w
<br />M
<br />L
<br />1
<br />1
<br />K
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />J �
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />H
<br />4
<br />1
<br />i
<br />1
<br />1
<br />1
<br />1
<br />1
<br />G j
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />F
<br />1
<br />1
<br />1
<br />1
<br />1
<br />E 1
<br />1
<br />4
<br />1
<br />1
<br />1
<br />1
<br />1
<br />D
<br />f
<br />1
<br />1
<br />1
<br />1
<br />� 1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />B 1
<br />A
<br />1 1 2 1 3 4 1 5 6 1 7 1 8 9 1 10 1 11 1 12 1 13 1 14 1
<br />ABBREVIATIONS
<br />AD
<br />ACCESS DOOR
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />BFF
<br />BELOW FINISHED FLOOR
<br />BOT
<br />BOTTOM
<br />CLG
<br />CEILING
<br />D
<br />DRAIN
<br />DN
<br />DOWN
<br />EL
<br />ELEVATION
<br />EQUIP
<br />EQUIPMENT
<br />EXIST
<br />EXISTING
<br />FD
<br />FLOOR DRAIN
<br />FL
<br />FLOOR
<br />F
<br />FIRE MAIN
<br />FS
<br />FLOW SWITCH
<br />GPM
<br />GALLONS PER MINUTE
<br />MAX
<br />MAXIMUM
<br />MIN
<br />MINIMUM
<br />NIC
<br />NOT IN CONTRACT
<br />SPK.
<br />SPRINKLER
<br />TS
<br />TAMPER SWITCH
<br />TYP
<br />TYPICAL
<br />UG
<br />UNDERGROUND
<br />UON
<br />UNLESS OTHERWISE NOTED
<br />VIF
<br />VERIFY IN FIELD
<br />LEGEND
<br />• SPRINKLER HEAD - WHITE PENDENT (SEE SCHEDULE)
<br />+; - - - - - - - - - EXISTING PENDENT MOUNTED SPRINKLER HEAD
<br />AND ARMOVER
<br />VALVE IN RISER
<br />f FLUSHING CONNECTION
<br />TOP CONNECTION, 45 OR 90 DEG.
<br />SIDE CONNECTION
<br />RISE OR DROP IN PIPE
<br />PRESSURE GAGE
<br />GATE VALVE
<br />-i CHECK VALVE
<br />BALL VALVE
<br />(LER
<br />SPRINKLER HEAD ---
<br />QUICK RESPONSE PENDENT
<br />SEMI -RECESSED MOUNTED SPRINKLER HEAD DETAIL
<br />NOT TO SCALE
<br />LOCATE FOR EASY ACCESS
<br />EXTERIOR WALL
<br />90' ELBOW
<br />SPLASH BLOCK
<br />1» FLOW FROM HYDRAULICALLY
<br />�/� MOST REMOTE POINT OF
<br />FIRE SPRINKLER SYSTEM
<br />TEST VALVE LAY -IN CEILING
<br />SIGHT GLASS
<br />UNION WITH CORMSSSON
<br />RESISTANT ORIFICE GIVING
<br />EQUIVALENT FLOW TO MATCH
<br />THE SMALLEST SPRINKLER
<br />ORIFICE IN THE SYSTEM
<br />FLOOR
<br />"VSPECTORS TEST CONNECTIONOT TO N
<br />FIRE PROTECTION GENERAL NOTES
<br />1. FIRE PROTECTION WORK SHALL BE DESIGNED, INSTALLED, AND TESTED IN ACCORDANCE WITH NFPA 13,
<br />LATEST EDITION OR AS ADOPTED BY THE AUTHORITY HAVING JURISDICTION.
<br />2. INCLUDE ANY INCIDENTAL APPARATUS, APPLIANCES, MATERIAL LABOR AND SERVICES NECESSARY
<br />TO MAKE NEW WORK COMPLETE IN ALL RESPECTS AND FULLY READY FOR OPERATION.
<br />3. MAKE SUCH OFFSETS AND DEVIATIONS FROM WORK SHOWN ON THE DRAWINGS, AS MAY BE
<br />NECESSARY TO FIT THE ACTUAL SPACE CONDITIONS.
<br />4. THE INSTALLER SHALL VISIT THE JOB SITE, INSPECT ALL EXISTING CONDITIONS AFFECTING THE
<br />WORK. SUBMISSION OF HIS PROPOSAL SHALL BE CONSTRUED AS INDICATING SUCH KNOWLEDGE.
<br />NO ADDITIONAL PAYMENT WILL BE MADE ON CLAIMS THAT ARISE FROM THE CONTRACTOR'S
<br />FAILURE TO COMPLY WITH THIS REQUIREMENT.
<br />5. THE PLANS AND DIAGRAMS OF FIRE PROTECTION PIPING ARE SCHEMATIC ONLY AND SHOULD NOT
<br />BE SCALED. INSTALLER SHALL COORDINATE AT SITE WITH ALL PLUMBING, HVAC, FIRE PROTECTION,
<br />AND ELECTRICAL WORK SO AS NOT TO CONFLICT IN LOCATION WITH OTHER WORK UNDER THIS
<br />CONTRACT OR THAT MAY BE EXISTING. CONTRACTOR SHALL ADJUST PIPE ROUTING AS NECESSARY
<br />TO AVOID CONFLICTS WITH EXISTING DUCTWORK, EQUIPMENT, LIGHTING, ETC.
<br />6. INSTALLER SHALL NOT CUT ANY EXISTING STRUCTURAL MEMBERS WITHOUT FIRST SECURING WRITTEN
<br />APPROVAL FROM THE ARCHITECT.
<br />7. IN GEOGRAPHICAL LOCATIONS SUBJECT TO TEMPERATURES BELOW 407, PROVIDE PROTECTION FOR
<br />ALL EXPOSED FIRE PROTECTION PIPING IN ACCORDANCE WITH NFPA 13.
<br />8. PROVIDE TAMPER SWITCHES ON ALL VALVES THAT CAN SHUT OFF FLOW IN MAINS OR BRANCHES.
<br />CHAINS AND LOCKS IN LIEU OF TAMPER SWITCHES MAY BE USED AT OUTDOOR BACK FLOW
<br />PREVENTERS ONLY IF APPROVED BY THE AUTHORITY HAVING JURISDICTION.
<br />9. PIPE SIZED, GENERAL ROUTING, AND CONFIGURATION IN SYSTEMS REQUIRED TO BE HYDRAULICALLY
<br />CALCULATED SHALL BE INSTALLED PER THIS ENGINEER'S CONSTRUCTION DOCUMENTS. ANY
<br />DEVIATION SUBMITTED BY THE CONTRACTOR SHALL BE RE -DESIGNED BY THIS ENGINEER WITH
<br />RELATED RE -DESIGN FEES BORN BY THE CONTRACTOR.
<br />10• CONTRACTOR SHALL ARRANGE FOR, OBTAIN AND BEAR THE COST OF NECESSARY PERMITS, BONDS,
<br />AND FEES.
<br />11. ALL MATERIALS SHALL BE U.L. LISTED AND BEAR THE U.L. LABEL.
<br />12. CONDITIONS SHOWN AS EXISTING (LOCATIONS, MATERIALS, ELEVATIONS, SIZED, ETC.) ARE BASED
<br />ON AVAILABLE EXISTING DATA AND SHOULD BE INTERPRETED TO BE APPROXIMATE. CONTRACTOR
<br />SHALL VERIFY CONDITIONS IN THE FIELD. EXISTING CONDITIONS FOUND TO DEVIATE FROM THOSE
<br />SHOWN SHALL BE REPORTED TO THE ENGINEER.
<br />13. PENETRATIONS THROUGH FIRE RATED ASSEMBLIES, PENETRATIONS FOR PIPES, CONDUITS, OR OTHER
<br />PURPOSES THROUGH ASSEMBLIES (FLOORS, ROOF, WALLS, PARTITIONS, ETC.) WITH A REQUIRED
<br />FIRE RESISTANCE RATING FIRE STOP MATERIAL SHALL BE UL LISTED AND INSTALLED IN STRICT
<br />ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS TO MEET OR EXCEED THE FIRE RATING OF
<br />THE PENETRATED ASSEMBLY.
<br />14. BEFORE SHUTTING OFF ANY SECTION OF THE FIRE PROTECTION SYSTEM TO MAKE ADJUSTMENTS
<br />OR ADDITIONAL CONNECTIONS, COORDINATE WITH THE OWNER AND NOTIFY THE AUTHORITY
<br />HAVING JURISDICTION. PLAN THE WORK CAREFULLY AND ASSEMBLE ALL MATERIALS TO ENABLE
<br />COMPLETION IN THE SHORTEST POSSIBLE TIME. WORK SHALL BE USED TO COMPLETION WITHOUT
<br />INTERRUPTION, AND PROTECTION SHALL BE RESTORED AS PROMPTLY AS POSSIBLE.
<br />15. WHERE ELECTRICAL PANELS EXIST, PROVIDE DEFLECTORS ON ELECTRICAL EQUIPMENT TO PREVENT
<br />WETTING PANELS. SPRINKLER PIPING SHALL NOT BE INSTALLED DIRECTLY ABOVE ELECTRIC PANELS.
<br />16. PROVIDE FLUSHING CONNECTION AT END OF SPRINKLER SYSTEM WHERE LAY -IN CEILING OCCURS.
<br />ALL SPRINKLER PIPING THAT REQUIRES CHANGE IN ELEVATION DUE TO COORDINATION ROUTING OF
<br />PIPING SHALL HAVE FLUSH CONNECTION AT ALL LOWER ELEVATION. THE SPRINKLER SYSTEM SHALL
<br />BE INSTALLED WITH COMPLETE DRAINABLE SYSTEM.
<br />17. VERIFY THE EXACT LOCATION OF EXISTING FIRE PROTECTION PIPING, FROM THE ACTUAL JOB SITE.
<br />ALL NEW LINES ARE TO BE ROUTED TO AND/OR FROM VERIFIED LOCATIONS. TAPS, WHEN NOT
<br />PROVIDED BY PREVIOUS INSTALLER SHALL BE PROVIDED BY THIS INSTALLER.
<br />18. PROVIDE AND MAINTAIN TEMPORARY CONNECTIONS TO KEEP EXISTING FIRE PROTECTION SYSTEM
<br />IN SERVICE. ANY SHUT DOWNS ARE TO BE APPROVED BY OWNER'S REPRESENTATIVE.
<br />19. NEW SPRINKLER HEADS IN RENOVATION AREA SHALL BE QUICK RESPONSE TYPE.
<br />20. ALL SPRINKLER HEADS SHALL BE U.L. LISTED AND INSTALLED IN ACCORDANCE WITH THEIR
<br />LISTING REQUIREMENTS. ALL ESCUTCHEONS AND ACCESSORIES SHALL BE METAL.
<br />21. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1)
<br />YEAR FROM DATE OF FINAL ACCEPTANCE. ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED
<br />WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE
<br />OWNER AT NO ADDITIONAL COST TO THE OWNER.
<br />22. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT, THE CONTRACTOR SHALL REMOVE ALL
<br />TOOLS, APPLIANCES, SURPLUS MATERIALS, AND SCRAP. ALL IDENTIFIED EXISTING EQUIPMENT TO
<br />BE REMOVED SHALL BE TURNED OVER TO THE OWNER.
<br />23. WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS, OR BETWEEN EITHER, THE ITEMS
<br />OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED.
<br />24. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS.
<br />25. CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ALL CEILING TILES AND GRIDS AS
<br />NECESSARY TO INSTALL NEW SPRINKLER SYSTEM.
<br />26. COORDINATE EXACT LOCATION OF SPRINKLERS AND PIPING WITH CEILING, ELECTRICAL,
<br />MECHANICAL, AND STRUCTURAL ELEMENTS OF BUILDING. MAKE MODIFICATIONS WITHOUT
<br />ADDITIONAL COST TO THE OWNER.
<br />27. PROVIDE ALL HANGERS AS REQUIRED TO COMPLY WITH NFPA 13.
<br />28. TAMPER SWITCHES AND FLOW SWITCHES TO BE PROVIDED AND INSTALLED BY FIRE PROTECTION
<br />CONTRACTOR AND CONNECTED BY FIRE ALARM CONTRACTOR. COORDINATE TO VERIFY
<br />COMPATIBILITY OF SWITCHES AND LOCATIONS.
<br />29• PROVIDE ALL DRAINS AS REQUIRED BY NFPA 13.
<br />30. PROVIDE CONNECTION TO CITY MAIN AND PAY ALL FEES ASSOCIATED.
<br />31. EQUIP ALL GATE AND BUTTERFLY VALVES WITH LOCKING DEVICES AND TAMPER SWITCHES IF
<br />REQUIRED BY AUTHORITY HAVING JURISDICTION.
<br />32. PENDENT MOUNTED SPRINKLER HEADS SHALL BE ALIGNED WITHIN NORMAL FABRICATION AND
<br />INSTALLATION TOLERANCES AND WILL BE CENTERED IN CEILING TILES.
<br />DRAWING SYMBOLS
<br />POINT OF NEW CONNECTION
<br />-� POINT OF INTERFACE BETWEEN CONTRACTORS
<br />® KEYED NOTES
<br />DRAWING INDEX
<br />FIRE PROTECTION
<br />FP-001 ABBREVIATIONS, LEGENDS AND GENERAL NOTES
<br />FP-100 FIRE PROTECTION FLOOR PLAN
<br />FIRE SPRINKLER HEAD SCHEDULE
<br />SYMBOL
<br />NAME
<br />METAL FINISH
<br />TEMPERATURE
<br />K-FACTOR
<br />N.P.T.
<br />ORIFICE
<br />ESCHUTCHEON
<br />MANUFACTURER
<br />MODEL
<br />Q
<br />PENDENT
<br />WHITE
<br />155' F
<br />5.6
<br />1 /2"
<br />0.5
<br />RECESSED
<br />CSC
<br />BV-QR
<br />NOTE:
<br />M-ESE AM • ' • SYMBOLS AID ! :ffL4L • 1: AM MAY •
<br />(A THE PROJECTDIRAWNGS HOWE*RRU- THE SYMBOL- - ON
<br />WALL
<br />PLASTIC WATERPROOF SEALANT
<br />EACH END OF PIPE SLEEVE -
<br />PIPE SLEEVE
<br />PIPE SLEEVES SHALL BE 2
<br />PIPE SIZES LARGER THAN
<br />CARRIER PIPE.
<br />SPRINKLER PIPING WALL PENETRA11ON DETAIL
<br />NOT TO SCALE I
<br />TA71111111
<br />%-, .. T / -
<br />NEW SPRINKLER LOCATION
<br />IN CENTER OF CEILING TILE
<br />COORDINATE WITH ALL LIGHTING
<br />AND DIFFUSER LOCATIONS (TYP)
<br />CONTINUOUS THREADED
<br />ROD
<br />12» MAXIMUM
<br />CLEVIS HANGER
<br />FM/UL APPROVED
<br />(TYP)
<br />PRINKLER PIPING ARMOVER DETAILI
<br />1 z 3 4 5 6 1 8 9 10 11 12
<br />Z:\rbk\EAST PASCO MEDICAL CENTER\081040 - Hyperbaric Treatment\Design\081040_FP-1.dwg Feb 14, 2008 - 1:51pm alejandro-lez
<br />AIr%T Tf% C/'AI C ■
<br />13 14
<br />4
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />REVISION NO.: DESCRIPTION:
<br />r
<br />CONSULTANT
<br />Mg &GGI,(C.
<br />PROJECT NAME
<br />' FLORIDA
<br />HOSPITAL
<br />Zephyrhillr
<br />Fs-EAL
<br />DATE
<br />3203 QUEEN PALM DRIVE
<br />TAMPA, FLORIDA 33619
<br />PHONE (813) 241-6488
<br />FAX (813) 241-6498
<br />Board of Profei clonal Engine - Lloenee / 27336
<br />Building °M"
<br />Wound Care Renovations
<br />LEGEND, ABBREVIATIONS
<br />AND GENERAL11 ANOTES
<br />COMMISSION NUMBER DRAWING NUMBER
<br />DEAN S. KENYON, P.E. DATE:
<br />FL LIC. No. 44012 FP=001
<br />oQ' 2-15-08
<br />i) -- � c, `
<br />SHEET OF