Laserfiche WebLink
CONNECT TO EXISTING WASTE <br />2" VTR <br />W <br />4" <br />3/4" ! ,/ WC <br />/ 1 /2" <br />LAv I1 /2 <br />�• 1 /2" <br />� 1 /2 LAV <br />E.W.C. <br />2" �. <br />W.C. 1 /2�,` �,�•\3/4" <br />MOP SINK <br />WASTE do VENT RISER/HOT A COLD WATER <br />SCALE: NONE <br />PLUMBING PLAN <br />SCALE: 1 /4' = 1'-0' <br />1/2- <br />WC <br />CONNECT TO EXISTING WATER <br />:XISTING COLD WATER <br />PLUMBING LEGEND <br />NEW SANITARY WASTE PIPING <br />NEW COLD WATER PIPING <br />NEW HOT WATER PIPING <br />— — v — — — v — — NEW VENT PIPING <br />RD NEW ROOF DRAIN PIPING <br />pd GLOBE SHUTOFF VALVE <br />PLUMBING SPECIFICATIONS <br />PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED FOR A COMPLETE <br />9. WATER HEATERS <br />SYSTEM AS OUTLINED IN THE CONTRACT DRAWINGS AND THESE SPECIFICATIONS. <br />A) PROVIDE ISOLATION VALVES AT THE INLET AND OUTLET OF ALL <br />NOTE THAT DRAWINGS ARE DIAGRAMMATIC ONLY AND INTENDED TO SHOW THE <br />WATER HEATERS. <br />GENERAL ARRANGEMENT OF SYSTEMS, NOT EVERY MINUTE DETAIL. PROVIDE ALL <br />B) PROVIDE A SEPARATE DISCONNECT SWITCH FOR ALL ELECTRIC <br />NECESSARY FITTINGS, TRANSITIONS, CONNECTORS, ETC. WHETHER SHOWN OR NOT <br />WATER HEATERS OR A GAS SHUTOFF VALVE FOR ALL GAS WATER <br />ON PLANS. ALL WORK SHALL CONFORM TO THE FOLLOWING CODES (AS <br />HEATERS. <br />APPLICABLE) AS WELL AS ALL LOCAL REGULATIONS, ORDINANCES, AND <br />AMENDMENTS : <br />10. VALVES & ACCESSORIES <br />2004 FLORIDA BUILDING CODE <br />A) PROVIDE WATER HAMMER ARRESTORS OR AIR CHAMBERS AS <br />REQUIRED TO ELIMINATE WATER HAMMER AND COMPLY WITH LOCAL <br />2. SCOPE OF WORK <br />REGULATIONS. <br />PROVIDE PLUMBING SYSTEM AS SHOWN AND CONNECT TO EXISTING SYSTEM <br />B) PROVIDE A MAIN SHUTOFF VALVE AT THE BUILDING'S DOMESTIC <br />DESCRIBED BY THESE DOCUMENTS. <br />WATER SERVICE ENTRANCE. <br />C) PROVIDE MANUFACTURED PIPE HANGERS, RODS, AND INSERTS OR <br />3. ITEMS FURNISHED BY CONTRACTOR <br />FOR THE PROPER SUPPORT OF ALL PIPING. BAND IRON, TIE <br />IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL IT <br />WIRE, OR WIRE STRAPPING ARE NOT ACCEPTABLE. ALL PIPES SHALL <br />MATERIALS, EQUIPMENT, AND ACCESSORIES NECESSARY TO MAKE A COMPLETE <br />BE SUPPORTED AT REGULAR INTERVALS. PIPE SWAY AND/OR <br />INSTALLATION. ALL EQUIPMENT SHALL BE STORED IN A SAFE, DRY PLACE IN THE <br />VIBRATION SHALL NOT BE ACCEPTABLE. DO NOT HANG PIPING FROM <br />VI <br />MANUFACTURER'S ORIGINAL PACKAGING UNTIL READY FOR USE. THE OWNER SHALL <br />ANYTHING OTHER THAN THE BUILDING STRUCTURE. <br />NOT BE RESPONSIBLE FOR PROVIDING ANY PART OF THE PROJECT, UNLESSAPPLY <br />MIN. 20 MILS <br />INS <br />SPECIFICALLY NOTED. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR PAYING <br />TAPE COVERING OVER ALL STEELORCOPPER( WATERUPIP NG <br />ALL REQUIRED FEES, OBTAINING ALL PERMITS, AND ARRANGING FOR ALL <br />CONTACT WITH MASONRY OR CONCRETE. <br />INSPECTIONS. <br />E) PROVIDE CHROME PLATED ESCUTCHEONS WHERE PIPES <br />PENETRATE ANY EXPOSED WALLS, PARTITIONS, ETC. TO COVER THE <br />4. COORDINATION <br />ALL WORK ON THIS PROJECT SHALL BE COORDINATED WITH ALL OTHER TRADES. <br />PENETRATION. <br />F) PROVIDE VACUUM BREAKERS WITH ALL HOSE BIBBS, SILLCOCKS, <br />CONTRACTOR SHALL REVIEW PLANS OF ALL DISCIPLINES INVOLVED AND ADVISE <br />THE ARCHITECT IN WRITING OF ANY CONFLICTS, CODE OR SAFETY ISSUES THAT <br />OR HYDRANTS. <br />MAY EXIST PRIOR TO ANY FABRICATION OR ORDERING OF EQUIPMENT. PROVIDE <br />ROUTING AND OFFSETS NECESSARY TO AVOID CONFLICTS WITH STRUCTURE, <br />FINISHES, AND WORK OF OTHERS. CONTRACTOR SHALL PROVIDE ALL CORE <br />11. FIXTURES <br />A) FIXTURES HAVE BEEN SELECTED TO ESTABLISH A STANDARD OF <br />PENETRATIONS AND PATCHING FOR PIPING FLOOR PENETRATIONS. <br />QUALITY AND SUBSTITUTIONS ARE NOT PERMITTED UNLESS SUBMITTED <br />AND APPROVED PRIOR TO USE. <br />5. PLUMBING GENERAL <br />B) ALL VITREOUS CHINA FIXTURES SHALL BE WHITE UNLESS <br />A) ALL PLUMBING SERVICES TERMINATE 5'-0" FROM THE BUILDING EXTERIOR <br />OTHERWISE NOTED. <br />WAS. <br />C) SEE ARCHITECTURAL PLANS FOR EXACT FIXTURE LOCATIONS AND <br />B) NO LEAD OR ASBESTOS CONTAINING MATERIALS OF ANY KIND SHALL BE USED <br />MOUNTING HEIGHTS. <br />IN THE FABRICATION OF POTABLE WATER SUPPLY SYSTEMS. GALVANIZED STEEL <br />D) INSTALL HOT WATER SUPPLY ON THE LEFT SIDE OF ALL <br />PIPING SHALL NOT BE USED FOR POTABLE WATER SUPPLY PIPING. <br />FIXTURES <br />C) INSTALL ALL WORK IN COMPLIANCE WITH ADA REQUIREMENTS. <br />E) PROVIDE LAVATORY CARRIERS WITH ALL WALL MOUNTED <br />D) THE MAXIMUM HOT WATER SUPPLY TEMPERATURE SHALL NOT EXCEED 115 F. <br />LAVATORIES. CARRIERS SHALL WITHSTAND A MINIMUM VERTICAL LOAD <br />E) PROVIDE "P" TRAPS WITH CLEANOUTS IN THE DRAINS OF ALL FIXTURES EXCEPT <br />OF 250 POUNDS ON THE FRONT OF THE FIXTURE. <br />THOSE WITH INTERNAL TRAPS OR AS SPECIFICALLY NOTED ON PLANS. <br />F) PROVIDE PROTECTIVE ANTI —MICROBIAL INSULATION ON THE <br />F) ALL PIPING SHALL BE CONCEALED IN WALLS, CHASES, CEILINGS, ETC. UNLESS <br />SUPPLY SET AND WASTE DRAIN AND TRAP OF ALL HANDICAPPED <br />SPECIFICALLY NOTED ON DRAWINGS. ANY PIPING OR ACCESSORIES THAT MUST BE <br />LAVATORIES. <br />EXPOSED SHALL HAVE A POLISHED CHROME FINISH. <br />G) ALL WATER CLOSETS SHALL BE THE ELONGATED TYPE WITH OPEN <br />G) COORDINATE THE ELECTRICAL CHARACTERISTICS OF ALL ELECTRICAL EQUIPMENT <br />FRONT SEATS. <br />WITH THE ELECTRICAL CONTRACTOR PRIOR TO ORDERING. <br />H) PIPING SHALL NOT PASS THROUGH DUCTWORK OF ANY KIND UNLESS <br />12. PENETRATIONS <br />A) ALL PENETRATIONS THROUGH RATED WALLS OR FLOORS SHALL BE <br />APPROVED BY THE ENGINEER. <br />SEALED WITH AN APPROVED FIREPROOFING TO MAINTAIN THE <br />6. SANITARY WASTE. VENT, AND STORM DRAIN PIPING <br />INTEGRITY OF THE WALL OR FLOOR. <br />A) ALL SANITARY WASTE, VENT, AND STORM DRAIN PIPING SHALL BE SCHEDULE <br />B) ALL PIPING PASSING THROUGH BUILDING STRUCTURE OR RATED <br />40 PVC. <br />WALLS OR FLOORS SHALL BE SLEEVED. <br />B) ALL SANITARY WASTE PIPING SHALL BE SLOPED AT NO LESS THAN 1 /6" PER <br />13, WARRANTIES AND MAINTENANCE <br />FOOT. <br />C) VERIFY LOCATIONS AND INVERT ELEVATIONS OF ANY AND ALL EXISTING WASTE, <br />A) ALL FIXTURES SHALL BE TESTED, CLEANED, AND PLACED IN <br />GOOD OPERATING CONDITION BY THE CONTRACTOR. CONTRACTOR <br />VENT, AND STORM DRAIN PIPING PRIOR TO BEGINNING ANY WORK. <br />SHALL GUARANTEE ALL EQUIPMENT, MATERIALS, AND WORKMANSHIP <br />TO BE FREE OF DEFECTS FOR A PERIOD OF ONE YEAR FROM THE <br />7. DOMESTIC WATER PIPING <br />A) ALL DOMESTIC WATER PIPING ABOVE GROUND SHALL BE TYPE "L" COPPER <br />DATE OF ACCEPTANCE BY THE OWNER AND THE CONTRACTOR SHALL <br />REPAIR ANY SUCH DEFECTS AT NO COST TO THE OWNER. ALL <br />WITH WROUGHT COPPER FITTINGS AND LEAD FREE SOLDER JOINTS. <br />EQUIPMENT INCLUDED IN THE PROJECT SHALL BE COVERED BY THE <br />B ALL HOT WATER SUPPLY PIPING SHALL BE INSULATED WITH 1" THICK, MIN. <br />MANUFACTURER'S WARRANTY FOR THE DURATION OF THAT WARRANTY.COPIES <br />R-6, CLOSED CELL FOAM INSULATION (ARMAFLD( OR EQUIVALENT). <br />OF ALL MANUFACTURER'S WARRANTIES AND CONTRACTOR <br />WARRANTIES SHALL BE PROVIDED TO THE OWNER AT FINAL <br />8, VENTS <br />ACCEPTANCE. <br />A ALL TRAPS OR TRAPPED FIXTURES SHALL BE PROVIDED WITH AN INDIVIDUAL <br />B) CONTRACTOR SHALL RECORD DRAWINGS DURING CONSTRUCTION <br />VENT UNLESS OTHERWISE NOTED. <br />AND NOTE OF ANY OFFSETSOTHER DEVIA FROM <br />NS <br />B) PLUMBING VENTS SHALL NOT BE LOCATED LESS THAN 10'-0" FROM ANY <br />THE ORIGINAL COONTRACT DOCUMENTS. ATOTHE CLOSE OF THE <br />OUTSIDE AIR INTAKE, WINDOW, OR DOOR. <br />PROJECT, CONTRACTOR SHALL PROVIDE A COPY OF THESE DRAWINGS <br />C) OFFSET ALL VTR'S AS REQUIRED WHETHER SHOWN OR NOT ON DRAWINGS. <br />TO THE OWNER AS "AS—BUILTS". <br />D) PROVIDE ALL VTR'S WITH 4 LB. HIGH BOOT LEAD FLASHING OR AS REQUIRED <br />BY THE ROOFING MANUFACTURER. FLASHING SHALL EXTEND UPWARD AROUND THE <br />PIPE AND TURN DOWN INSIDE THE PIPE. <br />HEAT <br />TRAP <br />VACUUM BREAKER <br />36 WATTS OR EQUAL <br />T & P RELIEF <br />VALVE <br />3/4" COPPER <br />TO PAN I� <br />i <br />COLD WATER <br />SUPPLY --- <br />EXPANSION TANK <br />SERVICE <br />—DRAIN VALVE <br />It, 1 1 /2" EDGE <br />SAFETY PAN <br />EXTERIOR OR <br />MOP SINK <br />CATER HEATER INSTALLATION <br />SCALE: NONE <br />* TO THE BEST OF THE ARCHITECT OR ENGINEERS KNOWLEDGE AND <br />BELIEF, THESE PLANS AND SPECIFICATIONS COMPLY WITH THE <br />FLORIDA BUILDING CODE 2004 4 2005, 2006 5UPPLEMENTS <br />' THE O WIN66 4 OM16N ARE VALID FOR 12 MONTHS FROM DATE <br />OF BEING SEALED. <br />TO THE BEST OF THE KNOWLEDCsE OF THE ARCHITECTS OR <br />ENGINEERS, SAID PLANS AND SPECIFICATIONS COMPLY WITH THE <br />APPLICABLE MINIMUM BUILDIWS CODES AND THE APPLICABLE <br />MINIMUM FIRE SAFETY STANDARDS. <br />ALL DIMENSIONS AND JOB CONDITIONS SHALL BE VERIFIED BY THE <br />CONTRACTOR, ANY AND ALL DISCREPANCIES SHALL BE REPORTED <br />TO THE ARCHITECT PRIOR TO COMMENCEMENT OF CONSTRUCTION. <br />13811E DATE BYs <br />REvIEW Orin1/08 MK <br />PERMIT 01AII08 MK <br />REV <br />REV. <br />REV. <br />REV. <br />TICIE DOA0M8 M DE WA VOM DETAU NO <br />810601ROATIM ND C442 IS ARE 7W SOLE <br />PROP M OF MtAZ 00ft W. Mo SOU Wr BE <br />wIllm om, RE i m OR OOPm Fat onee <br />MWZ07% M MW OR PART MT W M Mil = <br />WOW OF FRANC PitM AWHIMT, Alk <br />ALL MGM ARE ItESmkm Or ME AWAMT M <br />AC40MWM M rH US. WPfR1W NO PAM LAMS. <br />UNFUTHOItl� R�RODUGTION MLL � PR09EGJIm TO <br />TIE MLL Ex W OF 7W LW <br />S <br />o� <br />00 <br />v 1 <br />W <br />W <br />� <br />Q <br />O <br />Nxx <br />0 <br />L7 <br />N <br />11 ORA PRAWLIN FRAZE, IV j <br />'00 <br />0 <br />� <br />� <br />M <br />t` <br />QONO <br />r` <br />U <br />(Yi <br />a <br />00 <br />W <br />W <br />ao <br />N <br />N <br />r <br />w <br />W <br />Z <br />W <br />U <br />00 <br />00 <br />� <br />F <br />� <br />W <br />eq <br />� <br />b <br />..uz <br />O <br />x <br />�T TITLE <br />PLI.A"IE�ING <br />I PLANS <br />Bic <br />