Laserfiche WebLink
PLUMBING FIXTURE DEMAND TABULATION <br />Project Name:SAGE DENTAL BUILDING TYPE: NEW <br />Project No.: 212028 PREDOMINANTLY: FLUSH TANK <br />Date: ;6/7/20211 16:30 <br />FIXTURE <br />DESCRIPTION <br />OCCUPANCY <br />QTY. <br />DRAINAGE <br />SUB- <br />LOAD VALUES IN WATER (EACH) <br />LOAD VALUES IN WATER (TOTAL) <br />Remarks <br />FIXTURE <br />TOTAL <br />SUPPLY FIXTURE <br />UNITS (WSFU) <br />SUPPLY <br />FIXTURE UNITS (WSFU) <br />UNITS <br />COLD <br />HOT <br />TOTAL <br />COLD <br />HOT <br />TOTAL <br />WC-1A <br />WATER CLOSET <br />PUBLIC <br />2 <br />4 <br />8 <br />5 <br />0 <br />10 <br />10 <br />0 <br />20 <br />L-1 <br />LAVATORY <br />PUBLIC <br />2 <br />1 <br />2 <br />1.5 <br />1.5 <br />2 <br />3 <br />3 <br />4 <br />S-1 <br />SINK <br />PUBLIC <br />1 <br />1 <br />1 <br />1.5 <br />1.5 <br />2 <br />1.5 <br />1.5 <br />2 <br />S-2 <br />SINK <br />PUBLIC <br />1 <br />1 <br />1 <br />1.5 <br />1.5 <br />2 <br />1.5 <br />1.5 <br />2 <br />S-3 <br />SINK <br />PUBLIC <br />4 <br />1 <br />4 <br />1.5 <br />1.5 <br />2 <br />6 <br />6 <br />8 <br />S4 <br />SINK <br />PUBLIC <br />3 <br />1 <br />3 <br />1.5 <br />1.5 <br />2 <br />4.5 <br />4.5 <br />6 <br />MS-1 <br />MOP SINK <br />PUBLIC <br />1 <br />1 3 <br />3 <br />1.5 <br />1.5 <br />2 <br />1.5 <br />0 <br />2 <br />TOTALS <br />DFU = DRAINAGE FIXTURE UNITS <br />WSFU = WATER SUPPLY FIXTURE UNITS <br />22 DFU <br />EIGHTH INCH SLOPE PER FOOT <br />3 DIAMETER OF PIPE (INCHES) <br />28 <br />16.5 <br />44 <br />22.6 <br />18.2 <br />27.4 <br />1.5 <br />1.5 <br />2 <br />WSFU <br />GPM <br />INCHES REQ'D. <br />PLUMBING FIXTURE SCHEDULE <br />EQUIP. <br />NO. <br />MANUFACTURER <br />MODEL NO. <br />DESCRIPTION <br />CW <br />HW <br />WASTE <br />VENT <br />NOTES <br />EWC-1 <br />ELKAY <br />VRC8(FR)S <br />ELECTRIC WATER COOLER W/BASINS (BARRIER FREE) <br />1/2" <br />- <br />1 1/2" <br />1 1/2" <br />8.0 GPH CAPACITY, 370 RATED WATTS, 5.0 F.L.A., 120-1-60. <br />VITREOUS CHINA WALL -HUNG LAVATORY (HANDICAP) <br />FAUCET - KOHLER K-394-4, LEVER HANDLES, 0.5 GPM <br />L-1 <br />KOHLER <br />K-5027-8 <br />TRAP - 1 1/4" CAST BRASS WITH C.O. PLUG SUPPLY - 3/8" ANGLE -TYPE WITH STOPS <br />1/2" <br />1/2" <br />1 1/2" <br />1 1/2" <br />PROVIDE OFFSET TAILPIECE INSULATE TRAP <br />OUTLET & HW SUPPLY TO MEET A.D.A. <br />MS-1 <br />FIAT <br />TSB-500 <br />32"x32" MOLDED STONE FLOOR MOUNTED MOP BASIN W/STAINLESS STEEL GUARDS <br />1/2" <br />1/2" <br />3" <br />2" <br />FAUCET - FIAT 830 AA W/VACUUM BREAKER, INTEGRAL STOPS, ADJ. WALL BRACE, PAIL HOOK & 3/4" HOSE TREAD ON SPOUT <br />SINGLE -COMPARTMENT, 4" CENTER 2-HOLE, 18-GAUGE 304 STAINLESS STEEL SELF -RIMMING, FULLY COATED UNDERSIDE; <br />S-1 <br />KOHLER <br />K3894-NA <br />FAUCET WITH SWIVEL GOOSENECK SPOUT WITH WRIST BLADE HANDLES. INSTALL PER ADA REQUIREMENTS. PROVIDE <br />1/2" <br />1/2" <br />1 1/2" <br />1 1/2" <br />CHROME -PLATED P-TRAP, ANGLE STOPS, AND BRAIDED FLEXIBLE SUPPLY HOSES. <br />DAYTON <br />SINGLE COMPARTMENT, 25X22 20-GAUGE 304 STAINLESS STEEL SELF -RIMMING, FULLY COATED UNDERSIDE; PROVIDE CHROME <br />S-2 <br />ELKAY <br />DPM-SR-12722P <br />PLATED LOOSE KEY ANGLE STOP, ESCUTCHEON, P-TRAP AND SUPPLIES. INSTALLED PER ADA ACCESSIBILITY; TRUEBRO LAV <br />1/2" <br />1/2" <br />1 1/2" <br />1 1/2" <br />D 4-HOLE <br />GUARD UNDERSINK PROTECTIVE COVERS FOR P-TRAP AND ANGLE VALVE ASSEMBLIES MODEL 102. LKAD18 GRID DRAIN WITH <br />(SIDE -SPRAY) <br />OFFSET TRAP. <br />S-3 <br />DENTAL SINK <br />FIXTURE BY <br />OWNER <br />DENTAL STATION WITH INTEGRAL SINK. COORDINATE WITH ARCHITECTUAL PLANS AND DETAIL. <br />1/2" <br />1/2" <br />1 1/2" <br />1 1/2" <br />DAYTON <br />#K-11515 <br />SINGLE COMPARTMENT, 15X15, 20-GAUGE 304 STAINLESS STEEL SELF -RIMMING, FULLY COATED UNDERSIDE; PROVIDE CHROME <br />S-4 <br />ELKAY <br />NSTAINLESS <br />PLATED LOOSE KEY ANGLE STOP, ESCUTCHEON, P-TRAP AND SUPPLIES. INSTALLED PER ADA ACCESSIBILITY; TRUEBRO LAV <br />1/2" <br />1/2" <br />1 1/2" <br />1 1/2" <br />STEEL SINK <br />GUARD UNDERSINK PROTECTIVE COVERS FOR P-TRAP AND ANGLE VALVE ASSEMBLIES MODEL 102. FULL SIZE GRID DRAIN <br />BOWL: (ADA) VITREOUS CHINA, FLOOR MOUNTED, TOP SPUD, FULLY GLAZED TRAP WAY, SIPHON JET ACTION FLUSH AND <br />WCAA <br />KOHLER <br />K-4405 <br />ELONGATED BOWL. VALVE: MANUAL BRONZE BODY, ACCESSORIES SHALL INCLUDE VACUUM BREAKER, ANGLE STOP, CHECK <br />1/2" <br />- <br />4" <br />2" <br />VALVE AND ESCUTCHEON. SEAT: EXTRA HEAVY WEGIHT PLASTIC, OPEN FRONT LESS COVERINTEGRALLY MOULDED BUMPERSM <br />BOLT CAPS AND STAINLESS STEEL HINGE. <br />NOTE: <br />1. PROVIDE MIXING VALVE AT EYEWASH EQUAL TO BRADLEY S59-4000A <br />WATER HEATER SCHEDULE <br />TEMPERATU <br />0 <br />ELECTRIC <br />POWER <br />LOCATION <br />MINIMUM STORAGE CAPACITY <br />MINIMUM RECOVERY CAPACITY <br />SUPPLY <br />(V/O/HZ) <br />TYPE MARK <br />DISC. <br />ELEMENT <br />Manufacturer <br />(GAL) <br />(GPH) <br />INPUT (kW) <br />NOTES <br />EWH-1 <br />AO SMITH <br />MECHANICAL <br />30 <br />23 <br />140 <br />4.5 <br />208-1-60 <br />1 <br />NOTE: <br />1. PROVIDE WATER CIRCULATION PUMP EQUAL TO TACO MODEL 006B, 3 GPM@ 9FT/HD. <br />PIPE MATERIAL LIST: <br />1. SANITARY, WASTE, AND VENT PIPING: FITTINGS SHALL BE LONG RADIUS FITTINGS, EXCEPT FITTINGS IN VENT PIPING <br />MAY BE SHORT RADIUS FITTINGS. CONTRACTOR OPTIONS: <br />A. BELOW GRADE: CAST IRON, ASTM A74, STANDARD, SINGLE HUB, COATED. <br />B. ABOVE GRADE: CAST IRON, NO HUB, CISPE STANDARD 301. <br />C. ABOVE AND BELOW GRADE: PVC, SCHEDULE 40, MEETING ASTM D1785. <br />2. DOMESTIC WATER PIPING: <br />A. BELOW GRADE: TYPE K, COATED WITH COAL TAR SHELLAC. <br />B. ABOVE GRADE: TYPE L. <br />C. ABOVE AND BELOW GRADE UP TO 1 1/4": CPVC MEETING ASTM D2846. <br />D. ABOVE AND BELOW GRADE 1 1/2" AND LARGER: CPVC SCHEDULE 80 MEETING ASTM F441 AND ASTM F439. <br />E. EXTERIOR DOMESTIC WATER PIPING: PVC, SCHEDULE 40 MEETING ASTM D1785. <br />3. COMPRESSED -AIR PIPING: <br />A. PIPING 3" AND SMALLER: TYPE L, COPPER MEDICAL GAS TUBE; WROUGHT -COPPER FITTINGS; AND BRAZED JOINTS <br />B. PIPING LARGER THAN 3": TYPE K, COPPER TUBE; WROUGHT -COPPER FITTINGS; AND BRAZED JOINTS. <br />4. DENTAL VACUUM PIPING: <br />A. ASTM B 88, TYPE M, SEAMLESS, DRAWN TEMPER COPPER WATER TUBE, WROUGHT -COPPER FITTINGS, AND <br />BRAZED JOINTS. <br />PLUMBING TESTING AND DISINFECTING: <br />1. TESTING: <br />A. SOIL, WASTE, VENT SYSTEM: <br />1. TEMPORARILY PLUG ALL OUTLETS. <br />2. FILL LINES WITH WATER TO THE ROOF LEVEL. <br />3, ALLOW TO REMAIN FULL FOR 24 HOURS. <br />B. WATER SYSTEM: <br />1. TEST AT 150 PERCENT OF DESIGN PRESSURE, BUT NOT LESS THAN 100 PSIG. <br />2. ALLOW PRESSURE TO REMAIN ON LINE FOR 24 HOURS. <br />C. REPAIR ALL DETECTABLE LEAKS IN PIPING SYSTEMS <br />2. DISINFECTION OF DOMESTIC WATER SYSTEM: <br />A. DISINFECT DOMESTIC WATER SYSTEM AFTER APPROVAL OF TEST RESULTS AND PIPING INSTALLATION BY <br />BUILDING OFFICIAL. <br />B. PRIOR TO SUBSTANTIAL COMPLETION STERILIZE PIPING SYSTEM IN ACCORDANCE WITH LOCAL PLUMBING CODE <br />REQUIREMENTS. <br />C. DELIVER CERTIFICATION TO BUILDING OFFICIAL. <br />PLUMBING GENERAL NOTES <br />1. IN THE PREPARATION OF THESE PLANS, THE ENGINEER HAS USED CERTAIN <br />ABBREVIATIONS, CONVENTIONS, AND SYMBOLS, THE MEANING OF WHICH ARE <br />ILLUSTRATED AND EXPLAINED WITHIN THE LEGEND. <br />2. PLANS ARE DIAGRAMMATIC ONLY. THEY ARE INTENDED TO INDICATE CAPACITY, <br />SIZE, LOCATION, DIRECTION AND GENERAL ARRANGEMENT, BUT NOT EXACT <br />DETAILS OF CONSTRUCTION. THE FACT THAT ONLY CERTAIN FEATURES OF THE <br />INSTALLATION ARE INDICATED MUST NOT BE TAKEN TO MEAN THAT OTHER <br />FEATURES WILL NOT BE REQUIRED. <br />3. COORDINATE WITH THE OTHER TRADES TO ENSURE THAT EACH TRADE SHALL <br />HAVE SUFFICIENT SPACE TO INSTALL THEIR EQUIPMENT (DUCTWORK, PIPING, <br />ELECTRICAL WORK, ETC.). <br />4. ONCE THE PIPING HAS ENTERED EACH UNIT FROM BELOW THE FLOOR SLAB, <br />PIPING SHALL BE RUN ABOVE THE CEILING IN EACH UNIT UNLESS NOTED OR <br />INDICATED OTHERWISE. <br />5. VERIFY ALL DIMENSIONS FROM ARCHITECTURAL PLANS AND FIELD DIMENSIONS. <br />6. ALL RISES AND DROPS IN PIPING ARE NOT NECESSARILY SHOWN. <br />7. PROVIDE STOP OR ANGLE VALVES ON EACH WATER CONNECTION TO EACH <br />PLUMBING FIXTURE. <br />8. PROVIDE ALL STRUCTURAL MEMBERS, SUPPORT BRACKETS, FLASHING, <br />HARDWARE, ETC. REQUIRED TO INSTALL A COMPLETE SYSTEM. <br />9. PROVIDE CHROME PLATED ESCUTCHEON PLATES AT ALL EXPOSED WALL <br />PENETRATIONS AND CEILING PENETRATIONS. <br />10. PROVIDE CLEANOUTS ON SANITARY LINES AND CONDENSATE DRAIN LINES AS <br />REQUIRED BY CODE. <br />11. PROVIDE ACCESS PANELS FOR ALL SHUT-OFF VALVES LOCATED ABOVE <br />GYPSUM BOARD CEILINGS. COORDINATE WITH GENERAL CONTRACTOR. <br />ABBREVIATIONS <br />A/C <br />ABOVE CEILING <br />AFF <br />ABOVE FINISHED FLOOR <br />AFG <br />ABOVE FINISHED GRADE <br />BFF <br />BELOW FINISHED FLOOR <br />BFG <br />BELOW FINISHED GRADE <br />BTU <br />BRITISH THERMAL UNIT <br />CO <br />CLEANOUT <br />CONN <br />CONNECTION <br />CW <br />COLD WATER <br />DN <br />DOWN <br />DW <br />DOMESTIC WATER <br />DWV <br />DRAIN WASTE VENT <br />DFU <br />DRAINAGE FIXTURE UNIT <br />ED <br />EQUIPMENT DRAIN <br />EX <br />EXISTING <br />FU <br />FIXTURE UNIT <br />FL <br />FLOOR <br />FCO <br />FLOOR CLEANOUT <br />GPM <br />GALLONS PER MINUTE <br />GC <br />GENERAL CONTRACTOR <br />GCO <br />GRADE CLEANOUT <br />GW <br />GREASE WASTE <br />HW <br />HOT WATER <br />HWR <br />HOT WATER RETURN <br />IE <br />INVERT ELEVATION <br />IN <br />INCHES <br />MIN <br />MINIMUM <br />OST <br />OVERFLOW STORM <br />PC <br />PLUMBING CONTRACTOR <br />SAN or S <br />SANITARY <br />ST <br />STORM <br />V <br />VENT <br />VTR <br />VENT TO ROOF <br />WCO <br />WALL CLEANOUT <br />W <br />WASTE <br />WTR <br />WATER <br />WSFU <br />WATER SUPPLY FIXTURE UNIT <br />W/ <br />WITH <br />W/O <br />WITHOUT <br />GENERAL SYMBOLS <br />PLAN OR DETAIL NO. <br />SHEET NUMBER <br />OKEYED <br />NOTE TO PLAN <br />QREVISION <br />NUMBER <br />N <br />NORTH ARROW <br />FIRE PROTECTION GENERAL NOTES <br />PLUMBING SYMBOL LEGEND <br />- - - <br />COLD WATER PIPE <br />- - - - - - - - <br />HOT WATER PIPE <br />- - <br />HOT WATER RETURN PIPE <br />- - <br />EXISTING COLD WATER PIPE <br />- - - <br />EXISTING HOT WATER PIPE <br />- - <br />EXISTING HOT WATER RETURN PIPE <br />FIRE <br />- <br />GREASE WASTE <br />SOIL OR WASTE PIPE <br />EXISTING SOIL OR WASTE PIPE <br />STORM <br />STORM SECONDARY <br />- - - - - - - <br />VENT PIPE <br />- - - <br />EXISTING VENT PIPE <br />CHILLED WATER RETURN PIPE <br />CHILLED WATER SUPPLY PIPE <br />CONDENSER WATER PIPE <br />COOLING WATER RETURN PIPE <br />COOLING WATER SUPPLY PIPE <br />O <br />TURNED UP <br />TURNED DOWN <br />TEE, OUTLET DOWN <br />tE <br />TEE, OUTLET UP <br />T&P <br />TEMPERATURE AND PRESSURE <br />RELIEF DRAIN PIPING <br />ED <br />EMERGENCY DRAIN PAN PIPING <br />GATE VALVE <br />PRESSURE RELIEF VALVE <br />BALL VALVE <br />FIXTURE <br />PLUMBING FIXTURE <br />DESIGNATION (UNDER LINED) <br />CONNECT TO EXISTING <br />DISCONNECT FROM EXISTING <br />- <br />DENTAL VACUUM <br />- - - - - - - <br />DENTAL COMPRESSED AIR <br />___ - ___ <br />FILTERED WATER <br />1. FIRE PROTECTION WORK SHALL BE DESIGNED, INSTALLED, AND TESTED IN ACCORDANCE WITH NFPA 13, LATEST EDITION OR AS OTHERWISE <br />ADOPTED BY THE AUTHORITY HAVING JURISDICTION. <br />2. INCLUDE ANY INCIDENTAL APPARATUS, APPLIANCES, MATERIAL, LABOR AND SERVICES NECESSARY TO MAKE NEW WORK COMPLETE IN ALL <br />RESPECTS AND FULLY READY FOR OPERATION. <br />3. PLANS ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL REQUIRED SYSTEM COMPONENTS. MAKE SUCH OFFSETS AN <br />DEVIATIONS FROM WORK SHOWN ON THE DRAWINGS, AS MAY BE NECESSARY TO ACCOMMODATE THE ACTUAL SPACE CONDITIONS. <br />4. INSTALLER SHALL COORDINATE WITH ALL PLUMBING, HVAC, ELECTRICAL AND GENERAL WORK SO AS NOT TO CONFLICT IN LOCATION WITH <br />OTHER TRADES UNDER THIS CONTRACT OR THAT MAY BE EXISTING. CONTRACTOR SHALL ADJUST PIPE ROUTE AS NECESSARY TO AVOID <br />CONFLICTS WITH DUCTWORK, EQUIPMENT, LIGHTING, ETC. <br />5. INSTALLER SHALL NOT NOT OR MODIFY IN ANY WAY ANY STRUCTURAL MEMBER WITHOUT FIRST SECURING WRITTEN APPROVAL FROM THE <br />ARCHITECT. <br />6. PIPE SIZES, ROUTING, AND SPECIFIC CONFIGURATION OF SYSTEMS ARE REQUIRED TO BE HYDRAULICALLY CALCULATED AND SHALL BE <br />SUBMITTED TO THIS ENGINEER FOR REVIEW. <br />7. CONTRACTOR SHALL ARRANGE FOR, OBTAIN, AND BEAR THE COST OF NECESSARY PERMITS, BONDS, AND FEES. <br />8. ALL MATERIALS SHALL BE U.L. LISTED AND BEAR THE U.L. LABEL. <br />9. CONDITIONS SHOWN AS EXISTING (LOCATIONS, MATERIALS, ELEVATIONS, SIZES, ETC.) ARE BASED ON AVAILABLE EXISTING DATA AND <br />SHOULD BE INTERPRETED TO BE APPROXIMATE. CONTRACTOR SHALL VERIFY CONDITIONS IN THE FIELD. EXISTING CONDITIONS FOUND TO <br />DEVIATE FROM THOSE SHOWN SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY UPON DISCOVERY. <br />10. PENETRATIONS THROUGH FIRE -RATED ASSEMBLIES, PENETRATIONS FOR PIPES, CONDUITS, OR OTHER PURPOSES THROUGH ASSEMBLIES <br />(FLOORS, ROOFS, WALLS, PARTITIONS, ETC.) WITH A REQUIRED FIRE STOP MATERIAL FIRE SHALL BE U.L. LISTED AND INSTALLED IN STRICT <br />ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS TO MEET OR EXCEED THE FIRE RATING OF THE PENETRATED ASSEMBLY. <br />11. BEFORE SHUTTING OFF ANY SECTION OF THE FIRE PROTECTION SYSTEM TO MAKE ADJUSTMENTS OR ADDITIONAL CONNECTION, <br />COORDINATE WITH THE OWNER AND NOTIFY THE AUTHORITY HAVING JURISDICTION. PLAN THE WORK CAREFULLY AND ASSEMBLE ALL <br />MATERIALS TO ENABLE COMPLETION IN THE SHORTEST POSSIBLE TIME. WORK SHALL BE USED TO COMPLETION WITHOUT INTERRUPTION, <br />AND PROTECTION SHALL BE RESTORED AS PROMPTLY AS POSSIBLE. <br />12. PROVIDE DEFLECTORS ON ELECTRICAL EQUIPMENT TO PREVENT WETTING PANELS. SPRINKLER PIPING SHALL NOT BE INSTALLED DIRECTLY <br />ABOVE ELECTRICAL PANELS, TRANSFORMERS, ETC. <br />13. PROVIDE FLUSHING CONNECTION AT END OF SPRINKLER SYSTEM WHERE LAY -IN CEILING OCCURS. ALL SPRINKLER PIPING THAT REQUIRES <br />CHANGE IN ELEVATION DUE TO COORDINATION OF ROUTING OF PIPING SHALL HAVE FLUSH CONNECTION AL ALL LOWER ELEVATIONS. THE <br />SPRINKLER SYSTEM SHALL BE INSTALLED AS COMPLETELY DRAINABLE. <br />14. WHEN CONFLICTS OCCUR IN THE SPECIFICATIONS OR DRAWINGS, THE ITEM(S) OF GREATER QUANTITY OR HIGHER COST SHALL BE <br />PROVIDED. <br />15. SPRINKLER HEADS IN MECHANICAL ROOMS SHALL BE COORDINATED WITH THE EQUIPMENT AND DUCTWORK. THE SPRINKLER CONTRACTOR <br />SHALL COORDINATE HIS SHOP DRAWINGS WITH THOSE OF THE HVAC CONTRACTOR AND PROVIDE HEADS BETWEEN EQUIPMENT AND UNDER <br />DUCTWORK AS REQUIRED BY CODE. ADDITIONAL SPRINKLERS SHALL BE PROVIDED UNDER ALL DUCTS AND OBSTRUCTIONS GREATER THAN 4 <br />FEET IN WIDTH, AND AS OTHERWISE REQUIRED BY NFPA 13. <br />16. THE INSTALLED SHALL VISIT THE PROJECT SITE AND INSPECT ALL EXISTING CONDITIONS AFFECTING THE WORK. SUBMISSION OF HIS <br />PROPOSAL SHALL BE CONSTRUED AS INDICATING SUCH KNOWLEDGE. NO ADDITIONAL PAYMENT WILL BE MADE ON CLAIMS THAT ARISE FROM <br />THE CONTRACTOR'S FAILURE TO COMPLY WITH THIS REQUIREMENT. <br />17. VERIFY THE EXACT LOCATION OF THE FIRE PROTECTION PIPING, FROM THE ACTUAL JOB SITE. ALL NEW PIPES ARE TO BE ROUTED TO AND/OR <br />FROM VERIFIED LOCATIONS. TAPS, WHEN NOT PROVIDED BY THE PREVIOUS INSTALLER, SHALL BE PROVIDED BY THIS INSTALLER. <br />18. PROVIDE AND MAINTAIN TEMPORARY CONNECTIONS TO KEEP EXISTING FIRE PROTECTION SYSTEM IN SERVICE. ANY SERVICE INTERRUPTION <br />SHALL BE APPROVED BY THE OWNER'S REPRESENTATIVE. <br />19. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT, THE CONTRACTOR SHALL REMOVE ALL TOOLS, APPLIANCES, SURPLUS MATERIAL, <br />AND SCRAP. ALL IDENTIFIED EXISTING EQUIPMENT TO BE REMOVED SHALL BE TURNED OVER TO THE OWNER. <br />o-i/ ;Z <br />0.i� STATE OF ; W ZZ <br />'ONAL <br />MicVEIGH&MANGUM <br />ENGINEERING INC <br />Atlanta - Charlotte • lacksonville Raleigh <br />www.McVeighMangum com <br />1955 Lake Park Drive SE, Suite 325 <br />Smyrna; Georgia 30080 <br />Ph (678) 213-4616 <br />email: mail@McVeighMangum.com <br />PEF005182 <br />Eng. of Record:KENNETH GONZALEZ License No.:61015 <br />!R <br />A <br />N <br />D <br />A <br />L <br />L <br />la r c h i t e c t s <br />Roswell Mill <br />85-A Mill Street, Suite 200 <br />Roswell, Georgia 39075 <br />t 710.650.7558 f 710.650.1559 <br />e-mail architects@?randalipaulson.com <br />These plans and specifications are no property of Randall•Paulson Architects, <br />Incorporated. These documents may not be copied, reproduced, used or <br />implemented in any way, in part of in whole, Mtheutthe Written Consent of <br />Randall-Paulsan Architects, Incorporated. All common law rights of copyright are <br />hereby specifically reserved. <br />TENANT <br />BUILD -OUT <br />at <br />ZEPHYRHILLS <br />for <br />U.S. HIGHWAY 301 & PRETTY <br />POND ROAD, <br />ZEPHYRHILLS, FLORIDA 33541 <br />Print Record <br />Revisions <br />Date Project No. <br />14 JUNE 2021 2021217.00 <br />Sheet Title <br />NOTES, LEGENDS, & SYMBOLS <br />- - - <br />� r :Ilr. ., u _ ,. I _.� . I <br />-;- �, . ..�. �� ;i:•.r.l, -.l ,:�rir�ui 71 ��1-�ILC71�1� T%1 . <br />