Laserfiche WebLink
FRAMING NOTES <br />1. U.N.O. ALL STRAPS FOR ROOF TRUSSES TO BE <br />CONCRETE TO WOOD ROOF: SIMPSON HETA16 W/ (9) lDd x 1 1/2" HDG NAILS. <br />CONCRETE TO WOOD FLOOR: <br />SIMPSON LTA2 W/ (8) 1Dd x 1 1/2" HDG NAILS, WOOD TO WOOD: <br />SIMPSON H10A OR LGT2 W/ 10d x / 1/2" HDG NAILS, FILL ALL HOLES. <br />2. ALL PLYWOOD FOR WALL AND ROOF SHEATHING IS TO BE PER FASTENER <br />SCHEDULE. <br />3. ALL PLYWOOD FOR FLOOR SHEATHING SHALL BE PER FASTER SCHEDULE <br />MEETING THE REQUIREMENTS OF AFG-01 AND APPLIED IN ACCORDANCE WITH <br />MANUFACTURER'$ SPECIFICATIONS. <br />4. ALL NAILS FOR TRUSS TO BEAM AND TRUSS TO TRUSS METAL CONNECTORS <br />ARE TO BE GALVANIZED. <br />5. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE, <br />CONNECTERS ARE TO BE GALVANIZED. <br />6. LINTELS AND MASONRY BEAMS WERE DESIGNED BASED ON CAST-CRETE <br />CONCRETE LINTELS. <br />7. BOTTOM OF LINTELS ARE TO BE PLACED AT TOP OF WINDOW, DOOR AND <br />CLEAR SPAN OPENINGS. <br />B. LINTELS SHALL HAVE 4' NOMINAL BEARING (41. <br />9. THE TRUSS FRAMING SHOWN IS SCHEMATIC IN NATURE. HOWEVER THE <br />SUPPORTING STRUCTURE HAS BEEN DESIGNED UNDER THE ASSUMPTION THE <br />FRAMING SCHEME SHOWN WILL CLOSELY PARALLEL FINAL TRUSS DESIGNERS <br />LAYOUT. SUBMIT FINAL TRUSS DRAWINGS FOR THE ENGINEER'S REVIEW AND <br />APPROVAL. <br />10. PLACE 2x4 PT TO ALIGN WITH TOP AND BOTTOM CHORDS OF ROOF TRUSSES <br />SECURE 2x MEMBERS TO WALL WITH HILTI X-ZF, POWDER ACCTUATED <br />FASTENER, ZF 72 PBS36, .177" " x 2 7/8" LONG, WITH WASHER @ 16" O.C. <br />11. TRUSS REACTIONS AND UPLIFTS SHOWN ARE THE SAME ON EACH END <br />UNLESS OTHERWISE SHOWN DIFFERENT. <br />12. WOOD BEARING WALLS AND HEADERS HAVE BEEN DESIGNED BASED ON <br />RATIONAL ANALYSIS. <br />13, ALL ELEVATIONS ARE REFERENCED FROM U-0", FINISH FLOOR. UNLESS <br />NOTED OTHERWISE. <br />HEADER SCHEDULE <br />MARK <br />DESCRIPTION <br />REMARK <br />tO <br />(2)2x6 <br />(2) 2X12 <br />BEAM SCHEDULE <br />INDICATES OPENING BELOW / T.O.B. = TOP OF BEAM / B.O.L. = BOTTOM OF LINTEL / T.O. O.A. = TOP OF ARCH / T.O.S = TOP OF SLAB <br />ABBREVIATIONS <br />E.E. = EACH END, O/C = ON CENTER, F.E.S. = FROM EACH SUPPORT, T.O. = THROUGHOUT <br />MARK <br />DESCRIPTION <br />(PsI) ft <br />SIZE <br />REINFORCEMENT <br />STIRRUPS <br />REMARKS <br />BTM. <br />TOP <br />MID <br />SIZE <br />SPACING <br />Bel <br />MASONRY <br />3000 <br />Bx16 <br />(1)NS <br />(1)Nfi <br />WA <br />GROUTED SOLID <br />BB2 <br />MASONRY <br />3000 <br />8x8 <br />11) a <br />WA <br />GROUTED SOLID <br />SEE SHEET <br />S5.1A FOR <br />SAFE LOAD TABLES <br />SECOND FLOOR LIFT BEAM PLAN <br />SCALE: 1/4" = l'-0" <br />1441 N. RONALD REAGAN BLVD <br />LONGWOOD, FL 32760 <br />PH: 407.774.6078 <br />FAX 407-774-4078 <br />www,abdeslgngroup.com <br />AA Y: 0003325 J <br />Y <br />C <br />C <br />SLTSDN Ie LOT: <br />ABBOTT PARK <br />LOT #27 <br />BLK. #11 <br />PROJEOT <br />04 81.00t-27111 <br />MODEL, <br />3EEB <br />"2260—ELSTON" <br />GAisAGE swsNO; <br />RIGHT <br />PAGE: <br />SECOND FLOOR <br />LIFT BEAM PLAN <br />AND NOTES <br />160 MPH ER. C <br />