Laserfiche WebLink
Q <br />LO <br />3 <br />r2 <br />of <br />8 <br />t2 <br />LO <br />LO <br />H <br />a <br />0 <br />N <br />Q <br />O <br />E <br />9 <br />10 <br />i= <br />4 <br />C <br />E <br />, <br />C.. <br />v <br />E <br />CIL <br />a <br />c <br />c <br />c <br />Of <br />c <br />0 <br />c <br />a <br />NOTE: PENDING BEAM <br />"DIAGONAL SPACED BEARING LOCATION, THE <br />AT 15'-0" O.C. MAX BEAM CAN SIT ON TOP OF <br />SEE ROOF PROVIDE 2X4 MIN. BLOCKING AT COLUMN w/ (2) SIMPSON <br />PLAN SHEATHING Q OF HIP/RIDGE, TYP.BETWEEN HTS20 w/ (24) 10d x 1 1/2" JACK TRUSS (AS SHOWN) <br />TRUSSES W/ (2) 12D NAILS EACH NAILS EACH OR GABLE END SEE TRUSS <br />END TO TRUSS TOP CHORD LAYOUT <br />2X4 BLOCKING TYP. SIMPSON HU46/HUC46 w/ (8) CLIP EACH TRUSS <br />�— 16d NAILS TO POST & (4) 10d SEE ROOF PLAN <br />BETWEEN TRUSSES (2) 2x8 #2 SYP w/ FOR TYPE) <br />TRUSS NAILS TO BEAM <br />O.S.B. FLITCH PLATE <br />BLOCKING SECT. A -A kA <br />TOP @ TRUSS BRG. FRAME OUT TO <br />U.N.O. ON ROOF SUPPORT COLUMN BUILT-UP BLOCK EDGE <br />PLAN (2) 2x4's OR 4x4 w/ (2) 10d <br />G.T. NAILS @ 8" O.C. EACH PLY SEE PLAN <br />(SHOWN AS 4 x 4) FOR BEAM SIZE <br />ADD 2X4 ALONGSIDE EXTERIOR SHEATHING <br />TOP CHORD WHEN REQ'D (2) SIMPSON HETA20 w/ (8) 10d ATTACHED PER NAILING <br />TO PREVENT PLYWOOD TYPICAL BLOCK x 1 1/2" NAILS EACH - OR (2) SCHEDULE 2x SPF #2 <br />SPAN FROM EXCEEDING ACK WALL SIMPSON MSTAM36 w/ (7) 10d AT 16" O.C. <br />MAX 24" SPAN (EITHER USSES HIP & (4) 1/4"x2 1/4" TITENS EACH <br />SIDE OR BOTH IF REQ'D) 00 G.T <br />TIE BEAM --BUILDER FRAME <br />RADIUS <br />CONTINUOUS LATERAL BRACING - <br />AS REQUIRED <br />NAIL OVER X-BRACE AS SHOWN - <br />INSTALL BLKG. AT TRUSS WEBS 12" NAILS <br />A <br />FOR NAILING AT 12" O.C. MAX <br />X-BRACING-2x4 SPF OR SYP BEAM @ RAISED ENTRY <br />w/ 2-16d @ EACH TRUSS WEB <br />�+ BRACING DETAIL(TYP.)K"HIP/RIDGE BLOCKING DETAIL 2 MASONRY WALL 4 KNEEWALL ENTRY FRONT WALL 6 <br />CROSS 1 SCALE: NTS <br />SCALE: NTS SCALE: NTS SCALE: NTS <br />TRUSS NOTES: TYP. HAND FRAMING ABOVE TRUSS <br />CONV. FRAMED RIDGE 2X4 STUDS & PLATES AT 2'-0" O.C. SIMPSON LSTA18 <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 MAY BE NAILED EACH DIRECTION TYP. U.N.O. VERTICAL SCAB 2 x 6 w/ (12) 10d NAILS SEE PLAN <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN #2 SPF 48" O.C. W/ (4) CENTERED AT 1S6d INTO NHEADER & (6)4) FOR CANT. <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO 2x8 BLOCKING NAILED @ 10d TOP & BOTTOM SPLIT TO TIE 10d INTO BEAM - SEE <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS- EACH SIDE w/ (3) 12d NAILS OR SIMPSON H2.5A w/ BEAMS TOGETHER ROOF PLAN FOR MORE <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES WHEN REQUIRED w/ (2) (10) 8d NAILS INFO <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD SIMPSON HTS20 w/ (24) 10d x <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & 1 1/2" NAILS EACH —SEE FLOOR PLAN FOR <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION COLUMN SIZE & BASE 7/16" OSS FLITCH PLATE <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED SEE FLOOR PLAN CONNECTION INFO REQ'D ONLY WHEN 2x4 #2 SYP NAILER. NAIL <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER COLLAR TIE FOR COLUMN SIZE INDICATED ON BM. TO STUDS w/ (3) 16d AT <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. - & ADDITIONAL INFO. SCHEDULE/PLAN EACH STUD - TOENAIL ROOF AND EXTERIOR <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS EVERY 3rd REQ'7/16"D <br />OSB FLITCH PLATE SEE FLOOR PLAN FOR <br />RAFTER REQ'D ONLY WHEN COLUMN SIZE & BASE EACH TRUSS TO NAILER SHEATHING ATTACHED <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING INDICATED ON BM. C w/ (3)10d SEE 2ND FLOOR WALL SECTION <br />PER NAILING SCHEDULE <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" 2x4 SPF 2 (2) #7 x 3-1/2" OPTION A SCHEDULE/PLAN OPTION B CONNECTION INFO OPTION <br />O.C. MAXIMUM. WOOD SCREW EACH <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d TRUSS OR SIMPSON FOR ADDITIONAL INFORMATION <br />NAILS AT EACH TRUSS INTERSECTION. CB H2.5A w/ (10) 8d NAILS COMMON B M . TO POST ATTACHMENT KA <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS AT 48" O.C. <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT TB SEE ROOF PLAN SCALE: 3/4"=1'-0" IF 2x DOUBLE LEDGER, <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. Dg B FOR BEAM SIZE & BM. SPLICE OVER ATTACH FIRST PLY <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS BEVEL CUTS CONNECTION INFO. CENTER OF POST E D 16d NAILS H EA <br />N <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS PRE-ENG. TRUSS (OPTIONAL) q A END C TRUSS THEN <br />SEE PLAN FOR ATTACH SECOND PLY <br />2X4 BLOCKING TOP OF AM w/ (3) ROWS OF 16d <br />2X4 DIAGONAL AT 8'-0" O.C. BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP <br />MAX & EACH END ALTERNATE CHORD AT ALL HAND FRAMED AREAS TYP. NAILS AT 24" O.C. • <br />DIRECTION TYP. q • <br />DIAGONAL 2x8 #2 SPF RIDGE BEAM SIMPSON LUS26 w/ (8)10d NAILS <br />AT 8'-0" WOOD 2x6 #2 SYP RAFTERS FOR SPANS 4FT SIMPSON MTS18 w/ (14) — OR IF 2 PLY TRUSS SIMPSON ZSEE FLOOR FRAMING PLAN <br />MAX TRUSS "k SEE PLAN FOR SIMPSON LUS26-2 w/ (8) 16d NAILS TO <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS 10d NAILS TYP. U.N.O. AND J/S6 FOR MORE INFO. <br />CANTILEVER IF MTS18 w/ (14) LEDGER <br />THAN 4FT @ 2'-0"O.C. MAX. w/ (3) 10d INDICATED VERIFY WITH PLAN FOR <br />COMMON TOENAILS TO TIE BEAM SEE FLOOR PLAN FOR 10d NAILS <br />2X10 #2 SYP CONT. LEDGER w/ (3) COLUMN SIZE & TYP. U.N.O. 1/2" X 41/2" LAG SCREWS ATTACH LOCATION AND DIRECTION <br />MASONRY ADDITIONAL INFO. LAG SCREWS INTO END OF EACH (IF PARALLEL SEE 2/D2 FOR <br />2X4 CONT. AT CONC. <br />T & B CHORD STEEL M WOOD (WOOD COLUMN SHOWN) FLOOR TRUSS, 24" O.C. MAX. (AT BLOCKING INFO) <br />BEARING SUPPORT MIDDLE EACH SIDE OF G.T. INSTALL (4) LAG MASONRY WALL <br />SCREWS EACH SIDE) (TYPICAL) <br />SECTION AT LOW ROOF g <br />A -A ALTERNATE BLOCKING CORNER SEE FOUNDATION <br />PLAN FOR MORE INFO SCALE: NTS <br />DETAIL @INTERIOR BEARING 3 5 <br />4L SCALE: NTS COMMON B M . ATTACHMENT 1 g <br />WOOD TRUSS <br />A PROVIDE BLOCKING AT ALL TRUSS BEARING SCALE: NTS <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />TYP. WOOD TRUSS BLOCKING DETAIL STANDARD HEEL HEIGHT <br />SCALE: NTS <br />2x STUDS @ 16" O.C. <br />VARIES � <br />�� ! ��� � 1� � ��y � r � � w/ SIMPSON SP1 w/ (10) 10d <br />ROOF SHEATHING <br />SEE 1/S5 FOR SEE PLAN FOR NAILS AT BASE & SIMPSON <br />ATTACHED PER ADDITIONAL 8d NAILS AT VALLEY TRUSS SP2 w/ (12) 10d NAILS AT TOP <br />NAILING SCHEDULE 77OUTLOOKER 4" O.C. INFO. <br />2x4 #2 SPF BRACING @ EXTERIOR SHEATHING INFO. 2x BLOCKING BETWEEN STUDS <br />16" O.C. W/ (4) 12d COMMON TRUSSES. ti ATTACHED PER TO TRUSS W/ (2) 12d TOENAILS <br />TOENAILS TO TOP' SEE TRUSS PLAN 2x4 STUDS w/ SIMPSON NAILING SCHEDULE EACH END ( BETWEEN TRUSSES <br />PLATE & (2) 12d END MIN. (2) 2x4 FOR CONNECTION SP1 w/ (10) 10d NAILS (2) 12d NAILS TO EACH VERTICAL <br />STRUCTURAL SHEATHING NAILS TO TRUSS SPF TOP INFORMATION. AT BASE SEE J/S6 FOR GABL LOW ROOFNVALL STUD) <br />ATTACHED PER NAILING BOTTOM CHORD PLATE MORE INFO. TRUSS-- SHEATHING ATTACHED <br />! SCHEDULE _ - h j PER NAILING SCHEDULE 2x BASE PLATE W/ (2) 12d <br />- — <br />VARIES SEE PLAN 2x4 BASE PLATE W/ 1/2 PLYWOOD NAILS @ 16" O.C. ALONG W/ <br />VARIES W/ FOR WALL LOCATION SIMPSON LSTA30 w/ "' SIMPSON MTS12 w/ BLOCKING <br />G x <br />11 1 1/2" NAILS TO BLOCKING <br />(2) 16d NAILS TO <br />ROOF SLOPE (22) 10d NAILS OR r - BELOW 16' O.C. <br />SIMPSON MTS12 w/ EACH COMMON x � I' @ <br />' WOOD WALL MIN. 2x4 #2 SPF STUDS (14) 10d x 1 1/2" NAILS TRUSS/ FRAMING r <br />ra. , <br />i@ - TYP TOP & BOTTOM <br />OR TRUSS. 2X4 CONT. W/ (2)— 16" O.C. W/ EXTERIOR TO FLOOR GIRDER <br />SEE PLAN 16d COMMONS BELOW @ 16" O.C. <br />NAILS EACH SHEATHING ATTACHED <br />PER NAILING SCHEDULE & • MASONRY WALL BELOW: SIMPSON PLYWOOD <br />i / NAILS RING <br />STUD TYP. T&B <br />(3) 12d TOENAILS TO --- - 4. HETA16 w/ (9) 10d x 1 1 2 @ FLOG <br />PLATE BELOW - MASONRY WALL 4'-0" O.C. TO GABLE TRUSS „ <br />TRUSS OR SEE PLAN FOR OR BEAM • BEAM BELOW: SIMPSON HTS20 w/ <br />ROOF SYSTEM TOP OF WALL SEE TRUSS PLAN a,, (24) 10d x 1 1/2 NAILS @ 4-0 O.C. <br />MIN. 2x4 #2 SYP P.T. PLATE 16 FLOOR SYSTEM FLOOR GIRDER TO GABLE TRUSS LOW ROOF TRUSS W/ (2) 2x6 BLOCKING UNDER FLOOR G.T. <br />W/ 1/2"X8" EPDXY ANCHOR SEE PLAN FOR SEE PLAN FOR SEE PLAN <br />MASONRY WALL SEE @ 3" FROM EACH END & DIRECTION CONNECTION COMMON TRUSS RAISED BOTTOM CHORD SI FLOOR WALL w/ <br />°' SEE ROOF PLAN EXTENSION SEE TRUSS SIMPSON LUS24-2 w/ (16) <br />PLAN FOR MORE 16" O.C. MAX. FLOOR FOR CONNECTION MANUF. SPEC'S FOR 16d NAILS AT EACH END <br />3 <br />SHEAR TRANSFER INFO. SECTION @ <br />CONNECTIONS TO G.T. <br />CONNECTION r22 SECTION AT HIP GABL 12 SECTION BUMP OUT �39 <br />EXTERIOR. WALL(7'��SECTION ENTRY 8 <br />SCALE: NTS SCALE: NTS <br />SCALE: NTS SCALE: NTS SCALE: NTS <br />DETAILS & SECTION <br />R <br />�i <br />00 <br />N <br />W. <br />r R <br />` <br />F L O <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residentiel 7th Edition. Engineers signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineers sionalure and seal. <br />W <br />a <br />g g8 <br />00 <br />0 <br />W <br />r� <br />inr,-O-t-L32 <br />8 , <br />fA <br />Q <br />tN•� v 2SS <br />C <br />w It <br />—1 5 <br />a lL LL <br />LL W <br />0.V <br />,^ <br />Z <br />— o <br />m c M, <br />24iO <br />w <br />a <br />W <br />���rn <br />0 <br />or <br />m <br />L'o <br />-0 <br />N Z <br />d <br />N OU <br />U <br />Z <br />W <br />p0 <br />� <br />v <br />Z <br />z� <br />M <br />N Cl) <br />z <br />Q <br />_ <br />o_ <br />.-- <br />N <br />f� o <br />U <br />O <br />w <br />s <br />V1 <br />C <br />N <br />U <br />w <br />8 <br />_ <br />Q <br />cm <br />O <br />z <br />J <br />� <br />S <br />o <br />O <br />E <br />WoEE <br />az <br />UO <br />Z <br />t <br />�n <br />WE <br />z <br />Nra <br />C <br />J <br />Yba <br />�� <br />iy <br />3 <br />�m <br />a <br />S� <br />2. <br />ao= <br />W� <br />^7 <br />2I <br />U <br />o O <br />>Q <br />LID <br />LIB <br />M <br />-^ <br />N <br />F-- <br />00 <br />�i <br />� <br />O <br />CID <br />O <br />O <br />co <br />m <br />m <br />c <br />IN <br />QI <br />Q <br />-2fV <br />2 <br />o <br />Qi <br />O <br />00 <br />O <br />N o <br />` <br />Lf)O <br />M <br />Q <br />U')T <br />(.0 <br />00 <br />ui <br />E <br />M <br />C <br />E <br />OO <br />O <br />M <br />0 <br />c <br />n <br />a <br />U <br />_j <br />Q <br />c <br />JOB NO: <br />22-09413 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />D1 <br />