATIONS. <br />2. PROVIDE MINIMUM 2-1/2- DEEP 28 GAUGE ALUMINUM DRAIN PAN. <br />3. WATER HEATERS, AS SPECIFIED, COMPLY WITH FLORIDA BUILDING CODE. CONTRACTOR SHALL INSTALL PER <br />MANUFACTURER'S SPECIFICATIONS. <br />Z <br />W <br />0 <br />z <br />00 <br />w <br />10 <br />:2 <br />'45 <br />E <br />ca <br />z <br />2 <br />n_ <br />_j <br />LL <br />U) <br />_j <br />w <br />N <br />SHEET INFORMATION <br />DATE: 10/19/2021 <br />DRAWN BY: AM <br />PROJECT NO: 20-6001 <br />REVEWED BY: SAS <br />7 Plan Revisions Date: <br />06/04/2021 ISSUED FOR PERMIT <br />1 10/18/2021 OWNER REVISION <br />Sheet Name <br />PLUMBING <br />LEGEND,NOTES <br />CA# 26308 121270.00 & <br />AlkINGENUITY ABBREVIATIONS <br />ENGINEERS,INC. Sheet No. <br />14pp "PROACTIVE ENGINEERING SOLUTIONS" P0. 1 <br />4798 NEW BROAD ST. SUITE 300 1 ORLANDO, FLORIDA 1407.398.6007 <br />