Laserfiche WebLink
. . J <br />A <br />F <br />M <br />@ <br />AT <br />F <br />FAHRENHEIT <br />MAINT <br />MAINTENANCE <br />A <br />AMPS <br />FA <br />FIRE ALARM <br />MATL <br />MATERIAL <br />ACI <br />AMERICAN CONCRETE INSTITUTE <br />FAC <br />FACTORY <br />MAX <br />MAXIMUM <br />ACT <br />ACOUSTICAL CEILING TILE <br />FAP <br />FIRE ALARM PANEL <br />MDF <br />MEDIUM DENSITY FIBERBOARD <br />ADMIN <br />ADMINISTRATIVE <br />FC <br />FOOTCANDLES <br />MECH <br />MECHANICAL <br />ADA <br />AMERICAN DISABILITIES ACT <br />FDC <br />FIRE DEPT. CONNECTION <br />MFL <br />MAXIMUM FORESEEABLE LOSS <br />AFF <br />ABOVE FINISHED FLOOR <br />FEB <br />FIRE EXTINGUISHER BRACKET <br />MFR <br />MANUFACTURER <br />AHU <br />AIR HANDLING UNIT <br />FEC <br />FIRE EXTINGUISHER CABINET <br />MGR <br />MANAGER <br />AISC <br />AMERICAN INSTITUTE OF STEEL CONSTRUCTION <br />FF <br />FINISH FLOOR <br />MH <br />MANHOLE <br />AFF <br />ABOVE FINISHED FLOOR <br />FIN <br />FINISH <br />MHU <br />MAKEUP AIR UNIT <br />AHU <br />AIR HANDLING UNIT <br />FM <br />FACTORY MUTUAL <br />MIN <br />MINIMUM <br />AISC <br />AMERICAN INSTITUTE OF STEEL CONSTRUCTION <br />FP <br />FIRE PROTECTION <br />MISC <br />MISCELLANEOUS <br />ALUM <br />- ALUMINUM <br />FRP <br />FIBERGLASS REINFORCED PANEL <br />MM <br />MILLMETER <br />ALT <br />ALTERNATE <br />FT <br />FEET <br />MO <br />MASONRY OPENING <br />ANOD <br />ANODIZED <br />MOD <br />MOTOR OPERATED DOOR <br />ANSI <br />AMERICAN NATIONAL STANDARDS INSTITUTE <br />MPH <br />MILES PER HOUR <br />APPROX <br />APPROXIMATELY <br />M/W <br />MICROWAVE <br />ARCH <br />ARCHITECTURAL <br />�± <br />ASTM <br />AMERICAN SOCIETY FOR TESTING MATERIALS <br />ASHRAE <br />AMERICAN SOCIETY HEATING REFRIGERATING <br />G <br />GAS <br />AND AIR CONDITIONING ENGINEERS <br />GA <br />GAUGE <br />N <br />AU <br />AUXILIARY <br />GALV <br />GALVANIZED <br />NA <br />NOT APPLICABLE <br />GVIIB <br />GYPSUM WALLBOARD <br />NEC <br />NATIONAL ELECTRIC CODE <br />GEN <br />GENERATOR <br />NEG <br />NEGATIVE <br />B <br />GFCI <br />,GROUND FAULT CURRENT <br />NFPA <br />NATIONAL FIRE PROTECTION ASSOC <br />INTERRUPTER <br />BATT <br />BATT INSULATION <br />BB <br />BULLETIN BOARD <br />BD <br />BOARD <br />BFF <br />BELOW FINISHED FLOOR <br />BLDG <br />BUILDING <br />BIO <br />BOTTOM OF <br />BOS <br />BOTTOM OF STEEL <br />BTU <br />BRITISH THERMAL UNIT <br />CA <br />CLEAR ANODIZED <br />CFM <br />CUBIC FEET PER MINUTE <br />CIP <br />CAST IN PLACE <br />CJ <br />CONTROL JOINT <br />CL <br />CENTERLINE <br />CLG <br />CEILING <br />CLR <br />CLEAR <br />CMU <br />CONCRETE MASONRY UNIT <br />CO <br />CASED OPENING <br />COL <br />COLUMN <br />CONC <br />CONCRETE. <br />CONT <br />CONTINUOUS <br />CPT <br />CARPET <br />CT <br />CERAMIC TILE <br />CU <br />CUBIC <br />CW <br />COLD WATER <br />D <br />DBL <br />DOUBLE <br />DIA <br />DIAMETER <br />DN <br />DOWN <br />DOE <br />DEPARTMENT OF ENERGY <br />DR <br />DOOR <br />DS <br />DOWNSPOUT <br />D/W <br />DISHWASHER <br />DW <br />DOMESTIC WATER <br />DWG(S) DRAWINGS <br />E <br />E, ELEC <br />ELECTRIC, ELECTRICAL <br />EA <br />EACH <br />EF <br />EXHAUST FAN <br />EIFA <br />EXTERIOR INSULATION FINISH SYSTEM <br />EJ <br />EXPANSION JOINT <br />ELEV. EL <br />ELEVATION <br />EPDM <br />ETHYLENE PROPYLENE DIENE <br />MONOMER <br />EPS <br />EXTERIOR PAINT SYSTEM <br />EQ <br />EQUAL <br />EQUIP <br />EQUIPMENT <br />ESFR <br />EARLY SUPPRESSION FAST RESPONSE <br />EVS <br />ENVIRONMENT SERVICES CLOSET <br />EWH <br />ELECTRIC WALL HEATER <br />EWC <br />ELECTRIC WATER COOLER <br />EXF, EF <br />EXHAUST FAN <br />EXP <br />EXPANSION <br />EXIST <br />EXISTING <br />EXT <br />EXTERIOR <br />GND GROUND <br />H <br />H <br />HOOD <br />HB <br />HOSE BIBB <br />HC <br />HANDICAPPED <br />HD <br />HUB DRAIN <br />HDWR <br />HARDWARE <br />HM <br />HOLLOW METAL <br />HORIZ <br />HORIZONTAL <br />HP <br />HORSEPOWER <br />HPS <br />HIGH PRESSURE SODIUM <br />HR <br />HOUR <br />HWH <br />HOT WATER HEATER <br />HZ <br />HERTZ <br />f <br />e. <br />IBC <br />INTERNATIONAL BLDG CODE <br />ICC <br />INTERNATIONAL CODE COUNCIL <br />ID <br />INSIDE DIMENSION <br />IE <br />INVERT ELEVATION <br />IECC <br />INTL ENERGY CONSERVATION CODE <br />IFC <br />INTERNATIONAL FIRE CODE <br />IG <br />INSULATING GLASS <br />I/M <br />ICE MAKER <br />IMC <br />INTERNATIONAL MECHANICAL CODE <br />IN <br />INCHES <br />INSUL <br />INSULATION, INSULATING <br />INV <br />INVERT <br />IPC <br />INTERNATIONAL PLUMBING CODE <br />J <br />JB JOIST BEARING <br />JT JOINT <br />K.O. <br />KNOCK OUT <br />KW <br />KILOWATT <br />KV <br />KILOVOLTS <br />KVA <br />KILOVOLT AMPS <br />L <br />LAM <br />LAMINATE <br />LAV <br />LAVATORY <br />LB <br />POUND <br />LF <br />LINEAR FEET <br />LSP <br />LIFE SAFETY PLAN <br />LT <br />LEFT <br />LVT <br />LUXURY VINYL TILE <br />NFWH <br />NON -FREEZE WALLHYDRANT <br />NIC <br />NOT IN CONTRACT <br />NO/# <br />NUMBER <br />NOM <br />NOMINAL <br />O <br />OA <br />OVERALL <br />OC <br />ON CENTER <br />OCC <br />OCCUPANT <br />OD <br />OUTSIDE DIMENSION <br />OH <br />OVERHEAD <br />OPNG <br />OPENING <br />OPP <br />OPPOSITE <br />OSB <br />ORIENTED STRAND BOARD <br />P <br />PA <br />PUBLIC ADDRESS <br />PERP <br />PERPENDICULAR <br />PIV <br />POST INDICATOR VALVE <br />PLAM <br />PLASTIC LAMINATE <br />POS <br />POSITIVE <br />PR <br />PAIR <br />PREFAB <br />PREFABRICATED <br />PR <br />PAIR <br />PRI <br />PRIMARY <br />PRV <br />PRESSURE REDUCTION VALVE <br />PSI <br />POUNDS PER SQUARE INCH <br />PSF <br />POUND -FORCE PER SQUARE FOOT <br />PT <br />PRESSURE TREATMENT <br />PVC <br />POLYVINYL CHLORIDE <br />Q <br />QA QUALITY ASSURANCE <br />QC QUALITY CONTROL <br />11 <br />R <br />RADIUS <br />RA <br />RETURN AIR <br />RB <br />RUBBER BASE <br />RCP <br />REINFORCED CONCRETE PIPE <br />RD <br />ROOF DRAIN <br />REINF <br />REINFORCED <br />REQD <br />REQUIRED <br />REF <br />REFRIGERATOR <br />REG <br />REGISTRATION <br />RL <br />RAIN LEADER <br />RM <br />ROOM <br />RT <br />RIGHT <br />RTU <br />ROOF TOP UNIT <br />,J <br />SA <br />SUPPLY AIR <br />SC <br />SHADING COEFFICIENT <br />SCHED,SCH <br />SCHEDULE <br />SD <br />STORM DRAIN <br />SEC <br />SECONDARY <br />SGL <br />SINGLE <br />SHGC <br />SOLAR HEAT GAIN COEFFICIENT <br />SIM <br />SIMILAR <br />SOG <br />SLAB ON GRADE <br />SS <br />SANITARY SEWER LINE <br />STC <br />SOUND TRANSMISSION CLASS <br />STD <br />STANDARD <br />STL <br />STEEL <br />STOR <br />STORAGE <br />STRUCT <br />STRUCTURAL <br />I� <br />TEL <br />TELEPHONE <br />TECH <br />TECHNICAL <br />TEMP <br />TEMPERATURE <br />THRESH <br />THRESHOLD <br />TI <br />TENANTIMPROVEMENT <br />T/O <br />TOP OF <br />TOS <br />TOP OF STEEL <br />TP <br />TOILET PARTITION <br />TR <br />TRANSITION STRIP <br />TSTAT <br />THERMOSTAT <br />TYP <br />TYPICAL <br />LIJ <br />UH UNIT HEATER <br />UL UNDERWRITERS LABORATORY <br />UNO UNLESS OTHERWISE NOTED <br />UTIL UTILITY <br />V <br />V <br />VOLTS, VENT <br />VA <br />VOLTAMPS <br />VCT <br />RESILIENT VINYL <br />VINYL COMPOSITION <br />RESILIENT TILE <br />VERT <br />VERTICAL <br />VEST <br />VESTIBULE <br />VIF <br />VERIFY IN FIELD <br />VTR <br />VENT THROUGH ROOF <br />VWC <br />VINYL WALL COVERING <br />1T <br />W <br />WATER <br />W/ <br />WITH <br />WC <br />WATER CLOSET <br />WCO <br />WALL CLEANOUT <br />WD <br />WOOD <br />WHSE <br />WAREHOUSE <br />WM <br />WOMEN <br />WP <br />WEATHERPROOF <br />I SYMBOLS <br />WALL SECTION INDICATION <br />DETAIL NUMBER <br />A-000 DRAWN ON THIS SHEET <br />ELEVATION INDICATION <br />1 DETAIL NUMBER <br />A101 - DRAWN ON THIS SHEET <br />PLAN DETAIL INDICATION <br />DETAIL NUMBER <br />1 <br />A-101 <br />l - J DRAWN ON THIS SHEET <br />INTERIOR ELEVATION INDICATION <br />1 DETAIL NUMBER <br />A101 _ DRAWN ON THIS SHEET <br />DOOR NUMBER INDICATION <br />DOOR NUMBER <br />WINDOW TYPE INDICATION <br />O= WINDOW NUMBER <br />ROOM INDICATION <br />ROOM NAME NAME OF ROOM USED ON PLAN AND IN FINISH SCHEDULE <br />101 <br />150 SF <br />ELEVATION HEIGHT INDICATION <br />HEIGHT ABOVE OR BELOW REFERENCE <br />0'-0 <br />LOCATION OF REFERENCE HEIGHT <br />ROOF SLOPE INDICATION <br />12 RUN <br />3� <br />RISE <br />SPECIAL NOTE INDICATION <br />-- SPECIAL NOTES IN BOXES REFER TO SPECIFIC <br />REQUIREMENTS NOT OTHERWISE OBVIOUS <br />ON PLANS OR ELEMENTS OF WORK WHICH <br />REQUIRE SPECIAL ATTENTION <br />REFERENCE NORTH <br />TRUE NORTH <br />JOB NORTH <br />PANEL NUMBER INDICATION <br />P # # # PANEL NUMBER <br />CENTERLINE <br />PLAN NOTES <br />TRANSITION CHANGE <br />DEMOLITION KEY NOTE <br />PARTITION KEYNOTE <br />Fool <br />GENERAL NOTES <br />A PRODUCT SUBSTITUTION CONSTITUTES A REPRESENTATION THAT THE CONTRACTOR HAS INVESTIGATED PROPOSED PRODUCT AND DETERMINED THAT IT <br />MEETS OR EXCEEDS THE QUALITY LEVEL OF THE SPECIFIED PRODUCT; THAT HE WILL PROVIDE THE SAME WARRANTY FOR THE SUBSTITUTION AS FOR THE <br />SPECIFIED PRODUCT; THAT HE WILL COORDINATE INSTALLATION AND MAKE CHANGES TO OTHER WORK THAT MAY BE REQUIRED FOR THE WORK TO BE <br />COMPLETE WITH NO ADDITIONAL COST TO THE OWNER; THAT HE WAIVES CLAIMS FOR ADDITIONAL COSTS OR TIME EXTENSION THAT MAY SUBSEQUENTLY ■ <br />BECOME APPARENT; AND THAT HE WILL REIMBURSE THE OWNER AND/OR ARCHITECT FOR REVIEW OR REDESIGN SERVICES ASSOCIATED WITH RE -APPROVAL <br />BY AUTHORITIES. SHOULD SUCH SUBSTITUTION IMPACT ANY CODE RELATED ITEMS IN THE DOCUMENTS SUCH AS, BUT NOT LIMITED TO, UL DETAILS, FIRE <br />RATINGS, SIZING, SPACING OR REVISION OF STRUCTURAL REQUIREMENTS, IT SHALL BE THE CONTRACTOR'S DUTY TO RESEARCH AND PROVIDE ANY REQUIRED <br />DOCUMENTATION INCLUDING SIGNED AND SEALED ENGINEERING CERTIFICATIONS AS MAY BE NECESSARY FOR APPROVALS BY AHJ. <br />1. REFER TO THE PROJECT SPECIFICATIONS FOR FURTHER INFORMATION. R A N D A L <br />2. THE DESIGN OF THIS PROJECT TO THE BEST OF OUR PROFESSIONAL KNOWLEDGE, INFORMATION AND BELIEF COMPLIES WITH APPLICABLE PROVISIONS OF <br />THE AMERICANS WITH DISABILITIES ACT (ADA), LATEST PREVAILING ANSI STANDARDS, AND THE FLORDIA ACCESSIBILITY CODE REQUIREMENTS AS THEY APPLY <br />TO THIS PROJECT. BECAUSE THE REQUIREMENTS OF THE ADA ARE SUBJECT TO VARIOUS AND POSSIBLY CONTRADICTORY INTERPRETATIONS, WE CANNOT AND <br />DO NOT WARRANT OR GUARANTEE THAT THIS PROJECT WILL COMPLY WITH INTERPRETATIONS OF ADA REQUIREMENTS AS THEY APPLY TO THIS PROJECT. P U L S O N <br />ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH THE PREVAILING EDITIONS OF ALL APPLICABLE STATE AND LOCAL CODES. <br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS FOR THE SCOPE OF THE WORK. a t c I t t <br />4. ANY ERRORS, INCONSISTENCIES OR OMISSIONS IN THE CONTRACT DOCUMENTS DISCOVERED BY THE CONTRACTOR SHALL BE REPORTED PROMPTLY TO THE <br />ARCHITECT BEFORE THE WORK IS DONE. <br />E pF _�O <br />5. THE CONTRACTOR SHALL PROVIDE A WARRANTY FOR CORRECTION OF THE WORK OF THIS PROJECT FOR THE PERIOD OF ONE YEAR AFTER SUBSTANTIAL " • 9� <br />COMPLETION OR AS OTHERWISE STIPULATED IN THE CONTRACT DOCUMENTS. <br />Aso , <br />6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING WORK WITH THE <br />ARCHITECTURAL DRAWINGS. ALL DISCREPANCIES IN THE DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT FOR RESOLUTION OF ANY CONFLICTS WITH ANY �,`, iso6 <br />DESIGN ELEMENTS BEFORE THE WORK IS DONE. IF WORK IS COMPLETE & NOT APPROVED, THE WORK SHALL BE REDONE TO MEET INENT WITH NO ADDITIONAL F <br />COST TO OWNER, c/S�FR E p ARL�`� <br />7. THE ARCHITECT IS NOT RESPONSIBLE FOR CHANGES MADE OR AUTHORIZED BY THE OWNER, OWNER'S REPRESENTATIVES, TENANTS, CONTRACTOR OR <br />OTHERS WITHOUT WRITTEN CONSENT BY THE ARCHITECT OR CONSULTANT. 06,/S,2_021 <br />8. THE CONTRACTOR SHALL SUBMIT TO THE ARCHITECT OR OWNER'S REPRESENTATIVE AND THE OWNER A LIST OF ALL ITEMS AND THEIR DELIVERY SCHEDULES. R011lll <br />THE LIST SHALL IDENTIFY ALL LONG -LEAD TIME ITEMS ON THE PROJECT SUCH AS MATERIALS, FABRICS, HARDWARE, ETC. PRIOR TO ORDERING AN ITEM, THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE ARCHITECT AND OWNER OF ANY ITEM WHICH MAY CAUSE THE PROJECT TO BE DELAYED. 05-A Mill Street, Suite 200 <br />9. ALL SUBSTITUTIONS PROPOSED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE ARCHITECT FOR APPROVAL PRIOR TO IMPLEMENTATION. PRIOR TO Roswell, Georgia 30075 <br />SUBMISSION FOR REVIEW, THE CONTRACTOR SHALL VERIFY THAT THE PROPOSED SUBSTITUTE MEETS THE PERFORMANCE AND CONSTRUCTION t 170.650,7550 f 770.650.7559 <br />SPECIFICATIONS OF THE SPECIFIED ITEM. e-mail a rchitgcB@'andalipauiSon.com <br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DELAY TO THE MOVE -IN DATE CAUSED BY SCHEDULING WITHIN THE SCOPE OF THE WORK. <br />=.: <br />11. THE EXTENT OF THE WORK SHALL BE LIMITED TO THAT INDICATED IN THE DRAWINGS. ANY ADDITIONAL WORK DONE MUST HAVE WRITTEN PERMISSION FROM <br />THE ARCHITECT OR OWNER'S REPRESENTATIVE. WORK DONE WITHOUT WRITTEN PERMISSION SHALL BE AT THE CONTRACTOR'S EXPENSE. <br />12. THE CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT THE BUILDING OCCUPANTS, MATERIALS AND EXISTING FINISHES THROUGHOUT THE _ �msepansandspe catansara apmperiyv 8amla sonAreiritects <br />DURATION OF THE WORK. BARRIERS TO CONTROL NOISE, DUST, AND SECURITY BETWEEN CONSTRUCTION AREAS -AND OCCUPIED AREAS OR PUBLIC AREAS Ins6rpardte 16adncamamsmaynadhecopaedApOuted usedar_ <br />SHALL BE ERECTED AND MAINTAINED BY THE CONTRACTOR. pheredmay"Aweuapl )e;wa w6wifi Haut <br />dandallPaulsoaArch ectxl rparated. ikesmmon IkisafcapYr Mare J . <br />13, THE CONTRACTOR SHALL FIELD VERIFY CONSTRUCTION TOLERANCES AND TAKE FIELD MEASUREMENTS OF ANY EXISTING CONDITIONS RELATED TO THE <br />WORK OF THIS PROJECT. CONDITIONS ENCOUNTERED AT THE SITE MATERIALLY DIFFERENT FROM THOSE INDICATED IN THE CONTRACT DOCUMENTS SHALL BE PROMPTLY REPORTED TO THE ARCHITECT OR OWNER'S REPRESENTATIVE BEFORE THE CONDITIONS ARE DISTURBED.13. THE CONTRACTOR SHALL FIELD VERIFY FLORIDA REGISTRATIONNA0003296 <br />CONSTRUCTION TOLERANCES AND TAKE FIELD MEASUREMENTS OF ANY EXISTING CONDITIONS RELATED TO THE WORK OF THIS PROJECT. CONDITIONS <br />ENCOUNTERED AT THE SITE MATERIALLY DIFFERENT FROM THOSE INDICATED IN THE CONTRACT DOCUMENTS SHALL BE PROMPTLY REPORTED TO THE <br />ARCHITECT OR OWNER'S REPRESENTATIVE BEFORE THE CONDITIONS ARE DISTURBED. <br />14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, PATCHING AND FITTING NECESSARY TO ACHIEVE THE SCOPE OF THE WORK. <br />15. EXISTING UTILITIES OR OTHER MECHANICAL, ELECTRICAL OR PLUMBING EQUIPMENT REQUIRING REMOVAL, CAPPING, TERMINATION, AND/OR RELOCATION TENANT <br />SHALL BE INCLUDED IN THE OVERALL SCOPE AND PERFORMANCE OF THE PROJECT BY THE CONTRACTOR. <br />16. THE CONTRACTOR. SHALL PROTECT AND SHALL NOT DISCONNECT ALL EXISTING FIRE ALARM DEVICES, SMOKE ALARMS, SPRINKLER HEADS, EXIT SIGNS, BUILD -OUT <br />' <br />ASSOCIATED WIRING, AND OTHER LIFE SAFETY DEVICES IN OPERATION. RELOCATE AS REQUIRED IN NEW PLAN. <br />17. ALL MATERIALS AND DEVICES USED FOR THIS PROJECT ARE TO BE NEW, NEITHER PREVIOUSLY STORED NOR PREVIOUSLY USED IN THIS OR ANOTHER <br />LOCATION. <br />18. DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN. <br />19. CENTERLINE OF PARTITIONS SHALL ALIGN WITH COLUMN, COLUMN' LINE, DIMENSION REFERENCE, OR CENTERLINE OF WINDOW MULLIONS AS SHOWN UNLESS <br />OTHERWISE NOTED. at <br />20. DIMENSIONS ON THE FLOOR OR PARTITION PLAN ARE FROM FACE OF PARTITION FINISH TO FACE OF PARTITION FINISH UNLESS OTHERWISE NOTED. <br />DIMENSIONS AT GLAZING WILL BE FACE OF GLASS TO FACE OF FINISH. <br />21. NEW WORK AT EXISTING CONDITIONS SHALL ALIGN WITH AND MATCH EXISTING WORK EXCEPT WHERE OTHERWISE DIMENSIONED OR DETAILED. <br />22. "TYPICAL" OR "TYP." SHALL MEAN THAT THE REFERENCED DETAIL OR DIMENSION SHALL APPLY FOR ALL SIMILAR CONDITIONS UNLESS OTHERWISE <br />INDICATED. <br />23. PROVIDE BRACING ABOVE PARTITIONS AS NECESSARY TO SUPPORT ASSEMBLIES ATTACHED OR CONTAINED WITHIN IN COMPLIANCE WITH MINIMUM <br />STANDARDS OF ASTM C645-88. DESIGN INTERIOR PARTITIONS FOR MAXIMUM DEFLECTION OF L/240. ZEP HYRH I LLS <br />24. AT EXISTING PARTITIONS TO REMAIN WHICH ARE CHANGED TO BE TENANT DEMISING PARTITIONS, MODIFY THE PARTITION CONSTRUCTION ASSEMBLY AS <br />REQUIRED TO MEET THE REQUIREMENTS FOR THE APPLICABLE FIRE RATING. <br />25. PERMANENTLY IDENTIFY BOTH SIDES OF ALL FIRE RATED AND SMOKE PARTITIONS IN CONCEALED SPACES WITH PROPER WORDING OF WALL RATING. <br />26. ALL SOUND PARTITIONS SHALL INCLUDE ACOUSTICAL SEALANT AT BASE, HEAD, PERIMETER AND ALL OPENINGS. <br />27. PARTITIONS ABUTTING CURTAINWALL MULLIONS AND/OR STOREFRONT SHALL NOT BE ATTACHED BY SCREWS OR OTHER MECHANICAL FASTENERS. <br />28. ALL WOOD USED AS STUDS, BLOCKING OR BRACING SHALL BE PRESSURE TREATED IF EXPOSED TO WET AREAS, AND/OR IN CONTACT WITH CONCRETE OR <br />MASONRY; AND FIRE TREATED. for <br />29. HORIZONTAL ELEMENTS SUCH AS DOOR HEADS SHALL BE MAINTAINED AT A CONSTANT LEVEL AND SHALL NOT FOLLOW VARIATIONS IN FLOOR PLANE. LEVEL <br />FLOORS AS REQUIRED USING APPROVED LEVELING COMPOUND UNLESS OTHERWISE DIRECTED IN DRAWINGS. <br />30. PROVIDE BLOCKING, BRACING, AND NAILERS AS REQUIRED FOR MILLWORK (UPPER AND LOWER CABINETS), EQUIPMENT (I.E. RESTROOM), SHELVING, <br />FIXTURES, ETC. CONTRACTOR TO COORDINATE REQUIRED HEIGHTS AND TYPE OF BLOCKING FOR LOCATIONS INDICATED AND/OR CODE REQUIREMENTS. WOOD <br />BLOCKING SHALL BE FIRE TREATED. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL NECESSARY REINFORCING TO ACCOMMODATE INTERIOR FINISHES, <br />FIXTURES AND EQUIPMENT AS DESCRIBED IN THE SCOPE OF THE WORK. <br />31. ALL SUBSTRATE SURFACES ARE TO BE PREPARED TO RECEIVE FINISH MATERIALS PER MANUFACTURER'S PRODUCT LITERATURE AND WRITTEN <br />INSTRUCTIONS FOR INSTALLATION OR APPLICATION. PATCH AND REPAIR ALL FLOORS FOR SMOOTH AND LEVEL FINISH FLOOR INSTALLATION. <br />32. ALL FASTENERS AND ATTACHMENTS SHALL BE CONCEALED FROM VIEW UNLESS OTHERWISE NOTED.... ... ... .. ......... . ... <br />33. EXIT DOORS SHALL NOT REQUIRE THE USE OF A KEY, TOOL, OR SPECIAL KNOWLEDGE OR EFFORT FOR OPERATION FROM THE INSIDE OF THE BUILDING PER <br />THE LATEST PREVAILING EDITION OF THE NFPA 101 LIFE SAFETY CODE: LOCKS, LATCHES, AND ALARM DEVICES. <br />34. NEW AND EXISTING PENETRATIONS, WITHIN THE SCOPE OF THE WORK, INTO OR THROUGH EITHER VERTICAL OR HORIZONTAL FIRE -RATED BARRIERS SHALL <br />BE PROTECTED BY A SYSTEM LISTED BY A RECOGNIZED TESTING AGENCY. PROVIDE A DETAIL AND LISTING NUMBER PER THE LATEST PREVAILING EDITION OF <br />THE NFPA 101 LIFE SAFETY CODE: PENETRATIONS IN FIRE BARRIERS. <br />35. THE CONTRACTOR SHALL PROVIDE AND INSTALL EQUIPMENT AND APPLIANCES SPECIFIED UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL PROVIDE <br />AND/OR COORDINATE INSTALLATION OF TENANT=FURNISHED EQUIPMENT AND APPLIANCES UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL VERIFY ALL <br />PLUMBING AND ELECTRICAL REQUIREMENTS RELATED TO EQUIPMENT AND APPLIANCES IN THE SCOPE OF THE WORK. <br />36. THE CONTRACTOR SHALL VERIFY THAT NO CONFLICTS EXIST IN LOCATIONS OF ANY AND ALL MECHANICAL, TELEPHONE/DATA, ELECTRICAL, LIGHTING AND U.S. HIGHWAY 301 &'PRETTY <br />PLUMBING EQUIPMENT (TO INCLUDE ALL PIPING* DUCTWORK AND CONDUIT) AND THAT ALL REQUIRED CLEARANCE FOR INSTALLATION OR MAINTENANCE OR POND ROAD, <br />ABOVE EQUIPMENT IS PROVIDED. ZEPHYRHILLS, FLORIDA 33541 <br />37. VERIFY LOCATIONS OF ALL FIRE EXTINGUISHERS, SURFACE -MOUNTED OR RECESSED, FOR CODE COMPLIANCE. PROVIDE FIRE EXTINGUISHERS PER CODE IF <br />NOT SHOWN ON DRAWINGS. <br />38. VERIFY LOCATIONS OF ALL ELECTRICAL DEVICE, LIFE SAFETY DEVICES AND THERMOSTAT LOCATIONS WITH ARCHITECT FOR COORDINATION WITH DESIGN <br />ELEMENTS PRIOR TO INSTALLATION. AT LOCATIONS WHERE ELECTRICAL, MECHANICAL AND/OR OTHER DEVICES OCCUR TOGETHER BUT AT DIFFERENT HEIGHTS, Print Record <br />THE DEVICES SHALL BE CENTERED ABOVE EACH OTHER. <br />39. AT RENOVATION/ADDITION PROJECTS WITH ELECTRICAL DEVICES AND COVER PLATES TO REMAIN, NEW ELECTRICAL DEVICES AND COVER PLATES SHALL 14 JUNE 2021 ISSUED FOR PERMIT <br />MATCH EXISTING, UNLESS OTHERWISE NOTED IN CONSTRUCTION DOCUMENTS. <br />40. SIGNAGE UNDER SEPARATE CONTRACT (NIC). <br />41. FIRE EXTINGUISHERS, SPRINKLERS, AND FIRE ALARM DRAWINGS TO BE SUBMITTED TO FIRE MARSHAL BY FIRE SUPPRESSION CONTRACTOR AND APPROVED <br />BEFORE WORK BEGINS. <br />42. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH THE PREVAILING EDITIONS OF ALL APPLICABLE STATE AND LOCAL CODES. <br />43. VISITS TO THE SITE DURING THE BID PHASE SHALL BE COORDINATED WITH THE OWNERS REPRESENTATIVE. THE CONTRACTOR SHALL VERIFY LOCATIONS Revisions <br />OF ALL EXISTING CONSTRUCTION AND SHALL VERIFY DIMENSIONS RELATING TO EXISTING CONDITIONS BEFORE ANY NEW CONSTRUCTION OF PARTITIONS OR <br />WALLS IS COMMENCED. ANY DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT IN WRITING AT ONCE. <br />44. WHERE WORK IS DONE ADJACENT TO EXISTING WORK/ FINISHES, CONTRACTOR IS TO PATCH AND REPAIR EXISTING AS REQUIRED FOR A "LIKE NEW" <br />INSTALLATION. <br />Date <br />14 JUNE 2021 <br />Project No. <br />2021217.00 <br />Sheet Title <br />GENERAL NOTES, SYMBOLS, & <br />ABBREVIATIONS <br />Sheet No. <br />Am002 <br />■ Released for Construction <br />❑Not Released for Construction <br />