Laserfiche WebLink
new <br />#1 CONRETE MA50NRY UNIT SHALL BE HOLLOW UNIT <br />MASONRY IN ACCORDANCE 1,1.1ITH ASTM C-90 AND SHALL <br />HAVE MINIMUM F,M OF 1500 P.S.I. <br />#2 MORTAR SHALL CONFORM TO ASTMC -270 AND SHALL BE <br />EITHER TYPE M OR 5, <br />'W3 REINFORCING STEEL SHALL BE GRADE 40 MINIMUM AND <br />IDENTIFIED IN ACCORANCE WITH AS , EA-61E.LAP SPLICES <br />WHERE RE TIRED SHALL BE A rMINfMUM OF 25" FOR 0 REDAR <br />30" FOR *(i REBAR AND 3ra" FOR *-! REBAR® <br />4 GROUT FOR POURED CELLS AND LINTELS SHALL €-IAv- A <br />MAXIMUM COURSE AGGREGATE SIZE OF 3 a" PLACED AT 8 TO <br />11 INCH SLUMP AND HAVE A MINIMUM 28 DAY COMPRESSIVE 1 <br />STRENGTH OF 3000 F,5.1f ( WHEN TESTED PER 45T1" 1 C-1O1 ) <br />05 PROVIDE CLEAN OUT OPENINGS (12 SQ IN,) IN CELLS <br />CONTAINING SPLICED REINFORCEMENT. WHEN/ THE GROUT <br />FOUR EXCEEDS 5 FEET IN HEIGHT. <br />r I ALL EXTERIOR WINDOWS AND GLASS DOORS OR ENTRANCE <br />DOOR SHALL BE TESTED IN ACCORDANCE, WITH <br />ANSI/At-fMA/lNUffWDA 1011182 STANDARD AND BEAR IN AMM OR <br />WDMA LABEL IDENTIFYING THE MANUFACTURERS PERFORMANCE <br />C+-IARACTERI STICS AND APPROVED PRODUCT TESTING ENTITY. <br />#2 ALL MULLIONS AND .ADJACENT DOOR/WINDOW ASSE1" IBLIE5 <br />SHALL BE TESTED OR ENGINEERED TO TRANSFER 1.5 TIMES THE <br />DE51GN LOADS TO THE ROUGH OPENINGS SUBSTRATE. <br />#3 INSTALL ALL WINDOWS AND DOOR ASSEMBLIES PER THE <br />MANUFACTURERS.— <br />ANCHORING <br />RECOMMENDATIONS TO ACHIEVE <br />THE DESIGN PRESSURE SPECIFIED, <br />0 THIS SYMBOL INDICATES THE APPROXIMATE <br />LOCATION OF THE FILLED CELLS CAN THE FOUNDATION <br />PAGE OF THIS PLAN, <br />THE FILLED CELLS ARE BLOCK CELLS FILLED <br />SOLID WITH 3000 PSI AND VERT. #5 REBAR. THE <br />VERT REBAR ARE THEN TIED TO THE HORIZ, REB, R,;.S <br />IN THE FOOTER AND THE TOP COURSE LINTEL. <br />THE MIN LAR FOR ANY REBAIR WILL BE 25". <br />I <br />ft <br />I <br />8" CONCRETE BLOCK <br />I EXTERIOR WALLS <br />!F <br />I I <br />If <br />f+ I <br />Ef I <br />I #5 REBAR IN FILLED CELLS ] <br />I 5TAFNDAR1 4" <br />If MONOLITHIC SLAB <br />f FINI,a.,H D GRADE — — — _ — — I <br />1211 <br />If <br />l ro MIL, I <br />' MIN _ _ If V 15OUEEI*i <br />u. II <br />I_ I <br />I2FI f Et <br />I <br />3� EE <br />� I <br />r <br />4" 13000 P51 MONOLITHIC CONCRETE SLAB O VER CLEAN, <br />TREATED AND COMPACTED SOIL. THE SOIL WILL BE I <br />E x-, y <br />COMPACTED TO _� MIN, � �OOO SF A i P TIED O AND BE TREATED <br />j FOR TERMITE5 AS PER THIS PLAN. <br />IIt <br />x 6" 10/10 WIRE I`°`IESH OVER to1'-1ILr VISQUEEN VAPOR � <br />i BARRIER WILL BE INSTALLED FOR REINFORCING THE SLAB, <br />FIBERMESH CONCRETE CAN BE USE IN PLACE OF THE WIRE I <br />MESH. SEE THE DETAIL. SHEET OF THIS PLAN FOR THE � <br />COMPLETE TERMITE TREATMENT REQUIRED, j <br />E <br />TYPICAL MASONRY WALL SECTION If <br />----------- - ------------------------------------------- I <br />W1 MONOLITHIC, FOOTER AND SLA5 <br />11EE1 V LEY LINING MATERIAL <br />'# #� Co" MIN, <br />NORMAL WIND LOAD <br />5" ExPOSUR <br />' 7 <br />FL*10124J 2„ CENTERL.INIE <br />ALWAYS REFER TO THE MANUFACTURERS <br />SPEC <br />IFICATION5 FURNISHED TO THE JOBSITE, <br />411x5" ANGLE 26 GAUGE GALVANIZED METAL <br />RIBBER VALLEY FLASHING OVER THE TOP OR <br />12" WIDE 26 GAUGE GALVANIZED METAL <br />ALL SNINSLES ARE TO BE NAILED WITH 11 OR 12 GAUGE <br />GALVAN14-ED NAILS WITH 3/5" DIAMETER. HEADS., ALL NAILS <br />PENETRATE T " <br />MUST,�..� .. _,�-BETE ,T LEAST, ��4 INTO THE, WOOD SHEATHING. <br />5I1" 1PSON HETA I& <br />EMBEDDED TRUSS STRAPS <br />MIN OF 4" E1`18EDDfi'lENT� <br />EXCEPT WHERE DOTED <br />ALUM, DRIP EAVE <br />PRE FINISHED FASCIA <br />OVER 2X SUB-FA6C-IA <br />VENTED SOFFITT <br />R O3.6.1 EXTERIOR PLASTE15Z <br />EXTERIOR USE OF PORTLAND CEMENT <br />PLASTER SHALL COMPLY WITH APPLICATION <br />REQUIREMENTS OF ASTM Ca2&-'BS AND C I063-'3l <br />PRECAST CONCRETE SILL <br />'5 REBAR IN FILLEDCELL <br />PER FOUNDATION PLAN <br />FINISHED GRADE <br />12`I MIN 015TANCE <br />ImTn Imm <br />NAIL 2r BLOCKING BETWEEN. TRUSSES IN ALL <br />AREAS THAT A PLY -CLIP CANT BE APPLIED <br />F1BER LASS SHINGLES INSTALLED <br />PER THE DETAIL OF TH15 FLAN OR <br />A5 FER THE MANUFACTURER IF <br />ANOTHER TYPE OF SHINGLE <br />IS CHO05EN ` <br />30 ROOFING FELT <br />1/2" CDX (32124)OR OSB SHEATHING NAILED <br />WITH 8d COMMONS AT Co" OC UNLESS OTHERWISE NOTED <br />j r <br />I <br />ILL W Tl S5 <br />PR <br />i R-30 INSULATION <br />ALL TEMPORARY AND PERMANENT <br />BRACING INFORMATION FOR. THE <br />ENGINEERED ROOF TRUSSES ' <br />WILL BE FURNISHED BY THE <br />TRU65 COMPANY THAT <br />PRODUCES THE TRUSSES. <br />POURED LINTEL BLOCKS WITH (1) 05 ROD <br />TIED TO VERT RODS IN FILLED CELLS <br />POURED CONCRETE POWER STEEL LINTELS <br />OVER ALL OPENINGS EXCEPT WHERE NOTED <br />I '2" DRYWALL OVER IX FURRING STRIPS <br />AND RIGID INSULATION <br />SEE RETAIL SHEET OF THIS PLAN FOR <br />r WINDOW AND DOOR INSTALLATION, THE <br />CONTRACTOR 15 RESPONSIBLE TO HAVE <br />INSTALLATION INSTRUCTIONS ON THE JOB51TE� <br />I IF OTHER COMPONENTS ARE CHOOSEN. <br />Ef <br />rf <br />ti F' <br />„ INTERIOR TRIM <br />FINISHED FLOORING <br />GLEAKTREATED: COMPACTED 501L <br />6TANDARD " LP45 NOTE: <br />4f1 13000 PSI CONCRETE SLAB OVER <br />CLEAN, TREATED AND COMPACTED SOIL, <br />THE SOIL WILL BE COMPACTED TO A MIN, <br />OF 2000 P5F AND BE TREATED FOR TERMITES <br />AS PER THIS FLAN, <br />ro x ro„ 10/10 WIRE MESH OVER bMIL. Vl5QUEEN <br />VAPOR BARRIER WILL BE INSTALLED FOR <br />REINFORCING THE SLAB. <br />FIBERMESH CONCRETE CAN BE USE IN PLACE <br />OF THE WIRE MESH, <br />THESE SPECS REFER TO EITHER; A STEMWALL <br />FOUNDATION OR A MONOLITHIC 51 AAB. <br />&TANDAIRD 6INGLE ! 1 FOOTER <br />8" x lro"CONT. 3000 PSI CONCRETE FOOTER WITH (2) #5 REBARS <br />OF10"x20" CONT. 3000 PSI CONCRETE FOOTER WITH (2) #5 REBAR a <br />(` ON ROD CHAIRS SPACED NO MORE THAN 48" OC. <br />I FILLED CELLS WILL BE VERT, #5 RODS IN ALL CORNER'S. <br />AND BESIDE EACH OPENING, THE MAX, SPAC INC:; ° <br />FOR ANY FILLED CELL WILL BE S'-t�"t7O? ALL RODS MUST <br />1 Et ; <br />BE BENT AND TIED TOGETHER WITH A MIN LAP OF 25 � <br />t <br />SEE THE FOUNDATION PLAN I <br />{ <br />3 <br />1/2" CEILING DRYWALL <br />ON ALL INTERIOR CEILINGS <br />AND VINYL CEILINGS OVER <br />1X3 STRIPPING fro" OC ON ALL <br />EXTERIOR CEILINGS <br />1/2" FAINTED COX MAY BE <br />SUBSTITUTED FOR THE <br />VIYNL CEILING. <br />PRE - ENGINEERED -ROOF TRIU55E51jj <br />24" OC MAXIMUM SPACING I <br />TC LL 20.0 P5F <br />TC DL ?.O FSF <br />BC DL 10E0 FSF I <br />BC LL 0-0 P5F <br />TOT,LD. _3.0 F.SF <br />I OUR_FAC, 1.25 <br />DEFLECTION MEETS L l 3ro'' LIVE I <br />AND L ! 240 TOTAL LOAD <br />SECTION 3 BUILDING PLANNING <br />SECTION R301B GARAGES AND CARPORTS, <br />R30'5t1 OPENING PROTECTION <br />OPENINGS BETWEEN THE GARAGE AND RESIDENCE SHALL <br />BE EQUIPPED WITH 60LID WOOD DOORS NOT LESS THAN <br />1 3JO" IN THICKNESS, SOLID OR HONEYCOMB CORE STEEL <br />DOORS NOT LE55 THAN 1 3!8" THICK OR 20 MINUTE FIRE <br />RATED DOORS, <br />R30'3.2 SEPERATION REQUIRED <br />T HE GARAGE SHALL BE SEPERATED FROM THE RESIDENCE <br />AND ITS ATTIC AREA BY NOT LESS THAN 1/2" GYPSUM BOARD <br />APPLIED TO THE GARAGE SIDE. GARAGES BENEATH HABITABLE <br />ROOMS SHALL BE SEPERATED FROM ,ALL HABITABLE ROOMS <br />ABOVE BY NO LESS THAN 5" TYPE X GYPSUM BOARD OR <br />EQUIVALENT. WHERE THE 5EPERATION 15 A FLOOR -CEILING <br />ASSEMBLY, THE STRUCTURE SUPPORTING THE SEPERATION SMALL <br />ALSO BE PROTECTED BY NOT LESS THAN 1/2" GYPSUM BOARD <br />OR EQUIVALENT. <br />ATTIC ACCESS <br />ATTIC ACCESS SHALL BE PROVIDED TO ATTIC AREAS ' <br />! EXCEEDING 30 6Q.FT, AND HAVING MINIMUM 30 INCHES OF <br />1 VERTICAL HEIGHT. ROUGH FRAMED OPENINGS NOT TO BE <br />I LESS 1 HAT 22' X30" INCHES, WHEN MECHANICAL EQUIPMENT I iz I <br />LOCATED IN THE ATTIC IT SHALL BE INSTALLED IN <br />ACCORDANCE WITH 2O04 FLORIDA BUILDING CODE <br />I <br />RE5IDENITIAL-5ECTION, M1305.1-13r <br />TREATMENT; C SOIL CHEMICAL BARRIER METHOD) <br />a 4=1 1AN 1T SIGN TO I NT1F" THE ' � �-� TI ATiIENT -RO I }ER {A I <br />NEED FOR RE -INSPECTION AND TREATMENT CONTRACT RENEWAL SHALL BE PROVIDED_ <br />THE SIGN SHALL. BE POSTED NEAR TIDE WATER HEATER OR ELECTRIC PANEL. <br />2) C E:NDINSATE AND ROOF DOWN SPORTS SHALL �{C� ;RGE AT LEAST 1'-0" AWAY FROM <br />THE BUILDING SIDEWALLS_ <br />33 IRRIGATION SYSTEMS INCLUDING ALL RISERS AND SPRAY REA15 SHALL <br />NOT BE INSTALLED WITHIN 14-0 4 CF THE BUILDINGS 511DEWI ALLS_ <br />4) TO F'ROv IDE FOR 4-45PEC T I N FOR TERMITE INFESTATION BETWEEN MALL COvERIN6t <br />AND FINAL EARTH GRADE SHALL NOT BE LESS TWA & INCHES ( EXCEPTION PAINT OR <br />DEG—ORATI' E CEMENTICUS° FINISH LESS THAN F f,IV' THIC4 ADHERED DIRECTLY TO THE <br />'FOUNDATION WALL_ <br />5) INITIAL TREATMENT SHALL BE DONE AFTER ,ALL EXCAVATION AND BACK. FILL IS COMPLETED_ <br />6) SOIL DISTURBED AFTER THE INITIAL TREATMENT SHALL BE RETREATED INGLUDING SPACES BOXED <br />OR. FORMED. <br />-1) BOXED AREAS 4N CONCRETE FLOURS FOR 5Ue5E0UENT IN5TALLLATION OF TRAPS, ETC. SHALL BE <br />MADE WITH PERMANENT METAL OR PLASTIC FORMS. PERM ANEI�!`I -70R 1S MUST BE OF ,A 517-E �.N <br />DEPTH THAT WILL ELIMINATE THE 015TUR ,ANGE OF 6 IL AFTER' THE INITIAL TREATMENT <br />6 ) A h'f1NIMI1 IM & MIL: AP -OR RETARDER MUST BE [MSTALLEL: TO PROTECT AGAINST <br />RAINFALL DILUTION, IF RAINFALL OCCURS BFFORE VAPOR RFT,ARDFR PLA-CIQMENT, <br />RE -TREATMENT 15 REQUIRED, <br />�j CONCRETE OVER POUR AND MORTAR ALONG THE FOUNDATION' PERIMETER MUST BE <br />REMOVE:> BEFORE EXTI=RIOR- SOIL TREATMENT, <br />10) SOIL TREATMENT MUST BE APPLIED UNDER ALL EXTERIOR CONCRETE OR GRADE WITH 1'-0„ <br />F THE 5TRUCTURE5.51DEWIALLS. <br />II 1, AN EXTERIOR VERTICAL CHEMICAL BARRIERS MUST BE IieISTALLED AFTER: <br />COvTRi.IG T 1ON, IS COMPLETE INCLUDINGLANDSCA;-P <br />rNG A;I*iD IRRIGATION - <br />ANT SOIL r .ST[1RBED , AFTER. T14E `>�ERTfCAL BARRIER IS APPLIED, SHALL F_E <br />RETRFATFD. <br />12) ,ALL BUILDINGS ARE REQUIRED TO HAVE flRE-CONSTRUCTION TREATI"IEN f . <br />13 ,A CERTIFICATE OF COMPLIANCE MUST BE ISSUED TO THE BUILDING DEPARTMENT BY <br />A LICENSED PEST c`. GPI , v B: EFOf;z A !CERTIFICATE-.J` ::%r"..,'�..UPA'NNIC'i WILL <br />BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL. 5TATE. "THE BUILDING HAS <br />RECEIVED A COMPLETE TREATMENT FOR THE PR ENTION OF SUBTERRANEAN TER/ MITES_ <br />THE TREAT?-fENT IS IN -WIT-WtT44 THE RULES AND -'AW5 OF THE <br />FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES. <br />14J AFTER ALL WORK 15 COMPLETE LOOSE 1. 4�:CD - ;.ND FILL MUST BE REMOVED FROM <br />BELOW AND WITHIN I'-v€r OFTHEE+t ilL`c:INc�Z. THIS 11�f Lt.IGE. , +L GR t+fE 5T 41 �ES,TI IB <br />TRAP" BOXES, FORM5,5HORING OR OTHER CELLULOSE CONTAINING MATERIAL.. <br />5 ` NO WOOD, VEGETATION, 5T~.3MPS, G, ARDBJARD ,TRASH ETC. , SHALL BE BURIED WIT ° p <br />I'a 0" OF AN" BUILDING OR PROPOSED BUILDING, II <br />S. HNE <br />, <br />DESIGN SERVICES Ift-1, <br />MOBILE/ OFFICE_ 3 - 0 -SS2l <br />OFFICE FAX 352-586-2342 <br />P .0 BOX 1325 SAN ANTONIO <br />FLA. 33516 <br />THE CLIENT UNDERSTANDS THE THE DESIGNER CARRIES <br />NO LIABILITY INSURANCE AND THEREFOR AGREES TO <br />HOLD HARMLESS, IDEMNIPT` AND DEFEND THE DESIGNER, <br />FROM ALL CLAIMS, LO55ES AND EXPENSES( INCLUDING <br />ATTORNEYS FEES AR fSINS OUT OF OR RESULTING FROM <br />THE PROJECT, THE DE-51 NER IN GOOD FAITH ATTEMPT TO <br />PROVIDE ERROR FREE CON5TRUCTION DRAWINGS, <br />IN THE EVENT ERRORS OCCUR THE DESIGNER WILL NOT <br />BE HELD LIABLE FOR THE COST OF THE REPAIRS OR <br />DELAY TO THE JOB, THE CONTRACTOR NEEDS TO VERIFY <br />AND UNDERSTAND ALL INFORMATION BEFORE BIDDING <br />OR STARTING ANY WORD. ON THE JOB. <br />THE PLU °IBiNG , ELECTRICAL AND MECHANICAL <br />PARTS OF THE PLAN ARE NON-STRUCTURAL AND <br />MAY BE ADJUSTED BY THE 5U5-CONTRACTORS <br />PERMITTED TO DO THE JOB. BUT THE CHA C-aE6 <br />MUST MEET THE MIN/MUM STANDARDS OF THE <br />CURRENT FLORIDA BUILDING CODE. THESE CH,4NxE5 <br />ARE NOT fZEQUIRED TO BE VERIFIED BY THE ENGINEER <br />OF RECORD FOR THIS PLAN{ <br />1='aECAUSE THIS IS AN ADDITION IT WILT_. BE THE <br />RESPONSIBILITY OF ALL SUB5 AND SUPPLIERS <br />LL <br />t <br />A. INFORMATION <br />TO VERIFY 11�1 ORt "€ TION IN THE FIELD <br />BEFORE ORDERING ANY MATERIAL OR STARTING <br />ANY WORK, THE HOMEOWNER REQUIRES THAT <br />TH15 NEW ADDITION MATCHES THE EXISTNG HOUSE. <br />IF ANY INFORMATION IS NOT ON THIS PLAN THE <br />CONTRACTOR WILL NEED TO VERIFY THAT THE NEW <br />WORK 15 MATCHING THE EXISTING. <br />THE SWEENEY ADDI710N <br />.� dw • <br />I <br />.r wow <br />THE CONTRACTOR WILL BE RESPONSIBLE TO VERIRY THE SF. <br />DAVID lU. SMITH/ MS. FE. <br />t r► A <br />v� <br />