Laserfiche WebLink
1 1 I 2 3 1 4 1 5 1 <br />6 1 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 <br />. <br />4 <br />1 <br />1 <br />M <br />L <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />K � <br />1 <br />1 <br />1 <br />1 <br />J <br />F <br />i <br />E j <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />D � <br />1 <br />4 <br />1 <br />1 <br />C i i <br />ABBREVIATIONS <br />AD <br />ACCESS DOOR <br />AFF <br />ABOVE FINISHED FLOOR <br />BFF <br />BELOW FINISHED FLOOR <br />BOT <br />BOTTOM <br />CLG <br />CEILING <br />D <br />DRAIN <br />DN <br />DOWN <br />EL <br />ELEVATION <br />EQUIP <br />EQUIPMENT <br />EXIST <br />EXISTING <br />FD <br />FLOOR DRAIN <br />FL <br />FLOOR <br />F <br />FIRE MAIN <br />FS <br />FLOW SWITCH <br />GPM <br />GALLONS PER MINUTE <br />MAX <br />MAXIMUM <br />MIN <br />MINIMUM <br />NIC <br />NOT IN CONTRACT <br />SPK. <br />SPRINKLER <br />TS <br />TAMPER SWITCH <br />TYP <br />TYPICAL <br />UG <br />UNDERGROUND <br />UON <br />UNLESS OTHERWISE NOTED <br />VIF <br />VERIFY IN FIELD <br />LEGEND <br />SPRINKLER HEAD - WHITE PENDENT (SEE SCHEDULE) <br />--------- EXISTING PENDENT MOUNTED SPRINKLER HEAD <br />AND ARMOVER <br />' VALVE IN RISER <br />I FLUSHING CONNECTION <br />TOP CONNECTION, 45 OR 90 DEG. <br />' 1 z SIDE CONNECTION <br />----�� RISE OR DROP IN PIPE <br />Q/ PRESSURE GAGE <br />GATE VALVE <br />-� v--z CHECK VALVE <br />r---ryl BALL VALVE <br />SPRINKLER HEAD <br />(LER <br />vvnvarww mvvn i �.� <br />SPRINKLER HEAD <br />o� OUICK RESPONSE CONCEALED SCALEMSPRINKLER HEAD DETAIL <br />NOT TO <br />MI <br />FIRE PROTECTION DESIGN CRITERIA <br />* First Floor <br />* Fire Protection system to be designed to NFPA 13 and Authority having jurisdiction <br />* Hazard Type: Light hazard <br />* Sprinkler Head Design Area: 196 sq.ft. <br />* Sprinkler Head Density: .15 gpm/sq.ft. <br />* Sprinkler Head Response Type: Quick Response <br />* System Coverage Area: Most remote 1500 sq.ft. <br />* Sprinkler Head Temperature Rating: 135 degree F <br />* All materials to be UL Listed and/or Factory Mutual approved. <br />* All piping shall be pressure tested at 200 psi for 2 hour as per NFPA-13. <br />* Fire sprinkler system to be centrally monitored. <br />* Main and Branch piping 2" and under shall be black steel schedule 40 with threaded pipe <br />utilizing grooved coupling and fitting, outlets to be welded groove-o-lets. <br />* Provide signed and sealed hydraulic calculations. <br />B' <br />1 <br />4 <br />1 <br />1 <br />1 <br />_ 1 <br />A 1 <br />1 <br />1 <br />4 <br />Z:\rbk\EAST PASCO MEDICAL CENTER\081040 - Hyperboria Treatment\Design\081040_FP-1.dwg Mar 05, 2008 - 2:22pm joy.malllson <br />FIRE PROTECTION GENERAL NOTES <br />1. FIRE PROTECTION WORK SHALL BE DESIGNED, INSTALLED, AND TESTED IN ACCORDANCE WITH NFPA 13, <br />LATEST EDITION OR AS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. <br />2. INCLUDE ANY INCIDENTAL APPARATUS, APPLIANCES, MATERIAL LABOR AND SERVICES NECESSARY <br />TO MAKE NEW WORK COMPLETE IN ALL RESPECTS AND FULLY READY FOR OPERATION. <br />3. MAKE SUCH OFFSETS AND DEVIATIONS FROM WORK SHOWN ON THE DRAWINGS, AS MAY BE <br />NECESSARY TO FIT THE ACTUAL SPACE CONDITIONS. <br />4. THE INSTALLER SHALL VISIT THE JOB SITE, INSPECT ALL EXISTING CONDITIONS AFFECTING THE <br />WORK. SUBMISSION OF HIS PROPOSAL SHALL BE CONSTRUED AS INDICATING SUCH KNOWLEDGE. <br />NO ADDITIONAL PAYMENT WILL BE MADE ON CLAIMS THAT ARISE FROM THE CONTRACTOR'S <br />FAILURE TO COMPLY WITH THIS REQUIREMENT. <br />5. THE PLANS AND DIAGRAMS OF FIRE PROTECTION PIPING ARE SCHEMATIC ONLY AND SHOULD NOT <br />BE SCALED. INSTALLER SHALL COORDINATE AT SITE WITH ALL PLUMBING, HVAC, FIRE PROTECTION, <br />AND ELECTRICAL WORK SO AS NOT TO CONFLICT IN LOCATION WITH OTHER WORK UNDER THIS <br />CONTRACT OR THAT MAY BE EXISTING. CONTRACTOR SHALL ADJUST PIPE ROUTING AS NECESSARY <br />TO AVOID CONFLICTS WITH EXISTING DUCTWORK, EQUIPMENT, LIGHTING, ETC. <br />6. INSTALLER SHALL NOT CUT ANY EXISTING STRUCTURAL MEMBERS WITHOUT FIRST SECURING WRITTEN <br />APPROVAL FROM THE ARCHITECT. <br />7. IN GEOGRAPHICAL LOCATIONS SUBJECT TO TEMPERATURES BELOW 40'F, PROVIDE PROTECTION FOR <br />ALL EXPOSED FIRE PROTECTION PIPING IN ACCORDANCE WITH NFPA 13. <br />8. PROVIDE TAMPER SWITCHES ON ALL VALVES THAT CAN SHUT OFF FLOW IN MAINS OR BRANCHES. <br />CHAINS AND LOCKS IN LIEU OF TAMPER SWITCHES MAY BE USED AT OUTDOOR BACK FLOW <br />PREVENTERS ONLY IF APPROVED BY THE AUTHORITY HAVING JURISDICTION. <br />9. PIPE SIZED, GENERAL ROUTING, AND CONFIGURATION IN SYSTEMS REQUIRED TO BE HYDRAULICALLY <br />CALCULATED SHALL BE INSTALLED PER THIS ENGINEER'S CONSTRUCTION DOCUMENTS. ANY <br />DEVIATION SUBMITTED BY THE CONTRACTOR SHALL BE RE -DESIGNED BY THIS ENGINEER WITH <br />RELATED RE -DESIGN FEES BORN BY THE CONTRACTOR. <br />10. CONTRACTOR SHALL ARRANGE FOR, OBTAIN AND BEAR THE COST OF NECESSARY PERMITS, BONDS, <br />AND FEES. <br />11. ALL MATERIALS SHALL BE U.L. LISTED AND BEAR THE U.L. LABEL. <br />12. CONDITIONS SHOWN AS EXISTING (LOCATIONS, MATERIALS, ELEVATIONS, SIZED, ETC.) ARE BASED <br />ON AVAILABLE EXISTING DATA AND SHOULD BE INTERPRETED TO BE APPROXIMATE. CONTRACTOR <br />SHALL VERIFY CONDITIONS IN THE FIELD. EXISTING CONDITIONS FOUND TO DEVIATE FROM THOSE <br />SHOWN SHALL BE REPORTED TO THE ENGINEER. <br />13. PENETRATIONS THROUGH FIRE RATED ASSEMBLIES, PENETRATIONS FOR PIPES, CONDUITS, OR OTHER <br />PURPOSES THROUGH ASSEMBLIES (FLOORS, ROOF, WALLS, PARTITIONS, ETC.) WITH A REQUIRED <br />FIRE RESISTANCE RATING FIRE STOP MATERIAL SHALL BE UL LISTED AND INSTALLED IN STRICT <br />ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS TO MEET OR EXCEED THE FIRE RATING OF <br />THE PENETRATED ASSEMBLY. <br />14. BEFORE SHUTTING OFF ANY SECTION OF THE FIRE PROTECTION SYSTEM TO MAKE ADJUSTMENTS <br />OR ADDITIONAL CONNECTIONS, COORDINATE WITH THE OWNER AND NOTIFY THE AUTHORITY <br />HAVING JURISDICTION. PLAN THE WORK CAREFULLY AND ASSEMBLE ALL MATERIALS TO ENABLE <br />COMPLETION IN THE SHORTEST POSSIBLE TIME. WORK SHALL BE USED TO COMPLETION WITHOUT <br />INTERRUPTION, AND PROTECTION SHALL BE RESTORED AS PROMPTLY AS POSSIBLE. <br />15. WHERE ELECTRICAL PANELS EXIST, PROVIDE DEFLECTORS ON ELECTRICAL EQUIPMENT TO PREVENT <br />WETTING PANELS. SPRINKLER PIPING SHALL NOT BE INSTALLED DIRECTLY ABOVE ELECTRIC PANELS. <br />16. PROVIDE FLUSHING CONNECTION AT END OF SPRINKLER SYSTEM WHERE LAY -IN CEILING OCCURS. <br />ALL SPRINKLER PIPING THAT REQUIRES CHANGE IN ELEVATION DUE TO COORDINATION ROUTING OF <br />PIPING SHALL HAVE FLUSH CONNECTION AT ALL LOWER ELEVATION. THE SPRINKLER SYSTEM SHALL <br />BE INSTALLED WITH COMPLETE DRAINABLE SYSTEM. <br />17. VERIFY THE EXACT LOCATION OF EXISTING FIRE PROTECTION PIPING, FROM THE ACTUAL JOB SITE. <br />ALL NEW LINES ARE TO BE ROUTED TO AND/OR FROM VERIFIED LOCATIONS. TAPS, WHEN NOT <br />PROVIDED BY PREVIOUS INSTALLER SHALL BE PROVIDED BY THIS INSTALLER. <br />18. PROVIDE AND MAINTAIN TEMPORARY CONNECTIONS TO KEEP EXISTING FIRE PROTECTION SYSTEM <br />IN SERVICE. ANY SHUT DOWNS ARE TO BE APPROVED BY OWNER'S REPRESENTATIVE. <br />19. NEW SPRINKLER HEADS IN RENOVATION AREA SHALL BE QUICK RESPONSE TYPE. <br />20, ALL SPRINKLER HEADS SHALL BE U.L. LISTED AND INSTALLED IN ACCORDANCE WITH THEIR <br />LISTING REQUIREMENTS. ALL ESCUTCHEONS AND ACCESSORIES SHALL BE METAL. <br />21. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) <br />YEAR FROM DATE OF FINAL ACCEPTANCE. ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED <br />WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE <br />OWNER AT NO ADDITIONAL COST TO THE OWNER. <br />22. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT, THE CONTRACTOR SHALL REMOVE ALL <br />TOOLS, APPLIANCES, SURPLUS MATERIALS, AND SCRAP. ALL IDENTIFIED EXISTING EQUIPMENT TO <br />BE REMOVED SHALL BE TURNED OVER TO THE OWNER. <br />23. WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS, OR BETWEEN EITHER, THE ITEMS <br />OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. <br />24. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. <br />25. CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ALL CEILING TILES AND GRIDS AS <br />NECESSARY TO INSTALL NEW SPRINKLER SYSTEM. <br />26. COORDINATE EXACT LOCATION OF SPRINKLERS AND PIPING WITH CEILING, ELECTRICAL, <br />MECHANICAL, AND STRUCTURAL ELEMENTS OF BUILDING. MAKE MODIFICATIONS WITHOUT <br />ADDITIONAL COST TO THE OWNER. <br />27. PROVIDE ALL HANGERS AS REQUIRED TO COMPLY WITH NFPA 13. <br />28. TAMPER SWITCHES AND FLOW SWITCHES TO BE PROVIDED AND INSTALLED BY FIRE PROTECTION <br />CONTRACTOR AND CONNECTED BY FIRE ALARM CONTRACTOR. COORDINATE TO VERIFY <br />COMPATIBILITY OF SWITCHES AND LOCATIONS. <br />29. PROVIDE ALL DRAINS AS REQUIRED BY NFPA 13. <br />30. PROVIDE CONNECTION TO CITY MAIN AND PAY ALL FEES ASSOCIATED. <br />31. EQUIP ALL GATE AND BUTTERFLY VALVES WITH LOCKING DEVICES AND TAMPER SWITCHES IF <br />REQUIRED BY AUTHORITY HAVING JURISDICTION. <br />32. PENDENT MOUNTED SPRINKLER HEADS SHALL BE ALIGNED WITHIN NORMAL FABRICATION AND <br />INSTALLATION TOLERANCES AND WILL BE CENTERED IN CEILING TILES. <br />33. FIRE SPRINKLER SYSTEM CONSISTS OF 6 SPRINKLER HEADS AND HYDRAULIC <br />EXISTING 3" DOMESTIC WATER SUPPLY IS A MAX. FLOW OF 175 GPM <br />DRAWING SYMBOLS <br />POINT OF NEW CONNECTION <br />4>_POINT OF INTERFACE BETWEEN CONTRACTORS <br />® KEYED NOTES <br />DRAWING INDEX <br />FIRE PROTECTION <br />FP-001 ABBREVIATIONS, LEGENDS AND GENERAL NOTES <br />FP-100 FIRE PROTECTION FLOOR PLAN <br />FIRE SPRINKLER HEAD SCHEDULE <br />SYMBOL METAL FINISH TEMPERATURE K-FACTOR N.P.T. ORIFICE PLATE MANUFACTURER MODEL <br />0 CPENDENTD WHITE 155' F 5.6 1 /2" 0.5 WHITE TYCO TY3531 <br />NOTE: <br />THESE ARE STANDARD SYMBOLS AND GENERAL NOTES AND MAY NOT ALL APPEAR <br />ON THE PROJECT DRAWINGS; FIOVVEVBi WHEREVER THE 3YM601_ APPEARS ON THE <br />PROJECT DRAWNC38, THE ITEM SHALL BE FRONDED AND INSTALLED. <br />EXISTING GYP BOARD CLG.-/ <br />THREADED ROD - 2" SUPPLY <br />(TYP) FIRE SERVICE <br />PIP ( HA) GER� <br />TYP <br />NEW LAY -IN <br />CEILING <br />NOTES <br />1. DEVICE MUST BE INSTALLED LEVEL. <br />2. ALL JOINTS SHALL BE SCREWED (U.O.N.) <br />3. WILKINS DC 950 SCREW TYPE UL/FM APPROVED 2" SIZE <br />4. INSTALL DDC VALVE ASSEMBLY MIN. 1'-6" t OF PIPING OFF <br />EXISTING WEST WALL <br />1" DRAIN OFFSET <br />AND DROP IN NEW <br />CHASE WALL AND <br />OPEN END 6" ABV. <br />EXTERIOR SLAB <br />OS&Y VALVES (TYP) <br />DOUBLE DETECTOR CHECK <br />BACKFLOW PREVENTER <br />ASSEMBLY <br />BACKFLOW PREVENTER DETAIL NOT TO SCALE <br />NEW <br />3CH. 40) ARMOVER <br />NEW CONCEALED MOUNTED <br />SPRINKLER LOCATION <br />IN CENTER OF CEILING TILE <br />COORDINATE WITH ALL LIGHTING <br />AND DIFFUSER LOCATIONS (TYP) <br />CONTINUOUS THREADED <br />ROD <br />12" MAXIMUM <br />CLEVIS HANGER <br />FM/UL APPROVED <br />(TYP) <br />SPRINKLER PIPING ARMOVER DETAIL <br />NOT TO SCALE <br />8 9 10 11 12 I 13 14 <br />1 <br />1 <br />1 <br />1 <br />1 FIRE MARSHALL COMMENTS <br />REVISION NO.: DESCRIPTION: <br />CONSULTANT <br />KPI 1RNGRMLC ING. 'INC. <br />I <br />FLORIDA <br />HOSPITAL <br />Zephyrhillr <br />03/07/08 <br />DATE <br />3203 QUEEN PALM DRIVE <br />TAMPA, FLORIDA 33619 <br />PHONE (813) 241-6488 <br />FAX (813) 241-6498 <br />Board of Professional Engineers - Lleense / 27336 <br />Building "M" <br />Wound Care Renovations <br />LEGEND, ABBREVIATIONS <br />AND GENERAL NOTES <br />COMMISSION NUMBER <br />GUY VAN MEULEBROUCK, RE <br />kL LIC. No. 53808 DATE: <br />o� <br />2-15-08 <br />DRAWING NUMBER <br />FP=001 <br />SHEET OF <br />T- It -fT- F- i <br />