My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6599 Padon Wheel St
Zephyrhills
>
Building Department
>
Building Plans
>
6599 Padon Wheel St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 12:42:57 PM
Creation date
2/19/2025 1:03:14 PM
Metadata
Fields
Template:
Building Plans
Street #
6599
Location
Paden Wheel St
Contractor
Lennar Homes LLC
Building Plans - Permit #
18305
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CORNER OF <br />HOME <br />GARAGE SIDE <br />w <br />m <br />cal <br />ROOF DIAPHRAGM NAILING SCHEDULE <br />RIDGE LINE <br />+ + <br />+ + + + + + + + + <br />+ + + + + + + + + + + + + + <br />+ <br />+ <br />+ + + + + + + + o <br />+ + + + + + + + + + + + + + <br />+ + <br />+ + <br />+ + + + + + + + + zo <br />+ + + + + + + + + + + + + + <br />+ <br />+ <br />+ + + + + + + + + <br />+ + + + + + + + + + + + + + <br />+ + <br />+ + <br />+ <br />+ <br />+ + <br />+ <br />+ <br />-0" (TYP.) <br />+ <br />+ + <br />6'-0" <br />+ + <br />+ <br />+ <br />+++ <br />+++ <br />+ + <br />+ + <br />+ <br />+ <br />+ + <br />+ <br />+ <br />+ + <br />+ <br />+ + <br />+++ <br />+++ <br />+ <br />+ + + + + + <br />+ <br />+ + +++++ + + + ++ <br />+ <br />+ <br />+ + + + ++ <br />/++ <br />+ <br />+ + + + + + + + + <br />+ <br />+ <br />++++++zo <br />+++++++ <br />+++++++ <br />++ <br />+ <br />++++++++ <br />+ <br />01i <br />`—RIDGE LINE <br />140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE 140 MPH (ult)3 SECOND GUST EXPOSURE "C" WIND ZONE <br />15/32" CDX <br />PLYWOOD OR <br />7/16" OSB <br />8d RING SHANK NAILS @ 6" O.C. & 8d RING SHANK NAILS @ 6" O.C. EDGES & <br />+ + + + + 4" O.C. @ GABLE END WALL OR GABLE TRUSS 8d RING SHANK NAILS @ 6" O.C. INTERMEDIATE <br />0.113 INCH NOMINAL SHANK DIAMETER 0.113 INCH NOMINAL SHANK DIAMETER <br />RING DIAMETER OF 0.012 OVER SHANK DIAMETER RING DIAMETER OF 0.012 OVER SHANK DIAMETER <br />16 TO 20 RINGS PER INCH 16 TO 20 RINGS PER INCH <br />0.280 INCH FULL ROUND HEAD DIAMETER 0.280 INCH FULL ROUND HEAD DIAMETER <br />2 INCH NAIL LENGTH 2 INCH NAIL LENGTH <br />NOTE: * FOR 8d RING SHANK NAILS 0.113x 2x 3/8" RING SHANK COIL GUN NAILS MAY BE USED <br />1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. <br />2) END JOINTS OF THE ROOF SHEATHING SHALL BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS FIR OR BETTER. IF ROOF FRAMING CONSISTS <br />OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST CONTACT ENGINEER OF RECORD FOR ALTERNATE NAILING PATTERN. <br />Backer and Filler Block Dimensions <br />BCI®Joist <br />Backer Block <br />Thickness <br />Filler Block Thickness <br />Series <br />3/4" orp <br />5000s 1.8/1.7 <br />nel <br />wood panels <br />Two 3/4" wood panels or 2 x <br />1-1/8" or two 1 /2" <br />6000s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1 /8" or two 1 /2" <br />6500s 1.8/1.7 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />1-1 /8" or two 1 /2" <br />602.0 <br />wood panels <br />2 x _ + 5/8" or 3/4" wood panel <br />902.0 <br />2 x _ lumber <br />Double 2 x _ lumber <br />DOUBLE JOIST CONSTRUCTION <br />(Not required if both loaded equally from above) <br />Filler blocking ° X <br />1/8" gap + <br />k 1� <br />FILL CELLS STD. 900 HOOK BOND BEAM <br />v7 <br />w <br />. <br />... <br />... ......... <br />STD.90° <br />CONT. #5 <br />=77- <br />CONT. #5 HOOK <br />BAR <br />BAR <br />E <br />#5 CONT. <br />FROM <br />ON <br />E <br />TOUHIG HIGHEST <br />I BOND BEAM <br />BOND BEAM STEP <br />SCALE: N.T.S. <br />2nd FLOOR <br />INTERIOR/EXT WALL SEE <br />PLAN FOR MORE INFO <br />CONT. BASE PLATE <br />BEARING COLUMN <br />PLYWOOD FLOOR <br />SEE PLAN FOR REQ'D <br />SHEATHING PER PLAN <br />COLUMN AND <br />CONNECTION <br />TJI TO BE CUT TO ALLOW <br />FOR BLOCKING/TJI <br />MASONRY WALL OR <br />INTERIOR BRG. WALL <br />TJI PER PLAN <br />OTHERWISE SOLID <br />BLOCKING TO MATCH <br /># OF 2nd FLOOR <br />Solid block all posts from <br />STUDS <br />above to bearing below. <br />SECTION @ INT. BRG. WALL <br />N.T.S. <br />1/8" min. 2" min. <br />)Small gap <br />2" ma <br />x• � 4 max. <br />4 <br />Clinch nails <br />when <br />possible <br />1) Support back of web during nailing to prevent damage to <br />web -flange connection. <br />2) Block solid between joists for full length of span. Tight fit <br />3) Leave 1/8" gap between top of filler blocking and bottom of top flange. <br />4 Place joists together and nail from each side with 2 rows of 10d nails 2x4/Plywood/OSB web stiffener 2" min. <br />g required when indicated or 4" max. <br />2x_: CONTRACTOR TO PROVIDE 2x TO FILL THE HEIGHT at 12" o.c., clinched when possible. Stagger rows from opposite -Hangers with side nailing. <br />OF THE JOIST ASA REQUIRED LEAVING %" GAP @ TOP sides by 6". - Hangers with sides not containing WEB STIFFENER <br />top flange of joist. <br />DOUBLE JOIST CONNECTION Birdsmouth cuts. N.T.S. <br />- Under 2nd floor column w/ loads <br />N.T.S. <br />SQUASH BLOCKS AT INTERIOR <br />BEARING <br />Vertical load transfer =1900 pif max along load bearing wall. <br />Load bearing wall must stack <br />*Non -stacking walls over squash=20 blocks and <br />require additional wall or beam below.* <br />consideration. Check <br />local building 6 <br />code for appropriate 1/16 <br />10'-0" details in One 10d box <br />TANK -LESS W/H areas=20 of high or--20 sinker <br />F1 <br />lateral load. nail each side <br />at bearing. <br />5'-0" <br />STUB -OUT FOR ' <br />GAS METER O <br />0 <br />CV <br />• MEASUREMENTS ARE FROM FINISHED FLOOR <br />• ROUGH -IN GAS TO RIGHT (ALWAYS) - 12" OFF -CENTER <br />• ROUGH -IN ELECTRIC TO LEFT (ALWAYS) - 12" OFF -CENTER <br />GAS CONNECTION DETAIL <br />**ONLY APPLIES TO HILLSBOROUGH AND PASCO COUNTY** <br />RAFTER SPAN TABLE <br />MEMBER SIZE AND SPACING <br />MAXIMUM LENGTH <br />MEMBER CONNECTIONS* <br />2" X 4" @ 16" O.C. <br />T-5" <br />(2) 16d TOENAILS <br />2" X 6" @ 16" O.C. <br />10'-8" <br />(2)16d TOENAILS <br />2" X 8" @ 16" O.C. <br />13'-9" <br />(3)16d TOENAILS <br />2" X 10" @ 16" O.C. <br />16'-5" <br />(1) USP HTW20 OR (3) 16d TOENAILS <br />2" X 12" @ 16" O.C. <br />19'-3" <br />(1) USP HTW20 OR (4)16d TOENAILS <br />2" X 4" @ 24" O.C. <br />6'-1" <br />(2) 16d TOENAILS <br />2" X 6" @ 24" O.C. <br />8'-6" <br />(2)16d TOENAILS <br />2" X 8" @ 24" O.C. <br />11'-0" <br />(2) 16d TOENAILS <br />2" X 10" @ 24" O.C. <br />'IT-0" <br />(3) 16d TOENAILS <br />2" X 12" @ 24" O.C. <br />154" <br />(1) USP HTW20 OR (3) 16d TOENAILS <br />* TOENAIL CONNECTIONS DESIGNED FOR SHEAR ONLY (i.e. RAFTER TO RIDGEBEAM). <br />** SOUTHERN YELLOW PINE, 55 PSF LOADING <br />Squash block / <br />(2x4 minimum) �J <br />Bearing wall, Versa -Lam LVL or <br />Glulam Beam <br />Boise Joist Blocking <br />Hsn 3" (10d) nails at 6" ac_ <br />Provide adequate bearing <br />for each lapped joist. <br />10dnails SECTION @ INT. BRG. WALL <br />N.T.S. <br />MINIMUM SPACING = 2x GREATEST <br />KNOCKOUTS) ALLOWED DIMENSION OF LARGEST HOLE <br />IN BEARING ZONES D (KNOCKOUT EXEMPTS) <br />(see table below) D <br />61 (see table below) <br />DO NOT cut, notch <br />or drill flanges <br />Web Stiffener Fastener Schedule <br />Joist BearingLocation <br />Series —Depth End Intermediate <br />BCI5000s® <br />9-1/2" <br />2-8d <br />2-8d <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />BCI6000s® <br />BCI6500s® <br />9-1/2" <br />11-7/8" <br />2-8d <br />2-8d <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />1 2-8d <br />6-8d <br />BCI60se <br />11-7/8" <br />2-8d <br />3-8d <br />14" <br />2-8d <br />5-8d <br />16" <br />2-8d <br />6-8d <br />BCI90s® <br />11-7/8" <br />3-16d <br />3-16d <br />14" <br />5-16d <br />5-16d <br />16" <br />6-16d <br />6-16d <br />higher than 15001b. <br />BLOCKING PANEL, INTERIOR <br />Vertical load transfer =1900 plf max. along bearing wall <br />Required on interior walls : - for vertical load transfer Plumbing <br />when load bearing - for lateral support when joists <br />meet over wall, or wall stacks directly over wall or <br />beam below Load bearing wall must stack over <br />blocking and wall or beam below.* <br />Joist <br />When joists meet over wall, provide <br />1 3/4" minimum bearing for each. I -Joist can be offset <br />up to 3" to avoid <br />vertical plumbing <br />3" max <br />JOISTS OFFSET <br />N.T.S. <br />Use 10dx3" nails at 6"o.c. for all joist <br />blocking panel *Non -stacking walls <br />require additional consideration. <br />6„ A 1Y' ROUND HOLE MAY 6„ 6, DO NOT CUT HOLES <br />BE CUT ANYWHERE IN CANTILEVER LARGER THAN 11/2" <br />THE WEB. PROVIDE AT ROUND IN <br />LEAST 3" OF CLEARANCE CANTILEVERS. <br />FROM OTHER HOLES <br />MINIMUM DISTANCE FROM SUPPORT, LISTED BELOW, IS REQUIRED FOR ALL HOLED GREATER THAN 1Y" <br />NOTES: <br />1. JOISTS MUST BE PROPERLY DESIGNED TO MEET BUILDING CODE REQUIREMENTS. <br />2. TABLE IS FOR UNIFORMLY LOADED MAXIMUM LOADS OF 40 PSL(LIVE) AND 15 PSF (DEAD) ON SIMPLE SPAN APPLICATIONS ONLY.- <br />3. REFER TO JOIST SPECIFIER GUIDE FOR INSTALLATION AND OTHER INFO. <br />4. SELECT A TABLE ROW BASED ON JOIST DEPTH AND THE ACTUAL JOIST SPAN ROUNDED UP TO THE NEAREST TABLE SPAN. SCAN ACROSS <br />THE ROW TO THE COLUMN HEADED BY THE APPROPRIATE ROUND HOLE DIAMETER OR RECTANGULAR HOLE SIDE. USE THE LONGEST SIDE OF <br />A RECTANGULAR HOLE. THE TABLE VALUES IS THE CLOSEST THAT THE CENTERLINE OF THE NEAREST SUPPORT. <br />5. THE ENTIRE WEB MAY BE CUT OUT. DO NOT CUT THE FLANGES. HOLES APPLY TO EITHER SINGLE OR MULTIPLE JOISTS IN REPETITIVE <br />MEMBER CONDITIONS. <br />6. FOR MULTIPLE HOLES, THE AMOUNT OF UNCUT WEB BETWEEN HOLES MUST EQUAL AT LEAST TWICE THE DIAMETER (OR LONGEST SIDE) OF <br />THE LARGEST HOLE. <br />7. 1Y" ROUND KNOCKOUTS IN THE WEB MAY BE REMOVED BY USING A SHORT PIECE OF METAL PIPE AND HAMMER. <br />8. HOLES MAY BE POSITIONED VERTICALLY ANYWHERE IN THE WEB. THE JOIST MAY BE SET WITH THE 1Y" KNOCKOUT HOLES TURNED WITHER <br />UP OR DOWN. <br />9. THIS TABLE WAS DESIGNED TO APPLY TO THE DESIGN TO APPLY TO THE DESIGN CONDITIONS COVERED BY TABLES ELSEWHERE IN HIS <br />PUBLICATION. USE THE BC CALC SOFTWARE TO CHECK OTHER HOLE SIZES OR HOLES UNDER OTHER DESIGN CONDITIONS. IT MAY BE <br />POSSIBLE TO EXCEED THE LIMITATIONS OF THIS TABLE BY ANALYZING A SPECIFIC APPLICATION WITH THE BC CALC SOFTWARE. <br />HOLE CUTTING CHART <br />N.T.S. <br />Joist hanger <br />USP <br />MUC <br />5/8"0 <br />THRU <br />BOLT <br />UE <br />Ml <br />R TRUSS <br />'OP PLATE <br />LC <br />TYPICAL USP MUGT15 TO <br />BUILT-UP COLUMN DETAIL <br />TYPICAL HUS INSTALLATION <br />AIN. EMBEDMENT <br />SCHEDULE FOR <br />AND QUANTITY <br />)F FASTENERS <br />TYPICAL HTA 20-18 / HTA 20 <br />INSTALLATION <br />A/C CHASE 4" PVC <br />SLEEVE THRU STEM <br />WALL <br />Backer block (12" wide min.)1(— <br />Nail with 10-10d nails. <br />SLEEVE THRU STEM <br />k1iht. <br />SEE PLAN FOR °. 4 .. .; . • a ° <br />FOUNDATION INFO 4•. '' ° 4" <br />STEM FOUNDATION <br />r— GRADE <br />\ Filler block. <br />Nail with <br />10-10d nails. <br />Backer block required where top <br />mount hanger load exceeds 250 lbs. <br />Install tight to top flange. <br />1/4"-2" gap <br />Backer Block <br />"Top Mount" "Face Mount" <br />Backer block shall be tight Backer block shall be tight <br />to bottom of top flange with to top of bottom flange with <br />1/4"-2" gap at top of bottom 1/4%2" gap at bottom of top <br />flange. flange. <br />Web stiffner as <br />Web stiffeners are not required when top required if hanger <br />flange is laterally supported by joist hanger. doesn't meet <br />height <br />requirements <br />0.6 X Joist <br />" depth <br />I -JOISTS BUCKETS <br />N.T.S. <br />i-Vt, UnHat 4 rvU <br />SLEEVE THRU FOOTING <br />MONO FOUNDATION <br />TYP. FND. PENETRATIONS <br />SCALE: N.T.S. <br />HTA 20-18 / HTA 20 <br />INSTALLATION @ MID SPAN <br />NOTE: <br />LOCATION OF UPLIFT VALUE <br />SECOND RT16 IS BASED ON <br />S.P.F. <br />USP RT16 USING <br />�® 16-8d x1 1/2" NAILS <br />UPLIFT =1030# <br />.° <br />TYPICAL RT16 INSTALLATION <br />TYPICAL MTW INSTALLATION <br />TOP (2) #5's x 4'-0" <br />CENETERED @ PIPE <br />PENETRATION <br />,4- <br />a <br />4 <br />12" BELOW <br />GRADE <br />PLUMBING LINE <br />PVC OR SCH40 SLEEVE <br />r—�J I <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE VERTICAL THRU FND. <br />PVC OR SCH40 SLEEVE <br />CENETERED @ PIPE <br />PENETRATION PLUMBING LINE <br />------------ <br />ILO <br />A-. L <br />SEE FND. PLN. <br />SIZE & REINF. <br />PIPE PERPENDICULAR TO FND. <br />TOP (2) #5's x 4'-0" PVC OR SCH40 SLEEVE <br />CENETERED @ PIPE <br />PENETRATION PLUMBING LINE <br />v 4 <br />-----� —a.-- —•—.• 4G. 4/ da G <br />i a 4 <br />SEE FND. PLN. <br />SIZE & REINF. <br />zM <br />0 <br />z <br />Q <br />OJ <br />co z <br />0 <br />Q) C <br />4-1 w <br />Q <br />eU — <br />Ow <br />�V) ~ <br />o0 <br />Cor` <br />C)0M <br />LU <br />M <br />C t0 M <br />2 :9 - <br />—0 <br />ElyEE <br />000 <br />u- co <br />CJ <br />Ly Y <br />0 <br />O <br />o <br />Qrn <br />� o:s <br />rnao <br />® <br />Y-C B D C <br />*c <br />® <br />�ss Gfl <br />N <br />N LO <br />in r <br />o`, pr i <br />fxe•�• CV <br />CnZ <br />o 6 <br />Il�LL. <br />Z °ee <br />w <br />.a <br />!�11� <br />V -'�00•" bi e <br />e <br />aY o <br />=v <br />@ <br />o <br />\- <br />❑ <br />SS10'�P <br />- ation, and <br />To the best of the En ' a§ <br />belief, the j$ �g •a <br />structural plans a iEt)tTl ions contained <br />within these drawings comply with the Florida Building <br />Code 5th Edition (2014) Residential. Engineer's signature <br />and seal is only for the structural engineering portions of <br />the drawing pages bearing Engineer's signature and seal. <br />O <br />Z N <br />0 � N <br />O <br />z <br />M <br />Q 'p In <br />a. <br />'o <br />%:z- (A <br />Q U_ <br />F—�" (M <br />� V CL 00 <br />Q <br />E� <br />z 3: <br />c° <br />Wko <br />J C:) <br />oZ <br />ZWUo <br />mz <br />Zd <br />w� <br />�0>.za00 <br />°'zaUz <br />Zw�Z <br />�gv o <br />in <br />04�3�N <br />N <br />U <br />�aoZLU <br />o <br />UJ�w <br />J <br />Ll') <br />N <br />N <br />rl <br />w0� <br />LU <br />000�ostV <br />Q <br />ooWz <br />LU00.U�z <br />UJ <br />6, <br />Q ¢8 <br />¢ <br />0wZn �w<<�a <br />N <br />N <br />=5 <br />'nZw <br />NQZ <br />rQJ ao <br />Z <br />.. <br />> <br />0 <br />� <br />� <br />_ <br />a <br />SCALE : AS NOTED <br />PLOT DATE : 12/7/2012 <br />TECH: FFLORES <br />VERSION NO. <br />106 <br />JOB NO: 16-6653 <br />SHEET NO. <br />SN 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.