My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
4826 Airport Rd
Zephyrhills
>
Building Department
>
Building Plans
>
4826 Airport Rd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 2:42:28 PM
Creation date
2/19/2025 2:00:02 PM
Metadata
Fields
Template:
Building Plans
Street #
4826
Location
Airport Rd
Contractor
Aspen Contract SVC Inc
Building Plans - Permit #
10849
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! un me •!' re 11n!�.w��erne111 1a I ii IIMlillll PI�II�AIIIIIIIIIAIIII�I�'I I! hll7�lOnllll■M��RI�IA�V_Ak II I �gi�lil+l�llllfl� I�:I lift II lilfl �Ih � i�_�_1 if 11�1��1[;Iq'Ilrlli�lplll'I <br />61 oll <br />ROOF PERLINS PER STEEL <br />BUILDING MANUFACTURE <br />-------------------- <br />---------------------------------------------------------- <br />---------------- <br />--- <br />8" STEEL TRACK ATTACHED TO ROOF <br />ADI� ON CANTILEVER ROOF AREA PERLIN WITH 1/4" X 1 1/2" SDS SCREWS <br />TO BE ENGINEERED BY STEEL BUILDING 4" OC <br />MANUFACTURE TO ATTACH TO EXISTING <br />BUILDING COLUMNS <br />1 <br />8" STRUCTURAL STEEL STUD WALL AT FRONT <br />OF BUILDING. STUDS TO BE SPACED 16" OC <br />1 <br />1 <br />EXISTING STEEL BUILDING <br />STRUCTURAL COLUMNS Q 25' O" <br />1 <br />STEEL WALL PANELS INSTALLED , <br />HORIZONTALLY TO FACE OF STEEL 25' O" <br />STUD WALL <br />1 <br />1 <br />, <br />1 <br />1 - - <br />1 <br />8" STEEL TRACK ATTACHED TO CONCRETE <br />WITH 1/2" X 8" ANCHOR BOLTS im 24" OC <br />FORMED END WALL AND POURED WITH <br />3000 PSI CONCRETE, DECORATIVE <br />STUCCO EXTERIOR OF WALL <br />MINIMUM 1 1/2" STEEL PIPE RAILING <br />PRIMED AND PAINTED <br />LAY BLOCK FOR STAIRS AND ALLOW <br />FOR 4" FORMED AND POURED CONCRETE <br />CAP AREA AT LANDING <br />LAY BLOCK FOR STAIRS AND ALLOW <br />FOR 2" FORMED AND POURED CONCRETE <br />CAP AREA AT STEPS <br />_ 1' 411 <br />i' <br />cll <br />it O <br />--- <br />LOADING DOCK FINISH FLOOR <br />---- ----- --- -- ------------ ------------------------ - - - - -- <br />N ---MAIN BUILDING FINISH FLOOR <br />14 <br />c4 <br />05 VERTICAL REBAR AT LOCATIONS <br />SHOWN ON FOUNDATION PLAN. POUR i „ , 11 tv <br />ALL CELLS SOLID WHEN POURING O 8"Xi21" FOOTINGS WITH (1) 05 REBAR <br />CAPS 11 11 <br />EXTERIOR STAIR SECTION DETAIL <br />NOT TO SCALE <br />12' 6" CLEAR SPAN (MAX) <br />6"X 25 1 <br />BEAM WITH 6" FLANGE <br />TYPICAL END VIEW OF "3.0 OF" <br />WELDED <br />AT TOP OF TUBE COLUMNS <br />20 GA COMPOSITE FLOOR DECK <br />PANEL <br />1 <br />1 <br />11 O,1 <br />1 <br />"3,0 CF" COMPOSITE FLOOR DECK <br />11 O" <br />or <br />WITH 6" THICK CONCRETE POUR WITH <br />12 " BEND INTO SLAB (TYP) <br />6/6 10/10 WIRE MESH (3000 PSI) <br />SUPERIMPOSED LIVE LOAD 133 PSF <br />—.r----v----ti-----v-----v-----�r----v----ti-----v-----�r----r----v--- <br />v---------v-----�r----v--------v----v----r----v----�---- <br />-- <br />— <br />e <br />e ° <br />e <br />o <br />° <br />12" X 42" X <br />42" CONCRETE PAD WITH (5) <br />TACK WELD DECK TO TOP OF BEAM <br />ae <br />05 REBAR <br />EACH WAY AT EACH COLUMN e a e <br />AT EACH EDGE AND IN CENTER <br />LOCATION <br />POURED ON TOP OF EXISTING o 4!0 0 <br />SLAB <br />.° <br />o D D D <br />D D <br />D D D <br /><t <br />II II II <br />EXISTING BUILDING FOOTING EDGE, <br />II DRILL 6" HOLE INTO EDGE AND <br />11411 EPDXY VERTICAL "5 REBAR w <br />11 2411 OC <br />MINIMUM 1 1/21' STEEL PIPE RAILING <br />PRIMED AND PAINTED <br />LAY BLOCK FOR, STAIRS AND ALLOW <br />FOR 2" FORMED AND POURED CONCRETE <br />CAP AREA AT STEPS OR FORM ENTIRE <br />STEP AND POUR WITH 3000 PSI CONCRETE <br />11 4" <br />nl <br />- <br />cll � <br />LOADING DOCK FINISH FLOO <br />cal <br />MAIN BUILDING FINISH FLOOR <br />INTERIOR STAIR SECTION DETAIL <br />NOT TO SCALE <br />1/4 X 4 X 4 STEEL TUBE COLUMN WITH <br />3' 6" 70, 1/4" X 4" X 10" STEEL PLATE AT BOTTOM <br />WITH (2) 5/0" X 6" ANCHOR BOLTS IN <br />CONCRETE PAD, <br />CUT 6ECTI <br />ON DETAIL A <br />NOT t0 SCALE <br />FORMED END WALL AND <br />POURED WITH 3000 PSI <br />CONCRETE <br />LOADING DOCK FINISH FLOOR <br />1 <br />t <br />O <br />MAIN BUILDING FINISH FLOOR <br />POUR FOOTING ON TOP OF EXISTING <br />SLAB AS SHOWN AT INTERIOR LOCATION <br />WITH (3) #5 REBAR ON CHAIRS WITH VERTICAL <br />*5 REBAR 6 24" OC <br />ARKAY ENGINEERING INC. <br />STRUCTURAL ENGINEERS <br />t <br />v <br />RlCHARD L.. K DDT'!' = ,M <br />FLORiOA LICENSE NUMBER 3-1296 <br />I HERBY CERTIFY T,4AT TWTAE PLANS AND SP£CIFICATIO NS <br />WERE PREPARED BY. ME OR UNDER MY DIRECT SUPERVISION <br />ARE IN COMPLIANCE WITH CWAPTEP. 16, SECTION WOOS O F THE <br />FLORIDA BUILDING CCDE 2oo-i FOR 120 MPH (3 SECOND GUST) <br />WIND ZONE - 100 MPH FASTEST SPEED AND THE ENTIRE 2001 <br />FLORIDA BUILDING CODE AND 2009 SUPPLEMENTS <br />it, y <br />Z <br />W <br />� -4 CA <br />2aMtq NQ <br />ymQ� W o�p <br />40dW- <br />W <br />0-4� <br />v M <br />M.4 <br />p N t-4 W <br />Ilk H y <br />>r <br />Wm <br />2� <br />cct"Icq <br />o � <br />L— <br />z L LoR <br />0 <br />UJ <br />pC D <br />A <br />W u---� <br />Id p� <br />(p QN� <br />ui <br />Q <br />z <br />0 <br />N <br />Q�L <br />3 ccn <br />� O � <br />Z <br />d w Z <br />cA . <br />Q Q- <br />z <br />u- <br />1 O v/ <br />c^ <br />_ <br />VJ � V! 3: . <br />O <br />J O <br />E3 <br />PC-c <br />(OOF(0 <br />ARKAY 0 t3M-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.