My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
3951 Copeland Dr
Zephyrhills
>
Building Department
>
Building Plans
>
3951 Copeland Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 2:17:08 PM
Creation date
2/19/2025 1:59:10 PM
Metadata
Fields
Template:
Building Plans
Street #
3951
Location
Copeland Dr
Contractor
Canco General Contractors
Building Plans - Permit #
9108
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Covering Schedule <br />Trim <br />Schedule <br />Id Qty Type Start Length <br />Gage <br />OP Fin. Color <br />Direction <br />Id <br />Parts <br />Color <br />#8 44 PR 6'-11 7/8" <br />26 <br />1 K ZG <br />Left to <br />Right <br />T1 <br />DF10,JT07 <br />Match <br />Wall <br />Color <br />#9 21 PR 19'-1 7/8" <br />26 <br />F K ZG <br />Left to <br />Right <br />T2 <br />DF05,HTS05 <br />Match <br />Wall <br />Color <br />#10 2 PR 18'-11 3/8" <br />26 <br />1 K ZG <br />Left to <br />Right <br />T3 <br />(6.9)BA1,(14)FDT10 <br />Match <br />Wall <br />Color <br />Oper. Code:1=SQ,SQ <br />T4 <br />JT12,RKC15 <br />Match <br />Wall <br />Color <br />Oper. Code:F=CR,SQ <br />T5 <br />(2.6)BAl <br />Match <br />Wall <br />Color <br />Finish:K=KXL <br />T6 <br />DE1,DN1, (2)DS10, (4)DST1 <br />Match <br />Wall <br />Color <br />Color:ZG=Zinc Gray <br />T7 <br />(10)EG201, (20)PCA10A, (69)STR2 <br />Cool <br />Colonial Red <br />T <br />T7 <br />Details <br />WC24A1 <br />WC24A2 <br />EN52A1,RC00AI,WC01A7,WC04A1 <br />EN52A1,RC00AI,WC01DI,WC04A1 <br />RC38F1 <br />RC03B1,RC04B1,RC32B1,RC39A2,RC61B6,WC04A1,WC11A1 <br />(8)#8 <br />(16)#8 <br />(12)#8 <br />T3-24'-6" <br />(4)#9 <br />#10 <br />(4)#9 <br />T3-49'-0" <br />#10 (2)#9 <br />T3-39'-6" <br />(10)#9 <br />T3-24'-6" <br />/ <br />/ ' /i <br />i <br />/ <br />/ / � / // #9 <br />/ <br />/ / % / j j/ <br />/ <br />/ <br />O n <br />/ / <br />T2. <br />�" �X. <br />1 / / <br />/ /O n / / I <br />�/ <br />T2 <br />N <br />% / O P N ` <br />T2 <br />F - <br />0 ei, <br />F <br />E <br />F <br />/ <br />/� / �� / i i� / H <br />ElF <br />�/ <br />/ <br />E. <br />El <br />��. <br />/ <br />S_ll'-3 3/4" <br />- <br />T5-1l'-3 <br />3/4" <br />/ <br />% j / T5-2`-3 3/4" <br />T5-4'-9 3/4"/ <br />L <br />T5-11'-3 <br />3/4" <br />T5-11'-3 <br />4'-6" 11'-3 3/4" 3'-9 1/+__ <br />11'-3 3/9 <br />I <br />1. PRE -DRILLING 118 DIAMETER HOLES FOR WALL STRUCTURAL FASTENERS <br />MAY BE REQUIRED AT I GAGE GIRTS, NESTED GIRTS, GIRT LAP <br />LOCATIONS, AND/OR SECONDARY STRUCTURAL BEAMS <br />2. WALL SHEETS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM, <br />REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED. <br />3. PANELS SHOWN WITH A LENGTH LESS THAN 1-0, 5-0 FOR SSR, MAY HAVE <br />TO BE FIELD CUT. <br />4. SEE JOB DETAILS FOR SHEETING AND TRIM FASTENER SPECIFICATION. <br />THE VP ENGINEER'S SEAL APPLIES <br />ONLY TO THE WORK PRODUCT OF <br />VP AND DESIGN AND PERFORMANCE <br />REQUIREMENTS SPECIFIED BY VP. <br />THE VP ENGINEER'S SEAL DOES <br />NOT APPLY TO THE PERFORMANCE <br />OR DESIGN OF ANY OTHER PRODUCT <br />OR COMPONENT FURNISHED BY VP <br />EXCEPT TO ANY DESIGN OR PER- <br />FORMANCE REQUIREMENTS <br />SPECIFIED BY VP. <br />9'-0" <br />"13 33'-4 l/ 4'-9 3/4" 39'-6" <br />I I II <br />00'-0" <br />COVERING ELEVATION AT F <br />Shape Name = 100 X 200, Wall = 4 <br />THIS DRAWING, INCLUDING THE INFORMATION HEREON, <br />REMAINS THE PROPERTY OF VP BUILDINGS. <br />IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING <br />DESCRIBED IN THE APPLICABLE PURCHASE ORDER AND <br />SHALL NOT BE MODIFIED, REPRODUCED OR USED FOR <br />ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN <br />APPROVAL OF VP BUILDINGS. <br />THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY <br />RESPONSIBLE FOR ACCURATE, GOOD QUALITY WORKMANSHIP <br />IN ERECTING THIS BUILDING IN CONFORMANCE WITH THIS <br />DRAWING, DETAILS REFERENCED IN THIS DRAWING, <br />ALL APPLICABLE VP ERECTION GUIDES, <br />AND INDUSTRY STANDARDS PERTAINING TO PROPER <br />ERECTION, INCLUDING THE CORRECT USE OF TEMPORARY <br />BRACING. <br />VP Buildings <br />3200 Players Club Circle Memphis TN 38126 <br />REV I DATE I BY I DESCRIPTION <br />NTS <br />4/21 /2009 9:29:30 <br />l'-3 3/4" 3'-4 1/,L11'-3 3/4" � 24'-6 <br />I II <br />Thomas W. Truxton <br />P.E. No. 57109 <br />/yIl A VP Buildings,1w_ <br />1140 West Mountab SkM <br />KernersviHo, NC 77204 <br />PERMIT SET- For Building Dept. Approval <br />COVERING ELEVATION AT F <br />BUILDER Canco General Contractors <br />Mike Lynch <br />Zephyrhills, Florida <br />PROJECT Wheelblast <br />BUILDERS PO# 1162 <br />JOBNO <br />09-7858 <br />DATE <br />RVPBUILDINGS 4/2/2009 <br />VARCO PRUDEN DRAWN/CHECK <br />FCJ <br />A BlueScope Steel Company PAGE <br />VPC VERSION: 7.1 f 23 <br />FILENAME` Mike Lynch canopy3.VPC <br />a division of BlueScope Buildings North America, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.