Laserfiche WebLink
RS&H <br />Revision no. 5 Narrative — CCD#2 <br />Kitchen & HVAC Renovation <br />AdventHealth Zephyrhills <br />02-03-21 <br />1715 Westshore Blvd Suite 600 O 813 289 5550 <br />Tampa, Florida 33607 3999 rsandh.com <br />Narrative summary of revisions: The following are issued for revision/ clarification per RFIs <br />PROJECT DRAWING REVISIONS: <br />ARCHITECTURAL <br />PH001— PHASING PLANS <br />• Revised phasing plan 1 to omit work in Bakery area <br />MECHANICAL <br />M101- LEVEL 1 RENOVATION PLAN - PHASE 1- DUCTWORK <br />• Revised exhaust ductwork in EVS room per RFI 48 <br />• Revised airflow into EVS room and balanced undercut air flow in surrounding areas <br />• Added verbiage to omit work in Bakery area until later Phase <br />MD101- LEVEL 1 DEMOLITION PLAN - PHASE 1- DUCTWORK <br />• Revised exhaust ductwork in EVS room per RFI 48 <br />• Added verbiage to omit work in Bakery area until later Phase <br />FIRE PROTECTION: <br />FP101- NEW FLOOR PLAN - PHASE 1- FIRE PROTECTION <br />• Added verbiage to omit work in Bakery area until later Phase <br />ELECTRICAL: <br />E101— LEVEL 1 RENOVATION PLAN — PHASE 1- POWER <br />• Adjusted connections to power soak and booster pump per RFI 38 <br />• Added verbiage to omit work in Bakery area until later Phase <br />E401— PANEL SCHEDULES <br />• Adjusted circuit designations. <br />Note: Narrative descriptions of changes to the drawing are general in nature, refer <br />to actual revised documents for the full extent of changes. <br />End of Revision 05 Narrative <br />Rs&„ <br />F1 Cert Nos AAC001886.1826000956•LCC000210 <br />